Skip to content

H.R. 2492 · 119th Congress (2025–2027)

Fire Safe Electrical Corridors Act of 2025

This bill allows the Forest Service and the Bureau of Land Management (BLM) to expedite the removal of trees or other vegetation near electrical lines on their lands under certain circumstances. Specifically, the Forest Service and the BLM may include in special use permits or easements provided to electrical utilities permission to cut, remove, and sell trees or other vegetation near electrical lines on such lands without a separate timber sale if the cutting or removal is consistent with (1) any applicable land and resource management plan, and (2) other applicable environmental laws.

A special use permit or easement that includes permission for cutting and removal of trees or vegetation must include a requirement that, if the applicable electrical utility sells any portion of the material removed under the permit or easement, the utility must provide to the Forest Service or the BLM any proceeds received from the sale, less any transportation costs incurred in the sale.

Show official title

To authorize the Secretary of Agriculture and the Secretary of the Interior to permit removal of trees around electrical lines on National Forest System lands and Bureau of Land Management lands, respectively, without conducting a timber sale, and for other purposes.

Passed House

Latest actionReferred to committee

This bill’s path

43 days after it was introduced

This is H.R. 2492’s recorded path, not a universal congressional workflow.

How bills become lawAll actions
  1. Introduced

  2. Passed House

  3. Passed Senate

  4. Sent to President

  5. Signed into law

Sponsor
Rep. Salud O. Carbajal (D-CA-24)
Cosponsors
3 cosponsors

3 original · 0 later

  1. Rep. Jim Costa (D-CA-21)· Original · Mar 31, 2025
  2. Rep. Brian K. Fitzpatrick (R-PA-1)· Original · Mar 31, 2025
  3. Rep. David G. Valadao (R-CA-22)· Original · Mar 31, 2025
Policy area
Public Lands and Natural Resources
Subjects
  • Electric power generation and transmission
  • Fires
  • Forests, forestry, trees
  • Licensing and registrations

On this page

Timeline

i

In chronological order. Major procedural acts are shown in full. Committee work and ordinary amendments fold in place where they happened, so they do not jump the sequence or stretch the timeline.

  1. Introduced in House

    Document: Introduced in House

    Sources
  2. ▸ 2 committee actions · Mar 31, 2025 – Apr 18, 2025
    1. Referred to committee

      Referred to the Committee on Natural Resources, and in addition to the Committee on Agriculture, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.

      Sources
    2. Referred to Forestry and Horticulture

      Referred to the Subcommittee on Forestry and Horticulture.

      Sources
  3. Passed House

    Congressional Record H1983

    On motion to suspend the rules and pass the bill Agreed to by voice vote.

    The House passed the bill.

    Document: Engrossed in House

    Sources
  4. Latest

    Referred to committee

    Received in the Senate and Read twice and referred to the Committee on Agriculture, Nutrition, and Forestry.

    Sources

Committees

  1. HouseAgricultureReferred Mar 31, 2025
  2. HouseForestry and HorticultureReferred Apr 18, 2025
  3. HouseNatural ResourcesReferred Mar 31, 2025
  4. SenateAgriculture, Nutrition, and ForestryReferred May 14, 2025

Floor record

i

Explicit consideration evidence: the measure’s bill-status citation matched a GovInfo title, headline, or first paragraph. Incidental mentions are not listed.

  1. May 13, 2025 · House · Considered under suspension of the rulesCongressional Record H1983–H1984

    Fire Safe Electrical Corridors Act of 2025

Text & titles

i

Each distinct name Congress.gov recorded, once. Official, short, display, and popular titles stay distinct when the wording differs. The same wording is not repeated for every text version.

Text versions
VersionDateLinks
Introduced in House
Engrossed in House
Referred in Senate
Titles (2)
  1. To authorize the Secretary of Agriculture and the Secretary of the Interior to permit removal of trees around electrical lines on National Forest System lands and Bureau of Land Management lands, respectively, without conducting a timber sale, and for other purposes.

    Official title · Engrossed in House, Introduced in House

  2. Fire Safe Electrical Corridors Act of 2025

    Short title, Display title · Referred in Senate, Engrossed in House, Introduced in House