Minority Views
[To accompany H.R. 1115]
The Committee on Energy and Commerce, to whom was referred
the bill (H.R. 1115) to provide for Federal and State agency
coordination in the approval of certain authorizations under
the Natural Gas Act, and for other purposes, having considered
the same, reports favorably thereon with an amendment and
recommends that the bill as amended do pass.
The amendment is as follows:
Strike all after the enacting clause and insert the
following:
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Promoting Interagency Coordination for
Review of Natural Gas Pipelines Act''.
SEC. 2. FERC PROCESS COORDINATION FOR NATURAL GAS PIPELINE PROJECTS.
(a) Definitions.--In this section:
(1) Commission.--The term ``Commission'' means the Federal
Energy Regulatory Commission.
(2) Federal authorization.--The term ``Federal
authorization'' has the meaning given that term in section
15(a) of the Natural Gas Act (15 U.S.C. 717n(a)).
(3) NEPA review.--The term ``NEPA review'' means the process
of reviewing a proposed Federal action under section 102 of the
National Environmental Policy Act of 1969 (42 U.S.C. 4332).
(4) Project-related nepa review.--The term ``project-related
NEPA review'' means any NEPA review required to be conducted
with respect to the issuance of an authorization under section
3 of the Natural Gas Act or a certificate of public convenience
and necessity under section 7 of such Act.
(b) Commission NEPA Review Responsibilities.--In acting as the lead
agency under section 15(b)(1) of the Natural Gas Act for the purposes
of complying with the National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.) with respect to an authorization under section 3
of the Natural Gas Act or a certificate of public convenience and
necessity under section 7 of such Act, the Commission shall, in
accordance with this section and other applicable Federal law--
(1) be the only lead agency;
(2) coordinate as early as practicable with each agency
designated as a participating agency under subsection (d)(3) to
ensure that the Commission develops information in conducting
its project-related NEPA review that is usable by the
participating agency in considering an aspect of an application
for a Federal authorization for which the agency is
responsible; and
(3) take such actions as are necessary and proper to
facilitate the expeditious resolution of its project-related
NEPA review.
(c) Deference to Commission.--In making a decision with respect to a
Federal authorization required with respect to an application for
authorization under section 3 of the Natural Gas Act or a certificate
of public convenience and necessity under section 7 of such Act, each
agency shall give deference, to the maximum extent authorized by law,
to the scope of the project-related NEPA review that the Commission
determines to be appropriate.
(d) Participating Agencies.--
(1) Identification.--The Commission shall identify, not later
than 30 days after the Commission receives an application for
an authorization under section 3 of the Natural Gas Act or a
certificate of public convenience and necessity under section 7
of such Act, any Federal or State agency, local government, or
Indian Tribe that may issue a Federal authorization or is
required by Federal law to consult with the Commission in
conjunction with the issuance of a Federal authorization
required for such authorization or certificate.
(2) Invitation.--
(A) In general.--Not later than 45 days after the
Commission receives an application for an authorization
under section 3 of the Natural Gas Act or a certificate
of public convenience and necessity under section 7 of
such Act, the Commission shall invite any agency
identified under paragraph (1) to participate in the
review process for the applicable Federal
authorization.
(B) Deadline.--An invitation issued under
subparagraph (A) shall establish a deadline by which a
response to the invitation shall be submitted to the
Commission, which may be extended by the Commission for
good cause.
(3) Designation as participating agencies.--Not later than 60
days after the Commission receives an application for an
authorization under section 3 of the Natural Gas Act or a
certificate of public convenience and necessity under section 7
of such Act, the Commission shall designate an agency
identified under paragraph (1) as a participating agency with
respect to an application for authorization under section 3 of
the Natural Gas Act or a certificate of public convenience and
necessity under section 7 of such Act unless the agency informs
the Commission, in writing, by the deadline established
pursuant to paragraph (2)(B), that the agency--
(A) has no jurisdiction or authority with respect to
the applicable Federal authorization;
(B) has no special expertise or information relevant
to any project-related NEPA review; or
(C) does not intend to submit comments for the record
for the project-related NEPA review conducted by the
Commission.
(4) Effect of non-designation.--
(A) Effect on agency.--Any agency that is not
designated as a participating agency under paragraph
(3) with respect to an application for an authorization
under section 3 of the Natural Gas Act or a certificate
of public convenience and necessity under section 7 of
such Act may not request or conduct a NEPA review that
is supplemental to the project-related NEPA review
conducted by the Commission, unless the agency--
(i) demonstrates that such review is legally
necessary for the agency to carry out
responsibilities in considering an aspect of an
application for a Federal authorization; and
(ii) requires information that could not have
been obtained during the project-related NEPA
review conducted by the Commission.
(B) Comments; record.--The Commission shall not, with
respect to an agency that is not designated as a
participating agency under paragraph (3) with respect
to an application for an authorization under section 3
of the Natural Gas Act or a certificate of public
convenience and necessity under section 7 of such Act--
(i) consider any comments or other
information submitted by such agency for the
project-related NEPA review conducted by the
Commission; or
(ii) include any such comments or other
information in the record for such project-
related NEPA review.
(e) Water Quality Impacts.--
(1) In general.--Notwithstanding section 401 of the Federal
Water Pollution Control Act (33 U.S.C. 1341), an applicant for
a Federal authorization shall not be required to provide a
certification under such section with respect to the Federal
authorization.
(2) Coordination.--With respect to any NEPA review for a
Federal authorization to conduct an activity that will directly
result in a discharge into the navigable waters (within the
meaning of the Federal Water Pollution Control Act), the
Commission shall identify as an agency under subsection (d)(1)
the State in which the discharge originates or will originate,
or, if appropriate, the interstate water pollution control
agency having jurisdiction over the navigable waters at the
point where the discharge originates or will originate.
(3) Proposed conditions.--A State or interstate agency
designated as a participating agency pursuant to paragraph (2)
may propose to the Commission terms or conditions for inclusion
in an authorization under section 3 of the Natural Gas Act or a
certificate of public convenience and necessity under section 7
of such Act that the State or interstate agency determines are
necessary to ensure that any activity described in paragraph
(2) conducted pursuant to such authorization or certification
will comply with the applicable provisions of sections 301,
302, 303, 306, and 307 of the Federal Water Pollution Control
Act.
(4) Commission consideration of conditions.--The Commission
may include a term or condition in an authorization under
section 3 of the Natural Gas Act or a certificate of public
convenience and necessity under section 7 of such Act proposed
by a State or interstate agency under paragraph (3) only if the
Commission finds that the term or condition is necessary to
ensure that any activity described in paragraph (2) conducted
pursuant to such authorization or certification will comply
with the applicable provisions of sections 301, 302, 303, 306,
and 307 of the Federal Water Pollution Control Act.
(f) Schedule.--
(1) Deadline for federal authorizations.--A deadline for a
Federal authorization required with respect to an application
for authorization under section 3 of the Natural Gas Act or a
certificate of public convenience and necessity under section 7
of such Act set by the Commission under section 15(c)(1) of
such Act shall be not later than 90 days after the Commission
completes its project-related NEPA review, unless an applicable
schedule is otherwise established by Federal law.
(2) Concurrent reviews.--Each Federal and State agency--
(A) that may consider an application for a Federal
authorization required with respect to an application
for authorization under section 3 of the Natural Gas
Act or a certificate of public convenience and
necessity under section 7 of such Act shall formulate
and implement a plan for administrative, policy, and
procedural mechanisms to enable the agency to ensure
completion of Federal authorizations in compliance with
schedules established by the Commission under section
15(c)(1) of such Act; and
(B) in considering an aspect of an application for a
Federal authorization required with respect to an
application for authorization under section 3 of the
Natural Gas Act or a certificate of public convenience
and necessity under section 7 of such Act, shall--
(i) formulate and implement a plan to enable
the agency to comply with the schedule
established by the Commission under section
15(c)(1) of such Act;
(ii) carry out the obligations of that agency
under applicable law concurrently, and in
conjunction with, the project-related NEPA
review conducted by the Commission, and in
compliance with the schedule established by the
Commission under section 15(c)(1) of such Act,
unless the agency notifies the Commission in
writing that doing so would impair the ability
of the agency to conduct needed analysis or
otherwise carry out such obligations;
(iii) transmit to the Commission a
statement--
(I) acknowledging receipt of the
schedule established by the Commission
under section 15(c)(1) of the Natural
Gas Act; and
(II) setting forth the plan
formulated under clause (i) of this
subparagraph;
(iv) not later than 30 days after the agency
receives such application for a Federal
authorization, transmit to the applicant a
notice--
(I) indicating whether such
application is ready for processing;
and
(II) if such application is not ready
for processing, that includes a
comprehensive description of the
information needed for the agency to
determine that the application is ready
for processing;
(v) determine that such application for a
Federal authorization is ready for processing
for purposes of clause (iv) if such application
is sufficiently complete for the purposes of
commencing consideration, regardless of whether
supplemental information is necessary to enable
the agency to complete the consideration
required by law with respect to such
application; and
(vi) not less often than once every 90 days,
transmit to the Commission a report describing
the progress made in considering such
application for a Federal authorization.
(3) Failure to meet deadline.--If a Federal or State agency,
including the Commission, fails to meet a deadline for a
Federal authorization set forth in the schedule established by
the Commission under section 15(c)(1) of the Natural Gas Act,
not later than 5 days after such deadline, the head of the
relevant Federal agency (including, in the case of a failure by
a State agency, the Federal agency overseeing the delegated
authority) shall notify Congress and the Commission of such
failure and set forth a recommended implementation plan to
ensure completion of the action to which such deadline applied.
(g) Consideration of Applications for Federal Authorization.--
(1) Issue identification and resolution.--
(A) Identification.--Federal and State agencies that
may consider an aspect of an application for a Federal
authorization shall identify, as early as possible, any
issues of concern that may delay or prevent an agency
from working with the Commission to resolve such issues
and granting such authorization.
(B) Issue resolution.--The Commission may forward any
issue of concern identified under subparagraph (A) to
the heads of the relevant agencies (including, in the
case of an issue of concern that is a failure by a
State agency, the Federal agency overseeing the
delegated authority, if applicable) for resolution.
(2) Remote surveys.--If a Federal or State agency considering
an aspect of an application for a Federal authorization
requires the person applying for such authorization to submit
data, the agency shall consider any such data gathered by
aerial or other remote means that the person submits. The
agency may grant a conditional approval for the Federal
authorization based on data gathered by aerial or remote means,
conditioned on the verification of such data by subsequent
onsite inspection.
(3) Application processing.--The Commission, and Federal and
State agencies, may allow a person applying for a Federal
authorization to fund a third-party contractor to assist in
reviewing the application for such authorization.
(h) Accountability, Transparency, Efficiency.--For an application for
an authorization under section 3 of the Natural Gas Act or a
certificate of public convenience and necessity under section 7 of such
Act that requires multiple Federal authorizations, the Commission, with
input from any Federal or State agency considering an aspect of the
application, shall track and make available to the public on the
Commission's website information related to the actions required to
complete the Federal authorizations. Such information shall include the
following:
(1) The schedule established by the Commission under section
15(c)(1) of the Natural Gas Act.
(2) A list of all the actions required by each applicable
agency to complete permitting, reviews, and other actions
necessary to obtain a final decision on the application.
(3) The expected completion date for each such action.
(4) A point of contact at the agency responsible for each
such action.
(5) In the event that an action is still pending as of the
expected date of completion, a brief explanation of the reasons
for the delay.
SEC. 3. PIPELINE SECURITY.
In considering an application for an authorization under section 3 of
the Natural Gas Act or a certificate of public convenience and
necessity under section 7 of such Act, the Federal Energy Regulatory
Commission shall consult with the Administrator of the Transportation
Security Administration regarding the applicant's compliance with
security guidance and best practice recommendations of the
Administration regarding pipeline infrastructure security, pipeline
cybersecurity, pipeline personnel security, and other pipeline security
measures.
CONTENTS
Page
Purpose and Summary.............................................. 5
Background and Need for Legislation.............................. 5
Committee Action................................................. 6
Committee Votes.................................................. 7
Oversight Findings and Recommendations........................... 12
New Budget Authority, Entitlement Authority, and Tax Expenditures 12
Congressional Budget Office Estimate............................. 12
Federal Mandates Statement....................................... 12
Statement of General Performance Goals and Objecti
Purpose and Summary
H.R. 1115, the ``Promoting Interagency Coordination for
Review of Natural Gas Pipelines Act,'' was introduced by
Representative Burgess (R-TX) on February 21, 2023. The
legislation would help address the critical need to expand and
modernize the nation's natural gas pipeline infrastructure by
promoting more timely and efficient reviews.
Background and Need for Legislation
The Federal Energy Regulatory Commission (FERC) is the
principal Federal agency involved in the review of interstate
natural gas pipelines. FERC has exclusive authority under
section 7 of the Natural Gas Act (NGA) to review and grant the
certificate of public convenience and necessity required to
construct a new or expanded interstate natural gas pipeline.
FERC conducts the environmental review of each proposed natural
gas pipeline project as required under the National
Environmental Policy Act (NEPA). Under the Energy Policy Act of
2005 (EPAct), FERC is designated as the lead agency for
coordinating necessary environmental reviews and associated
Federal authorizations. As the lead agency, FERC often
coordinates with a variety of Federal, State, and local
governments and Indian tribes to balance a wide range of
issues, including potential impacts on environmental and
wildlife resources, land-use, and property rights.
Multiple permits are often required for a natural gas
pipeline project, including permits under the Clean Water Act
(CWA), Endangered Species Act (ESA), and Clean Air Act (CAA).
Under current FERC regulations, Federal and State agencies
participate in the development of the NEPA analysis for a
pipeline project and then are required to complete their
respective permit application reviews no later than 90 days
after FERC issues its final environmental document, unless
another schedule is established by Federal law.
Despite the increased authority given to FERC under EPAct,
there is growing evidence that pipeline infrastructure
approvals are being delayed unnecessarily due to a lack of
coordination or insufficient action among agencies involved in
the permitting process. It has also become apparent that
inadequate infrastructure to transport natural gas has
negatively affected electric grid reliability and electric
rates, especially in New England states, as natural gas-fired
power plants have had difficulty accessing the fuel they need
to maintain operations. Furthermore, the lack of pipeline
capacity in the Northeast, especially during times of high
demand in winter months, has resulted in the region becoming
dangerously dependent on liquefied natural gas (LNG) imports,
including from Russia.
There are numerous large natural gas pipelines that would
have carried billions of cubic feet of natural gas per day and
served tens of millions of customers that have been cancelled
in recent years due to permitting challenges and delays.\1\
While FERC is partly responsible, some States, such as New
York, have weaponized their Federally delegated
responsibilities under CWA Section 401 to veto pipeline
construction projects for reasons unrelated to water quality.
---------------------------------------------------------------------------
\1\E.g., Atlantic Coast Pipeline, Constitution Pipeline, Northeast
Supply Direct, and Penn East Pipeline.
---------------------------------------------------------------------------
H.R. 1115 would improve the permitting process for natural
gas pipelines by strengthening the lead agency role of FERC and
further defining the process for participating Federal and
State agencies. The intent of these provisions is to involve
stakeholders sooner so that they can be involved in the setting
of the schedule and identify issues of concern earlier in the
process. The legislation would require agencies that may
consider an aspect of an application to participate in the
review process and comply with the schedules established by
FERC. The legislation requires that agencies conduct their
respective reviews concurrently, and in conjunction with, the
project-related review conducted by FERC in compliance with
NEPA. In considering an aspect of an application, Federal and
State agencies may accept remote aerial survey data and use
that data to grant conditional approvals, conditioned on the
onsite inspection. Remote aerial surveys are a widely accepted,
proven method of collecting environmental data, and allowing
their use will lead to better, more informed decisions.
H.R. 1115 would increase public accountability,
transparency, and efficiency by requiring FERC to publish the
schedule, a list of all actions required by each applicable
agency, and the status of all pending actions. The legislation
also contains a provision that would improve the water quality
review by shifting the responsibility from the States to FERC.
Under H.R. 1115, an applicant for a Federal authorization for
an interstate pipeline would not be required to obtain a CWA
Sec. 401 certification from a State. Instead, FERC would
incorporate the water quality certification into its NEPA
review, with necessary terms or conditions proposed by the
States participating in the review process.
Committee Action
On January 31, 2023, the House Committee on Energy and
Commerce held a full committee oversight hearing on ``American
Energy Expansion: Strengthening Economic, Environmental, and
National Security.'' The Committee received testimony from:
The Honorable Paul Dabbar, Former Under
Secretary of Energy; Distinguished Visiting Fellow,
Center on Global Energy Policy, Columbia University;
CEO, Bohr Quantum Technology; and
Mr. Robert McNally, President, Rapidan
Energy Group; and
Ms. Donna Jackson, Director of Membership
Development, National Center for Public Policy
Research, Project 21; and
Dr. Ana Unruh Cohen, Former Majority Staff
Director, U.S. House Select Committee on the Climate
Crisis.
On February 7, 2023, the Subcommittees on Energy, Climate,
and Grid Security and Environment, Manufacturing, and Critical
Materials held a legislative hearing on 17 pieces of
legislation, including H.R. 1115. The Subcommittees received
testimony from:
The Honorable Mark Menezes, Former United
States Deputy Secretary of Energy, Principal at Global
Sustainable Energy Advisors, LLC, and Adjunct
Professor, Georgetown Law School; and
The Honorable Bernard McNamee, former
Commissioner at the Federal Energy Regulatory
Commission, Partner at McGuire Woods; and
Jeffrey Eshelman, President and CEO,
Independent Petroleum Association of America; and
Katie Sweeney, Executive Vice President and
COO, National Mining Association; and
Raul Garcia, Legislative Director for
Healthy Communities, Earthjustice; and
Tyson Slocum, Director of the Energy
Program, Public Citizen.
On February 28, 2023, the Subcommittee on Energy, Climate,
and Grid Security met in open markup session and forwarded H.R.
1115, as amended, to the full Committee by a record vote of 13
yeas and 8 nays.
On March 9, 2023, the full Committee on Energy and Commerce
met in open markup session and ordered H.R. 1115, as amended,
favorably reported to the House by a record vote of 27 yeas and
23 nays.
Committee Votes
Clause 3(b) of rule XIII requires the Committee to list the
record votes on the motion to report legislation and amendments
thereto. The following reflects the record votes taken during
the Committee consideration:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
OVERSIGHT FINDINGS AND RECOMMENDATIONS
Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII, the Committee held hearings and made findings that
are reflected in this report.
NEW BUDGET AUTHORITY, ENTITLEMENT AUTHORITY, AND TAX EXPENDITURES
Pursuant to clause 3(c)(2) of rule XIII, the Committee
finds that H.R. 1115 would result in no new or increased budget
authority, entitlement authority, or tax expenditures or
revenues.
Congressional Budget Office Estimate
Pursuant to clause 3(c)(3) of rule XIII, at the time this
report was filed, the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974 was not available.
FEDERAL MANDATES STATEMENT
The Committee adopts as its own the estimate of Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
STATEMENT OF GENERAL PERFORMANCE GOALS AND OBJECTIVES
Pursuant to clause 3(c)(4) of rule XIII, the general
performance goal or objective of this legislation is to
increase American energy production and restore energy
leadership by helping to address the critical need to expand
and modernize the nation's natural gas pipeline infrastructure
by promoting more timely and efficient reviews.
DUPLICATION OF FEDERAL PROGRAMS
Pursuant to clause 3(c)(5) of rule XIII, no provision of
H.R. 1115 is known to be duplicative of another Federal
program, including any program that was included in a report to
Congress pursuant to section 21 of Public Law 111-139 or the
most recent Catalog of Federal Domestic Assistance.
RELATED COMMITTEE AND SUBCOMMITTEE HEARINGS
Pursuant to clause 3(c)(6) of rule XIII,
(1) the following hearings were used to develop or consider
H.R. 1115:
On January 31, 2023, the Committee on Energy and Commerce
held an oversight hearing entitled, ``American Energy
Expansion: Strengthening Economic, Environmental, and National
Security.'' The Committee received testimony from:
The Honorable Paul Dabbar, Former Under
Secretary of Energy, Department of Energy;
Robert McNalley, President, Rapidan Energy
Group, LLC;
Donna Jackson, Director of Membership
Development--National Center for Public Policy
Research, Project 21; and
Ana Unruh Cohen, Former Majority Staff
Director, U.S. House Select Committee on the Climate
Crisis.
On February 16, 2023, the Subcommittee on Energy, Climate,
and Grid Security held a field hearing in Midland, Texas,
entitled, ``American Energy Expansion: Improving Local
Economies and Communities'' Way of Life.'' The Committee
received testimony from:
The Honorable Lori Blong, Mayor of Midland,
Texas, and President of Octane Energy;
Adrian Carrasco, Chairman Midland Hispanic
Chamber of Commerce, and President of Premier Energy
Services;
Steven Pruett, President and CEO, Elevation
Resources, and Chairman of the Board for Independent
Petroleum Association of America; and
Dr. Michael Zavada, Professor of Biology and
Geosciences, and Chair, Department of Geosciences at
The University of Texas--Permian Basin.
(2) The following related hearing was held:
On February 7, 2023, the Subcommittees on Energy, Climate,
and Grid Security and Environment, Manufacturing, and Critical
Materials held a joint hearing entitled, ``Unleashing American
Energy, Lowering Energy Costs, and Strengthening Supply
Chains,'' on 17 pieces of legislation, including H.R. 1121. The
Subcommittees received testimony from:
The Honorable Mark Menezes, Former United
States Deputy Secretary of Energy, Department of
Energy;
The Honorable Bernard McNamee, Former
Commissioner, Federal Energy Regulatory Commission;
Jeffrey Eshelman, II, President and Chief
Executive Officer, Independent Petroleum Association of
America;
Katie Sweeney, Executive Vice President and
Chief Operating Officer, National Mining Association;
Raul Garcia, Legislative Director for
Healthy Communities, Earthjustice; and
Tyson Slocum, Director of the Energy
Program, Public Citizen.
COMMITTEE COST ESTIMATE
Pursuant to clause 3(d)(1) of rule XIII, the Committee
adopts as its own the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974. At the time this report was
filed, the estimate was not available.
EARMARK, LIMITED TAX BENEFITS, AND LIMITED TARIFF BENEFITS
Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the
Committee finds that H.R. 1115 contains no earmarks, limited
tax benefits, or limited tariff benefits.
ADVISORY COMMITTEE STATEMENT
No advisory committees within the meaning of section 5(b)
of the Federal Advisory Committee Act were created by this
legislation.
APPLICABILITY TO LEGISLATIVE BRANCH
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
SECTION-BY-SECTION ANALYSIS OF THE LEGISLATION
Section 1. Short title
This section provides the short title, the ``Promoting
Interagency Coordination for Review of Natural Gas Pipelines
Act.''
Section 2. FERC process coordination for natural gas pipeline projects
Section 2(a) provides definitions for terms used throughout
this section.
Section 2(b) designates FERC as the only lead agency for
the purposes of complying with NEPA for an authorization under
section 3 of the NGA or a certificate of public convenience and
necessity under section 7 of the NGA. This section requires
FERC to coordinate as early as practicable with each agency
designated as a participating agency under subsection (d)(3)
and to take such actions as necessary and proper to facilitate
the expeditious resolution of its project-related NEPA review.
Section 2(c) directs each agency to give deference, to the
maximum extent authorized by law, to the scope of the project-
related NEPA review that FERC determines to be appropriate,
when making a decision with respect to a Federal authorization
under section 3 of the NGA or a certificate of public
convenience and necessity under section 7 of the NGA.
Section 2(d)(1) requires FERC to identify as early as
practicable, after it is notified by a person applying for an
authorization under section 3 of the NGA or a certificate of
public convenience and necessity under section 7 of the NGA,
any Federal or State agency, local government, or Indian Tribe
that may issue a Federal authorization or is required by
Federal law to consult with FERC on the issuance of a Federal
authorization.
Section 2(d)(2) requires FERC to invite the identified
agencies to participate in the review process for the
applicable Federal authorization. The invitation shall
establish a deadline for when the agency must submit a response
to FERC. FERC may extend the deadline for good cause.
Section 2(d)(3) requires FERC to designate identified
agencies as participating agencies with respect to an
application for authorization under section 3 of the NGA or a
certificate of public convenience and necessity under section 7
of the NGA, unless the agency informs FERC, in writing, that
the agency does not have jurisdiction over the application, has
no special expertise relevant to the NEPA review, and does not
intend to submit comments for the record for the NEPA review
conducted by FERC.
Section 2(d)(4) provides that any agency not designated as
a participating agency may not request or conduct a NEPA review
that is supplemental to FERC's project-related NEPA review,
unless the agency (1) demonstrates that such review is legally
necessary or (2) requires information that could not have been
obtained during FERC's project-related NEPA review.
Additionally, it directs FERC not to consider any comments or
other information submitted by an agency that is not designated
as a participating agency for FERC's project-related NEPA
review and not to include any comments in the record for the
Commission's NEPA review from an agency that is not designated
as a participating agency.
Section 2(e)(1) provides that an applicant for a Federal
authorization under the NGA shall not be required to provide a
certification under Section 401 of the Federal Water Pollution
Control Act.
Section 2(e)(2) requires FERC to coordinate its NEPA review
as necessary with States where a potential discharge into
navigable waters may occur.
Section 2(e)(3) allows for States to propose conditions to
FERC to protect water resources.
Section 2(e)(4) allows for FERC to include terms or
conditions proposed by a State.
Section 2(f)(1) directs the Commission not to establish a
deadline for a Federal authorization exceeding 90 days after
the Commission completes its project-related NEPA review.
Section 2(f)(2) directs each Federal and State agency
considering a Federal authorization for an application or an
aspect of an application under section 3 of the NGA or a
certificate of public convenience and necessity under section 7
of NGA to formulate and implement a plan to ensure completion
of Federal authorizations in compliance with schedules
established by FERC. When considering an aspect of an
application for a Federal authorization, each Federal and State
agency shall carry out the obligations of that agency under
applicable law concurrently with FERC's project-related NEPA
review, and in compliance with FERC's established schedule,
unless the agency notifies FERC in writing that doing so would
impair the ability of the agency to conduct needed analysis or
otherwise carry out the agency's obligations. Each Federal and
State agency considering an aspect of a Federal authorization
shall transmit to FERC a statement acknowledging receipt of the
schedule established by FERC. The statement shall also contain
the plan formulated to ensure completion of the Federal
authorizations in compliance with FERC's schedule. Not later
than 30 days after the agency receives an application for a
Federal authorization under section 3 of the NGA or a
certificate of public convenience and necessity under section 7
the NGA, a Federal or State agency shall transmit to the
applicant a notice indicating whether the application is ready
for processing. If the application is not ready for processing,
the agency shall provide a comprehensive description to the
applicant of the information needed for the agency to determine
that the application is ready for processing. Each Federal and
State agency shall transmit to FERC a report once every 90 days
describing the progress made in considering an application.
Section 2(e)(3) specifies that if a Federal or State agency
fails to meet a deadline for a Federal authorization set forth
in FERC's schedule, the head of the relevant Federal agency
shall notify Congress and FERC of such failure and set forth a
recommended implementation plan to ensure completion of the
action.
Section 2(g)(1) directs Federal and State agencies
considering an aspect of an application for a Federal
authorization to identify any issues of concern that may delay
or prevent an agency from working with FERC to resolve the
identified issues and grant the authorization. FERC may forward
any identified issue of concern to the heads of relevant
agencies for resolution.
Section 2(g)(2) instructs Federal or State agencies
considering an aspect of an application for a Federal
authorization to consider any data gathered by aerial or other
remote means submitted by the applicant. The agency may grant a
conditional approval for the Federal authorization based on
data gathered by aerial or remote means, conditioned on the
verification of such data by subsequent onsite inspection.
Section 2(g)(3) specifies that FERC, and Federal and State
agencies, may allow a person applying for a Federal
authorization to fund a third-party contractor to assist in
reviewing an application.
Section 2(h) directs FERC, with input from any Federal or
State agency considering an aspect of an application, to track
and make available to the public on the Commission's website
information related to the actions required to complete a
Federal authorization.
CHANGES IN EXISTING LAW MADE BY THE BILL, AS REPORTED
With respect to the requirement of clause 3(e) of rule XIII
of the Rules of the House of Representatives, changes in
existing law made by the bill, as reported, this section was
not made available to the Committee in time for the filing of
this report.
Minority Views
H.R. 1115 would substantially weaken the environmental
review process required under the National Environmental Policy
Act (NEPA) for pipeline authorizations required under sections
3 and 7 of the Natural Gas Act (NGA). Furthermore, an amendment
adopted on a recorded vote by the Full Committee at markup
would further violate bedrock environmental statutes by
effectively negating the framework and application of the
Federal Water Pollution Control Act (commonly known as the
Clean Water Act) as it applies to pipeline authorizations.
The siting and authorization of natural gas pipelines is
often controversial, and any legislation proposing significant
alterations to that process, such as H.R. 1115, would benefit
substantially from an opportunity for experts from agencies
that currently hold jurisdiction over that process to weigh in.
Unfortunately, the Committee did not receive any testimony from
the Federal Energy Regulatory Commission (FERC) on this bill.
When the Committee last considered nearly identical legislation
in 2017, FERC's Director of the Office of Energy Projects, Mr.
Terry Turpin, testified that he was ``. . . concerned that this
[bill] will require the use of Commission resources that could
be better spent analyzing the proposed projects and could lead
to unproductive tension between the agencies in the review
process''.\1\ Turpin also testified that FERC had significant
responsibilities to track and report progress for large and
complex pipelines projects under Title XLI of the Fixing
America's Surface Transportation Act (FAST-41), and that the
bill required significant duplication of those efforts.\2\
Given that Turpin testified just six months after the enactment
of FAST-41, the Committee could have benefited from his updated
opinion after six years of FAST-41 implementation of how and if
provisions under section 2(g) of the Committee Print of H.R.
1115 are duplicative of efforts currently carried out by the
Federal Permitting Improvement Steering Council (FPISC) or
would unnecessarily drain FERC's resources. Unfortunately, the
Committee was not given that opportunity.
---------------------------------------------------------------------------
\1\House Committee on Energy and Commerce, Testimony of Terry
Turpin, Director, Office of Energy Projects, Federal Energy Regulatory
Commission, Hearing on Legislation Pipeline and Infrastructure
Modernization, 115th Congress. (May 3, 2017).
\2\Id.
---------------------------------------------------------------------------
More broadly, H.R. 1115 is a solution in search of a
problem. Turpin testified six years ago that between 2009-2016,
88 percent of pipeline projects applying for section 7
authorization received certificates within one year.\3\ Then-
FERC Chairman Richard Glick indicated in an appearance before
the Senate Committee on Energy and Natural Resources in 2021
that ``. . . the time the commission was taking to approve
certificate applications was comparable to that in previous
years''.\4\ FERC is approving natural gas pipelines under
current statutes at its normal, efficient pace.
---------------------------------------------------------------------------
\3\Id.
\4\Congressional Research Service, Interstate Natural Gas Pipeline
Siting: FERC Policy and Issues for Congress (June 9, 2022) (R45239).
---------------------------------------------------------------------------
While H.R. 1115 is unlikely to speed up the pipeline
authorization process, it would gut the environmental review
process for natural gas pipeline authorizations. Section 2(d)
requires FERC to invite certain agencies to become
``participating agencies'' for a specific authorization
application, and all Federal, State, local, and Tribal agencies
not invited to become such an agency are automatically labeled
``non-designated agencies.'' These ``non-designated agencies''
are barred from participating in the environmental review
process and FERC is barred from considering or even accepting
into the record their comments. Effectively, H.R. 1115 gives
FERC the power to render certain agencies more powerless than
an outside intervenor in the environmental review process, even
if an agency has legal obligations under other statutes to
comment on the environmental review. This eviscerates the
ability of Federal, State, local, and Tribal agencies to
properly communicate the environmental impacts of proposed
authorizations.
Section (e)(1) of H.R. 1115 also requires Federal agencies
to make decisions for authorizations required for a natural gas
pipeline within 90 days of FERC issuing an environmental
review. This can leave Federal agencies between a rock and a
hard place--they can either violate their obligations under
bedrock environmental statutes to thoroughly consider and
evaluate the application of a proposed pipeline, or they can
violate this new obligation to adhere to FERC's timeline. This
would potentially have consequences unforeseen by the
majority--agencies may simply determine that the easiest way
forward without violating environmental statutes or the
provisions within H.R. 1115 is to deny more authorizations for
natural gas projects as they will not have the requisite time
to thoroughly vet projects.
Finally, section 2(f)(2) of H.R. 1115 requires Federal and
State agencies to accept data gathered by remote means, and
grant a conditional approval for Federal authorization based on
that remote data. In Turpin's response to questions during the
2017 hearing, he noted that remote data sometimes did not
discover certain features that are eligible for protection
under environmental statutes, requiring the applicant to
conduct an expensive re-route of the project.\5\ Furthermore,
witness Jennifer Danis, in the same hearing, in a response to a
question by Rep. Paul Tonko (D-NY), responded that ``Aerial
data . . . provides an extremely limited view of what is on the
ground. It cannot be accurate with respect to wetlands
delineation. It cannot be accurate with respect to endangered
species, vernal ponds, seeps, vegetation, other things that
require detailed onsite surveys. In the provision in the
amendments for aerial survey data, requiring ancillary federal
authorizations to consider those data simply decreases
efficiency because it in essence asks, for example, states
under 401 certification to consider an application based on
guesswork the first time, and then to go back and to reconsider
that same application once they can make a true determination
of what the onsite environmental impacts would be.''\6\ This
provision in the bill allows natural gas pipeline developers to
sidestep engagement with impacted landowners until far later in
the process, denying landowners an opportunity to engage with
the process from the very beginning.
---------------------------------------------------------------------------
\5\See note 1.
\6\House Committee on Energy and Commerce, Testimony of Jennifer
Danis, Senior Staff Attorney, Eastern Environmental Law Center, On
behalf of Columbia University, the New Jersey Conservation Foundation,
and the Stony-Brook Millstone Watershed Association, Hearing on
Legislation Pipeline and Infrastructure Modernization, 115th Cong. (May
3, 2017).
---------------------------------------------------------------------------
During the Subcommittee and Full Committee markups of H.R.
1115, Democrats offered several amendments to the bill to
address their concerns. At the Subcommittee markup, Rep. Paul
Tonko offered an amendment that would have struck the portion
of the bill limiting the authority of non-designated agencies.
At the Full Committee markup, Ranking Member of the
Subcommittee on Energy, Climate, and Grid Security Rep. Diana
DeGette (D-CO) offered an amendment that would have required
any company seeking to utilize section 7(h) of the NGA's
eminent domain authority to obtain a finding from FERC that
their usage of eminent domain is in the public interest.
Ranking Member of the Full Committee, Rep. Frank Pallone Jr.
(D-NJ) offered an amendment that would have struck the
provision discussed above relating to remote surveys. Finally,
Rep. Kathy Castor (D-FL) offered an amendment that would have
prevented the bill from taking effect until FERC certified that
the bill was necessary to efficiently and effectively authorize
pipelines pursuant to section 7 of the NGA, that section 2(g)
of the bill was not duplicative of other requirements (such as
FAST-41), and that the bill would not result in unnecessary
Federal spending. All four amendments failed on a recorded
vote, though Ranking Member DeGette's amendment won bipartisan
support.
At the Full Committee markup of H.R. 1115, Energy, Climate,
and Grid Security Chairman Rep. Jeff Duncan (R-SC) offered an
amendment that drastically altered the application of the
Federal Water Pollution Control Act to authorizations to
natural gas pipelines. The amendment guts the current power and
discretion granted to states under the current law, and instead
asks FERC, an energy regulator, to become an environmental
regulatory agency by picking which conditions filed by state
environmental regulators it wants natural gas pipelines to
abide by.
For the reasons stated above, we dissent from the views
contained in the Committee's report.
Frank Pallone, Jr.,
Ranking Member, Committee on Energy and Commerce.
[all]