H.R. 2749 · 118th Congress (2023–2025)
Efficient Grid Interconnection Act of 2023
This bill establishes requirements concerning (1) the equitable allocation of costs for electric grid upgrades; and (2) the deployment of grid enhancing technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system.
Specifically, it directs the Federal Energy Regulatory Commission (FERC) to issue regulations that require public electric utilities to allocate the cost of upgrades to the electric grid, such as upgrades to interconnect renewable generation projects, among all customers that benefit from the upgrades. In determining which parties benefit, FERC must consider all material benefits of the network upgrade, including environmental benefits and those that cannot be directly quantified.
In addition, FERC must issue regulations that apply to regional transmission organizations, independent system operators, or transmission planning coordinators when they are processing requests to interconnect generation projects or energy storage projects to the electric grid. The regulations must require such organizations, operators, and coordinators to study deploying technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system.
Show official title
To facilitate the generation and delivery of power from affordable and reliable renewable generation projects and energy storage projects.
Expired in House committee
Derived from the legislative history, not an official disposition.
Latest actionReferred to committee
This bill’s path
This is H.R. 2749’s recorded path, not a universal congressional workflow.
How bills become lawAll actionsIntroduced
Passed House
Passed Senate
Sent to President
Signed into law
Expired
- Sponsor
- Rep. Kathy Castor (D-FL-14)
- Cosponsors
2 cosponsors
2 original · 0 later
- Rep. Sean Casten (D-IL-6)· Original · Apr 20, 2023
- Rep. Scott H. Peters (D-CA-50)· Original · Apr 20, 2023
- Policy area
- Energy
On this page
Timeline
i
In chronological order. Major procedural acts are shown in full. Committee work and ordinary amendments fold in place where they happened, so they do not jump the sequence or stretch the timeline.
Introduced in House
Document: Introduced in House
Sources
- Congress.gov actionIntro-H
- Library of Congress
- Latest
Referred to committee
Referred to the House Committee on Energy and Commerce.
Sources
- Congress.gov action
- House floor actions
Expired
Introduced → Referred to House Energy and Commerce → No further action before the 118th Congress ended.
Committees
Text & titles
i
Each distinct name Congress.gov recorded, once. Official, short, display, and popular titles stay distinct when the wording differs. The same wording is not repeated for every text version.
| Version | Date | Links |
|---|---|---|
| Introduced in House |
Titles (2)
Efficient Grid Interconnection Act of 2023
Display title, Short title · Introduced in House
To facilitate the generation and delivery of power from affordable and reliable renewable generation projects and energy storage projects.
Official title · Introduced in House