Minority Views
[To accompany H.R. 1070]
The Committee on Energy and Commerce, to whom was referred
the bill (H.R. 1070) to amend the Solid Waste Disposal Act to
provide the owner or operator of a critical energy resource
facility an interim permit under subtitle C that is subject to
final approval by the Administrator of the Environmental
Protection Agency, and for other purposes, having considered
the same, reports favorably thereon with an amendment and
recommends that the bill as amended do pass.
CONTENTS
Page
Purpose and Summary.............................................. 2
Background and Need for Legislation.............................. 2
Committee Action................................................. 4
Committee Votes.................................................. 4
Oversight Findings and Recommendations........................... 8
New Budget Authority, Entitlement Authority, and Tax Expenditures 8
Congressional Budget Office Estimate............................. 8
Federal Mandates Statement....................................... 8
Statement of General Performance Goals and Objectives............ 8
Duplication of Federal Programs.................................. 8
Related Committee and Subcommittee Hearings...................... 8
Committee Cost Estimate.......................................... 9
Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 9
Advisory Committee Statement..................................... 9
Applicability to Legislative Branch.............................. 9
Section-by-Section Analysis of the Legislation................... 10
Changes in Existing Law Made by the Bill, as Reported............ 10
Minority Views................................................... 11
The amendment is as follows:
Strike all after the enacting clause and insert the
following:
SECTION 1. INTERIM HAZARDOUS WASTE PERMITS.
Section 3005(e) of the Solid Waste Disposal Act (42 U.S.C. 6925(e))
is amended--
(1) in paragraph (1)(A)--
(A) in clause (i), by striking ``or'' at the end;
(B) in clause (ii), by inserting ``or'' after ``this
section,'';
(C) by adding at the end the following:
``(iii) is a critical energy resource facility,'';
and
(2) by adding at the end the following:
``(4) Definitions.--For the purposes of this subsection:
``(A) Critical energy resource.--The term `critical energy
resource' means, as determined by the Secretary of Energy, any
energy resource--
``(i) that is essential to the energy sector and
energy systems of the United States; and
``(ii) the supply chain of which is vulnerable to
disruption.
``(B) Critical energy resource facility.--The term `critical
energy resource facility' means a facility that processes or
refines a critical energy resource.''.
Purpose and Summary
To amend the Solid Waste Disposal Act to provide the owner
or operator of a critical energy resource facility an interim
permit, under Subtitle C of such Act, that is subject to final
approval by the Administrator of the Environmental Protection
Agency or a State with primary enforcement responsibility.
Background and Need for Legislation
Between 1984 and 2018, for the global economy that was in
place pre-pandemic, total tonnage output of non-fuel minerals
increased more than 2.5 times (based on data from the World
Mining Congress, WMC, open source).\1\
---------------------------------------------------------------------------
\1\https://docs.house.gov/meetings/IF/IF18/20200916/111008/HHRG-
116-IF18-Wstate-MichotFossM-20200916-U1.pdf.
---------------------------------------------------------------------------
Testimony from a minerals expert before the Committee has
highlighted, though, that the challenge is not just gross
tonnage but also quality; particularly for high performance end
uses and applications.\2\ A significant hurdle is access for
development, including industrial infrastructure to support
mining and minerals processing.\3\ Investments can only proceed
at a pace that current critical supply chains can support--
meaning the global market needs new resource centers and
logistics pathways.\4\
---------------------------------------------------------------------------
\2\HHRG-116-IF18-Wstate-MichotFossM-20200916-U1.pdf (house.gov).
\3\Ibid.
\4\https://news.rice.edu/news/2023/energy-transition-requires-new-
investments-minerals-
heartland.
---------------------------------------------------------------------------
According to the International Energy Agency (IEA), the
supply chain for many clean energy technologies and their raw
materials is more geographically concentrated than that of oil
or natural gas--especially when it comes to minerals that are
central to manufacturing clean energy technology equipment and
infrastructure.\5\ Not only do certain countries dominate
critical minerals production, but the level of concentration is
also higher for processing and refining operations--currently
the U.S. does not even register when it comes to total
processing of the main critical minerals.\6\ This creates a
source of concern for potential supply disruptions,
manufacturing newer energy technologies, and maintaining an
effective standard of living.
---------------------------------------------------------------------------
\5\https://www.iea.org/reports/the-role-of-critical-minerals-in-
clean-energy-transitions/the-state-of-play.
\6\Ibid.
---------------------------------------------------------------------------
To rebalance global supply and strengthen the U.S. economy
for the future; more domestic mineral refining capacity needs
to be constructed and operating. A foreseeable need for a
facility of this nature is Subtitle C permit under the Solid
Waste Disposal Act--commonly referred to as the Resource
Conservation and Recovery Act (RCRA)--which is a precondition
to construction.
Under Subtitle C of RCRA, a mineral processing facility
that generates a RCRA-regulated waste needs a permit if it does
one of three things on-site: stores the waste for 90-days,
treats the waste, or disposes of the waste.\7\ Owners and
operators of four types of these treatment, storage, and
disposal facilities are subject to these requirements: new
facilities not yet constructed; newly regulated existing
facilities subject to RCRA permitting requirements for the
first time; permitted facilities with newly regulated units;
and interim status facilities.\8\ This permit must be applied
for 180 days before physical construction of a new facility can
begin--and no type of facility can operate without a permit.\9\
---------------------------------------------------------------------------
\7\RCRA section 3005(a)--42 U.S.C. Sec. 6925(a).
\8\https://rcrapublic.epa.gov/rcrainfoweb/documents/
rcra_subtitleC_forms_and_
instructions.pdf.
\9\Ibid.
---------------------------------------------------------------------------
It has been estimated that it can take 5 years for a RCRA
Subtitle C permit to be issued.\10\ According to the Business
Roundtable, ``[t]he slow and inefficient permitting process for
energy infrastructure projects continues to discourage private
sector investment, delay new projects and undermine the value
of taxpayer investments.''\11\
---------------------------------------------------------------------------
\10\https://www.era-environmental.com/blog/rcra-facts-an-overview-
of-the-hazardous-waste-
management-law.
\11\https://www.businessroundtable.org/policy-perspectives/smart-
regulation/the-case-for-
permitting-reform.
---------------------------------------------------------------------------
RCRA section 3305(e), through the creation of an
``interim'' permit status, provides a pathway to investment and
construction certainty; but also keeps the permittee
responsible for protecting the environment. While ``Interim''
status does not apply to prior to construction, it is a period
in which the owner or operator is treated as having been issued
a RCRA Subtitle C permit by EPA or a State even though the
owner or operator has not yet received a final
determination.\12\ Interim status continues until a final
determination is made by EPA or a state to issue or deny the
permit.\13\
---------------------------------------------------------------------------
\12\40 CFR Sec. Sec. 270.1(c) https://rcrapublic.epa.gov/
rcrainfoweb/documents/rcra_subtitleC_forms_
and_instructions.pdf.
\13\RCRA section 3005(e)(1).
---------------------------------------------------------------------------
Facility owners and operators who have interim status must
comply with interim status standards set forth in 40 CFR part
265 (standards for owners and operators of hazardous waste
treatment, storage, and disposal facilities) and 40 Part 266
(standards for management of specific hazardous wastes and
facilities) or with ``an analogous provision'' of a State
program which has received interim or final authorization under
40 CFR part 271.\14\ Facility owners and operators are not
relieved from complying with other State requirements, the
interim permit can be assessed by government officials at any
time for determining whether it can become more permanent, and
compliance with the regulations and information requirements is
necessary to maintain an interim permit. Finally, any facility
that has been denied an interim permit or been denied the
ability to operate cannot obtain an interim permit.\15\
---------------------------------------------------------------------------
\14\40 CFR 270(c).
\15\RCRA section 3005(e)(1).
---------------------------------------------------------------------------
Committee Action
On February 7, 2023, the Subcommittees on Environment,
Manufacturing, and Critical Materials and Energy, Climate, and
Grid Security jointly held a hearing on 17 separate pieces of
legislation, including a pre-introduced ``Discussion Draft''
version of H.R. 1070. The Subcommittee received testimony from:
The Honorable Mark Menezes, Former U.S.
Deputy Secretary of Energy, Department of Energy;
The Honorable Bernard McNamee, Former
Commissioner, Federal Energy Regulatory Commission;
Jeffrey Eshelman, II, President and Chief
Executive Officer, Independent Petroleum Association of
America;
Katie Sweeney, Executive Vice President and
Chief Operating Officer, National Mining Association;
Raul Garcia, Legislative Director Healthy
Communities, Earthjustice; and
Tyson Slocum, Director of the Energy
Program, Public Citizen.
On February 28, 2023, the Subcommittee on Environment,
Manufacturing and Critical Materials met in open markup session
and forwarded H.R. 1070, with amendment, to the full Committee
by a record vote of 13 yeas and 6 nays. On March 9, 2023, the
full Committee on Energy and Commerce met in open markup
session and ordered H.R. 1070, with amendment, favorably
reported to the House by a record vote of 27 yeas and 22 nays.
Committee Votes
Clause 3(b) of rule XIII requires the Committee to list the
record votes on the motion to report legislation and amendments
thereto. The following reflects the record votes taken during
the Committee consideration:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
OVERSIGHT FINDINGS AND RECOMMENDATIONS
Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII, the Committee held hearings and made findings that
are reflected in this report.
NEW BUDGET AUTHORITY, ENTITLEMENT AUTHORITY, AND
TAX EXPENDITURES
Pursuant to clause 3(c)(2) of rule XIII, the Committee
finds that H.R. 1070 would result in no new or increased budget
authority, entitlement authority, or tax expenditures or
revenues.
Congressional Budget Office Estimate
Pursuant to clause 3(c)(3) of rule XIII, at the time this
report was filed, the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974 was not available.
FEDERAL MANDATES STATEMENT
The Committee adopts as its own the estimate of Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
STATEMENT OF GENERAL PERFORMANCE GOALS AND OBJECTIVES
Pursuant to clause 3(c)(4) of rule XIII, the general
performance goal or objective of this legislation is to
increase American energy production and restore energy
leadership by amending the Solid Waste Disposal Act to provide
the owner or operator of a critical energy resource facility an
interim permit, under Subtitle C of such Act, that is subject
to final approval by the Administrator of the Environmental
Protection Agency or a State with primary enforcement
responsibility.
DUPLICATION OF FEDERAL PROGRAMS
Pursuant to clause 3(c)(5) of rule XIII, no provision of
H.R. 1070 is known to be duplicative of another Federal
program, including any program that was included in a report to
Congress pursuant to section 21 of Public Law 111-139 or the
most recent Catalog of Federal Domestic Assistance.
RELATED COMMITTEE AND SUBCOMMITTEE HEARINGS
Pursuant to clause 3(c)(6) of rule XIII:
(1) the following hearing was used to develop or consider
H.R. 1070:
On January 31, 2023, the Committee on Energy and Commerce
held an oversight hearing, entitled: ``American Energy
Expansion: Strengthening Economic, Environmental, and National
Security''. The Committee received testimony from:
The Honorable Paul Dabbar, Former U.S.
Undersecretary of Energy, Department of Energy.
Donna Jackson, Director of Membership
Development, National Center for Public Policy
Research, Project 21.
Robert McNally, President, Rapidan Energy
Group; and
Ana Unruh Cohen, Ph.D., Former Staff
Director, U.S. House Select Committee on the Climate
Crisis.
(2) The following related hearings were held:
On February 7, 2023, the Subcommittees on Environment,
Manufacturing, and Critical Materials and Energy, Climate, and
Grid Security jointly held a hearing on 17 separate pieces of
legislation, including H.R. 1070. The Subcommittee received
testimony from:
The Honorable Mark Menezes, Former U.S.
Deputy Secretary of Energy, Department of Energy;
The Honorable Bernard McNamee, Former
Commissioner, Federal Energy Regulatory Commission;
Jeffrey Eshelman, II, President and Chief
Executive Officer, Independent Petroleum Association of
America;
Katie Sweeney, Executive Vice President and
Chief Operating Officer, National Mining Association;
Raul Garcia, Legislative Director Healthy
Communities, Earthjustice; and
Tyson Slocum, Director of the Energy
Program, Public Citizen.
On September 16, 2020; the Subcommittee on Environment held
a hearing entitled, ``Building a 100 Percent Clean Economy:
Opportunities for an Equitable, Low-Carbon Recovery.'' The
witnesses included:
Lonnie R. Stephenson, International
President, International Brotherhood of Electrical
Workers;
Denise Fairchild, Ph.D., President & Chief
Executive Officer, Emerald Cities Collaborative; and
Michelle Michot Foss, Ph.D., Fellow in
Energy & Minerals, Baker Institute for Public Policy,
Center for Energy Studies, Rice University.
COMMITTEE COST ESTIMATE
Pursuant to clause 3(d)(1) of rule XIII, the Committee
adopts as its own the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974. At the time this report was
filed, the estimate was not available.
EARMARK, LIMITED TAX BENEFITS, AND LIMITED TARIFF BENEFITS
Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the
Committee finds that H.R. 1070 contains no earmarks, limited
tax benefits, or limited tariff benefits.
ADVISORY COMMITTEE STATEMENT
No advisory committees within the meaning of section 5(b)
of the Federal Advisory Committee Act were created by this
legislation.
APPLICABILITY TO LEGISLATIVE BRANCH
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
SECTION-BY-SECTION ANALYSIS OF THE LEGISLATION
H.R. 1070 contains one section with two distinct amendments
to section 3005(e) of the Solid Waste Disposal Act, related to
the creation of Interim status RCRA Subtitle C permits.
First, section 1 adds critical energy resource facilities
to the list of those facilities treated as having been issued a
RCRA interim status permit until (1) the final administrative
disposition of their permit application or (2) a legal
demonstration that the owner or operator failed to provide
information needed to process their permit application.
Second, section 1 adds definitions of ``critical energy
resource'' and ``critical energy resource facility''. Section 1
defines a ``critical energy resource'' as any energy resource
that, as determined by the Secretary of Energy, is essential to
the energy sector and energy systems of the United States and
whose supply chain is vulnerable to disruption. The Committee
intends this definition to be interpreted broadly and points to
the word ``any'' as proof of this desire. This designation is
not limited to the use of one kind of fuel but instead includes
all types of fuels that are important to our nation's energy
sector and system and that might be vulnerable to disruption.
Moreover, this designation is purposely the domain of the
Secretary of Energy--not the Secretary of Interior or
Environmental Protection Agency--who has been given statutory
responsibility of and care for the energy sector and systems of
the United States. The definition of ``critical energy resource
facility'' is defined to be a facility that processes or
refines a critical energy resource. This definition, too, is
not limited to the use of one kind of fuel or manufacturing
practice but instead to provide the greatest number of permit
compliant options that might address our nation's energy sector
and system and that might be vulnerable to disruption.
CHANGES IN EXISTING LAW MADE BY THE BILL, AS REPORTED
With respect to the requirement of clause 3(e) of rule XIII
of the Rules of the House of Representatives, changes in
existing law made by the bill, as reported, this section was
not made available to the Committee in time for the filing of
this report.
Minority Views
We oppose H.R. 1070, which amends the Solid Waste Disposal
Act (SWDA) to provide the owner or operator of a critical
energy resource facility an interim permit under Subtitle C
that is subject to final approval by the Administrator of the
Environmental Protection Agency, and for other purposes. The
bill would create temporary waivers for vaguely defined
``critical energy resource facilities'', creating a giant
loophole for any industry that claims to be working on critical
energy resources, allowing such industry to mismanage its waste
and get a temporary permit to do so.
Background
The SWDA of 1965 was amended by the Resource Conservation
and Recovery Act (RCRA) which is what is more commonly used to
describe the law governing the disposal of solid and hazardous
waste. RCRA set national goals for protecting human health and
the environment from the potential hazards of waste disposal,
conserving energy and natural resources, reducing the amount of
waste generated, and ensuring that wastes are managed in an
environmentally-sound manner.\1\ Subtitle C established the
``cradle to grave'' system for controlling hazardous waste from
the time it is generated until it is ultimately disposed.
Permits are a critical component of the cradle to grave system
and follow the principle of cooperative federalism. While EPA
is tasked with setting minimum federal standards, authorized
states implement and enforce those standards and issue relevant
permits.
---------------------------------------------------------------------------
\1\Environmental Protection Agency, EPA History: Resoure
Conservation and Recovery Act (www.epa.gov/history/epa-history-
resource-conservation-and-recovery-act#::text=The%20
Resource%20Conservation%20and%20Recovery,of%20municipal%20and%20industri
al%20waste) (accessed Mar. 21, 2023).
---------------------------------------------------------------------------
Like many of the bills under consideration by the
Committee, H.R. 1070 is an overly broad solution in search of a
problem. The author of this bill stated that critical energy
resource facilities are being bogged down by the lengthy
permitting process for RCRA permits, often taking many years to
secure, delaying the process for developing critical
resources.\2\ To date, the Majority has not been able to
substantiate such claims. In fact, energy generators do not
usually apply for RCRA permits, but rather ship their waste to
RCRA certified sites to manage the waste. Furthermore, RCRA
already includes short term timelines for on-site waste storage
for both small and large quantity hazardous waste generators.
Small quantity generators are allowed to hold waste on-site for
up to 180 days (or 270 if the shipping distance is greater than
200 miles) and large quantity generators are allowed to hold
waste on-site for up to 90 days.\3\ These flexible short-term
options allow many generators to ship waste to an appropriate
facility before ever needing a RCRA permit.
---------------------------------------------------------------------------
\2\House Committee on Energy and Commerce, Statement of
Representative Buddy Carter, Markup of Seven Bills, 118th Cong. (Feb.
28, 2023).
\3\Environmental Protection Agency, Categories of Hazardous Waste
Generators (www.epa.gov/hwgenerators/categories-hazardous-waste-
generators) (accessed Mar. 21, 2023).
---------------------------------------------------------------------------
In addition, concerns that RCRA permits are delaying the
mining and processing of critical minerals, are also misplaced.
For over 40 years, wastes from the extraction, beneficiation,
and processing of ores and minerals have been exempted from
Subtitle C of RCRA.\4\
---------------------------------------------------------------------------
\4\Environmental Protection Agency, Special Wastes (www.epa.gov/hw/
special-wastes) (accessed Mar. 21, 2023).
---------------------------------------------------------------------------
SUMMARY OF H.R. 1070
Section 1 of H.R. 1070 amends Section 3005(e) of the SWDA
to grant interim permits to so-called critical energy resource
facilities, and adds vague definitions of ``critical energy
resource'' and ``critical energy resource facility'' to the
statute.
Despite EPA administering the SWDA, the bill defines
``critical energy resource'' as ``. . . any energy resource
that is essential to the energy sector and energy systems of
the United States, and the supply chain of which is vulnerable
to disruption,'' as determined by the Secretary of Energy. The
bill does not define, provide parameters, or metrics for the
Secretary to use in making such determinations, essentially
allowing the Secretary to deem almost anything a ``critical
energy resource,'' ``essential to the energy sector and energy
system of the United States,'' and ``vulnerable to supply chain
disruptions.'' The bill fails to include any public review, or
accountability measures related to the Secretary's
determinations. And putting the Secretary of Energy in charge
of determining which environmental permits EPA and states are
allowed to require, sets a troubling precedent.
Due to the all-encompassing definition of ``critical energy
resource,'' essentially any category of industrial facility
could be considered critical and would be exempt from required
permits for treatment, storage, and disposal of hazardous
waste. Based on these definitions, wastes from the following
manufacturing and industrial processes could benefit from the
legislation's regulatory loophole: spent solvent wastes,
electroplating and other metal finishing wastes, dioxin-bearing
wastes, chlorinated aliphatic hydrocarbons production, wood
preserving wastes, petroleum refinery wastewater treatment
sludges, multisource leachate, wood preservation, organic
chemicals manufacturing, pesticides manufacturing, petroleum
refining, veterinary pharmaceuticals manufacturing, inorganic
pigment manufacturing, inorganic chemicals manufacturing,
explosives manufacturing, iron and steel production, primary
aluminum production, secondary lead processing, ink
formulation, and coking (processing of coal to produce
coke).\5\ Furthermore, any facility that processes these
hazardous wastes--like solid waste incinerators--could be
exempted from required permits for hazardous waste treatment,
storage, and disposal under RCRA.
---------------------------------------------------------------------------
\5\40 CFR Sec. 261.31; 40 CFR Sec. 261.32.
---------------------------------------------------------------------------
Since H.R. 1070 grants the Secretary of Energy enormous
latitude to determine what qualifies as a critical energy
resource, the aforementioned list demonstrates the wide range
of hazardous waste categories that could be granted interim
operating permits without appropriate RCRA safeguards.
CONCLUSION
Despite the Majority's claims that RCRA permitting is
holding up critical energy resource development, this bill is
nothing more than a solution is search of a problem. The RCRA
program is an example of cooperative federalism at work, with
flexible timelines, state led programs, and clear guidelines
for applying for and receiving permits. At best, this is a
misguided bill, misunderstanding how our country manages
hazardous waste, but at worst it represents an abandonment of
our federal responsibility to safely manage hazardous waste to
protect public health and safety.
For the reasons stated above, we dissent from the views
contained in the Committee's report.
Frank Pallone, Jr.,
Ranking Member Committee on Energy and Commerce.
[all]