H. Rept. 118-240

AMERICAN BROADBAND DEPLOYMENT ACT OF 2023

2023-10-02

Committees

Associated legislation

Text

Minority Views

[To accompany H.R. 3557] The Committee on Energy and Commerce, to whom was referred the bill (H.R. 3557) to streamline Federal, State, and local permitting and regulatory reviews to expedite the deployment of communications facilities, and for other purposes, having considered the same, reports favorably thereon with an amendment and recommends that the bill as amended do pass. CONTENTS Page Purpose and Summary.............................................. 24 Background and Need for Legislation.............................. 25 Committee Action................................................. 29 Committee Votes.................................................. 30 Oversight Findings and Recommendations........................... 37 New Budget Authority, Entitlement Authority, and Tax Expenditures 37 Congressional Budget Office Estimate............................. 37 Federal Mandates Statement....................................... 37 Statement of General Performance Goals and Objectives............ 37 Duplication of Federal Programs.................................. 37 Related Committee and Subcommittee Hearings...................... 37 Committee Cost Estimate.......................................... 38 Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 38 Advisory Committee Statement..................................... 38 Applicability to Legislative Branch.............................. 38 Section-by-Section Analysis of the Legislation................... 38 Changes in Existing Law Made by the Bill, as Reported............ 50 Minority Views................................................... 125 Exchange of Letters with Additional Committees of Referral....... 127 The amendment is as follows: Strike all after the enacting clause and insert the following: SECTION 1. SHORT TITLE; TABLE OF CONTENTS. (a) Short Title.--This Act may be cited as the ``American Broadband Deployment Act of 2023''. (b) Table of Contents.--The table of contents for this Act is as follows: Sec. 1. Short title; table of contents. TITLE I--STATE AND LOCAL SITING PROCESSES Sec. 101. Preservation of local zoning authority. Sec. 102. Removal of barriers to entry. Sec. 103. Requests for modification of certain existing wireless and telecommunications service facilities. TITLE II--CABLE Sec. 201. Request for new franchise. Sec. 202. Request regarding placement, construction, or modification of cable equipment. Sec. 203. Cable franchise term and termination. Sec. 204. Sales of cable systems. TITLE III--ENVIRONMENTAL AND HISTORIC PRESERVATION REVIEWS Sec. 301. Application of NEPA and NHPA to certain communications projects. Sec. 302. Presumption with respect to certain complete FCC forms. Sec. 303. Rule of construction. Sec. 304. Definitions. TITLE IV--OTHER MATTERS Sec. 401. Timely consideration of applications for Federal easements, rights-of-way, and leases. Sec. 402. Streamlining of certain fees relating to broadband infrastructure deployed using grant funds under BEAD Program. TITLE I--STATE AND LOCAL SITING PROCESSES SEC. 101. PRESERVATION OF LOCAL ZONING AUTHORITY. Section 332(c) of the Communications Act of 1934 (47 U.S.C. 332(c)) is amended by striking paragraph (7) and inserting the following: ``(7) Preservation of local zoning authority.-- ``(A) General authority.--Except as provided in this paragraph, nothing in this Act shall limit or affect the authority of a State or local government or instrumentality thereof over decisions regarding the placement, construction, or modification of personal wireless service facilities. ``(B) Limitations.-- ``(i) In general.--The regulation of the placement, construction, or modification of a personal wireless service facility by any State or local government or instrumentality thereof-- ``(I) shall not discriminate among personal wireless service facilities or providers of communications service, including by providing exclusive or preferential use of facilities to a particular provider or class of providers of personal wireless service; and ``(II) shall not prohibit or have the effect of prohibiting the provision, improvement, or enhancement of personal wireless service. ``(ii) Engineering standards; aesthetic requirements.--It is not a violation of clause (i) for a State or local government or instrumentality thereof to establish for personal wireless service facilities, or structures that support such facilities, objective, reasonable, and nondiscriminatory-- ``(I) structural engineering standards based on generally applicable codes; ``(II) safety requirements (subject to clause (vi)); or ``(III) aesthetic or concealment requirements (unless such requirements prohibit or have the effect of prohibiting the installation or modification of such facilities or structures). ``(iii) Timeframes.-- ``(I) In general.--A State or local government or instrumentality thereof shall grant or deny a request for authorization to place, construct, or modify a personal wireless service facility not later than-- ``(aa) in the case of a request for authorization to place, construct, or modify a personal wireless service facility that is not a small personal wireless service facility-- ``(AA) if the request is for authorization to place, construct, or modify such facility using an existing structure, including with respect to an area that has not previously been zoned for personal wireless service facilities (other than small personal wireless service facilities), 90 days after the date on which the request is submitted by the requesting party to the government or instrumentality; or ``(BB) if the request is for any other action relating to such facility, 150 days after the date on which the request is submitted by the requesting party to the government or instrumentality; and ``(bb) in the case of a request for authorization to place, construct, or modify a small personal wireless service facility-- ``(AA) if the request is for authorization to place, construct, or modify such facility using an existing structure, including with respect to an area that has not previously been zoned for personal wireless service facilities, 60 days after the date on which the request is submitted by the requesting party to the government or instrumentality; or ``(BB) if the request is for any other action relating to such facility, 90 days after the date on which the request is submitted by the requesting party to the government or instrumentality. ``(II) Treatment of batched requests.--In the case of requests described in subclause (I) that are submitted as part of a single batch by the requesting party to the government or instrumentality on the same day, the applicable timeframe under such subclause for each request in the batch shall be the longest timeframe under such subclause that would be applicable to any request in the batch if such requests were submitted separately. ``(III) Applicability.--The applicable timeframe under subclause (I) shall apply collectively to all proceedings required by a State or local government or instrumentality thereof for the approval of the request. ``(IV) No moritoria.--A timeframe under subclause (I) may not be tolled by any moratorium, whether express or de facto, imposed by a State or local government or instrumentality thereof on the submission, acceptance, or consideration of any request for authorization to place, construct, or modify a personal wireless service facility. ``(V) Tolling due to incompleteness.-- ``(aa) Initial request incomplete.-- ``(AA) Small personal wireless service facilities.--If, not later than 10 days after the date on which a requesting party submits to a State or local government or instrumentality thereof a request for authorization to place, construct, or modify a small personal wireless service facility, the government or instrumentality provides to the requesting party a written notice described in item (cc) with respect to the request, the timeframe described in subclause (I) is tolled with respect to the request and shall restart at zero on the date on which the requesting party submits to the government or instrumentality a supplemental submission in response to the notice. ``(BB) Other personal wireless service facilities.--If, not later than 30 days after the date on which a requesting party submits to a State or local government or instrumentality thereof a request for authorization to place, construct, or modify a personal wireless service facility that is not a small personal wireless service facility, the government or instrumentality provides to the requesting party a written notice described in item (cc) with respect to the request, the timeframe described in subclause (I) is tolled with respect to the request until the date on which the requesting party submits to the government or instrumentality a supplemental submission in response to the notice. ``(bb) Supplemental submission incomplete.--If, not later than 10 days after the date on which a requesting party submits to a State or local government or instrumentality thereof a supplemental submission in response to a written notice described in item (cc), the government or instrumentality provides to the requesting party a written notice described in item (cc) with respect to the supplemental submission, the timeframe under subclause (I) is further tolled until the date on which the requesting party submits to the government or instrumentality a subsequent supplemental submission in response to the notice. ``(cc) Written notice

Purpose and Summary

H.R. 3557, the ``American Broadband Deployment Act'' would streamline the broadband permitting process at the federal, state, and local level. It would amend the Communications Act of 1934 by establishing predictable timeframes for state and local permitting processes related to broadband deployment. It would also cap fees state and local governments charge for permit application reviews and use of public rights-of-way, requiring that those fees be based on actual costs. Additionally, H.R. 3557 would reform the cable franchising process. It would establish predictable timeframes for reviews of requests for new franchises and expansion of cable systems. It would also clarify and make more transparent the terms for franchises and streamline the process for transferring cable systems. H.R 3557 would also exempt certain broadband-deployment projects from environmental and historic preservation reviews and codify the Tribal notification process for new wireless infrastructure. Finally, H.R 3557 would deem granted applications to deploy broadband on federal lands that remain pending beyond the existing 270-day timeframe for such reviews. It would also require states to certify that projects funded by grants from the Broadband Equity, Access, and Deployment (BEAD) program are charged cost-based fees from state and local governments.

Background and Need for Legislation

The United States faces a persistent digital divide. According to the Federal Communications Commission (FCC), approximately 8.3 million homes and businesses lack access to high-speed broadband.\1\ The federal government has dedicated billions of dollars to address this need, most recently with $65 billion through the Infrastructure Investment and Jobs Act (IIJA) to support broadband deployment, digital equity, and affordability needs.\2\ --------------------------------------------------------------------------- \1\Jessica Rosenworcel, FCC, National Broadband Map: It Keeps Getting Better, https://www.fcc.gov/national-broadband-map-it-keeps- getting-better, (May 30, 2023); FCC National Broadband Map, https:// broadbandmap.fcc.gov/home (last accessed June 23, 2023). \2\Infrastructure Investment and Jobs Act, P.L. 117-58, div. F, tit. I Sec. 60101 et seq. (2021). --------------------------------------------------------------------------- The bulk of this money will be spent on broadband deployment. Before a broadband provider can begin deploying (or modifying) broadband infrastructure, however, it must secure zoning and construction permits, pay application fees, and conduct environmental and historic preservation reviews. This process often requires cooperation among providers, federal agencies, and state and local governments. But the unpredictable timelines for permit approvals and high fees for processing applications have made it more expensive and burdensome to deploy broadband infrastructure.\3\ Streamlining these regulations is essential to encourage and expedite broadband infrastructure deployment throughout the United States, and ensure federal funding is not wasted due to unnecessary permitting delays or fees. --------------------------------------------------------------------------- \3\Breaking Barriers: Streamlining Permitting to Expedite Broadband Deployment, Hearing before the Sub. on Commc'n. and Tech., H. Comm. on Energy and Commerce, 118th Cong. (2023) (``Permitting Hearing'') (Written Testimony of Michael O'Rielly at 3); see, e.g., Streamlining Federal Siting Working Group Final Report, FCC Broadband Deployment Advisory Committee (Jan. 23-24, 2018), https://www.fcc.gov/sites/ default/files/bdac-federalsiting-01232018.pdf (discussing Federal regulatory barriers to broadband deployment); Report Of The Removal of State and Local Regulatory Barriers Working Group, FCC Broadband Deployment Advisory Committee (Jan. 10, 2018), https://www.fcc.gov/ sites/default/files/bdac-regulatorybarriers-01232018.pdf (discussing State and local barriers). --------------------------------------------------------------------------- Federal Barriers The federal government manages a significant amount of land and buildings across the country. As a result, federal agencies such as the Department of Interior, Department of Agriculture, and General Services Administration, are responsible for reviewing and approving applications to deploy broadband on federal property. These agencies, however, often take significant time to review these applications, which results in project delays.\4\ As one stakeholder testified, ``[t]he existing federal permitting process takes too long, is too expensive, and is an impediment to the ability of broadband providers to meet the needs of their consumers and communities.''\5\ Problems include agencies not responding ``for long stretches of time regarding the status of applications or what else might be needed to deem an application `complete,''' followed by ``serial requests for additional information that could have been caught earlier or avoided altogether with better guidance and communication upfront.''\6\ Agencies also lack coordination or similar application of rules even within the same agency.\7\ --------------------------------------------------------------------------- \4\See Linda Hardesty, Whoa--The Fiber Permitting Process Could Crush Digital Divide Dreams, Fierce Telecom (Dec. 9, 2021), https:// www.fiercetelecom.com/broadband/whoa-fiber-permitting-process-could- crush-digital-divide-dreams (describing federal approvals needed to deploy broadband). \5\Permitting Hearing (Written Testimony of Louis Finkel at 1). \6\Permitting Hearing (Written Testimony of Michael Romano at 7). \7\Permitting Hearing (Testimony of Louis Finkel). --------------------------------------------------------------------------- To address this, Congress directed federal agencies to develop one or more master contracts to govern the placement of broadband infrastructure on property owned by the federal government, use a common application form, and established a 270-day shot clock for federal agencies to process applications to place communications facilities on federal property.\8\ Nonetheless, reviews often last beyond 270 days, as agencies find ways to avoid starting the shot clock,\9\ and there is currently no penalty when federal agencies miss this deadline.\10\ --------------------------------------------------------------------------- \8\47 U.S.C. Sec. 1455(b)(3)(A). \9\Permitting Hearing (Written Testimony of Michael Romano at 8). \10\Permitting Hearing (Response of Michael Saperstein to The Hon. Jay Obernolte). --------------------------------------------------------------------------- Other federal laws, such as the National Historic Preservation Act (NHPA)\11\ and the National Environmental Policy Act of 1969 (NEPA),\12\ complicate broadband infrastructure deployment. NEPA requires federal agencies to identify and evaluate the environmental effects of proposed ``major Federal actions,''\13\ while NHPA requires agencies to consider the effects of federal undertakings on historic properties,\14\ usually through consultation with an appropriate State Historic Preservation Officer or Tribal Historic Preservation Officer, and provide notification to Tribes that have expressed an interest in reviewing projects proposed in their designated areas of interest.\15\ These two laws are generally read coextensively\16\--major federal actions under NEPA are usually considered federal undertakings under NHPA. Certain broadband projects, such as those involving federal lands or federal funds or those involving certain wireless facilities, fall into these categories. Providers are therefore required to conduct environmental and historic preservation reviews for these projects. These reviews can cost tens of thousands of dollars to complete and take years to obtain approval,\17\ thus delaying and increasing the cost of deployment.\18\ Worse, these reviews can be required even on previously disturbed lands where a review previously took place.\19\ Modernizing these processes would ``give more certainty and predictability'' to broadband providers seeking to deploy.\20\ --------------------------------------------------------------------------- \11\54 U.S.C. Sec. 300101 et seq. \12\42 U.S.C. Sec. 4321 et seq. \13\42 U.S.C. Sec. 4332(2)(C); see also 40 CFR Sec. 1508.18 (defining major Federal action). \14\54 U.S.C. Sec. 306108; see also see also 54 U.S.C. Sec. 300320(3); 36 CFR Sec. 800.16(y) (defining undertaking). \15\Tower and Antenna Siting, FCC, https://www.fcc.gov/wireless/ bureau-divisions/competition-infrastructure-policy-division/tower-and- antenna-siting (June 29, 2022). https://www.fcc.gov/wireless/bureau- divisions/competition-infrastructure-policy-division/tower-and-antenna- siting#NHPA. \16\Sac and Fox Nation of Mo. v. Norton, 240 F.3d 1250, 1263 (10th Cir. 2001) (``Because of the operational similarity between the two statutes, courts generally treat `major federal actions' under the NEPA as closely analogous to `federal undertakings' under the NHPA.''). \17\Permitting Hearing (Written Testimony of Michael Romano at 5). \18\Id. (Written Testimony of Louis Finkel at 1). \19\Id. (Written Testimony of Louis Finkel at 2). \20\Id. (Written Testimony of Louis Finkel at 1). --------------------------------------------------------------------------- The FCC has tried streamlining the NEPA/NHPA processes. In the 2018 NEPA/NHPA Order, the FCC exempted construction of small-cell wireless facilities from NHPA and NEPA,\21\ but the U.S. Court of Appeals for the District of Columbia Circuit vacated that action in August 2019.\22\ --------------------------------------------------------------------------- \21\Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment, WT Docket No. 17-79, Second Report, Second Report and Order, 33 FCC Rcd 3102 (2018) (2018 NEPA/NHPA Order). \22\United Keetoowah Band of Cherokee Indians in Oklahoma v. FCC, 933 F.3d 728 (D.C. Cir. 2019) (vacating an FCC order eliminating NEPA and NHPA requirements as arbitrary and capricious for failing to justify that public interest did not require review of small cell deployments). --------------------------------------------------------------------------- The FCC also addressed the Tribal notification process under its rules implementing NHPA.\23\ The FCC's Nationwide Programmatic Agreement Regarding the Section 106 National Historic Preservation Act Review Process directs a provider seeking to deploy a wireless tower to provide ``all information reasonably necessary for [an] Indian Tribe or [Native Hawaiian Organization] to evaluate whether Historic Properties of religious and cultural significance may be affected'' and provide the Tribe with a reasonable opportunity to respond.\24\ The FCC's Forms 620 and 621 provide this information--Form 620 addresses new towers and Form 621 addresses collocations. --------------------------------------------------------------------------- \23\2018 NEPA/NHPA Order 104-113. \24\Nationwide Programmatic Agreement for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission, 47 C.F.R. pt.1, Appx. C Sec. IV.F. --------------------------------------------------------------------------- In the 2018 NEPA/NHPA Order, the FCC required applicants to provide all potentially affected Tribes with a Form 620/621 and clarified the timeframe for Tribes to respond to the submission. The FCC established a 45-day process for moving forward with construction in cases in which the Tribe does not respond after having been given the opportunity to review a Form 620/621 submission.\25\ If an applicant does not receive a response within 30 calendar days of the date the Tribe can be shown or may reasonably be expected to have received notification that the Form 620/621 submission, the applicant can refer the matter to the FCC for follow-up, and the FCC will inform the Tribe that it has 15 calendar days to respond. If the Tribe still does not respond, the applicant's pre- construction obligations are discharged with respect to that Tribe. The FCC also determined that ``the detailed information included in the Form 620/621 submission packet constitutes a reasonable and good faith effort to provide the information reasonably necessary for [Tribes] to ascertain whether historic properties of religious and cultural significance to them may be affected by the undertaking.''\26\ --------------------------------------------------------------------------- \25\2018 NEPA/NHPA Order 111. \26\Id. 106. --------------------------------------------------------------------------- State and Local Obstacles State and local governments play a key role in facilitating or obstructing broadband infrastructure deployment. They regulate land use, review siting applications, and issue relevant permits. State and local franchising authorities also approve whether cable operators can provide service in a region and impose other regulations related to their provision of service. State and local governments' review processes can be cumbersome and costly,\27\ which can delay or even prohibit broadband deployment. For example, some state and local governments charge excessive fees for reviewing applications or to access the public rights-of-way for construction and impose no deadlines to review applications.\28\ One provider reported that a government charged ``fees amounting to over $125 per subscriber and with no clear tie to the costs incurred by the state in processing the application or arising out of the use of the right-of-way.''\29\ --------------------------------------------------------------------------- \27\Permitting Hearing (Written Testimony of Michael O'Rielly at 5). \28\See, generally, Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment, WT Docket No. 17-79, WC Docket No. 17-84, Declaratory Ruling and Third Report and Order, 33 FCC Rcd. 9088 (2018). \29\Permitting Hearing (Written Testimony of Michael Romano at 5). --------------------------------------------------------------------------- Federal law preempts state and local authority to regulate communications facilities. Under Section 253 of the Communications Act of 1934, ``no State or local statute or regulation, or other State or local legal requirement, may prohibit or have the effect of prohibiting the ability of any entity to provide any interstate or intrastate telecommunications service.''\30\ Section 253 requires the Commission to preempt the enforcement of any such law.\31\ Similarly, Section 332(c)(7) of the Communications Act states that ``[t]he regulation of the placement, construction, and modification of personal wireless service facilities by any State or local government or instrumentality thereof . . . shall not prohibit or have the effect of prohibiting the provision of personal wireless services.''\32\ It further requires a State or local government or instrumentality thereof to ``act on any request for authorization to place, construct, or modify personal wireless service facilities within a reasonable period of time after the request is duly filed.''\33\ Finally, under Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012, ``a State or local government may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station.''\34\ --------------------------------------------------------------------------- \30\47 U.S.C. Sec. 253(a). \31\Id. Sec. 253(d). \32\Id. Sec. 332(c)(7)(B)(i). \33\Id. Sec. 332(c)(7)(B)(ii). \34\Middle Class Tax Relief and Job Creation Act of 2012, P.L. 112- 96, tit. VI, sub. D Sec. 6409(a) codified at 47 U.S.C. Sec. 1455(a). --------------------------------------------------------------------------- The FCC has used its authority to address state and local barriers to broadband infrastructure deployment. In 2009, the Commission adopted an interpretation of ``reasonable period of time'' under Section 332 to be 90 days for reviews of collocation applications and 150 days for reviews of siting applications other than collocations.\35\ --------------------------------------------------------------------------- \35\Petition for Declaratory Ruling to Clarify Provisions of Section 332(c)(7) to Ensure Timely Siting Review, Declaratory Ruling, 24 FCC Rcd 13994 56 (2009), aff'd, City of Arlington v. FCC, 569 U.S. 290 (2013). --------------------------------------------------------------------------- In 2014, the FCC adopted a Report and Order implementing Section 6409 that gave State and local governments 60 days to approve eligible facilities requests to modify existing wireless facilities.\36\ --------------------------------------------------------------------------- \36\Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies, Report & Order, 29 FCC Rcd 12865, 12966 243, 270, (2014) (2014 Wireless Infrastructure Order), aff'd, Montgomery County v. FCC, 811 F.3d 121 (4th Cir. 2015); 47 C.F.R. Sec. 1.6100. --------------------------------------------------------------------------- In 2018, the FCC codified the timelines for reviews it adopted in 2009 in a new Declaratory Ruling and Report and Order.\37\ That item also streamlined state and local government review of wireless small-cell siting applications by limiting application fees that state and local governments could charge an applicant to be based on cost, establishing new shot clocks for small wireless facilities, and adopting new remedies for failing to act within the shot-clock. The U.S. Court of Appeals for the Ninth Circuit upheld this action after a challenge from a number of local governments.\38\ --------------------------------------------------------------------------- \37\Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment, WT Docket No. 17-79, WC Docket No. 17-84, Declaratory Ruling and Third Report and Order, 33 FCC Rcd. 9088 138- 39 (2018) (2018 Small Cell Order); 47 C.F.R. Sec. 1.6003. \38\City of Portland v. United States, 969 F.3d 1020 (9th Cir. 2020). --------------------------------------------------------------------------- In 2018, the FCC also issued a Declaratory Ruling declaring that state and local moratoria on the deployment of telecommunications services or facilities prohibit or have the effect of prohibiting the ability of any entity to provide any interstate or intrastate telecommunications service.\39\ Thus, state and local governments cannot ban the deployment of telecommunications services or facilities or enact de facto bans, such as blanket refusals to process applications, refusals to issue permits for a category of structures, or frequent and lengthy delays. --------------------------------------------------------------------------- \39\Accelerating Wireline Broadband Deployment by Removing Barriers to Infrastructure Investment, WC Docket No. 17-84, WT Docket No. 17-79, Third Report and Order and Declaratory Ruling, 33 FCC Rcd. 7705 140 (2018); 47 U.S.C. Sec. 253. --------------------------------------------------------------------------- In 2020, the FCC adopted a Declaratory Ruling on state and local government review of modifications to existing wireless infrastructure to facilitate 5G deployment.\40\ The item clarified when the 60-day shot clock for local review begins, how certain aspects of proposed modifications affect eligibility for streamlined review, and when FCC applicants need to submit environmental assessments based only on potential impacts to historic properties.\41\ A number of municipalities are challenging this item in the U.S. Court of Appeals for the Ninth Circuit.\42\ --------------------------------------------------------------------------- \40\Implementation of State and Local Governments' Obligation to Approve Certain Wireless Facility Modification Requests Under Section 6409(a) of the Spectrum Act of 2012, WT Docket No. 19-250, Declaratory Ruling and Notice of Proposed Rulemaking, 35 FCC Rcd 5977 14-23 (2020) (5G Upgrade Order). \41\Id. \42\League of Calif. Cities, et al. v. FCC, et al., No. 20-71765 (9th Cir., filed June 22, 2020). --------------------------------------------------------------------------- Although these FCC actions have helped accelerate broadband infrastructure deployment, the litigation surrounding these rules and the risk that they could change with new administrations u

Committee Action

On April 19, 2023, the Subcommittee on Communications and Technology held a hearing entitled, ``Breaking Barriers: Streamlining Permitting to Expedite Broadband Deployment.'' The Subcommittee received testimony from: Michael Romano, Executive Vice President, NTCA--The Rural Broadband Association; Michael Saperstein, Senior Vice President of Government Affairs and Chief Strategy Officer, Wireless Infrastructure Association; Michael O'Rielly, President, MPORielly Consulting, LLC; Louis Finkel, Senior Vice President of Government Relations, National Rural Electric Cooperative Association; and, Ernesto Falcon, Senior Legislative Counsel, Electronic Frontier Foundation. On May 17, 2023, the Subcommittee on Communications and Technology met in open markup session and forwarded H.R. 3291, as amended, to the full Committee by a record vote of 16 yeas and 12 nays. That text became the base for H.R. 3557, which was introduced by Rep. Earl L. ``Buddy'' Carter (GA-01) on May 22, 2023. On May 24, 2023, the full Committee on Energy and Commerce met in open markup session and ordered H.R. 3557, as amended, favorably reported to the House by a record vote of 27 yeas and 23 nays.

Committee Votes

Clause 3(b) of rule XIII requires the Committee to list the record votes on the motion to report legislation and amendments thereto. The following reflects the record votes taken during the Committee consideration: Oversight Findings and Recommendations Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII, the Committee held a hearing and made findings that are reflected in this report. New Budget Authority, Entitlement Authority, and Tax Expenditures Pursuant to clause 3(c)(2) of rule XIII, the Committee finds that H.R. 3557 would result in no new or increased budget authority, entitlement authority, or tax expenditures or revenues.

Congressional Budget Office Estimate

Pursuant to clause 3(c)(3) of rule XIII, at the time this report was filed, the cost estimate prepared by the Director of the Congressional Budget Office pursuant to Section 402 of the Congressional Budget Act of 1974 was not available. Federal Mandates Statement The Committee adopts as its own the estimate of Federal mandates prepared by the Director of the Congressional Budget Office pursuant to Section 423 of the Unfunded Mandates Reform Act. Statement of General Performance Goals and Objectives Pursuant to clause 3(c)(4) of rule XIII, the general performance goal or objective of this legislation is to expedite broadband deployment by streamlining the permitting process at the federal, state, and local level. Duplication of Federal Programs Pursuant to clause 3(c)(5) of rule XIII, no provision of H.R. 3557 is known to be duplicative of another Federal program, including any program that was included in a report to Congress pursuant to Section 21 of Public Law 111-139 or the most recent Catalog of Federal Domestic Assistance. Related Committee and Subcommittee Hearings Pursuant to clause 3(c)(6) of rule XIII, the following related hearing was used to develop or consider H.R. 3557: On April 19, 2023, the Subcommittee on Communications and Technology held a hearing. The title of the hearing was ``Breaking Barriers: Streamlining Permitting to Expedite Broadband Deployment.'' The Subcommittee received testimony to develop H.R. 3557 from: Michael Romano, Executive Vice President, NTCA--The Rural Broadband Association; Michael Saperstein, Senior Vice President of Government Affairs and Chief Strategy Officer, Wireless Infrastructure Association; Michael O'Rielly, President, MPORielly Consulting, LLC; Louis Finkel, Senior Vice President of Government Relations, National Rural Electric Cooperative Association; and, Ernesto Falcon, Senior Legislative Counsel, Electronic Frontier Foundation. Committee Cost Estimate Pursuant to clause 3(d)(1) of rule XIII, the Committee adopts as its own the cost estimate prepared by the Director of the Congressional Budget Office pursuant to Section 402 of the Congressional Budget Act of 1974. At the time this report was filed, the estimate was not available. Earmark, Limited Tax Benefits, and Limited Tariff Benefits Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the Committee finds that H.R. 3557 contains no earmarks, limited tax benefits, or limited tariff benefits. Advisory Committee Statement No advisory committees within the meaning of Section 5(b) of the Federal Advisory Committee Act were created by this legislation. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of Section 102(b)(3) of the Congressional Accountability Act. Section-by-Section Analysis of the Legislation Section 1. Short title; table of contents This Section designates that the short title may be cited as the ``American Broadband Deployment Act of 2023.'' It also includes the table of contents for this legislation. Section 101. Preservation of local zoning authority Section 101 would amend Section 332(c) of the Communications Act of 1934 (47 U.S.C. 332(c)) by striking paragraph (7) and inserting a new paragraph (7). The amended subparagraph (7)(A) would provide that nothing in paragraph (7) shall limit or affect the authority of a State or local government or instrumentality over decisions regarding placement, construction, or modification of personal wireless service facilities. Subparagraph (B) would limit the general authority of subparagraph (A). Clause (i) would limit the ability of any State or local government or instrumentality thereof to discriminate among personal wireless service facilities or providers of communications services, and to prohibit or have the effect of prohibiting the provision, improvement, or enhancement of personal wireless services. The ``prohibit or have the effect of prohibiting'' language matches existing language in Section 332(c)(7), and the Committee intends this language to be interpreted in the same way, specifically adopting the ``materially inhibit'' standard used in the FCC's 1997 California Payphone decision.\44\ --------------------------------------------------------------------------- \44\California Payphone Ass'n, 12 FCC Rcd 14191 31 (1997). --------------------------------------------------------------------------- Clause (ii) would state that it is not a violation of clause (i) for a State or local government or instrumentality to establish structural engineering standards, safety requirements, or aesthetic requirements for personal wireless service facilities as long as those requirements are objective, reasonable, and nondiscriminatory. Regulations on safety requirements are subject to clause (vi), which would limit the ability for a State or local government to regulate personal wireless service facilities on the basis of the environmental effects of radio frequency, and aesthetic requirements could not prohibit or have the effect of prohibiting personal wireless facilities. Clause (iii) would establish the timeframes for reviewing a request for authorization to place, construct, or modify a personal wireless service facility. Subclause (I) would provide the timeframes within which a State or local government shall grant or deny a request for authorization to place, construct, or modify a personal wireless service facility: 90 days for a request to collocate a facility that is not a small personal wireless facility (small cell) on an existing structure; 150 days for a request to deploy a non-small cell facility on a new structure; 60 days for a request to collocate a small cell on an existing structure; and 90 days for a request to deploy a small cell on a new structure. Subclause (II) would provide that the timeframe to review requests that are submitted in a batch would be the longest timeframe under subclause (I) that would be applicable to any request in the batch. The timeframes and batching requirements in subclauses (I) and (II) are consistent with current FCC rules.\45\ --------------------------------------------------------------------------- \45\47 C.F.R. Sec. 1.6003(c). --------------------------------------------------------------------------- Subclause (III) would apply the timeframes under subclause (I) to all proceedings required by a State or local government for approval of the request. Subclause (IV) would prohibit a State or local government from tolling the timeframes under subclause (I) by placing a moratorium, whether express or de facto, on the submission, acceptance, or consideration of any request. Subclause (V) would address the tolling of the timeframes due to the initial incompleteness of requests. Like subclause (I), the requirements differ between small personal wireless services facilities and other personal wireless service facilities. Further, the subclause defines supplemental submissions to provide missing information, written notice requirements for incomplete requests, and limitations on subsequent written notices. Subclause (VI) would allow the State or local government and the requesting party to toll the timeframe by mutual agreement. Clause (iv) would deem a request granted if the State or local government failed to take final action to grant or deny a request within the timeframes established under clause (iii). This clause also contains a rule of construction stating that a request deemed granted shall be authorized without further action by the government or instrumentality. Clause (v) would outline the requirements for denial of a request. A denial would need to be in writing, supported by substantial evidence contained in a written record, and publicly released and provided to the requesting party on the same day the decision is made. Clause (vi) would prohibit a State or local government from regulating the operation, placement, construction, or modification of personal wireless service facilities on the basis of the environmental effects of radio frequency. Clause (vii) would address how a State or local government may charge fees for the consideration of a request or use of a right-of-way or facility in a right-of-way owned or managed by the government. Fees must be competitively neutral, nondiscriminatory, established in advance, calculated based on actual and direct costs, and described to a requesting party in a way that distinguishes between various types of fees, including recurring and nonrecurring fees. As the FCC held in its 2018 Small Cell Order, the Committee expects that only objectively reasonable costs may be factored into these fees.\46\ --------------------------------------------------------------------------- \46\2018 Small Cell Order 50. --------------------------------------------------------------------------- Subparagraph (C) would allow for any person adversely affected by any final action or failure to act by a State or local government to commence action in any court with competent jurisdiction. The same action may also be brought in front of the FCC. Subparagraph (D) would specify when a request is considered to be submitted. A request would be considered submitted on the date on which the applicant takes the first procedural step within its control to submit the application in accordance with the procedures established by the government or instrumentality for the review and approval of such a request or for a standard review for a similar facility or structure. Subparagraph (E) would establish a rule of construction stating that nothing in this paragraph may be construed to affect Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012, relating to modifications of certain facilities. Subparagraph (F) contains the definitions Section for the new Section 332(c) paragraph (7). Section 102. Removal of barriers to entry This Section would amend Section 253 of the Communications Act of 1934 (47 U.S.C) by replacing the existing section with new language. Subsection (a) of this new section would state that no State or local statute, or other regulations, may prohibit or have the effect of prohibiting the ability of any entity to provide, improve, or enhance the provision of an interstate or intrastate telecommunications service. As noted in Section 101, the use of the phrase ``prohibit or have the effect of prohibiting'' matches existing language, with the intent that it be interpreted consistent with the ``materially inhibit'' standard adopted in the FCC's California Payphone decision. Subsection (b) would address the placement, construction, or modification of telecommunications service facilities. Paragraph (1) would provide that a state or local government may not discriminate among telecommunications service facilities based on technology used or services provided, or against telecommunication service facilities as compared to the placement, construction, or modification of other facilities. Paragraph (2) would specify the timeframes that State or local governments must abide by in processing permit requests. Like Section 101, this paragraph contains the specified timelines, applicability, and rules regarding tolling for incomplete requests or by mutual agreement. Here, a State or local government would have 90 days to review requests that use existing infrastructure and 150 days for all other requests. These timeframes would apply collectively to all proceedings required by the State or local government for the approval of the request and may be tolled for incompleteness or by mutual agreement. Further, the paragraph addresses supplemental submissions to provide missing information, written notice requirements, and limitations on subsequent written notices. Paragraph (3) would deem a request granted if the request is not granted or denied within the timeframes established by paragraph (2), and paragraph (4) would require that a decision to deny a request would need to be in writing, supported by substantial evidence contained in a written record, and publicly released and provided to the requesting party on the same day the decision is made. Paragraph (5) would address how a State or local government may charge fees for the consideration of a request or use of a right-of-way or facility in a right-of-way owned or managed by the government. As with Section 101, fees must be competitively neutral, nondiscriminatory, established in advance, calculated based on actual and direct costs, and described to a requesting party in a way that distinguishes between various types of fees, including recurring and nonrecurring fees. Once again, the Committee expects that only objectively reasonable costs to be factored into these fees. Paragraph (6) would state that authorization by a State or local government to place, construct, or modify a telecommunications service facility in a right-of-way owned by that government is sufficient authorization to place, construct, or modify such a facility above or under a transportation crossing, such as a railroad crossing, intersecting that right-of-way. The paragraph would direct the FCC to coordinate with the Secretary of Transportation to promulgate regulations to implement this paragraph. These regulations would be implemented in manner that ensures safety; prevents interference with transportation crossings and related transportation operations; allows for the timely and efficient placement, construction, and modification of telecommunications service facilities; and establishes requirements and standards for just and reasonable compensation to private owners of transportation crossings, including compensation for costs related to the deployment of such facilities. The Committee recognizes that a number of states, including Iowa, Nebraska, Minnesota, and Illinois, have enacted legislation addressing broadband (or utility) deployment through transportation crossings. It is the Committee's intent that these laws serve as a model for the Commission, especially on the actual, objectively reasonable costs that a railroad can charge, and the timeframe for reviewing crossing requests. The Committee also recognizes that railroad companies have developed their own processes and procedures for the safe deployment of broadband in their rights of way and expects the FCC to account for these processes and procedures in developing rules. Subsection (c) would allow for any person adversely affected by any final action or failure to act by a State or local government to commence action in any court with competent jurisdiction. This review must be done on an expedited basis and must commence within 30 days after final action or failure to act. Subsection (d) would explicitly preserve the regulatory authority of States to impose competitively neutral and nondiscriminatory regulations to preserve and advance universal service, protect the public safety and welfare, ensure the continued quality of telecommunications services, and safeguard the rights of consumers. Subsection (e) preserves the ability of State and local governments to manage, on a competitively neutral and nondiscriminatory basis, the public rights-of-way, and to require compensation for the use of such rights-of-way consistent with the requirements of subsection (b)(5). Subsection (f) would allow the FCC to preempt a State or local government regulation or statute if, after notice and public comment, the Commission determines that the imposed statute, regulation, or legal requirement violates this section. Subsection (g) would qualify that the new Section 253 shall not affect that application of Section 332(c)(3) to commercial mobile providers or Section 621 to cable operators. Under subsection (h), it would not be a violation of this section for a State to require a telecommunications carrier that seeks to provide telephone exchange service to rural areas to meet the requirements in Section 214(e)(1) for designation as an eligible telecommunications carrier. However, paragraph (1) and (2) would limit this exemption in a service area that has obtained an exemption, suspension, or modification of Section 251(c)(4), effectively preventing competitors from meeting the requirements of Section 214(e)(1), and for providers of commercial mobile services. Subsection (i) would establish when a request is considered submitted. A request would be considered submitted on the date on which the applicant takes the first procedural step within its control to submit the application in accordance with the procedures established by the government or instrumentality for the review and approval of such a request or for a standard review for a similar facility or structure. Subsection (j) contains the definitions section for the new Section 253. Sec. 103. Requests for modification of certain existing wireless and telecommunications service facilities Subsection (a)(1) would amend Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012 (47 U.S.C. 1455) by striking the word ``wireless'' from the heading and inserting ``communications''. Subsection (a)(2)(A) would amend subsection (a) of Section 6409 to state that a State or local government or instrumentality thereof may not deny, and shall approve any: Eligible facilities request for the modification of an existing wireless tower, base station, eligible support structure, and Eligible telecommunications facility request for the modification of an existing telecommunications service facility in or on eligible support infrastructure that does not substantially change the physical dimensions of the facility.``Eligible support infrastructure'' would be defined in new subsection (a)(7) of Section 6409 to mean infrastructure that supports or houses a telecommunications service facility at the time when an eligible telecommunications facilities request for a modification of such facility is submitted to a State or local government or instrumentality thereof. The Committee intends this to include poles, towers, buildings, ducts, and conduits. Subsection (a)(2)(B) would amend subsection (a)(2) of Section 6409 by adding a timeframe for approval. Consistent with existing FCC rules,\47\ a State or local government would have to approve a request within 60 days of the submission or the request is deemed granted. A rule of construction would further clarify that a deemed granted request requires no further action by the relevant government or instrumentality. This subsection further outlines how a determination that a request is not an eligible facilities request or eligible telecommunications facility request must be described and formatted. Finally, this subsection would address tolling due

Minority Views

In November 2021, President Biden signed into law the Infrastructure Investment and Jobs Act, or the ``Bipartisan Infrastructure Law,'' which made historic and long overdue investments in surface transportation, energy, healthcare, and communications infrastructure. These investments included $42.45 billion for the Broadband Equity, Access, and Deployment Program to deploy broadband infrastructure to Americans who lack reliable access to high-speed internet service. These investments will do more to connect the unconnected than any previous congressional action ever has, and Congress and the Energy and Commerce Committee should focus on maximizing these dollars and ensuring projects are carried out as efficiently and expeditiously as possible. Committee Democrats do not dispute that there are barriers in the way of deploying broadband infrastructure. H.R. 3557 addresses none of them, unfortunately. If the Republican Majority adhered to the regular order process that the Energy and Commerce Committee typically observes, Members could have worked in a bipartisan fashion to develop legislation that addresses the concerns that all witnesses raised at the legislative hearing--most notably, the lack of adequate resources and qualified personnel to review permit applications at Federal agencies. Instead, the Republican Majority rushed directly to a legislative hearing on dozens of partisan bills, presupposing a handful of misguided legislative ``solutions'' in search of problems that compose H.R. 3557, as reported by the Energy and Commerce Committee. H.R. 3557 regrettably proposes to eliminate standard environmental and historic preservation reviews that simply do not affect the overwhelming majority of communications infrastructure projects in the manner suggested by Republicans. With respect to the application of the National Environmental Policy Act (NEPA), many projects to deploy communications infrastructure already qualify for expedited approval under existing categorical exclusions, which Federal agencies maintain to alleviate requirements for predetermined activities that do not have a significant environmental impact. If a proposed deployment project does not meet the parameters of an existing categorical exclusion, the grant recipient is still able to obtain approval after submitting an Environmental Assessment and receiving a Finding of No Significant Impact. There is little evidence to suggest that communications infrastructure deployment projects regularly trigger the highest level of scrutiny under NEPA and require applicants to develop and submit an Environmental Impact Statement, and certainly not enough to warrant the blanket NEPA exemptions proposed in H.R. 3557. Perhaps most troubling are provisions in H.R. 3557 which propose to eliminate local communities' roles in decision- making over the placement and construction of utility infrastructure. The bill imposes heavy-handed ``deemed granted'' provisions on local governments by setting narrow and arbitrary deadlines to approve requests to install communications infrastructure in areas managed by county or municipal governments. The 60-day ``shot clock'' to approve or deny an application implies an unfamiliarity with the realities of local government calendars and processes built around sunshine laws that many local governments follow to ensure transparency and provide residents with sufficient opportunity to be heard on important community matters. While the Republican Majority seems intent on helping big corporations evade scrutiny in communities they wish to serve, Democrats understand that mayors, councils, and local boards represent the best interests of their constituents and disagree with attempts by Republicans to constrain their ability to do so. Local officials are responsible for ensuring the safety and welfare of residents and efforts by House Republicans to automatically approve certain construction projects that have not been approved by regular local government processes will put people in harm's way. Communications providers that proceed with construction without the proper approvals from state, county, or municipal governments should recognize the liability they expose themselves to in doing so. These are just some of the reasons why H.R. 3557 is opposed by the National League of Cities, United States Conference of Mayors, the National Association of Counties, and the National Association of Telecommunications Officers and Advisors. The most effective action the Committee Republicans could have taken to expedite the deployment of high-speed internet to rural communities was to vote for the Bipartisan Infrastructure Law, which no current member of the Republican Majority did. Frank Pallone, Jr. Ranking Member, Energy and Commerce Committee.