Background and Need for Legislation
The Salt River Project (SRP) was authorized in 1903 as one
of the first Bureau of Reclamation (Reclamation) projects under
the Reclamation Act of 1902.\1\ The SRP service area is located
near Phoenix, Arizona, and includes about 240,000 acres
spanning portions of Maricopa, Gila, and Pinal Counties in
central Arizona.\2\ The project receives water from the Salt
and Verde Rivers and today SRP provides water and power to more
than 2 million people.\3\
---------------------------------------------------------------------------
\1\Ch. 1093, 32 Stat. 388. https://www.usbr.gov/lc/region/programs/
contracts/Legislation.pdf.
\2\USBR, Salt River Project. https://www.usbr.gov/projects/
index.php?id=395.
\3\Salt River Project, Our History. https://www.srpnet.com/about/
about-srp.
---------------------------------------------------------------------------
Currently, SRP is exploring a pumped storage hydropower
project. Pumped storage hydropower acts like a battery, it can
store energy and release it when needed. Typically, it is a
configuration of two water reservoirs at different elevations
that can generate power as water moves down from one reservoir
to the other.\4\ The project has the potential for
approximately 2,000 megawatts (MW) of energy storage capacity
for a duration of 10 hours.
---------------------------------------------------------------------------
\4\Department of Energy, Pumped Storage Hydropower. https://
www.energy.gov/eere/water/pumped-storage-hydropower.
---------------------------------------------------------------------------
H.R. 1607 would withdraw approximately 17,095 acres of
federal lands from the National Forest System to the Bureau of
Reclamation for the development of pumped storage hydropower
and the development, generation, and transmission of electrical
power and energy. Through the transfer of this land, the bill
would allow the proposed pumped storage project to be developed
entirely within the authorities and footprint of the federal
Reclamation Project--streamlining development and maximizing
federal Reclamation Project benefits. Without the legislation,
the project would need to be permitted by Reclamation and the
Federal Energy Regulatory Commission.
Since 1903, there have been over 50 federal land
withdrawals made by Congress and the Department of the Interior
on the Salt and Verde River and East Clear Creek watersheds to
develop the SRP.\5\ The management of the withdrawn lands would
be consistent with the existing Memorandum of Understanding
between the Forest Service, the SRP, and Reclamation, also
known as the ``Tri-party Agreement''. This ensures that these
lands are managed the same as the preexisting adjoining
withdrawn lands.
---------------------------------------------------------------------------
\5\Most of the withdrawals were accomplished administratively by
the Secretary of the Interior under Section 3 of the Reclamation Act of
1902. Congress authorized the Secretary to withdraw land from public
entry that were required for irrigation works. More recently, under
Public Laws 108-445 and 112-445, Congress withdrew National Forest
System land where the C.C. Cragin Dam and storage reservoir were
located for Reclamation purposes to clarify that the Secretary retained
jurisdiction over that facility as part of the Project.
---------------------------------------------------------------------------
Committee Action
H.R. 1607 was introduced on March 14, 2023, by Rep. David
Schweikert (R-AZ). The bill was referred to the Committee on
Natural Resources, and within the Committee to the Subcommittee
on Water, Wildlife and Fisheries. On June 14, 2023, the
Subcommittee on Water, Wildlife and Fisheries held a hearing on
the bill. On July 19, 2023, the Committee on Natural Resources
met to consider the bill. The Subcommittee on Water, Wildlife
and Fisheries was discharged from further consideration of H.R.
1607 by unanimous consent. Chairman Bruce Westerman (R-AR)
offered an amendment in the nature of a substitute to H.R.
1607, designated Westerman ANS_035. The amendment was adopted
by unanimous consent. H.R. 1607, as amended, was then ordered
favorably reported to the House of Representatives by unanimous
consent.
Hearings
For the purposes of clause 3(c)(6) of House rule XIII, the
following hearing was used to develop or consider this measure:
hearing by the House Natural Resources Subcommittee on Water,
Wildlife and Fisheries held on June 14, 2023.
Section-by-Section Analysis
Section 1. Land withdrawal and reservation
Section 1 allows for the withdrawal of approximately 17,905
acres of federal land from the National Forest System to the
Bureau of Reclamation for the development, generation, and
transmission of hydropower.
COMMITTEE OVERSIGHT FINDINGS AND RECOMMENDATIONS
Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII of the Rules of the House of Representatives, the
Committee on Natural Resources' oversight findings and
recommendations are reflected in the body of this report.
COMPLIANCE WITH HOUSE RULE XIII AND CONGRESSIONAL BUDGET ACT
1. Cost of Legislation and the Congressional Budget Act.
With respect to the requirements of clause 3(c)(2) and (3) of
rule XIII of the Rules of the House of Representatives and
sections 308(a) and 402 of the Congressional Budget Act of
1974, the Committee has received the following estimate for the
bill from the Director of the Congressional Budget Office:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
H.R. 1607 would direct the Forest Service to withdraw land,
which CBO expects would total about 17,000 acres, from the
National Forest System in an area adjacent to the Salt River
Project (SRP) in Arizona and transfer it to the Bureau of
Reclamation (BOR). The bill also would clarify that regulatory
jurisdiction to develop hydroelectricity and power transmission
on that land would be the responsibility of BOR.
The SRP is owned and regulated by BOR and jointly operated
by the Salt River Valley Water User's Association and the Salt
River Project Agricultural Improvement and Power District. The
project consists of seven dams and reservoirs, 1,300 miles of
conveyance infrastructure, and five hydroelectric plants on the
Salt and Verde Rivers that supply water and power to central
Arizona.
Two agreements signed in 1917 and 1979 among the
association, the district, the Forest Service, and BOR set
guidelines for managing the lands withdrawn from the National
Forest System for SRP purposes; such withdrawals have occurred
about 50 times since 1903. The agreements also authorize the
association and district to construct power infrastructure and
retain receipts from power sales for the SRP.
Under current law, the association is pursuing hydropower
development on the Salt River that will require a license from
the Federal Energy Regulatory Commission (FERC) because the
project will involve constructing a reservoir on land partly
owned and administered by the Forest Service. Enacting H.R.
1607 would simplify the regulatory process because transferring
the land would give BOR sole jurisdiction for the project and
the association would no longer need to obtain a FERC license.
Using information from the affected agencies, CBO estimates
that the Forest Service would incur insignificant costs to
transfer the land and prepare new maps; any spending would be
subject to the availability of appropriated funds. BOR would
not incur additional costs because the association would be
required to cover all costs incurred by BOR to approve and
oversee the project.
Finally, FERC recovers 100 percent of its costs, which are
controlled by annual appropriations, through user fees. Thus,
any reduction in FERC's costs resulting from shifting its
licensing responsibilities to BOR would be offset by an equal
change in fees, resulting in no net change in discretionary
spending.
The CBO staff contact for this estimate is Aurora Swanson.
The estimate was reviewed by H. Samuel Papenfuss, Deputy
Director of Budget Analysis.
Phillip L. Swagel,
Director, Congressional Budget Office.
2. General Performance Goals and Objectives. As required by
clause 3(c)(4) of rule XIII, the general performance goal or
objective of this bill is to clarify jurisdiction with respect
to certain Bureau of Reclamation pumped storage development,
and for other purposes.
EARMARK STATEMENT
This bill does not contain any Congressional earmarks,
limited tax benefits, or limited tariff benefits as defined
under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of
the House of Representatives.
UNFUNDED MANDATES REFORM ACT STATEMENT
According to the Congressional Budget Office, H.R. 1607
contains no unfunded mandates as defined by the Unfunded
Mandates Reform Act.
EXISTING PROGRAMS
Directed Rule Making. This bill does not contain any
directed rule makings.
Duplication of Existing Programs. This bill does not
establish or reauthorize a program of the federal government
known to be duplicative of another program. Such program was
not included in any report from the Government Accountability
Office to Congress pursuant to section 21 of Public Law 111-139
or identified in the most recent Catalog of Federal Domestic
Assistance published pursuant to the Federal Program
Information Act (Public Law 95-220, as amended by Public Law
98-169) as relating to other programs.
APPLICABILITY TO LEGISLATIVE BRANCH
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
PREEMPTION OF STATE, LOCAL OR TRIBAL LAW
Any preemptive effect of this bill over state, local, or
tribal law is intended to be consistent with the bill's
purposes and text and the Supremacy Clause of Article VI of the
U.S. Constitution.
CHANGES IN EXISTING LAW
As ordered reported by the Committee on Natural Resources,
H.R. 1607 would make no changes in existing law.