Background and Need for Legislation
The Upper Colorado and San Juan River Basins provide key
sources of water in the western United States. The Bureau of
Reclamation (Reclamation) has constructed numerous water and
power projects to store and use the water for irrigation,
drinking water, hydropower, and flood control purposes, and to
benefit recreation and fish and wildlife in the western United
States. Facilities include the Colorado River Storage Project's
(CRSP) Flaming Gorge Unit, which can store over 3.5-million-
acre feet of water and can generate over 150 megawatts of
power.\1\ The three dams that make up the Aspinall Unit, also
in the CRSP system, store more than 1-million-acre feet of
water and can generate more than 275 megawatts of power.\2\
---------------------------------------------------------------------------
\1\``Flaming Gorge Unit.'' U.S. Bureau of Reclamation. https://
www.usbr.gov/uc/rm/crsp/fg/index.html.
\2\``Aspinall Unit.'' U.S. Bureau of Reclamation. https://
www.usbr.gov/uc/rm/crsp/fg/index.html.
---------------------------------------------------------------------------
The Endangered Species Act of 1973 (ESA) has significant
impacts on the CRSP and other Reclamation and non-federal water
projects. The Colorado and San Juan Rivers are home to 14
native fish species. In 1988, four of these species--the
Colorado pikeminnow, razorback sucker, humpback chub, and
bonytail--were listed as ``endangered'' under the ESA. Those
designations led to the threat of water and power-use
restrictions. As a result, the states of Colorado, New Mexico,
Utah, and Wyoming signed cooperative agreements with the
federal government in 1988 and 1992 to help achieve the dual
goals of recovering endangered fish populations while
continuing water and power facility development and
operations.\3\ Other partners include water and power users,
tribes, and environmental organizations.
---------------------------------------------------------------------------
\3\``The Upper Colorado Endangered Fish Recovery Program.'' The
Nature Conservancy. 8/30/2019. https://www.nature.org/en-us/about-us/
where-we-work/priority-landscapes/colorado-river/endangered-fish-
recovery-program/#::text=Established%20in%201988%20and%20managed,
Colorado%20pikeminnow%20and%20razorback%20sucker.
---------------------------------------------------------------------------
These cooperative agreements led to the creation of the
Upper Colorado and San Juan Recovery Implementation Programs
(Programs) to help provide ESA compliance for over 2,500 water
and power projects that withdraw more than 3.7-million-acre
feet of water.\4\ The Programs' goals are to recover the
humpback chub, razorback sucker, bonytail, and the Colorado
pikeminnow while continuing facility operations to meet current
and future human needs, with the ultimate goals of species
delisting. Furthermore, genetically diverse, hatchery-based
fish are raised at federal, state, and tribal hatcheries. These
hatchery-raised fish help establish sustainable species
populations since the hatchery-produced fish are counted as
part of the recovery criteria under the ESA once they reach
adult status.\5\
---------------------------------------------------------------------------
\4\``2023 23 Highlights.'' Upper Colorado River Endangered Fish
Recovery Program. 2023. Briefing-Book-2022 2023.pdf
(coloradoriverrecovery.org).
\5\Id.
---------------------------------------------------------------------------
Federal participation and non-federal cost-sharing for the
Programs were authorized in 2000 with the enactment of the
Upper Colorado and San Juan River Basins Endangered Fish
Recovery Programs Act.\6\ The law also cost shares between the
impacted states, water and power users, and the federal
government. The Cooperative Agreements that implement both
programs were scheduled to sunset in FY 2023. In 2019, the John
D. Dingell, Jr. Conservation, Management, and Recreation
Act.\7\ (Dingell Act) made several changes to the Programs'
federal authorizations. The Dingell Act required the Secretary
of the Interior to submit a Report to Congress by September 30,
2021, on recommendations for the programs post-2023.
---------------------------------------------------------------------------
\6\P.L. 106-392.
\7\P.L. 116-9.
---------------------------------------------------------------------------
On January 21, 2020, the U.S. Fish and Wildlife Service
(FWS) proposed to reclassify the humpback chub from endangered
to threatened under the ESA.\8\ On October 18, 2021, FWS
published the final rule to reclassify the humpback chub in the
Federal Register with the rule being effective on November 17,
2021.\9\ In addition, on July 6, 2021, FWS proposed to downlist
the razorback sucker from endangered to threatened under the
ESA.\10\ This rule has not yet been finalized.
---------------------------------------------------------------------------
\8\85 FR 3586.
\9\86 FR 57588.
\10\86 FR 35708.
---------------------------------------------------------------------------
The Consolidated Appropriations Act of 2023 extended the
authorities until FY 2024 and gave the FWS until September 30,
2022, to submit its report to Congress. That report was
submitted to Congress on March 13, 2023, and stated that ``two
of the species have shown documented progress towards recovery,
but progress is slower than originally anticipated and is
compounded by increasing stresses in the system.''\11\
---------------------------------------------------------------------------
\11\``Report to Congress on the Upper Colorado and San Juan River
Basins Endangered Fish Recovery Program.'' U.S. Fish and Wildlife
Service. March 2023. Page 5. https://naturalresources.house.gov/
uploadedfiles/reporttocongress_ucsjrip_2023_03.pdf.
---------------------------------------------------------------------------
H.R. 4596 extends the authorization of appropriations for
the Programs at current funding levels through FY 2031.
Section-by-Section Analysis
Section 1. Short title
Section 1 establishes the short title of the bill as the
``Upper Colorado and San Juan River Basins Endangered Fish
Recovery Programs Reauthorization Act of 2023.''
Section 2. Reauthorization of Upper Colorado and San Juan River Basins
Endangered Fish and Threatened Fish Recovery Implementation
Programs
Section 2 extends authorizations for the Upper Colorado
River and San Juan River Basins Endangered Fish Recovery
Programs through FY 2031, at current funding levels.
Committee Oversight Findings and Recommendations
Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII of the Rules of the House of Representatives, the
Committee on Natural Resources' oversight findings and
recommendations are reflected in the body of this report.
Compliance With House Rule XIII and Congressional Budget
Act
1. Cost of Legislation and the Congressional Budget Act.
With respect to the requirements of clause 3(c)(2) and (3) of
rule XIII of the Rules of the House of Representatives and
sections 308(a) and 402 of the Congressional Budget Act of
1974, the Committee has received the following estimate for the
bill from the Director of the Congressional Budget Office:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
The bill would:
Reauthorize appropriations for the Bureau of
Reclamation (BOR) to complete capital projects for fish
recovery programs in the Upper Colorado River Basin and
the San Juan River Basin
Reauthorize appropriations for annual
operating costs of those programs
Authorize BOR to accept and spend
contributions from the Western Area Power
Administration (WAPA) and nonfederal entities
Estimated budgetary effects would mainly stem from:
Authorizing appropriations for the fish
recovery programs
Spending from amounts contributed by WAPA
for those programs
Areas of significant uncertainty include:
Estimating how much WAPA would contribute to
the fish recovery programs
Bill summary: H.R. 4596 would authorize the Bureau of
Reclamation (BOR) to participate in fish recovery programs
through 2031 in the Upper Colorado River Basin and the San Juan
River Basin. The agency's authority to operate those programs
expires at the end of fiscal year 2024. The bill also would
allow BOR to accept and spend contributions from the Western
Area Power Administration (WAPA) for annual operating costs of
the fish recovery programs.
Estimated Federal cost: The estimated budgetary effects of
H.R. 4596 are shown in Table 1. The costs of the legislation
fall within budget functions 270 (energy) and 300 (natural
resources and environment).
TABLE 1.--ESTIMATED BUDGETARY EFFECTS OF H.R. 4596
--------------------------------------------------------------------------------------------------------------------------------------------------------
By fiscal year, millions of dollars--
--------------------------------------------------------------------------------------------------
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2024-2029 2024-2034
--------------------------------------------------------------------------------------------------------------------------------------------------------
INCREASES IN DIRECT SPENDING
Estimated Budget Authority........................... 2 2 2 2 2 2 2 2 0 0 0 12 16
Estimated Outlays.................................... * 3 2 2 2 2 2 2 1 0 0 11 16
INCREASES IN SPENDING SUBJECT TO APPROPRIATION
Estimated Authorizationa............................. 0 16 18 19 19 19 19 20 0 0 0 91 130
Estimated Outlays.................................... 0 11 17 18 18 19 19 20 8 0 0 83 130
--------------------------------------------------------------------------------------------------------------------------------------------------------
* = between zero and $500,000.
aThe Bureau of Reclamation has allocated $15 million for the capital and operating expenses of the fish recovery programs in 2024 from funds provided in
the Consolidated Appropriations Act, 2024 (Public Law 118-42). The amounts shown reflect the difference between what CBO estimates would be authorized
under the bill and the amount already provided.
Basis of estimate: For this estimate, CBO assumes that H.R.
4596 will be enacted around the middle of calendar year 2024,
that the estimated amounts will be appropriated in each year,
and that outlays will follow historical spending patterns.
Background: The endangered fish recovery programs for the
Upper Colorado River Basin and the San Juan River Basin were
established in 1988 and 1992, respectively, to aid in the
recovery of four fish identified under the Endangered Species
Act: Colorado pikeminnow, humpback chub, razorback sucker, and
bonytail. The program is operated in the basins in coordination
with the relevant states, Native American tribes, power
customers, and other nonfederal entities to protect endangered
fish and to maintain reliable water and power supplies to
customers served by the water and power facilities in the
basins. (Participating states include Colorado, New Mexico,
Utah, and Wyoming.)
Direct spending: CBO estimates that enacting H.R. 4596
would increase direct spending by $16 million over the 2024-
2034 period.
WAPA Proceeds for fish recovery programs: H.R. 4596 would
authorize BOR to accept and spend proceeds that WAPA receives
from the sale of electricity generated by the Colorado River
Storage Project. Under current law, WAPA uses a portion of
those proceeds to repay outstanding obligations it owes to the
Treasury; those amounts are deposited in the Treasury and are
not available to be spent. Under the bill, any funds that WAPA
contributes to BOR's fish recovery program would be counted as
debt repayment and deducted from WAPA's outstanding obligations
to the Treasury. Those funds could then be spent on fish
recovery programs without further appropriation.
The amount that WAPA allocates to debt repayment under
current law varies from year to year based on the financial
performance of the storage project. The storage project's
financial performance depends on hydrological conditions, water
levels, electricity prices, and power needs in the Upper
Colorado River Basin.
Relative to CBO's baseline projections for the amount of
debt repayments WAPA will make each year and based on
information from BOR and WAPA, CBO estimates that under the
bill WAPA would contribute $16 million to fish recovery
programs over the 2024-2034 period. Under the bill, those
amounts would be available for the program's annual operating
costs including conducting research, monitoring fish
populations, stocking of endangered fish and maintaining fish
recovery facilities. Based on historical spending patterns for
those programs, CBO estimates that enacting those provisions
would increase direct spending by less than $500,000 in 2024
and $16 million over the 2024-2034 period.
Contributions from nonfederal sources: H.R. 4596 also would
authorize BOR to accept and spend contributions by nonfederal
entities including states and tribes in the Upper Colorado and
San Juan River Basins. Those contributions would be used for
capital projects such as constructing fish passage structures,
screens, or escapement devices; restoring habitats; or
rehabilitating existing capital projects. Using information
from BOR, CBO estimates that agency's collections for such
purposes would average less than $1 million each year. Such
contributions are recorded in the budget as offsetting
receipts, that is, as reductions in direct spending. Because
CBO expects that the spending of those receipts would occur
soon after they are received, we estimate the net effect on
direct spending from enacting that provision would be
negligible in each year and over the 2024-2034 period.
Spending subject to appropriation: H.R. 4596 would
authorize the appropriation of $130 million over the 2024-2031
period, plus annual adjustments for inflation, for BOR to
operate and complete capital projects for the fish recovery
programs. In 2024, BOR has allocated $15 million for those
activities; therefore, CBO estimates the bill would authorize
an additional $115 million for those purposes over the 2024-
2031 period.
Because CBO cannot predict how much would be provided in
each year, we assume that it would be provided in roughly equal
increments over the 2025-2031 period. On that basis, and after
accounting for anticipated inflation, CBO estimates that the
bill would authorize the appropriation of an additional $130
million over the 2025-2031 period--$115 million for the
specified amounts and $15 million for anticipated inflation.
Assuming appropriation of those amounts, CBO estimates that
implementing the bill would cost $83 million over the 2024-2029
period and $130 million over the 2024-2034 period.
Uncertainty: This estimate is subject to uncertainty
surrounding expected contributions from the Colorado River
Storage Project to BOR. While the storage project contributed
approximately $21 million per year for BOR environmental
activities, including fish recovery, prior to 2019, CBO does
not expect that hydropower revenues will support that amount of
funding over the 2024-2034 period. However, given that revenues
can vary substantially based on hydrological conditions, the
storage project's actual contributions could be higher or lower
than projected in this estimate.
Pay-As-You-Go considerations: The Statutory Pay-As-You-Go
Act of 2010 establishes budget-reporting and enforcement
procedures for legislation affecting direct spending or
revenues. The increases in outlays that are subject to those
pay-as-you-go procedures are shown in Table 2.
TABLE 2.--CBO's ESTIMATE OF THE STATUTORY PAY-AS-YOU-GO EFFECTS OF H.R. 4596, THE UPPER COLORADO AND SAN JUAN RIVER BASINS ENDANGERED FISH RECOVERY
PROGRAMS REAUTHORIZATION ACT OF 2023, AS ORDERED REPORTED BY THE HOUSE COMMITTEE ON NATURAL RESOURCES ON SEPTEMBER 20, 2023
--------------------------------------------------------------------------------------------------------------------------------------------------------
By fiscal year, millions of dollars--
-----------------------------------------------------------------------------------------------
2024-
2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2029 2024-2034
--------------------------------------------------------------------------------------------------------------------------------------------------------
NET INCREASE IN THE DEFICIT
Pay-As-You-Go Effect.................................... 0 3 2 2 2 2 2 2 1 0 0 11 16
--------------------------------------------------------------------------------------------------------------------------------------------------------
Increase in long-term net direct spending and deficits: CBO
estimates that enacting H.R. 4596 would not increase net direct
spending or deficits in any of the four consecutive 10-year
periods beginning in 2035.
Mandates: The bill contains no intergovernmental or
private-sector mandates as defined in the Unfunded Mandates
Reform Act.
Estimate prepared by: Federal Costs: Alaina Rhee (Bureau of
Reclamation and Western Area Power Administration), Aurora
Swanson (Bureau of Reclamation), Willow Latham-Proenca (Western
Area Power Administration); Mandates: Erich Dvorak.
Estimate reviewed by: Robert Reese, Chief, Natural and
Physical Resources Cost Estimates Unit; Kathleen FitzGerald,
Chief, Public and Private Mandates Unit; H. Samuel Papenfuss,
Deputy Director of Budget Analysis.
Estimate approved by: Phillip L. Swagel, Director,
Congressional Budget Office.
2. General Performance Goals and Objectives. As required by
clause 3(c)(4) of rule XIII, the general performance goal or
objective of this bill is to reauthorize the Bureau of
Reclamation to provide cost-shared funding to implement the
endangered and threatened fish recovery programs for the Upper
Colorado and San Juan River Basins.
Earmark Statement
This bill does not contain any Congressional earmarks,
limited tax benefits, or limited tariff benefits as defined
under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of
the House of Representatives.
Unfunded Mandates Reform Act Statement
According to the Congressional Budget Office, H.R. 4596
contains no unfunded mandates as defined by the Unfunded
Mandates Reform Act.
Existing Programs
Directed Rule Making. This bill does not contain any
directed rule makings.
Duplication of Existing Programs. This bill does not
establish or reauthorize a program of the federal government
known to be duplicative of another program. Such program was
not included in any report from the Government Accountability
Office to Congress pursuant to section 21 of Public Law 111-139
or identified in the most recent Catalog of Federal Domestic
Assistance published pursuant to the Federal Program
Information Act (Public Law 95-220, as amended by Public Law 98
169) as relating to other programs.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Preemption of State, Local or Tribal Law
Any preemptive effect of this bill over state, local, or
tribal law is intended to be consistent with the bill's
purposes and text and the Supremacy Clause of Article VI of the
U.S. Constitution.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (existing law
proposed to be omitted is enclosed in black brackets, new
matter is printed in italics, and existing law in which no
change is proposed is shown in roman):
PUBLIC LAW 106-392
AN ACT To authorize the Bureau of Reclamation to provide cost sharing
for the endangered fish recovery implementation programs for the Upper
Colorado and San Juan River Basins.
SECTION 1. PURPOSE.
The purpose of this Act is to authorize and provide funding
for the Bureau of Reclamation to continue the implementation of
the endangered and threatened fish recovery implementation
programs for the Upper Colorado and San Juan River Basins in
order to accomplish the objectives of these programs within a
currently established time schedule.
SEC. 2. DEFINITIONS.
As used in this Act:
(1) The term ``Recovery Implementation Programs''
means the intergovernmental programs established
pursuant to the 1988 Cooperative Agreement [to
implement the Recovery Implementation Program for the
Endangered Fish Species in the Upper Colorado River
dated September 29, 1987, and extended by the Extension
of the Cooperative Agreement dated December 6, 2001,
and the 1992 Cooperative Agreement to implement the San
Juan River Recovery Implementation Program dated
October 21, 1992, and as they may be amended] for the
Recovery Implementation Program for Endangered Species
in the Upper Colorado River Basin dated September 29,
1987, and the 1992 Cooperative Agreement for the San
Juan River Basin Recovery Implementation Program dated
October 21, 1992, as the agreements may be amended and
extended by the parties thereto.
(2) The term ``Secretary'' means the Secretary of the
Interior.
(3) The term ``Upper Division States'' means the
States of Colorado, New Mexico, Utah, and Wyoming.
(4) The term ``Colorado River Storage Project'' or
``storage project'' means those dams, reservoirs, power
plants, and other appurtenant project facilities and
features authorized by and constructed in accordance
with the Colorado River Storage Project Act (43 U.S.C.
620 et seq.).
(5) The term ``capital projects'' means planning,
design, permitting or other compliance, pre-
construction activities, construction, construction
management, and replacement, rehabilitation, and repair
of facilities, and the acquisition of interests in land
or water, as necessary to carry out the Recovery
Implementation Programs.
(6) The term ``facilities'' includes facilities for
the genetic conservation or propagation of the
endangered or threatened fishes, those for the
restoration of floodplain habitat or fish passage,
those for control or supply of instream flows, those
for protection of critical habitat, those for
preventing entrainment of fish in water diversions, and
those for the [removal or translocation] control of
nonnative fishes.
(7) The term ``interests in land and water''
includes, but is not limited to, [long-term] leases and
easements, and [long-term] enforcement, or other
agreements protecting instream flows.
(8) The term ``base funding'' means funding for
operation and maintenance of capital projects,
implementation of recovery actions other than capital
projects, monitoring and research to evaluate the need
for or effectiveness of any recovery action, and
program management, as necessary to carry out the
Recovery Implementation Programs. Base funding also
includes annual funding provided under the terms of the
[1988 Cooperative Agreement and the 1992 Cooperative
Agreement] Recovery Implementation Programs .
(9) The term ``recovery actions other than capital
projects'' includes short-term [leases and agreements]
acquisitions for interests in land, water, and
facilities; the reintroduction or augmentation of
endangered or threatened fish stocks; and the removal,
translocation, or other control of nonnative fishes, as
approved under the