[To accompany H.R. 1335] The Committee on Natural Resources, to whom was referred the bill (H.R. 1335) to restart onshore and offshore oil, gas, and coal leasing, streamline permitting for energy infrastructure, ensure transparency in energy development on Federal lands, and for other purposes, having considered the same, reports favorably thereon with an amendment and recommends that the bill as amended do pass. The amendment is as follows: Strike all after the enacting clause and insert the following: SECTION 1. SHORT TITLE; TABLE OF CONTENTS. (a) Short Title.--This Act may be cited as the ``Transparency, Accountability, Permitting, and Production of American Resources Act'' or the ``TAPP American Resources Act''. (b) Table of Contents.--The table of contents for this Act is as follows: Sec. 1. Short title; table of contents. TITLE I--ONSHORE AND OFFSHORE LEASING AND OVERSIGHT Sec. 101. Onshore oil and gas leasing. Sec. 102. Lease reinstatement. Sec. 103. Protested lease sales. Sec. 104. Suspension of operations. Sec. 105. Administrative protest process reform. Sec. 106. Leasing and permitting transparency. Sec. 107. Offshore oil and gas leasing. Sec. 108. Five-year plan for offshore oil and gas leasing. Sec. 109. Geothermal leasing. Sec. 110. Leasing for certain qualified coal applications. Sec. 111. Future coal leasing. Sec. 112. Staff planning report. Sec. 113. Prohibition on Chinese communist party ownership interest. Sec. 114. Effect on other law. TITLE II--PERMITTING STREAMLINING Sec. 201. Definitions. Sec. 202. BUILDER Act. Sec. 203. Codification of National Environmental Policy Act regulations. Sec. 204. Non-major Federal actions. Sec. 205. No net loss determination for existing rights-of-way. Sec. 206. Determination of National Environmental Policy Act adequacy. Sec. 207. Determination regarding rights-of-way. Sec. 208. Terms of rights-of-way. Sec. 209. Funding to process permits and develop information technology. Sec. 210. Offshore geological and geophysical survey licensing. Sec. 211. Deferral of applications for permits to drill. Sec. 212. Processing and terms of applications for permits to drill. Sec. 213. Amendments to the Energy Policy Act of 2005. Sec. 214. Access to Federal energy resources from non-Federal surface estate. Sec. 215. Scope of environmental reviews for oil and gas leases. Sec. 216. Expediting approval of gathering lines. Sec. 217. Lease sale litigation. Sec. 218. Limitation on claims. Sec. 219. Government Accountability Office report on permits to drill. Sec. 220. E-NEPA. TITLE III--PERMITTING FOR MINING NEEDS Sec. 301. Definitions. Sec. 302. Minerals supply chain and reliability. Sec. 303. Federal register process improvement. Sec. 304. Designation of mining as a covered sector for Federal permitting improvement purposes. Sec. 305. Treatment of actions under presidential determination 2022-11 for Federal permitting improvement purposes. Sec. 306. Notice for mineral exploration activities with limited surface disturbance. Sec. 307. Use of mining claims for ancillary activities. Sec. 308. Ensuring consideration of uranium as a critical mineral. Sec. 309. Barring foreign bad actors from operating on Federal lands. TITLE IV--FEDERAL LAND USE PLANNING Sec. 401. Federal land use planning and withdrawals. Sec. 402. Prohibitions on delay of mineral development of certain Federal land. Sec. 403. Definitions. TITLE V--ENSURING COMPETITIVENESS ON FEDERAL LANDS Sec. 501. Incentivizing domestic production. TITLE VI--ENERGY REVENUE SHARING Sec. 601. Gulf of Mexico Outer Continental Shelf revenue. Sec. 602. Parity in offshore wind revenue sharing. Sec. 603. Elimination of administrative fee under the Mineral Leasing Act. TITLE I--ONSHORE AND OFFSHORE LEASING AND OVERSIGHT SEC. 101. ONSHORE OIL AND GAS LEASING. (a) Requirement To Immediately Resume Onshore Oil and Gas Lease Sales.-- (1) In general.--The Secretary of the Interior shall immediately resume quarterly onshore oil and gas lease sales in compliance with the Mineral Leasing Act (30 U.S.C. 181 et seq.). (2) Requirement.--The Secretary of the Interior shall ensure-- (A) that any oil and gas lease sale pursuant to paragraph (1) is conducted immediately on completion of all applicable scoping, public comment, and environmental analysis requirements under the Mineral Leasing Act (30 U.S.C. 181 et seq.) and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and (B) that the processes described in subparagraph (A) are conducted in a timely manner to ensure compliance with subsection (b)(1). (3) Lease of oil and gas lands.--Section 17(b)(1)(A) of the Mineral Leasing Act (30 U.S.C. 226(b)(1)(A)) is amended by inserting ``Eligible lands comprise all lands subject to leasing under this Act and not excluded from leasing by a statutory or regulatory prohibition. Available lands are those lands that have been designated as open for leasing under a land use plan developed under section 202 of the Federal Land Policy and Management Act of 1976 and that have been nominated for leasing through the submission of an expression of interest, are subject to drainage in the absence of leasing, or are otherwise designated as available pursuant to regulations adopted by the Secretary.'' after ``sales are necessary.''. (b) Quarterly Lease Sales.-- (1) In general.--In accordance with the Mineral Leasing Act (30 U.S.C. 181 et seq.), each fiscal year, the Secretary of the Interior shall conduct a minimum of four oil and gas lease sales in each of the following States: (A) Wyoming. (B) New Mexico. (C) Colorado. (D) Utah. (E) Montana. (F) North Dakota. (G) Oklahoma. (H) Nevada. (I) Alaska. (J) Any other State in which there is land available for oil and gas leasing under the Mineral Leasing Act (30 U.S.C. 181 et seq.) or any other mineral leasing law. (2) Requirement.--In conducting a lease sale under paragraph (1) in a State described in that paragraph, the Secretary of the Interior shall offer all parcels nominated and eligible pursuant to the requirements of the Mineral Leasing Act (30 U.S.C. 181 et seq.) for oil and gas exploration, development, and production under the resource management plan in effect for the State. (3) Replacement sales.--The Secretary of the Interior shall conduct a replacement sale during the same fiscal year if-- (A) a lease sale under paragraph (1) is canceled, delayed, or deferred, including for a lack of eligible parcels; or (B) during a lease sale under paragraph (1) the percentage of acreage that does not receive a bid is equal to or greater than 25 percent of the acreage offered. (4) Notice regarding missed sales.--Not later than 30 days after a sale required under this subsection is canceled, delayed, deferred, or otherwise missed the Secretary of the Interior shall submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that states what sale was missed and why it was missed. SEC. 102. LEASE REINSTATEMENT. The reinstatement of a lease entered into under the Mineral Leasing Act (30 U.S.C. 181 et seq.) or the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) by the Secretary shall be not considered a major Federal action under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). SEC. 103. PROTESTED LEASE SALES. Section 17(b)(1)(A) of the Mineral Leasing Act (30 U.S.C. 226(b)(1)(A)) is amended by inserting ``The Secretary shall resolve any protest to a lease sale not later than 60 days after such payment.'' after ``annual rental for the first lease year.''. SEC. 104. SUSPENSION OF OPERATIONS. Section 17 of the Mineral Leasing Act (30 U.S.C. 226) is amended by adding at the end the following: ``(r) Suspension of Operations Permits.--In the event that an oil and gas lease owner has submitted an expression of interest for adjacent acreage that is part of the nature of the geological play and has yet to be offered in a lease sale by the Secretary, they may request a suspension of operations from the Secretary of the Interior and upon request, the Secretary shall grant the suspension of operations within 15 days. Any payment of acreage rental or of minimum royalty prescribed by such lease likewise shall be suspended during such period of suspension of operations and production; and the term of such lease shall be extended by adding any such suspension period thereto.''. SEC. 105. ADMINISTRATIVE PROTEST PROCESS REFORM. Section 17 of the Mineral Leasing Act (30 U.S.C. 226) is further amended by adding at the end the following: ``(s) Protest Filing Fee.-- ``(1) In general.--Before processing any protest filed under this section, the Secretary shall collect a filing fee in the amount described in paragraph (2) from the protestor to recover the cost for processing documents filed for each administrative protest. ``(2) Amount.--The amount described in this paragraph is calculated as follows: ``(A) For each protest filed in a submission not exceeding 10 pages in length, the base filing fee shall be $150. ``(B) For each submission exceeding 10 pages in length, in addition to the base filing fee, an assessment of $5 per page in excess of 10 pages shall apply. ``(C) For protests that include more than one oil and gas lease parcel, right-of-way, or application for permit to drill in a submission, an additional assessment of $10 per additional lease parcel, right- of-way, or application for permit to drill shall apply. ``(3) Adjustment.-- ``(A) In general.--Beginning on January 1, 2024, and annually thereafter, the Secretary shall adjust the filing fees established in this subsection to whole dollar amounts to reflect changes in the Producer Price Index, as published by the Bureau of Labor Statistics, for the previous 12 months. ``(B) Publication of adjusted filing fees.--At least 30 days before the filing fees as adjusted under this paragraph take effect, the Secretary shall publish notification of the adjustment of such fees in the Federal Register.''. SEC. 106. LEASING AND PERMITTING TRANSPARENCY. (a) Report.--Not later than 30 days after the date of the enactment of this section, and annually thereafter, the Secretary of the Interior shall submit to the Committee on Natural Resources of the House of Representatives and the Committee on Energy and Natural Resources of the Senate a report that describes-- (1) the status of nominated parcels for future onshore oil and gas and geothermal lease sales, including-- (A) the number of expressions of interest received each month during the period of 365 days that ends on the date on which the report is submitted with respect to which the Bureau of Land Management-- (i) has not taken any action to review; (ii) has not completed review; or (iii) has completed review and determined that the relevant area meets all applicable requirements for leasing, but has not offered the relevant area in a lease sale; (B) how long expressions of interest described in subparagraph (A) have been pending; and (C) a plan, including timelines, for how the Secretary of the Interior plans to-- (i) work through future expressions of interest to prevent delays; (ii) put expressions of interest described in subparagraph (A) into a lease sale; and (iii) complete review for expressions of interest described in clauses (i) and (ii) of subparagraph (A); (2) the status of each pending application for permit to drill received during the period of 365 days that ends on the date on which the report is submitted, including the number of applications received each month, by each Bureau of Land Management office, including-- (A) a description of the cause of delay for pending applications, including as a result of staffing shortages, technical limitations, incomplete applications, and incomplete review pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or other applicable laws; (B) the number of days an application has been pending in violation of section 17(p)(2) of the Mineral Leasing Act (30 U.S.C. 226(p)(2)); and (C) a plan for how the office intends to come into compliance with the requirements of section 17(p)(2) of the Mineral Leasing Act (30 U.S.C. 226(p)(2)); (3) the number of permits to drill issued each month by each Bureau of Land Management office during the 5-year period ending on the date on which the report is submitted; (4) the status of each pending application for a license for offshore geological and geophysical surveys received during the period of 365 days that ends on the date on which the report is submitted, including the number of applications received each month, by each Bureau of Ocean Energy management regional office, including-- (A) a description of any cause of delay for pending applications, including as a result of staffing shortages, technical limitations, incomplete applications, and incomplete review pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or other applicable laws; (B) the number of days an application has been pending; and (C) a plan for how the Bureau of Ocean Energy Management intends to complete review of each application; (5) the number of licenses for offshore geological and geophysical surveys issued each month by each Bureau of Ocean Energy Management regional office during the 5-year period ending on the date on which the report is submitted; (6) the status of each pending application for a permit to drill received during the period of 365 days that ends on the date on which the report is submitted, including the number of applications received each month, by each Bureau of Safety and Environmental Enforcement regional office, including-- (A) a description of any cause of delay for pending applications, including as a result of staffing shortages, technical limitations, incomplete applications, and incomplete review pursuant to the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) or other applicable laws; (B) the number of days an application has been pending; and (C) steps the Bureau of Safety and Environmental Enforcement is taking to complete review of each application; (7) the number of permits to drill issued each month by each Bureau of Safety and Environmental Enforcement regional office during the period of 365 days that ends on the date on which the report is submitted; (8) how, as applicable, the Bureau of Land Management, the Bureau of Ocean Energy Management, and the Bureau of Safety and Environmental Enforcement determines whether to-- (A) issue a license for geological and geophysical surveys; (B) issue a permit to drill; and (C) issue, extend, or suspend an oil and gas lease; (9) when determinations described in paragraph (8) are sent to the national office of the Bureau of Land Management, the Bureau of Ocean Energy Management, or the Bureau of Safety and Environmental Enforcement for final approval; (10) the degree to which Bureau of Land Management, Bureau of Ocean Energy Management, and Bureau of Safety and Environmental Enforcement field, State, and regional offices exercise discretion on such final approval; (11) during the period of 365 days that ends on the date on which the report is submitted, the number of auctioned leases receiving accepted bids that have not been issued to winning bidders and the number of days such leases have not been issued; and (12) a description of the uses of application for permit to drill fees paid by permit holders during the 5-year period ending on the date on which the report is submitted. (b) Pending Applications for Permits To Drill.--Not later than 30 days after the date of the enactment of this section, the Secretary of the Interior shall-- (1) complete all requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and other applicable law that must be met before issuance of a permit to drill described in paragraph (2); and (2) issue a permit for all completed applications to drill that are pending on the date of the enactment of this Act. (c) Public Availability of Data.-- (1) Mineral leasing act.--Section 17 of the Mineral Leasing Act (30 U.S.C. 226) is further amended by adding at the end the following: ``(t) Public Availability of Data.-- ``(1) Expressions of interest.--Not later than 30 days after the date of the enactment of this subsection, and each month thereafter, the Secretary shall publish on the website of the Department of the Interior the number of pending, approved, and not approved expressions of interest in nominated parcels for future onshore oil and gas lease sa

Background and Need for Legislation

Conventional energy resources will be a necessary component of the worldwide energy mix for many decades to come. The Energy Information Administration predicts a 50 percent increase in global energy consumption by 2050, with petroleum and other liquid fuels remaining the largest energy source, and natural gas consumption increases expected as well.\1\ Maximizing all-of-the-above energy production in America will limit the need to import energy resources from other nations, reduce global emissions and high energy costs, create jobs domestically, and help our allies abroad. --------------------------------------------------------------------------- \1\U.S. Energy Information Administration, EIA projects nearly 50% increase in world energy use by 2050, led by growth in renewables, Courtney Sourmehi, October 7, 2021, https://www.eia.gov/todayinenergy/ detail.php?id=49876 --------------------------------------------------------------------------- Since their first days in power, the Biden administration has taken action to severely limit oil, natural gas, and coal development on federal lands, driving up energy prices for American families and small businesses. For example, the Mineral Leasing Act explicitly states that ``lease sales shall be held for each State where eligible lands are available at least quarterly and more frequently if the Secretary of the Interior determines such sales are necessary.''\2\ Unfortunately, for a year and a half, the Biden administration did not hold a lease sale until June of 2022. To make matters worse, this sale was largely watered down as it only offered 20 percent of the parcels that were originally included, and it implemented a 50 percent royalty hike.\3\ --------------------------------------------------------------------------- \2\30 U.S. Code Sec. 226. \3\Energy in Depth, FIRST BIDEN ADMINISTRATION ONSHORE LEASE SALES BRING IN NEARLY $22 MILLION, 7/1/22, https://www.energyindepth.org/ first-biden-administration-onshore-lease-sales-bring-in-nearly-22- million/ --------------------------------------------------------------------------- Similarly, the Biden administration has held only one offshore oil and natural gas lease sale in the Gulf of Mexico to date, Lease Sale 257.\4\ A district court vacated the lease sale in January 2022 in an unprecedented decision\5\ and the Biden administration chose not to appeal this case, declining to defend their own work.\6\ As a result, no new leases were issued for this sale until the so called Inflation Reduction Act (IRA) required issuance of the leases from Lease Sale 257. The Biden administration canceled the three remaining sales under the current 5-year plan for offshore leasing\7\ and has only resumed planning for these sales at the direction of the IRA. --------------------------------------------------------------------------- \4\Department of the Interior, Bureau of Ocean Energy Management, Final Notice of Sale, Gulf of Mexico Outer Continental Shelf Oil and Gas Lease Sale 257, https://www.boem.gov/sites/default/files/documents/ oil-gas-energy/leasing/Final-NOS 257.pdf \5\Friends of the Earth, et al. vs. Debra Haaland, et al., U.S. District Court for the District of Columbia, Memorandum Opinion, filed January 27, 2022, https://subscriber.politicopro.com/eenews/f/eenews/ ?id=0000017e-a065-db8b-ab7f-f2ff5ec00000. \6\Rachel Frazin, ``Biden administration won't appeal invalidation of offshore oil leases,'' The Hill, March 1, 2022, https://thehill.com/ policy/energy-environment/596334-biden-administration-declines-to- appeal-invalidation-of-offshore \7\Department of the Interior. Bureau of Ocean Energy Management. 2017-2022 Lease Sale Schedule. https://www.boem.gov/2017 2022-lease- sale-schedule --------------------------------------------------------------------------- These actions, or lack thereof, have reduced certainty for domestic producers, resulting in less development at a time when energy prices are historically high. H.R. 1335 would restore certainty by requiring regular lease sales both onshore and offshore and would bring efficiency to the federal permitting process for oil and gas. This legislation would also cancel the existing moratoria on new federal coal leasing and would direct the timely issuance of qualified coal lease applications pending at the Department of the Interior (DOI). These provisions will allow for increased production, which will result in more jobs, lower energy bills, and less global emissions as U.S. production displaces production from countries with more lax environmental standards. Like oil and gas, renewable energy producers are also struggling to develop projects domestically given bureaucratic red tape. Last Congress, the Subcommittee on Energy and Mineral Resources held a hearing titled ``Plugging in Public Lands: Transmission Infrastructure for Renewable Energy,''\8\ which largely focused on the roadblocks to transmission infrastructure and renewable energy on federal lands. As anticipated, most of the issues that were highlighted during the hearing revolved around the National Environmental Policy Act (NEPA). In fact, NEPA has arguably become a bigger issue for renewable energy development as compared to conventional energy sources. According to a recent study by the R Street Institute, of all the Department of Energy's active NEPA projects, 42 percent were related to either clean energy, transmission or environmental conservation, while only 15 percent were related to fossil fuel.\9\ R Street published a similar study for the BLM and found that 24 percent of their active NEPA documents were for renewable energy projects, and only 13 percent were for fossil fuels.\10\ --------------------------------------------------------------------------- \8\https://naturalresources.house.gov/calendar/ eventsingle.aspx?EventID=410480 \9\Addressing NEPA-Related Infrastructure Delays, Phil Rossetti, July 7, 2021, https://www.rstreet.org/2021/07/07/addressing-nepa- related-infrastructure-delays/ \10\Id. --------------------------------------------------------------------------- The Trump administration took a positive step forward by releasing comprehensive NEPA reforms for the first time in more than 40 years.\11\ These reforms served as a means of expediting all projects on federal lands, including renewable energy development and transmission. Unfortunately, last April, the Council on Environmental Quality finalized its first phase of NEPA rulemaking by undoing major changes put in place by the Trump administration.\12\ --------------------------------------------------------------------------- \11\Council on Environmental Quality, Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act, 7/16/2020, https://www.federalregister.gov/documents/2020/ 07/16/2020-15179/update-to-the-regulations-implementing-the-procedural- provisions-of-the-national-environmental \12\National Environmental Policy Act Implementing Regulations Revisions, April 20, 2022, https://www.federalregister.gov/documents/ 2022/04/20/2022-08288/national-environmental-policy-act-implementing- regulations-revisions --------------------------------------------------------------------------- This bill would streamline the process for renewable energy development on federal lands along with the related transmission infrastructure required for these projects. The bill would also codify the Trump administration's NEPA regulations while modernizing the underlying NEPA statute to expedite all-of-the-above energy projects as well as broader infrastructure development. H.R. 1335 addresses the uncertainty associated with the environmental review process by putting reasonable time and page limits on reviews, while also clarifying the scope of these reviews. Further, this legislation places reasonable sidebars on judicial review under NEPA, allowing claims to be considered if they are filed within 120 days of a final agency action and the claimant has meaningfully participated in the environmental review process. These reforms will allow the U.S. to effectively compete with China, Russia and other countries who do not have the same interests as the U.S. Another vital sector to the energy and national security of the United States is the production of hardrock minerals, including critical minerals. H.R. 1335 sets up a process to maximize efficiency and minimize delays for mining projects on federal land. This begins with designating a lead federal agency to coordinate the mine permitting process. Upon request of a project sponsor, the lead agency may enter into a memorandum of agreement with the project sponsor or state or tribal government to carry out permitting activities. This will provide more clarity and efficiency throughout the process. H.R. 1335 also extends several existing permitting streamlining mechanisms to mining projects. For instance, publication of relevant federal actions in the Federal Register for all mineral projects will be delegated to the agency of jurisdiction to reduce delays. Minor surface disturbance on five acres or less may now receive expedited review under this bill. Additionally, this bill adds hardrock mining as a covered sector under the Fixing America's Surface Transportation (FAST) Act, and specifically includes any project that receives federal funds under the Defense Production Act for domestic mining or processing as covered projects unless the project sponsor opts out. This legislation also ensures that ancillary mining activities, including exploration operations and construction of a mine access roads, are permitted with or without the discovery of a valuable mineral deposit. It is essential for an operator to have certainty that they will be able to explore and utilize the full area they have sited for a prospective mine, without having to go through separate review for mining support operations. Additionally, H.R. 1335 addresses the politicization of DOI's critical minerals list, amending the existing critical mineral criteria to prevent the unilateral exclusion of uranium from future consideration. Mining companies operating in the United States have a history of operating in accordance with the world's leading environmental, safety, and labor standards. Section 309 of H.R. 1335, adopted as an amendment designated Luna #1, affirms the existing public process, which includes assessment of compliance with properly adopted legal requirements of other countries. The intent of the amendment is not to create new authority within the U.S. Department of the Interior or other agencies or to extend or create barriers for new or existing domestic production of minerals. The amendment is not intended to create additional penalties for companies that are subject to remedies for their overseas activities in the local courts, or alternatively in US courts or agencies, or in courts of other jurisdictions; rather it is intended to allow for the exclusion of companies that have a well-documented history of flaunting globally accepted mining standards or engaging in human rights and environmental abuses, such as those seen in Chinese-controlled mines in Africa. Additionally, H.R. 1335 addresses administrative mineral withdrawals by prohibiting mineral withdrawals on federal lands without a recent mineral assessment (within the previous 10- year period) and an assessment of the impacts of the withdrawal on the U.S. mineral supply chain (including negative impacts on economic and national security). This Title also requires DOI, upon discovery of a new mineral deposit in a previously withdrawn area, to recommend ways to reduce impacts the withdrawal may have on mineral exploration, development, and other mining activities. Finally, this Title requires a recent mineral assessment be part of a resource management plan, including the consideration of the economic, strategic, and national security value of mineral deposits in proposed resource management plan area. This legislation also rolls back the onerous fees and royalties imposed on onshore and offshore operators by the so- called, ``Inflation Reduction Act'' or ``IRA.'' Specifically, for offshore oil and gas development, the IRA amends OCSLA to raise the minimum royalty rate for offshore oil and gas leasing on the OCS from 12.5 percent to 16.66 percent and capping royalty rates at 18.75 percent for the first 10 years of a lease and 16.66 percent thereafter. Title IV of the TAPP American Resources Act would reverse these onerous fees and royalty increases to ensure competitiveness of federal lands and waters in terms of investment in new energy development. Operators face significantly less regulatory hurdles on states and private lands than on federal lands and waters. Imposing new fees and higher royalties in a time of inflation and rising energy prices both disincentivizes development and leads to higher energy prices for American consumers. Finally, H.R. 1335 allows for parity in revenue sharing for coastal states with offshore energy development. Specifically, this bill will increase the state share of offshore oil and gas revenues for Alabama, Mississippi, Louisiana and Texas from 37.5 percent to 50 percent. Additionally, H.R. 1335 includes provisions to establish revenue sharing for states with new offshore wind development off their coastline. Under this bill, states with offshore wind development will receive 50 percent of the revenues from offshore lease sales and 37.5 percent of the revenues will be deposited into the existing North American Wetlands Conservation Fund. This bill will also repeal a 2 percent administrative fee imposed on energy revenue sharing for onshore states with energy development on federal lands within their borders.

Committee Action

H.R. 1335 was introduced on March 3, 2023, by Chairman Bruce Westerman (R-AR). The bill was referred to the Committee on Natural Resources, and in addition to the Committees on Agriculture and Budget. On March 9, 2023, the Natural Resources Committee met to consider the bill. Chairman Westerman (R-AR) offered an amendment in the nature of a substitute designated Westerman_01. Rep. Katie Porter (D-CA) offered an amendment to the amendment in the nature of a substitute designated Porter #14. The amendment was not adopted by a roll call vote of 16 yeas and 21 nays, as follows: Rep. Susie Lee (D-NV) offered an amendment to the amendment in the nature of a substitute designated Lee #4. The amendment was not adopted by a roll call vote of 16 yeas and 22 nays, as follows: Ranking Member Raul Grijalva (D-AZ) offered an amendment to the amendment in the nature of a substitute designated Grijalva_025. The amendment was not adopted by a roll call vote of 15 yeas and 24 nays, as follows: Ranking Member Raul Grijalva (D-AZ) offered an amendment to the amendment in the nature of a substitute designated Grijalva #8. The amendment was not adopted by a roll call vote of 16 yeas and 23 nays, as follows: Rep. Mike Levin (D-CA) offered an amendment to the amendment in the nature of a substitute designated Levin #3. The amendment was not adopted by a roll call vote of 17 yeas and 23 nays, as follows: Rep. Jared Huffman (D-CA) offered an amendment to the amendment in the nature of a substitute designated Huffman #10. The amendment was not adopted by a roll call vote of 17 yeas and 23 nays, as follows: Rep. Paul Gosar (R-AZ) offered an amendment to the amendment in the nature of a substitute designated Gosar #1. The amendment was adopted by voice vote. Rep. Val Hoyle (D-OR) offered an amendment to the amendment in the nature of a substitute designated Hoyle_005 (revised). The amendment was agreed to by voice vote. Rep. Jared Huffman (D-CA) offered an amendment to the amendment in the nature of a substitute designated Huffman #51. The amendment was not adopted by a roll call vote of 17 yeas and 23 nays, as follows: Rep. Sydney Kamlager-Dove (D-CA) offered an amendment to the amendment in the nature of a substitute designated Kamlager-Dove #6. The amendment was not adopted by a roll call vote of 17 yeas and 23 nays, as follows: Rep. Melanie Stansbury (D-NM) offered an amendment to the amendment in the nature of a substitute designated Stansbury #7. The amendment was not adopted by a roll call vote of 17 yeas and 25 nays, as follows: Rep. Mike Levin (D-CA) offered an amendment to the amendment in the nature of a substitute designated Levin #12. The amendment was not adopted by a roll call vote of 18 yeas and 24 nays, as follows: Rep. Anna Paulina Luna (R-FL) offered an amendment to the amendment in the nature of a substitute designated Luna #1. The amendment was adopted by voice vote. Ranking Member Raul Grijalva (D-AZ) offered an amendment to the amendment in the nature of a substitute designated Grijalva #1. The amendment was not adopted by a roll call vote of 18 yeas and 24 nays, as follows: Ranking Member Raul Grijalva (D-AZ) offered an amendment to the amendment in the nature of a substitute designated Grijalva_026. The amendment was not adopted by a roll call vote of 18 yeas and 24 nays, as follows: Rep. Jen Kiggans (R-VA) offered an amendment to the amendment in the nature of a substitute designated Kiggans #1. The amendment was adopted by voice vote. Rep. Debbie Dingell (D-MI) offered an amendment to the amendment in the nature of a substitute designated Dingell_011. The amendment was not adopted by a roll call vote of 18 yeas and 24 nays, as follows: Rep. Nydia Velazquez (D-NY) offered an amendment to the amendment in the nature of a substitute designated Velazquez #16. The amendment was not adopted by a roll call vote of 18 yeas and 24 nays, as follows: Rep. Mary Peltola (D-AK) offered an amendment to the amendment in the nature of a substitute designated Peltola #9. The amendment was not adopted by a roll call vote of 19 yeas and 24 nays, as follows: Rep. Katie Porter (D-CA) offered an amendment to the amendment in the nature of a substitute designated Porter #15. The amendment was not adopted by a roll call vote of 17 yeas and 26 nays, as follows: Rep. Garret Graves (R-LA) offered an amendment to the amendment in the nature of a substitute designated Graves #1 (revised). The amendment was adopted by voice vote. The amendment in the nature of a substitute, offered by Chairman Westerman (R-AR), as amended, was adopted by voice vote. The bill, as amended, was ordered favorably reported to the House of Representatives by a roll call vote of 24 yeas and 19 nays, as follows:\13\ --------------------------------------------------------------------------- \13\Rep. Teresa Leger Fernandez (D-NM) was unable to attend the markup due to a medical procedure. Rep. Leger Fernandez requested, after the closing of this vote, that the record reflect that had she been present she would have voted ``no'' on final passage of the bill.

Hearings

For the purposes of clause 3(c)(6) of House rule XIII, the following hearings were used to develop or consider this measure: hearing by the Subcommittee on Energy and Mineral Resources held on February 28, 2023; and hearing by the full Committee on Natural Resources held on February 28, 2023.

Section-by-Section Analysis

Section 1. Short title; Table of contents Establishes the short title of the bill as the ``Transparency, Accountability, Permitting, and Production of American Resources Act'' or the ``TAPP American Resources Act'' and provides the table of contents for the Act. TITLE I--ONSHORE AND OFFSHORE LEASING AND OVERSIGHT Section 101. Onshore oil and gas leasing Requires the Department of the Interior (DOI) to immediately resume quarterly lease sales on federal lands. It also requires a minimum of four lease sales per year in each state with eligible lands and directs the Secretary of the Interior to conduct replacement sales when necessary. Section 102. Lease reinstatement Clarifies that geothermal and oil and gas lease reinstatement is not a major federal action under the National Environmental Policy Act (NEPA). Section 103. Protested lease sales Requires the Secretary of the Interior to resolve any protest to a lease sale within 60 days. Section 104. Suspension of operations Requires the Secretary of the Interior to grant operators' request for a suspension of operations (SOP) if the operator is awaiting adjacent leases to be offered by DOI. Section 105. Administrative protest process reform Requires those who submit a protest to a lease sale to pay a processing fee depending on the number of pages included in the protest. Section 106. Leasing and permitting transparency Requires DOI to publish information online and report to Congress regarding the processing of onshore and offshore drilling and exploration permits, nominated parcels for lease, leases won, and usage of Applications for Permits to Drill (APD) fees. Section 107. Offshore oil and gas leasing Requires the Secretary of the Interior to conduct all leas sales described in the 2017-2022 Outer Continental Shelf Oil and Gas Leasing Proposed Final Program that have not been conducted as of the date of enactment, but no later than September 30, 2023. It also requires a minimum of two oil and gas lease sales to be held annually in available federal waters in the Central and Western Gulf of Mexico Planning Area, and in the Alaska Region of the Outer Continental Shelf. This section does not apply to the Eastern Gulf of Mexico Planning Area or impact existing moratoria. Section 108. Five-year plan for offshore oil and gas leasing Requires the Secretary of the Interior to issue the 5-year oil and gas leasing program for 2023-2028 and requires the Secretary to begin preparation of the subsequent oil and gas leasing program not later than 36 months after conducting the first lease sale in an existing 5-year program. Section 109. Geothermal leasing Amends the Geothermal Steam Act (30 U.S.C. 1003(b)) to require yearly lease sales for geothermal energy and mandates the Secretary to hold replacement lease sales for any sales that are missed in a given calendar year. It also sets a 30-day time limit on the issuance of completed Geothermal Drilling Permits. Section 110. Leasing for certain qualified coal applications Directs the Secretary of the Interior to publish an environmental assessment (if not previously published) for each qualified coal lease application, finalize the fair market value of the coal tract for which a lease by application is pending, take all intermediate actions necessary to grant the qualified application, and then grant such application. This section also requires DOI to grant any additional approvals for previously awarded coal leases required for mining to commence. Section 111. Future coal leasing Ends the existing moratorium on new coal leasing. Section 112. Staff planning report Requires DOI and the Department of Agriculture to provide a yearly report detailing staffing capacity and planning to ensure timely processing of permits and planning for lease sales. Section 113. Prohibition on Chinese Communist Party ownership interest Provides that the Communist Part of China, or a person acting on behalf of the Communist Party of China, may not acquire any interest with respect to lands leased for oil or gas under the Mineral Leasing Act (30 U.S.C. 181 et seq.) or the Outer Continental Shelf Lands Act (43 U.S.C. 1331). Section 114. Effect on other law Makes clear that nothing in this Act, or any amendments made by this Act, shall affect the Presidential memorandum titled ``Memorandum on Withdrawal of Certain Areas of the United States Outer Continental Shelf From Leasing Disposition'' and dated September 8, 2020; the Presidential memorandum titled ``Memorandum on Withdrawal of Certain Areas of the United States Outer Continental Shelf From Leasing Disposition'' and dated September 25, 2020; and the Presidential memorandum titled ``Memorandum on Withdrawal of Certain Areas off the Atlantic Coast on the Outer Continental Shelf From Leasing Disposition'' and dated December 20, 2016. This section also makes clear that nothing in this Act, or any amendments made by this Act, shall affect the ban on oil and gas development in the Great Lakes described in Section 386 of the Energy Policy Act of 2005 (42 U.S.C. 15941). TITLE II--PERMITTING STREAMLINING Section 201. Definitions Provides definitions for the following terms: energy facility, energy storage device, public lands, right-of-way, Secretary concerned, and land use plan. Section 202. BUILDER act Codifies key elements of the One Federal Decision Framework, including development by the lead agency of a joint schedule, procedures to elevate delays or disputes, preparation of a single environmental impact statement (EIS) and joint Record of Decision (ROD) to the extent practicable, reasonable time limits for environmental reviews, reasonable page limits for environmental documents and paper reduction measures. It includes threshold considerations for agencies assessing whether the National Environmental Policy Act (NEPA) applies to a proposed activity or is otherwise fulfilled through another statute. It also requires claimants to have participated meaningfully in the NEPA process before filing suit and provides a reasonable timeline of 120 days to file those lawsuits. Section 203. Codification of National Environmental Policy Act regulations Codifies the revisions to the Code of Federal Regulations made pursuant to the final rule of the Council on Environmental Quality titled ``Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act'' and published on July 16, 2020 (85 Fed. Reg. 43304). Section 204. Non-major Federal actions Provides that an action by the Secretary concerned with respect to certain covered activity shall not be considered a major Federal action under NEPA. These actions include low- impact activities or activities taking place in areas that have previously been studied in a previous NEPA document. Section 205. No net loss determination for existing rights-of-way Allows the Secretary concerned to make a ``no net loss determination'' for any action or activity within an existing energy right-of-way if the activity will have no long-term net loss on the impacted area. Upon this determination, the activity shall not be considered a major Federal action under NEPA. Section 206. Determination of National Environmental Policy Act adequacy Directs the Secretary concerned to use previously completed environmental assessments and environmental impact statements to satisfy NEPA requirements if the Secretary concerned determines that the new proposed action and impacts are substantially similar. Section 207. Determination regarding rights-of-way Requires the Secretary concerned to notify applicants as to whether their right-of-way applications are complete within 60 days of receipt. Section 208. Terms of rights-of-way Amends the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1761) and the Mineral Leasing Act (30 U.S.C. 185(n)) to allow rights-of-way to be granted, issued, or renewed for up to 50 years or in perpetuity if the Secretary determines it is appropriate. Section 209. Funding to process permits and develop information technology Allows the Secretary of Agriculture and the Secretary of the Interior to accept and expend funds contributed by non- federal entities to pay for dedicated staff and technology upgrades to expedite permits, biological opinions, concurrence letters, and consultations for energy projects for three years. Section 210. Offshore geological and geophysical survey licensing Directs the Secretary of the Interior to authorize geological and geophysical surveys related to oil and gas activities on the Gulf of Mexico Outer Continental Shelf, except within areas subject to existing moratoria. Section 211. Deferral of applications for permits to drill Prevents the Bureau of Land Management (BLM) from deferring the approval of an application for a permit to drill due to agency formatting preferences. Section 212. Processing and terms of applications for permits to drill Requires the Secretary of the Interior to process applications for permits to drill under a valid existing lease regardless of unrelated civil action. Section 213. Amendments to the energy policy act of 2005 Designates low impact and previously studied oil and gas activities on federal lands as non-major federal actions under NEPA. Section 214. Access to Federal energy resources from non-Federal surface estate Clarifies that permitting for operations on state or private lands accessing oil and gas or geothermal resources in which the federal ownership interest is less than 50 percent will not be considered a federal action and shall not require a federal permit. Section 215. Scope of environmental reviews for oil and gas leases Provides that an environmental review for an oil and gas lease or permit prepared pursuant to NEPA shall apply only to areas that are within or immediately adjacent to the lease plot or plots and that are directly affected by the proposed action and shall not require consideration of downstream, indirect effects of oil and gas consumption. Section 216. Expediting approval of gathering lines Expedites the approval process for gathering lines on federal lands that capture or transport oil, natural gas and related constituents, or produced water by making them non- major federal actions under NEPA. Section 217. Lease sale litigation Clarifies that environmental reviews for lease sales should be limited to impacts directly related to that sale. Section 218. Limitation on claims Requires a claim arising under Federal law seeking judicial review of a permit, license, or approval issued by a Federal agency for a mineral project, energy facility, or energy storage device shall be barred unless the claim is filed within 120 days after publication of final agency actions and the claim is filed by a party that submitted a comment during the public comment period for such action being challenged. Section 219. Government Accountability Office report on permits to drill Requires the Government Accountability Office (GAO) to issue a report on the BLM's approval process for drilling permits and requires such report to include a recommendation on actions the BLM can take to expedite their process and permitting activities that could be transferred from BLM to states. Section 220. E-NEPA Directs the Council on Environmental Quality to conduct a study and submit a report to Congress within 1 year of enactment on the potential to create an online permitting portal for permits that require NEPA review. TITLE III--PERMITTING FOR MINING NEEDS Section 301. Definitions Provides definitions for the following terms: byproduct, mineral, Secretary, and State. Section 302. Minerals supply chain and reliability Designates a lead federal agency to coordinate the mine permitting process to maximize efficiency and minimize delays for mining projects on federal land. It authorizes a memorandum of agreement between the lead agency and the project sponsor or state or tribal government to carry out permitting activities, upon the request of a project sponsor. Section 303. Federal Register process improvement Applies previously enacted Federal Register process improvements to all mineral projects to reduce delays. Section 304. Designation of mining as a covered sector for Federal permitting improvement purposes Amends section 41001(6)(A) of the FAST Act (42 U.S.C. 4370m(6)(A)) to include ``mineral production'' as a covered sector. Section 305. Treatment of actions under Presidential Determination 2022-11 for Federal permitting improvement purposes Provides that any project that receives Federal funds under the Defense Production Act for domestic mining or processing is considered a covered project under the FAST Act unless the project sponsor opts out. Section 306. Notice for mineral exploration activities with limited surface disturbance Expedites review of minor surface disturbance activities on federal lands. Section 307. Use of mining claims for ancillary activities Ensures that ancillary mining activities, including exploration operations and construction of a mine access road, are permitted with or without the discovery of a valuable mineral deposit. Section 308. Ensuring consideration of uranium as a critical mineral Amends existing critical mineral criteria to prevent the unilateral exclusion of uranium from future consideration as a critical mineral. It requires the Secretary of the Interior to update the Final List of Critical Minerals with the revised criteria within 60 days of enactment. Section 309. Barring foreign bad actors from operating on Federal lands Bars a mining claimant from the right to use, occupy, and conduct operations on Federal land if the Secretary of the Interior finds the claimant has a foreign parent company that has a known record of human rights violations or knowingly operated an illegal mine in another country. TITLE IV--FEDERAL LAND USE PLANNING Section 401. Federal land use planning and withdrawals Prohibits mineral withdrawals on federal lands without a mineral assessment completed within the previous 10-year period and an assessment of the impacts of the withdrawal on the U.S. mineral supply chain, including the negative impacts on economic and national security interests. It provides that upon discovery of a new mineral deposit in a previously withdrawn area, the Secretary of the Interior shall recommend ways to reduce impacts the withdrawal may have on mineral exploration, development, and other mining activities. This section requires a recent mineral assessment be included as part of a resource management plan, including the consideration of the economic, strategic, and national security value of mineral deposits in the proposed resource management plan area. Section 402. Prohibitions on delay of mineral development of certain Federal land Prevents the Secretary of the Interior from halting or slowing leasing and permitting activities on Federal lands and waters in areas that are open to energy and mineral development. Section 403. Definitions Provides definitions for the following terms: Federal land, President, previously undiscovered mineral deposit, and Secretary. TITLE V--ENSURING COMPETITIVENESS ON FEDERAL LANDS Section 501. Incentivizing domestic production Rolls back onerous fees and royalties on onshore and offshore oil and gas development imposed by the Inflation Reduction Act. TITLE VI--ENERGY REVENUE SHARING Section 601. Gulf of Mexico Outer Continental Shelf revenue Creates parity among energy production states by increasing the state share of offshore oil and gas revenues from 37.5 percent to 50 percent. Section 602. Parity in offshore wind revenue sharing Provides for 50 percent of revenues from offshore wind leasing to be shared with coastal states. Section 603. Elimination of Administrative Fee under the Mineral Leasing Act Repeals the 2 percent administrative fee assessed on the state share of onshore revenue. COMMITTEE OVERSIGHT FINDINGS AND RECOMMENDATIONS Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII of the Rules of the House of Representatives, the Committee on Natural Resources' oversight findings and recommendations are reflected in the body of this report. COMPLIANCE WITH HOUSE RULE XIII AND CONGRESSIONAL BUDGET ACT 1. Cost of Legislation and the Congressional Budget Act. Pursuant to clause 3(c)(2) of House rule XIII and section 308(a) of the Congressional Budget Act of 1974, and pursuant to clause 3(c)(3) of House rule XIII and section 402 of the Congressional Budget Act of 1974, the Committee has requested but not received from the Director of the Congressional Budget Office a budgetary analysis and a cost estimate of this bill. 2. General Performance Goals and Objectives. As required by clause 3(c)(4) of rule XIII, the general performance goal or objective of this bill is to restart onshore and offshore oil, gas, and coal leasing, streamline permitting for energy infrastructure, and ensure transparency in energy development on Federal lands. EARMARK STATEMENT This bill does not contain any Congressional earmarks, limited tax benefits, or limited tariff benefits as defined under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of the House of Representatives. UNFUNDED MANDATES REFORM ACT STATEMENT An estimate of federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act was not made available to the Committee in time for the filing of this report. The Chair of the Committee shall cause such estimate to be printed in the Congressional Record upon its receipt by the Committee, if such estimate is not publicly available on the Congressional Budget Office website. EXISTING PROGRAMS This bill does not establish or reauthorize a program of the federal government known to be duplicative of another program. APPLICABILITY TO LEGISLATIVE BRANCH The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. PREEMPTION OF STATE, LOCAL OR TRIBAL LAW Any preemptive effect of this bill over state, local, or tribal law is intended to be consistent with the bill's purposes and text and the Supremacy Clause of Article VI of the U.S. Constitution. CHANGES IN EXISTING LAW With respect to the requirement of clause 3(e) of rule XIII of the Rules of the House of Representatives, changes in existing law made by the bill, as reported, this section was not made available to the Committee in time for the filing of this report. The Chair of the Committee shall have this printed upon its receipt by the Committee.

Dissenting Views

H.R. 1335 includes, with some changes: H.R. __ (Rep. Graves, R-LA) Discussion Draft of the BUILDER Act, H.R. __ (Rep. Westerman, R-AR) Discussion Draft of the TAP American Energy Act, H.R. 209 (Rep. Stauber, R-MN) Permitting for Mining Needs, H.R. 356 (Rep. Carl, R-AL) Unleashing American Energy Act, H.R. 1043 (Rep. Rosendale, R-MT) Restore Onshore Energy Production Act, H.R. 1067 (Rep. Boebert, R-CO) American Energy Act, H.R. 1430 (Rep. Valadao, R-CA) Determination of NEPA Adequacy Streamlining Act, H.R. 1449 (Rep. Fulcher, R-ID) Enhancing Geothermal Production on Federal Lands Act, and H.R. 1457 (Rep. Hageman, R-WY) COAL Act. H.R. 1335 is being included in a larger energy and ``permitting reform'' package, introduced as H.R. 1. House Republican leadership has called the package a pillar of the House Republican climate and energy plan developed by the Energy, Climate, and Conservation Task Force created by Speaker McCarthy to reportedly appeal to climate-conscious voters.\1\\2\\3\ Yet the House Republican plan sets no specific reduction targets for planet-warming emissions and instead would increase dirty emissions by expanding domestic fossil fuel production, increasing U.S. liquefied natural gas exports, and gutting core environmental laws through ``permitting reform'' for energy and mining projects.\4\\5\ --------------------------------------------------------------------------- \1\``House Republicans to Unveil Conservative Road Map on Climate, Energy.'' The Washington Post, June 1, 2022. https:// www.washingtonpost.com/climate-environment/2022/06/01/kevin-mccarthy- climate-change-energy/. \2\``Republicans Insist They Have a Climate Plan,'' EE News, January 24, 2023. https://www.eenews.net/articles/republicans-insist- they-have-a-climate-plan/. \3\``House Republicans to Introduce Climate Change Strategy with Eye on Midterms,'' Politico, June 1, 2022. https://www.politico.com/ news/2022/06/01/house-republicans-to-introduce-climate-change-strategy- with-eye-on-midterms-00036481. \4\``Let America Build: The Energy, Climate, and Conservation Task Force,'' House Speaker, July 19, 2022. https://www.speaker.gov/wp- content/uploads/2022/07/FINAL-Let-America-Build-7-19-2022-Copy.pdf. \5\``House Republicans to Introduce Climate Change Strategy with Eye on Midterms''. --------------------------------------------------------------------------- H.R. 1335 includes a multitude of provisions benefiting polluting industries at the expense of American communities. These policy proposals open our public lands and waters to ill- considered development without safeguards, eliminate longstanding community protections in federal law, and fast- track fossil fuel, mining, and other industrial projects by ignoring climate change, public input, and tribal consultation. Public input and environmental review protect Americans against industry exploitation. The public input and environmental review processes ensure a more responsible and accountable industry, prevent litigation down the road, and make sure federal decision-making prioritizes the public's interest--not polluting industries' profits. Title I of H.R. 1335 would require regular lease sales both on- and offshore and limit agency discretion for which parcels would be available for leasing. It would require the Secretary of the Interior to offer at least four onshore oil and gas lease sales per year of all eligible and nominated lands. If any lease sale were canceled, delayed, or received bids on less than 25 percent of lands offered, the Secretary would be required to hold a replacement sale that same fiscal year. Offshore, this Title would require the federal government to conduct all remaining lease sales from the Trump-era 2017-2022 Outer Continental Shelf (OCS) leasing plan and hold at least two region-wide oil and gas lease sales in the Gulf of Mexico and Alaska per year. By forcing the Department of the Interior (DOI) to hold unnecessary lease sales, this bill wastes taxpayer resources and gives away our public lands at cut-rate prices. Title II consists of Rep. Graves's discussion draft of the BUIILDER Act and other provisions from Chairman Westerman's TAP American Energy Act. Among other problems, Title II would greatly restrict judicial review to enforce federal environmental and public health laws against unlawful projects and operation plans that can significantly harm communities and the environment. For instance, section 202 would bar judicial review of any permit, license, or approval issued under any federal laws unless legal claims are filed within 120 days of a federal permit being issued--effectively weakening an essential compliance and enforcement mechanism included in most federal environmental and public health laws. Most major federal environmental laws include citizen suit provisions allowing members of the public to file legal claims seeking judicial review for unlawful permits, including to enforce the Clean Air Act, Clean Water Act, and Endangered Species Act, among many others. Congress included these citizen suit provisions because federal agencies historically lack the resources and ability to identify all the legal violations that harm communities and the environment. Section 202 of H.R. 1335 would dramatically limit the public's access to the judicial system to remedy illegal project development compared to current law. For example, the statute of limitations for NEPA enforcement claims is generally six years. Often, the harmful effects of unlawfully-issued permits--such as for a multi-year mining operations plan--are unknown by affected communities within 120 days. Section 202 would also effectively block the consideration of climate change in permitting decisions. NEPA requires the federal government to review the environmental impacts-- including climate change impacts--of major proposed federal actions. This environmental review process is one of our most fundamental protections against exploitive industry projects. H.R. 1335 would codify former President Trump's extreme 2020 NEPA implementing regulations, which the Biden administration is in the process of replacing. As more than 140 members of Congress wrote at the time, the Trump administration's NEPA regulations ``would have the effect of removing any analysis of climate impacts'' for proposed projects and ``ignores the reality of climate change and the critical role NEPA plays in addressing it.''\6\ --------------------------------------------------------------------------- \6\https://democrats-naturalresources.house.gov/download/degette- money-grijalva-et-al-to-ceq-about-trump-nepa-regulations_-jan-23-2020. --------------------------------------------------------------------------- Additionally, section 202 of H.R. 1335 would prevent federal agencies from considering reasonably foreseeable environmental effects likely to occur ten years or later, effectively preventing federal agencies from considering reliably measured climate impacts and medium- and long-term public health impacts for communities. Relatedly, section 218 of the bill would eliminate the requirement to consider downstream climate and other effects of oil and gas consumption. Furthermore, section 202 of the bill would eliminate the consideration of cumulative pollution impacts in NEPA reviews. Cumulative pollution impacts disproportionately burden frontline environmental justice communities because fossil fuel, mining, and other polluting industries disproportionately concentrate the most harmful projects in frontline environmental justice communities. Other parts of Sec. 202 reverse longstanding prohibitions against private sector applicants preparing environmental reviews for their own projects--effectively allowing a biased and often profit-driven party to conduct environmental reviews that are meant to serve the public interest. Sec. 202 also directs federal agencies to prepare environmental reviews that ``meet the goals of the [project] applicant'' when evaluating proposals instead of the public interest. Several parts of Title II also would arbitrarily limit the time the public has to evaluate and comment on environmental review documents for proposed projects--including fossil fuel and mining projects, which are disproportionately sited in frontline environmental justice communities. Furthermore, Title II would restrict legal challenges against numerous types of projects by blocking lawsuits for anyone who did not previously submit a comment during the NEPA public comment period, which would effectively block many state and local governments, tribes, and members of the public with legitimate claims from any legal redress. This restriction is especially problematic because it would require any potential plaintiffs to have made a public comment during the comment period, despite the public comment period itself is also being shortened. Title II would also create new exemptions from NEPA, including for offshore seismic surveys, and would exempt those surveys from the Marine Mammal Protection Act and the Endangered Species Act, with narrow exceptions for some mitigation and monitoring measures. The Title would also expedite drilling permits and loosen the requirements for such permits. Drilling permit applicants with pending civil actions against them would still be able to receive federal permits if the pending civil action doesn't directly affect the application or lease in question. The Secretary of the Interior would be required to process the application for a permit to drill under a valid existing lease unless a court has determined the lease wasn't issued in compliance with NEPA. This Title allows producers to extract federal subsurface oil and gas without a permit if the drilling is from non- federal lands and less than 50 percent of the oil is federally owned. The Title also exempts drilling from a non-federal surface from the National Historic Preservation Act and section 7 of the Endangered Species Act (ESA), the laws protecting cultural sites and endangered and threatened species. Lastly, Title II glaringly omits mining from section 113, which would prohibit the Communist Party of China, or any person acting on its behalf, from acquiring any interest with respect to lands leased for oil or gas under the Mineral Leasing Act or the Outer Continental Shelf Lands Act. During the markup of the bill, Democrats proposed strengthening this exclusion to also cover mining claims on federal lands. We were disappointed that Committee Republicans rejected banning the CCP and its agents from operating mines on public lands. The inconsistency is especially unsound given that--unlike with oil and gas--mining on federal land does not pay any royalty back to the American people for the extraction of public resources. In addition, thanks to our nation's extremely outdated mining law, the industry operates with minimal safeguards to protect the public. We should be especially on guard against foreign bad actors when it comes to mining, but instead this bill hands the CCP a special exemption. Title III of H.R. 1335 is based on H.R. 209, PERMIT-MN, introduced by Rep. Stauber (R-MN), and would significantly change and undermine the permitting process for hardrock mining on federal land. This Title would make it possible to stake a mining claim on public lands without a valuable mineral deposit, which would lock up public lands from other sustainable uses, and even allow for dumping waste to be the ``highest and best use'' of our public lands. This Title would designate mining as a covered activity under the FAST Act, which limits the time the public has to comment on environmental review documents and greatly restricts the public's access to the courts to seek remedies against illegal projects. Title IV would prohibit withdrawals of any federal lands and waters from leasing unless the Secretary has completed an assessment of the area's economic, energy, strategic, and national security value and assesses the reduction in revenue to the Land and Water Conservation Fund and Historic Preservation Fund. This Title would also prohibit the President from taking any action that would pause, restrict, or delay new oil, gas, coal, or mining leases or approvals unless otherwise authorized. Title V would roll back all the smart royalty rate changes and other long-needed reforms to the oil and gas leasing program made in the Inflation Reduction Act (IRA). This Title would reduce the onshore and offshore royalty rates, decrease minimum bids for federal land onshore, repeal the expression of interest fees, and bring back noncompetitive oil and gas leasing. Noncompetitive leasing was eliminated in the IRA because it led to the hoarding of low-priced land by oil and gas companies, 99 percent of which they never bring into production.\7\ --------------------------------------------------------------------------- \7\https://www.gao.gov/products/gao-21-138. --------------------------------------------------------------------------- Title VI would decrease revenue from offshore oil and gas to the U.S. Treasury and would remove the cap on offshore revenue distributions to states, which would incentivize unnecessary offshore oil and gas drilling and burden environmental justice communities in the Gulf of Mexico. This Title would also alter offshore wind revenue sharing, with 12.5 percent to the Treasury and the rest to conservation funds to states, which would be significantly less to the Treasury than other offshore wind revenue sharing proposals, and significantly less than the current standard for oil and gas. * * * * * * * In the past months. members of the majority had previewed this coming bill by stating that it was being drafted to attract bipartisan support for real solutions for improving permitting and meeting our energy needs amidst the ongoing climate crisis. Unfortunately, this extreme and irresponsible bill is not a serious attempt at bipartisanship or at accomplishing those important policy goals. Codifying the extremist and deeply unpopular Trump NEPA regulations--which 140 House Democrats are on record as opposing--is not a serious opening bid. Requiring fire sales on oil and gas leases even in the face of industry lack of interest; rewriting the law so that dumping toxic waste on our public lands can be the ``highest and best use'' of our public lands; giving enormous tax breaks to oil and gas companies when they are enjoying record profits--these are not serious proposals for bipartisanship or for growing our economy and addressing the climate crisis. Democrats stand ready to make real improvements to environmental reviews, the community input and tribal consultation processes, and the deployment of renewable energy. That's why Democrats fought for more than $1 billion in the Inflation Reduction Act to increase the capacity for federal agencies' environmental review offices. We were disappointed to see Republicans vote against that funding, which it is now estimated will enable most Environmental Impact Statements to be completed within two years. Democrats stand ready to improve public input processes so that project sponsors can identify and address issues up-front before they become more expensive and time-consuming to address. We stand ready to address barriers to building more renewable energy transmission lines, including planning and cost allocation processes. The list goes on. Instead, H.R. 1335 will accelerate the destruction of the planet, all while handing taxpayer money and our public lands out to corporate polluters and failing to protect environmental justice communities. Raul M. Grijalva, Ranking Member, House Committee on Natural Resources. Sydney Kamlager-Dove, Vice Ranking Member, House Committee on Natural Resources. Alexandria Ocasio-Cortez, Ranking Member, Subcommittee on Energy and Mineral Resources. Teresa Leger Fernandez, Ranking Member, Subcommittee on Indian and Insular Affairs. Melanie Stansbury, Ranking Member, Subcommittee on Oversight and Investigations. Jared Huffman, Ranking Member, Subcommittee on Water, Wildlife and Fisheries. [all]