Background and Need for Legislation
WRDA 2024, as amended, builds on a long-standing commitment
to address the Nation's water resources challenges, primarily
through the efforts of the Corps. WRDA 2024 aims to enhance the
Corps' ability to deliver critical water infrastructure
projects efficiently, meeting the diverse needs of river and
coastal navigation, flood and hurricane storm damage reduction,
shoreline protection, water supply, ecosystem restoration,
recreation, hydropower, and disaster response and recovery. The
need for WRDA 2024 arises from several key factors:
1. Aging Infrastructure: Many of the Nation's water
resources infrastructure projects are decades old and
require significant upgrades or replacements to meet
current and future demands.\2\ Modernizing these
projects is essential to ensure safety, reliability,
and efficiency.
---------------------------------------------------------------------------
\2\United States Army Corps of Engineers, Value to the Nation:
Capital Stock Fast Facts, (last accessed Jul. 9, 2024), available at
https://www.iwr.usace.army.mil/Missions/Value-to-the-Nation/Fast-Facts/
Capital-Stock/.
---------------------------------------------------------------------------
2. Economic Competitiveness: Efficient water
transportation systems are vital for the Nation's
economic competitiveness.\3\ Enhancing river and
coastal navigation through infrastructure improvements
ensures the smooth movement of goods and supports
economic growth.
---------------------------------------------------------------------------
\3\United States Army Corps of Engineers, Inland Marine
Transportation System, (last accessed July 9, 2024), available at
https://www.usace.army.mil/Missions/Civil-Works/Navigation/IMTS/.
---------------------------------------------------------------------------
3. Extreme Weather Events: The increasing frequency
and intensity of extreme weather events, such as
hurricanes, floods, and droughts, underscores the need
for robust water resources infrastructure.\4\ WRDA 2024
provides the Corps with the authority to undertake
projects that enhance community and infrastructure
resilience to these events.
---------------------------------------------------------------------------
\4\Jonathan D. Haskett Cong. Rsch. Services, Climate Change and
Extreme Heat, 2023, (IN12250) available at https://
crsreports.congress.gov IN12250.
---------------------------------------------------------------------------
4. Environmental Restoration and Protection: There is
a growing recognition of the importance of restoring
and protecting ecosystems that provide critical
services such as flood control, water filtration, and
wildlife habitat. Healthy ecosystems support industries
like tourism, fishing, and agriculture, offering
significant economic benefits.\5\ Additionally, natural
infrastructure solutions can be cost-effective
alternatives to traditional methods, reducing project
costs and maintenance.\6\ WRDA 2024 includes provisions
to support the Corps' efforts in ecosystem restoration,
mitigation, and protection, leveraging these economic
advantages to enhance community resilience and promote
economic vitality.
---------------------------------------------------------------------------
\5\Nicole T. Carter and Normand, Anna E. Normand, Cong. Rsch.
Services, Process for U.S. Army Corps of Engineers (USACE), 2024
(R47946) available at https://crsreports.congress.gov R47946.
\6\Headwaters Economics, Green Infrastructure: Cost-effective
solutions to flooding, (last accessed July 9, 2024), available at
https://headwaterseconomics.org/natural-hazards/green-infrastructure/.
---------------------------------------------------------------------------
5. Collaboration with the Non-Federal Interest: WRDA
2024 emphasizes the importance of collaboration between
the Corps and the non-Federal interest, other non-
Federal entities, including state and local
governments, to leverage resources and expertise and to
ensure early and engaged collaboration with affected
stakeholders. This approach helps ensure that projects
meet local needs, gain local support, and maximize the
benefits of Federal investments.
6. Project Delivery Efficiency: One of the central
focuses of WRDA 2024 is to improve the project delivery
process. By simplifying procedures, reducing
unnecessary hurdles, and empowering the non-Federal
interest, the legislation aims to expedite the
completion of vital water resources projects.
Enactment of WRDA 2024 is crucial for addressing these
challenges and ensuring that the Nation's water resources
infrastructure can meet the demands of the 21st Century. This
legislation provides the necessary authority and direction to
the Corps to carry out its mission effectively and efficiently,
thereby safeguarding communities, enhancing economic
productivity, and protecting valuable environmental resources.
WRDA 2024 Delivers Water Resource Projects
Using the established framework to carry out water resource
infrastructure projects by the Corps, infrastructure projects
are being delivered through established processes in WRDA 2024.
This includes projects focused on navigation, flood control,
ecosystem restoration, and other related areas. The process
involves several key steps:
1. Identifying Needs and Opportunities: The process
begins with the identification of water resources needs
and opportunities at the local, regional, and national
levels. This can be initiated by the non-Federal
interest, such as state and local governments, Tribal
entities, and other stakeholders, who recognize
specific challenges or opportunities in their areas.
Many of these projects are included in an annual report
issued by the Corps known as the ``7001 Report'' based
on a process established by section 7001 of the Water
Resources Reform and Development Act of 2014 (WRRDA
2014).\7\
---------------------------------------------------------------------------
\7\United States Army Corps of Engineers, WRRDA 7001 Proposals,
(last accessed July 9, 2024), available at https://www.usace.army.mil/
Missions/Civil-Works/Project-Planning/WRRDA-7001-Proposals/.
---------------------------------------------------------------------------
2. Feasibility Studies: Once a need or opportunity is
identified, a request can be made by a Member of
Congress to authorize a new feasibility study. Section
201 of WRDA 2024 authorizes the Secretary to carry out
more than 150 new feasibility studies. These studies
can be started after they receive appropriations.
3. Chief's Report: Following the completion of a
feasibility study, the Corps submits to Congress a
Report of the Chief of Engineers, more commonly
referred to as a Chief's Report, documenting the
findings and recommendations for a proposed water
resources project.\8\ This report serves as a key
milestone in the project authorization process,
providing the necessary information for Congressional
authorization and funding. In addition to Chief's
Reports, the Chief of Engineers prepares a Director's
Report when a water resources project is modified or
exceeds the existing project authorization.\9\ Section
401 of WRDA 2024 authorizes the construction of 12
pending Chief's Reports or Director's Reports that have
been submitted to Congress since the enactment of WRDA
2022. Construction of these projects can begin after
they receive appropriations.
---------------------------------------------------------------------------
\8\United States Army Corps of Engineers, Signed Chief's Reports,
(last accessed July 9, 2024), available at https://
planning.erdc.dren.mil/toolbox/
library.cfm?Option=Direct&Group=Main&Item=Chief%20Report⋐=None&Sort=D
efault.
\9\United States Army Corps of Engineers, Signed Director's
Reports, (last accessed July 9, 2024), available at https://
planning.erdc.dren.mil/toolbox/
library.cfm?Option=Direct&Group=Main&Item=Director%20Report⋐=None&Sor
t=Default.
---------------------------------------------------------------------------
Delivering Environmental Infrastructure Projects through WRDA 2024
In addition to the study and construction authority of
traditional water resources projects, the Corps has the
authority to provide design and construction assistance for
infrastructure in specified municipalities, counties, and
states through the Environmental Infrastructure program.
Projects within this program include water distribution works,
stormwater management, surface water protection, and
environmental restoration.\10\ Section 340 of WRDA 2024
authorizes 166 new environmental infrastructure authorities and
authorizes modifications to several existing environmental
infrastructure authorities.
---------------------------------------------------------------------------
\10\Anna E. Normand, Cong. Rsch. Services, Overview of U.S. Army
Corps of Engineers Environmental Infrastructure (EI) Assistance (2023)
(R47162) available at https://crsreports.congress.gov R47162.
---------------------------------------------------------------------------
Delivering Small Projects through WRDA 2024
WRDA 2024, as amended, enhances the delivery of small
projects, defined as those with a Federal commitment of less
than $15 million, by implementing significant changes to the
Continuing Authorities Programs (CAP).\11\ These modifications
aim to optimize project delivery and reduce unnecessary
hurdles. Key changes include:
---------------------------------------------------------------------------
\11\Section 7001(c)(1)(D) of Water Resources Reform and Development
Act of 2014 (33 U.S.C. 2282d).
---------------------------------------------------------------------------
1. Delegated Decision-Making Authority: WRDA 2024
delegates decision making authority for CAP to the
District level, which expedites project delivery and
empowers the staff at the District level who have a
better understanding of the specific needs and
conditions of their regions. This localized decision-
making process reduces the need for extensive reviews
and approvals from higher levels, which can add delays
and increase administrative costs. This streamlined
approach ensures that funds are allocated more directly
to project execution rather than administrative
overhead, resulting in more efficient use of resources
and quicker project completion.
2. Automatic Conversion to Feasibility Study: WRDA
2024 allows projects initiated under CAPs that exceed
the per-project authority limit to be automatically
converted into feasibility studies if the excess is
less than twice the authority threshold. This minimizes
project starts and stops, reducing costs and
maintaining momentum in project development.
Previously, exceeding the authorized threshold could
lead to significant delays as projects waited for
Congressional authorization to become a new feasibility
study. By allowing an automatic conversion to a
feasibility study, the process becomes smoother and
more predictable, preventing costly halts and
increasing project delivery for communities, all while
maintaining Congress' oversight role for significant
Corps' projects.
3. Increased Per-Project and Annual Program Limits:
The per-project authorization limit on six of the nine
CAPs has been increased in WRDA 2024, along with four
of the nine annual program authorization limits.
Increasing these limits acknowledges the impact of
inflation on infrastructure projects. Notably, the
limits for Small Flood Control Projects (33 U.S.C.
701s) and Aquatic Ecosystem Restoration (33 U.S.C.
2330) programs have been raised slightly higher than
others as these types of CAP projects are more
frequently pursued by the non-Federal interest. These
changes ensure that critical projects receive adequate
funding from the start, reducing the need for piecemeal
approaches and enabling more robust, long-term
solutions.
4. Inclusion of Stormwater: Stormwater management has
been incorporated into the Small Flood Control Projects
(33 U.S.C. 701s) program, emphasizing the growing
demand for addressing stormwater issues in communities.
This inclusion recognizes the increasing challenges
posed by larger and stronger storms, which cause severe
flooding and associated damage in urban and rural areas
alike. WRDA 2024 authorizes the Corps to be more
flexible and responsive to stormwater management, while
also making it easier for communities to qualify for
and receive Federal assistance. This change highlights
the program's adaptability to local needs and its
commitment to proactive flood risk management, which is
crucial for protecting lives, property, and the
environment in the face of changing climate patterns
and urban development pressures.
5. Resiliency: WRDA 2024 augments the Corps'
authority to address infrastructure resilience to
increasing frequency and intensity of extreme weather
events, such as increased precipitation and droughts.
WRDA 2024 amends the Small Flood Control Projects (33
U.S.C. 701s) program to direct the Secretary, where
appropriate, to include features for the reclamation,
treatment, and reuse of flood and stormwater associated
with projects to further enhance the resiliency of
communities. Similarly, this legislation amends the
authority for Project Modifications for Improvement of
the Environment (33 U.S.C. 2309a) to authorize the
Secretary to modify existing Corps' projects to enhance
drought resiliency. Under this modified authority, the
Secretary would be authorized to carry out
modifications to existing water resources development
projects, such as enhanced water conservation measures,
removal of excess sediment, the planting of native
vegetation, and other actions to increase drought
resilience, water conservation, and water availability.
6. Community Revitalization Program: The Community
Revitalization Program (enacted as Section 165(a) of
WRDA 2020) has been made permanent, ensuring long-term
support for community-led efforts to revitalize and
enhance local infrastructure. This stability provides
support for projects that address critical needs,
promote sustainable development, and improve overall
community well-being. Increasing the number of projects
that can be carried out through this program provides
all communities across the Nation with greater access
to Corps expertise in addressing local water resources
challenges, enabling communities of all economic means
to undertake vital projects that might otherwise be
unaffordable. Such investments lead to improved local
economies, enhanced quality of life, and greater
resilience to future challenges.
7. Alternative Delivery CAP Pilot: Subsection 101(a)
creates a new, alternative delivery office within the
Corps, and directs that office to implement a pilot
program carrying out projects using alternative
delivery. This new CAP delivery process focuses on
accelerating the delivery of projects through use of
methods, such as progressive design-build and
construction manager at risk approaches to project
delivery. The alternative delivery office is tasked
with working with the non-Federal interest to identify
and implement strategies that reduce project timelines,
cut costs, and improve overall project outcomes, with a
goal of enhancing project efficiency and effectiveness.
These changes demonstrate a commitment to delivering small
projects more effectively and efficiently, addressing key areas
of need while minimizing administrative burdens and costs.
Delivering Projects by Connecting Communities with the Corps in WRDA
2024
Section 102 of WRDA 2024, as amended, establishes a new
program designed to assist communities in identifying the
Federal program through the Corps that best suits their needs
and guiding them through the various stages or requirements.
The Committee recognizes disparities among Corps Districts in
their community engagement capabilities. This program aims to
level the playing field, ensuring equal access for all
communities, regardless of their respective Corps District.
Similarly, Section 106 of WRDA 2024 introduces reforms to
enhance consistency and efficiency within the Corps by creating
a centralized office tasked with reviewing requests for
permission to modify existing water resources development
projects under Section 408.\12\ This office will provide non-
Federal entities with clear, consistent, and timely
recommendations, ensuring uniformity across Corps Districts by
moving these reviews from Corps Districts to a centralized
office. Non-Federal entities may request pre-application
meetings through this office to clarify technical requirements,
determine optimal design package submissions, and address
potential concerns or conflicts with proposed actions.
---------------------------------------------------------------------------
\12\33 U.S.C. 408.
---------------------------------------------------------------------------
Delivering Projects with non-Federal Interests through WRDA 2024
In addition to establishing the new alternative delivery
CAP, Sections 104 and 105 of WRDA 2024, as amended, amend
Sections 203 and 204 of WRDA 1986, respectively, to clarify and
enhance the responsibilities of non-Federal interests in
conducting studies and construction activities for authorized
projects. These amendments provide clear guidelines and
expectations, ensuring efficient processes and effective
project oversight.
Section 327 of WRDA 2024, as amended, includes specific
schedules for a specific project being pursued under Section
203 of WRDA 1986. These are designed to facilitate timely
project execution, ensuring that studies progress efficiently
and conclusions are reached within reasonable timeframes.
Delivering Projects more Efficiently through Policy in WRDA 2024
WRDA 2024 marks a pivotal advancement in infrastructure
development policy, introducing strategic reforms aimed at
enhancing efficiency and effectiveness in project delivery
across the Nation. Through targeted policy changes, this
legislation empowers the Corps to better manage processes,
optimize resource allo
Hearings
For the purposes of rule XIII, clause 3(c)(6)(A) of the
118th Congress, the following hearings were used to develop or
consider H.R. 8812:
On Thursday, June 22, 2023, the Subcommittee on Water
Resources and Environment of the Committee on Transportation
and Infrastructure held a hearing titled ``Review of Fiscal
Year 2024 Budget Request: Agency Perspectives (Part I).'' The
Subcommittee received testimony from The Honorable Michael L.
Connor, Assistant Secretary of the Army for Civil Works,
Department of the Army; Major General William ``Butch'' H.
Graham, Deputy Chief of Engineers and Deputy Commanding
General, United States Army Corps of Engineers; Mr. Jeff Lyash,
President and Chief Executive Officer, Tennessee Valley
Authority; and Mr. Adam Tindall-Schlicht, Administrator, Great
Lakes St. Lawrence Seaway Development Corporation. This hearing
was part one of two in a series of hearings to provide Members
with an opportunity to review the President's Fiscal Year 2024
Budget Request, as well as the Administration's program
priorities within the jurisdiction of the Subcommittee.
On Tuesday, December 5, 2023, the Subcommittee on Water
Resources and Environment of the Committee on Transportation
and Infrastructure held a hearing titled ``Water Resources
Development Acts: Status of Past Provisions and Future Needs.''
The Subcommittee received testimony from The Honorable Michael
L. Connor, Assistant Secretary of the Army for Civil Works,
Department of the Army; and Lieutenant General Scott Spellmon,
Commanding General and Chief of Engineers, United States Army
Corps of Engineers. This hearing provided Members with an
opportunity to review the implementation of Corps projects and
policies included in past WRDAs, discuss proposals for the
development of a Water Resources Development Act of 2024, and
receive testimony from the Corps on the Administration's
priorities for a Water Resources Development Act of 2024.
On Wednesday, December 13, 2023, the Subcommittee on Water
Resources and Environment of the Committee on Transportation
and Infrastructure held a hearing titled ``Proposals for a
Water Resources Development Act of 2024: Stakeholder
Priorities.'' The Subcommittee received testimony from Mr.
Shane Kinne, Executive Director, Coalition to Protect the
Missouri River; Hon. Teresa Batts, Mayor, Surf City, North
Carolina; Mr. Jim Weakley, President, Lake Carriers'
Association; Hon. Paul Anderson, President and Chief Executive
Officer, Port Tampa Bay, and Chairman, Board of Directors,
American Association of Port Authorities; and Mr. Dave
Mitamura, Executive Director, National Water Supply Alliance.
This hearing was the second in a series of hearings to provide
Members with an opportunity to hear priorities for the
development of a Water Resources Development Act of 2024 from
interested parties, including the Administration, non-Federal
stakeholders, and off-Committee Members.
On Thursday, January 11, 2024, the Subcommittee on Water
Resources and Environment on the Committee on Transportation
and Infrastructure held hearing titled ``Proposals for a Water
Resources Development Act of 2024: Members'' Day Hearing.'' The
Subcommittee received testimony from Hon. Carol Miller, a
Representative from the 1st District of West Virginia; Hon.
Grace Meng, a Representative from the 6th District of New York;
Hon. Bryan Steil, a Representative from the 1st District of
Wisconsin; Hon. Ed Case, a Representative from the 1st District
of Hawaii; Hon. Clay Higgins, a Representative from the 3rd
District of Louisiana; Hon. Marcy Kaptur, a Representative from
the 9th District of Ohio; Hon. Marie Gluesenkamp Perez, a
Representative from the 3rd District of Washington; Hon.
Russell Fry, a Representative from the 7th District of South
Carolina; Hon. Derek Kilmer, a Representative from the 6th
District of Washington; Hon. Rashida Tlaib, a Representative
from the 12th District of Michigan; Hon. Erin Houchin, a
Representative from the 9th District of Indiana; Hon. Dan
Newhouse, a Representative from the 4th District of Washington;
Hon. Eric Sorensen, a Representative from the 17th District of
Illinois; Hon. Lizzie Fletcher, a Representative from the 7th
District of Texas; Hon. Earl L. ``Buddy'' Carter, a
Representative from the 1st District of Georgia; Hon. Byron
Donalds, a Representative from the 19th District of Florida;
Hon. Kevin Mullin, a Representative from the 15th District of
California; Hon. Anna Paulina Luna, a Representative from the
13th District of Florida; Hon. Nick LaLota, a Representative
from the 1st District of New York; Hon. Kim Schrier, a
Representative from the 8th District of Washington; Hon. Nikki
Budzinski, a Representative from the 13th District of Illinois;
Hon. Donald G. Davis, a Representative from the 1st District of
North Carolina; Hon. Jim Costa, a Representative from the 21st
District of California; Hon. James C. Moylan, a Delegate from
the Territory of Guam; Hon. Sylvia R. Garcia, a Representative
from the 29th District of Texas; Hon. Bill Pascrell, Jr., a
Representative from the 9th District of New Jersey; Hon. Andrew
Garbarino, a Representative from the 2nd District of New York;
Hon. Susie Lee, a Representative from the 3rd District of
Nevada; Hon. Debbie Wasserman Schultz, a Representative from
the 25th District of Florida; Hon. Mary E. Miller, a
Representative from the 15th District of Illinois; Hon. Rick W.
Allen, a Representative from the 12th District of Georgia; Hon.
Darren Soto, a Representative from the 9th District of Florida;
Hon. Robert C. ``Bobby'' Scott, a Representative from the 3rd
District of Virginia; Hon. Terri A. Sewell, a Representative
from the 7th District of Alabama; Hon. Katie Porter, a
Representative from the 47th District of California; Hon. Gabe
Amo, a Representative from the 1st District of Rhode Island;
Hon. Lisa Blunt Rochester, a Representative from Delaware; Hon.
J. Luis Correa, a Representative from the 46th District of
California; Hon. Jasmine Crockett, a Representative from the
30th District of Texas; Hon. Danny K. Davis, a Representative
from the 7th District of Illinois; Hon. Lloyd Doggett, a
Representative from the 35th District of Texas; Hon. Greg
Landsman, a Representative from the 1st District of Ohio; Hon.
John B. Larson, a Representative from the 1st District of
Connecticut; Hon. Mike Levin, a Representative from the 49th
District of California; Hon. Zoe Lofgren, a Representative from
the 18th District of California; Hon. Stephen F. Lynch, a
Representative from the 8th District of Massachusetts; Hon.
Harold Rogers, a Representative from the 5th District of
Kentucky; and Hon. Robert J. Wittman, a Representative from the
1st District of Virginia. This hearing provided Members with an
opportunity to testify before the Subcommittee on their
priorities for the development of a Water Resources Development
Act of 2024.
Legislative History and Consideration
H.R. 8812, the ``Water Resources Development Act of 2024'',
was introduced in the United States House of Representatives on
June 25, 2024, by Mr. Graves of Missouri, with Mr. Larsen of
Washington, Mr. Rouzer, and Ms. Napolitano as original
cosponsors, and referred to the Committee on Transportation and
Infrastructure. Within the Committee on Transportation and
Infrastructure, H.R. 8812 was referred to the Subcommittee on
Water Resources and Environment.
The Subcommittee on Water Resources and Environment was
discharged from further consideration of H.R. 8812 on June 26,
2024.
The Committee considered H.R. 8812 on June 26, 2024, and
ordered the measure to be reported to the House with a
favorable recommendation, with amendment, by recorded vote of
61 yeas to 2 nays.
The following amendments were offered:
An Amendment in the Nature of a Substitute to H.R. 8812,
offered by Mr. Graves of Missouri, as amended; was AGREED TO by
voice vote.
A Manager's Amendment to the Amendment in the Nature of a
Substitute to H.R. 8812, offered by Mr. Graves of Missouri
(Graves of Missouri 01); was AGREED TO by voice vote:
At the appropriate place in title I, insert the following:
SEC. __. DEFINITION.
For the purposes of this Act, the term ``State'' shall have
the meaning given to such term in the Act of October 15, 1940
(33 U.S.C. 701h-1). Page 69, line 2, insert ``hydropower,''
after ``flood control,''. Page 69, strike line 21 and all that
follows through page 70, line 2. Page 91, line 20, strike the
comma. Page 114, line 14, strike ``paragraph (1), (2), or (3)''
and insert ``paragraph (1) or (2)''. Page 118, beginning on
line 9, strike ``that has been authorized before the date of
enactment of this Act and''. Page 119, insert after line 20 the
following: (d) HURRICANE AND STORM DAMAGE REDUCTION PROJECT
IMPLEMENTATION.--(1) IN GENERAL.--During the 2-year period
beginning on the date of enactment of this Act, notwithstanding
any requirement of the Secretary for a covered project to
comply with the memorandum of the Corps of Engineers entitled
``Standard Estates--Perpetual Beach Nourishment and Perpetual
Restrictive Dune Easement'' and dated August 4, 1995, the
Secretary shall carry out each covered project in a manner
consistent with the previously completed initial construction
and periodic nourishments of the project, including repair and
restoration work on the project under section 5(a) of the Act
of August 18, 1941 (33 U.S.C. 701n(a)). (2) COVERED PROJECT
DEFINED.--In this subsection, the term ``covered project''
means an authorized project for hurricane and storm damage
reduction in any one of the following locations: (A) Brevard
County, Canaveral Harbor, Florida--Mid Reach. (B) Brevard
County, Canaveral Harbor, Florida--North Reach. (C) Brevard
County, Canaveral Harbor, Florida--South Reach. (D) Broward
County, Florida--Segment II. (E) Broward County, Florida--
Segment III. (F) Dade County, Florida--Main Segment. (G) Dade
County, Florida--Sunny Isles Segment. (H) Duval County,
Florida. (I) Fort Pierce Beach, Florida. (J) Lee County,
Florida--Captiva. (K) Lee County, Florida--Gasparilla. (L)
Manatee County, Florida. (M) Martin County, Florida. (N) Nassau
County, Florida. (O) Palm Beach County, Florida--Jupiter/Carlin
Segment. (P) Palm Beach County, Florida--Delray Segment. (Q)
Palm Beach County, Florida--Mid Town. (R) Palm Beach County,
Florida--North Boca. (S) Palm Beach County, Florida--Ocean
Ridge. (T) Panama City Beaches, Florida. (U) Pinellas County,
Florida--Long Key. (V) Pinellas County, Florida--Sand Key
Segment. (W) Pinellas County, Florida--Treasure Island. (X)
Sarasota, Lido Key, Florida. (Y) Sarasota County, Florida--
Venice Beach. (Z) St. Johns County, Florida--St. Augustine
Beach. (AA) St. Johns County, Florida--Vilano Segment. (BB) St.
Lucie County, Florida--Hutchinson Island. (3) SENSE OF
CONGRESS.--It is the sense of Congress that, for the purpose of
constructing and maintaining a project for hurricane and storm
damage risk reduction, the minimum estate necessary for
easements may not exceed the life of the project nor be less
than 50 years. At the appropriate place in title II, insert the
following: SEC. ll. WILSON LOCK FLOATING GUIDE WALL, ALABAMA.
On the request of the relevant Federal entity, the Secretary
shall, to the maximum extent practicable, use all relevant
authorities to expeditiously provide technical assistance,
including engineering and design assistance, and cost
estimation assistance to the relevant Federal entity in order
to address the impacts to navigation along the Tennessee River
at the Wilson Lock and Dam, Alabama. Page 141, line 14, insert
``flood risk management and'' after ``Project for''. Page 144,
after line 3, insert the following: (115) HARRIS COUNTY,
TEXAS.--Project for flood risk management and ecosystem
restoration, Halls Bayou, Harris County, Texas. Page 146,
strike lines 1 through 7. Page 146, line 20, insert ``and
widening'' after ``deepening''. Page 161, after line 11, insert
the following: Project for ecosystem restoration and
recreation, Los Angeles River, California, authorized by
section 1407(7) of the Water Resources Development Act of 2016
(130 Stat. 1714). Page 172, after line 17, insert the
following: (h) REPORT ON BOAT RAMPS.--Not later than 1 year
after the date of enactment of this Act, the Secretary shall
submit to the Committee on Transportation and Infrastructure of
the House of Representatives and the Committee on Environment
and Public Works of the Senate a report detailing--(1) the
number of boat ramps constructed by the Secretary that are
located at a site constructed, owned, operated, or maintained
by the Secretary; (2) the number of such boat ramps that are
operational; and (3) the number of such boat ramps that require
maintenance in order to be made operational. At the appropriate
place in title III, insert the following: SEC. ll.
CONGRESSIONAL NOTIFICATION OF DEFERRED PAYMENT AGREEMENT
REQUEST. Section 103(k) of the Water Resources Development Act
of 1986 (33 U.S.C. 2213(k)) is amended by adding at the end the
following: (5) CONGRESSIONAL NOTIFICATION.--(A) IN GENERAL.--
Upon receipt of a request for a renegotiation of terms by a
non-Federal interest under paragraph (2), the Secretary shall
submit to the Committee on Transportation and Infrastructure of
the House and the Committee on Environment and Public Works of
the Senate a report 30 days after enactment and quarterly
thereafter regarding the status of the request. (B) SENSE OF
CONGRESS.--It is the sense of Congress that the Secretary
should respond to any request for a renegotiation of terms
submitted under paragraph (2) in a timely manner. At the
appropriate place in title III, insert the following: SEC. ll.
MORGANZA TO THE GULF OF MEXICO, LOUISIANA. Section 1001(24) of
the Water Resources Development Act of 2007 (121 Stat. 1053) is
amended by adding at the end the following: (C) CREDIT.--The
Secretary shall credit toward the non-Federal share of the cost
of the project described in subparagraph (A) the cost of work
carried out by the non-Federal interest for interim flood
protection after March 31, 1989, if the Secretary determines
that the work--(i) is integral to the project; (ii) complies
with all applicable Federal laws, regulations, and policies
that were in place at the time the work was completed; and
(iii) notwithstanding the date described in this subparagraph,
is otherwise in compliance with the requirements of section 221
of the Flood Control Act of 1970 (42 U.S.C. 1962d-5b). Page
240, line 17, insert ``or'' at the end. Page 240, strike lines
18 through 23 and insert the following: (2) the failure of such
system. Page 241, line 3, strike ``system,'' and insert
``system for which a license for right-of-way has been provided
by the Secretary and is in effect on the date of enactment of
this Act,''. Page 241, line 6, insert ``and'' at the end. Page
241, strike lines 7 through 9. Page 256, line 10, strike
``INDIAN WELLS'' and insert ``KERN COUNTY''. Page 256, line 12,
strike ``the city of Indian Wells''' and insert ``Kern
County''. Page 265, line 11, strike ``POINT'' and insert
``POINTE''. Page 265, line 13, strike ``Point'' and insert
``Pointe''. Page 266, after line 17, insert the following:
``(lll) HANCOCK COUNTY, MISSISSIPPI.--$7,000,000 for
environmental infrastructure, including water and wastewater
infrastructure (including stormwater management), drainage
systems, and water quality enhancement, Hancock County,
Mississippi. Page 280, line 3, strike ``WATER DISTRICT'' and
insert ``COUNTY''. Page 280, after line 7, insert the
following: (i) in the paragraph heading, by striking ``WATER
DISTRICT'' and inserting ``COUNTY''; Page 282, line 1, strike
``BERNADINO'' and insert ``BERNARDINO''. Page 284, after line
21, insert the following: (ll) WILL COUNTY, ILLINOIS.--Section
219(f)(334) of the Water Resources Development Act of 1992 (106
Stat. 4835; 113 Stat. 334; 136 Stat. 3808) is amended by
striking ``$30,000,000'' and inserting ``$36,000,000''. Page
302, strike line 16 and all that follows through page 303, line
10 and insert the following: (g) NEWTOWN CREEK FEDERAL
NAVIGATION CHANNEL, NEW YORK.--(1) DEFINITION OF NEWTOWN CREEK
NAVIGATION PROJECT.--In this subsection, the term ``Newtown
Creek navigation project'' means the project for the Newtown
Creek Federal navigation channel, New York, described in The
Rivers and Harbors Act of 1919, Ch. 832, 40 Stat. 1275, 1276
(1919), The Rivers and Harbors Improvement Act of 1930, Ch.
847, 46 Stat. 918, 920 (1930), and The Rivers and Harbors
Improvement Act of 1937, Ch. 832, 50 Stat. 844, 845 (1937). The
Newtown Creek navigation project is modified to reduce, in
part, the authorized dimensions of the project, such that the
remaining authorized depths are as follows: A 18-foot deep
channel with a center line beginning at point North 40.727729
and West 73.929142, thence to a point North 40.722214 and West
73.925874. [Reach EA] A 18-foot deep Turning Basin South-West
of a line formed by points North 40.726202 and West 73.927289;
and North 40.723508 and West 73.924713. [Reaches E1A and GA] A
16-foot-deep channel with a center line beginning at a point
North 40.722214 and West 73.925874, thence to a point North
40.718664 and West 73.924176. [Reaches EB and H] A 16-foot-deep
channel with a center line beginning at a point North 40.718664
and West 73.924176, thence to a point North 40.717539 and West
73.927438. [Reach JA] A 14-foot-deep channel with a center line
beginning at a point North 40.717539 and West 73.927438, thence
to a point North 40.716611 and West 73.929278. [Reach JB] A 12-
foot-deep channel with a center line beginning at a point North
40.716611 and West 73.929278, thence to a point North 40.713156
and West 73.931351. [Reaches JC and KA] DEAUTHORIZATIONS.--IN
GENERAL.--The portions of the Newtown Creek navigation project
described in subparagraphs (B) through (E) are deauthorized.
PORTION DESCRIBED.--A portion referred to in Paragraph (1) is a
portion of the channel adjacent the Turning Basin, specifically
the area--East of a line formed by points North 40.726202 and
West 73.927289; and North 40.723508 and West 73.924713;
[Reaches E1B and GB] and Maspeth Creek. [Reach F] PORTION
DESCRIBED.--A portion referred to in Paragraph (1) is a portion
of the channel in East Branch, specifically the area--Beginning
at a point North 40.718066 and West 73.923931; and Extending
upstream. [Reach I] PORTION DESCRIBED.--A portion referred to
in Paragraph (1) is a portion of the channel in English Kills,
specifically the area--Beginning at a point North 40.713156 and
West 73.931351; and Extending upstream. [Reach KB] PORTION
DESCRIBED.--A portion referred to in Paragraph (1) as Dutch
Kills, specifically the area--Beginning at a point North
40.737623 and West 73.94681; and Extending upstream. [Reach L/
L1] Page 305, after line 9, insert the following: STUDY ON
ADDITIONAL DEAUTHORIZATIONS.--Not later than 180 days after the
date of enactment of this subsection, the Secretary shall
submit a report to the Committee on Transportation and
Infrastructure of the House of Representatives and the
Committee on Environment and Public Works of the Senate on the
impac