Background and Need for Legislation
In 2015, the Ninth Circuit Court of Appeals ruled in
Cottonwood Environmental Law Center v. United States Forest
Service (``Cottonwood'') that the U.S. Forest Service (USFS)
must reinitiate Endangered Species Act (ESA) consultation on
completed forest plans when a new species is listed, when
critical habitat is designated, or when new information is
brought forward. Since January 2016, there have been at least
35 Cottonwood-related lawsuits in 13 states and 57 notices of
intent (NOIs) to sue involving ESA new information claims,
challenging both plan-level and project-level decisions.
Completing re-consultation has required the USFS to spend an
estimated 400 person days valued at approximately $250,000 over
a 12-month period.
Cottonwood has led to significant challenges for USFS's
management of National Forest System lands, exacerbating the
forest health and wildfire crisis. Cottonwood unnecessarily
lengthens the consultation process and makes active forest
management projects virtually impossible to develop and
implement by creating limitless opportunities to reinitiate
consultation. This diverts finite agency resources from active
management in our nation's forests and public lands to endless
planning, regulatory compliance, and responses to litigation.
New lawsuits and threats of litigation directly contribute to
the devastating wildfire crisis by creating an `analysis
paralysis' where the agencies attempt to bulletproof
environmental reviews and consultations, only to still get
inevitably sued.
H.R. 200 is the latest example in a long, bipartisan
history that has spanned multiple administrations and
Congresses to enact a Cottonwood fix. In May of 2016, the Obama
administration petitioned the Supreme Court to review and
overturn the Cottonwood precedent. The Trump administration
supplemented that effort by crafting a proposed rule,
``Endangered and Threatened Wildlife and Plants; Regulations
for Interagency Cooperation,'' published on January 12, 2021,
to fix the Cottonwood precedent. Unfortunately, the Biden
administration has refused to finalize that rule. In addition,
Congress took bipartisan action advancing legislation in the
Senate Energy and Natural Resources Committee last year by a
bipartisan 16-4 vote to reverse Cottonwood's precedent.
Unfortunately, Congress failed to pass this fix by the end of
the 117th Congress, making the passage of the ``Forest
Information Reform Act'' or ``FIR Act'' necessary and urgent.
The Consolidated Appropriations Act of 2018 implemented a
partial fix to the Cottonwood ruling: an exemption from the re-
initiation of consultation, but only for species listings and
critical habitat designations (not new information) for 5 years
(through March 23, 2023). Urgently passing a full, permanent
fix to the Cottonwood decision is paramount, as the partial
legislative fix enacted by Congress in the FY 2018 Omnibus has
now expired. Resolving this issue is critically important for
the protection of our nation's forests and public lands and the
prioritization of critical agency resources. H.R. 200 would
also provide final, unwavering certainty to land managers who
have faced conflicting court decisions in the Ninth and Tenth
Circuit Courts and fix disparities between re-consultation
requirements as they are applied to USFS and the Bureau of Land
Management.
Section-by-Section Analysis
Section 1. Short title
Section 1 names the bill the ``Forest Information Reform
Act'' or ``FIR Act.''
Section 2. No additional consultation required
Section 2 amends the Forest and Rangeland Renewable
Resources Planning Act of 1974 and the Federal Land Policy and
Management Act of 1976 to specify that neither the U.S. Forest
Service nor Bureau of Land Management, respectively, are
required to reinitiate consultation on a land management or use
plan approved, amended, or revised, when a species is listed as
threatened or endangered, critical habitat is designated, or
new information concerning a listed species or critical habitat
becomes available.
Committee Oversight Findings and Recommendations
Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII of the Rules of the House of Representatives, the
Committee on Natural Resources' oversight findings and
recommendations are reflected in the body of this report.
Compliance With House Rule XIII and
Congressional Budget Act
1. Cost of Legislation and the Congressional Budget Act.
With respect to the requirements of clause 3(c)(2) and (3) of
rule XIII of the Rules of the House of Representatives and
sections 308(a) and 402 of the Congressional Budget Act of
1974, the Committee has received the following estimate for the
bill from the Director of the Congressional Budget Office:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
H.R. 200 would exempt the Bureau of Land Management and the
Forest Service from reinitiating consultations on approved land
management plans if a new species is listed as threatened or
endangered or if critical habitat is identified within an
approved plan's area. Under current law, those agencies must
reopen land management plans for additional consultation under
certain circumstances. Using information from the agencies on
current practices, CBO estimates that implementing H.R. 200
would not affect the federal budget.
On August 15, 2023, CBO transmitted a cost estimate for S.
1540, a bill to amend the Forest and Rangeland Renewable
Resources Planning Act of 1974 and the Federal Land Policy and
Management Act of 1976 to provide for circumstances under which
reinitiation of consultation is not required under a land and
resource management plan or land use plan under those Acts, and
for other purposes, as reported by the Senate Committee on
Energy and Natural Resources on July 25, 2023. The two bills
are similar, and CBO's estimates of their budgetary effects are
the same.
The CBO staff contact for this estimate is Lilia Ledezma.
The estimate was reviewed by Christina Hawley Anthony, Deputy
Director of Budget Analysis.
Phillip L. Swagel,
Director, Congressional Budget Office.
2. General Performance Goals and Objectives. As required by
clause 3(c)(4) of rule XIII, the general performance goal or
objective of this bill is to amend the Forest and Rangeland
Renewable Resources Planning Act of 1974 and the Federal Land
Policy and Management Act of 1976 to provide that the Secretary
of Agriculture and the Secretary of the Interior are not
required to reinitiate consultation on a land management plan
or land use plan under certain circumstances.
Earmark Statement
This bill does not contain any Congressional earmarks,
limited tax benefits, or limited tariff benefits as defined
under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of
the House of Representatives.
Unfunded Mandates Reform Act Statement
According to the Congressional Budget Office, H.R. 200
contains no unfunded mandates as defined by the Unfunded
Mandates Reform Act.
Existing Programs
Directed Rule Making. This bill does not contain any
directed rule makings.
Duplication of Existing Programs. This bill does not
establish or reauthorize a program of the federal government
known to be duplicative of another program. Such program was
not included in any report from the Government Accountability
Office to Congress pursuant to section 21 of Public Law 111-139
or identified in the most recent Catalog of Federal Domestic
Assistance published pursuant to the Federal Program
Information Act (Public Law 95-220, as amended by Public Law
98-169) as relating to other programs.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Preemption of State, Local or Tribal Law
Any preemptive effect of this bill over state, local, or
tribal law is intended to be consistent with the bill's
purposes and text and the Supremacy Clause of Article VI of the
U.S. Constitution.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (existing law
proposed to be omitted is enclosed in black brackets, new
matter is printed in italics, and existing law in which no
change is proposed is shown in roman):
FOREST AND RANGELAND RENEWABLE RESOURCES
PLANNING ACT OF 1974
* * * * * * *
Sec. 6. National Forest System Resource Planning.--(a) As a
part of the Program provided for by section 4 of this Act, the
Secretary shall develop, maintain, and, as appropriate, revise
land and resource management plans for units of the National
Forest System, coordinated with the land and resource
management planning processes of State and local governments
and other Federal agencies.
(b) In the development and maintenance of land management
plans for use on units of the National Forest System, the
Secretary shall use a systematic interdisciplinary approach to
achieve integrated consideration of physical, biological,
economic, and other sciences.
(c) The Secretary shall begin to incorporate the standards
and guidelines required by this section in plans for units of
the National Forest System as soon as practicable after
enactment of this subsection and shall attempt to complete such
incorporation for all such units by no later than September 30,
1985. The Secretary shall report to the Congress on the
progress of such incorporation in the annual report required by
section 8(c) of this Act. Until such time as a unit of the
National Forest System is managed under plans developed in
accordance with this Act, the management of such unit may
continue under existing land and resource management plans.
(d) Public Participation and Consultation.--
(1) In general.--The Secretary shall provide for
public participation in the development, review, and
revision of land management plans including, but not
limited to, making the plans or revisions available to
the public at convenient locations in the vicinity of
the affected unit for a period of at least three months
before final adoption, during which period the
Secretary shall publicize and hold public meetings or
comparable processes at locations that foster public
participation in the review of such plans or revisions.
[(2) No additional consultation required after
approval of land management plans.--
[(A) In general.--Except as provided in
subparagraph (B), notwithstanding any other
provision of law, the Secretary shall not be
required to engage in consultation under this
section or any other provision of law
(including section 7 of Public Law 93-205 (16
U.S.C. 1536) and section 402.16 of title 50,
Code of Federal Regulations (or a successor
regulation)) with respect to--
[(i) the listing of a species as
threatened or endangered, or a
designation of critical habitat
pursuant to Public Law 93-205 (16
U.S.C. 1531 et seq.), if a land
management plan has been adopted by the
Secretary as of the date of listing or
designation; and
[(ii) any provision of a land
management plan adopted as described in
clause (i).
[(B) Exception.--Subparagraph (A) shall not
apply if--
[(i) 15 years have passed since the
date on which the Secretary adopted the
land management plan described in
clause (i) of that subparagraph; and
[(ii) 5 years have passed since the
date of enactment of this section or
the date of the listing of a species as
threatened or endangered for a species
known to occur on the unit or the
designation of critical habitat within
the unit as described in clause (i) of
that subparagraph, whichever is later.
[(C) Effect of paragraph.--Nothing in this
paragraph affects any applicable requirement of
the Secretary to consult with the head of any
other Federal department or agency--
[(i) regarding any project carried
out, or proposed to be carried out, to
implement a land management plan
pursuant to Public Law 93-205 (16
U.S.C. 1531 et seq.), including any
requirement to consult regarding the
consideration of cumulative impacts of
completed, ongoing, and planned
projects; or
[(ii) with respect to--
[(I) the development of a
modification to a land
management plan; or
[(II) an amendment or
revision to a land management
plan in accordance with
paragraph (4) or (5) of
subsection (f).]
(2) No additional consultation required under certain
circumstances.--Notwithstanding any other provision of
law, the Secretary shall not be required to reinitiate
consultation under section 7(a)(2) of the Endangered
Species Act of 1973 (16 U.S.C. 1536(a)(2)) or section
402.16 of title 50, Code of Federal Regulations (or a
successor regulation), on a land management plan
approved, amended, or revised under this section when--
(A) a new species is listed or critical
habitat is designated under the Endangered
Species Act of 1973 (16 U.S.C. 1531 et seq.);
or
(B) new information reveals effects of the
land management plan that may affect a species
listed or critical habitat designated under
that Act in a manner or to an extent not
previously considered.
(e) In developing, maintaining, and revising plans for units
of the National Forest System pursuant to this section, the
Secretary shall assure that such plans--
(1) provide for multiple use and sustained yield of
the products and services obtained therefrom in
accordance with the Multiple-Use Sustained-Yield Act of
1960, and, in particular, include coordination of
outdoor recreation, range, timber, watershed, wildlife
and fish, and wilderness; and
(2) determine forest management systems, harvesting
levels, and procedures in the light of all of the uses
set forth in subsection (c)(1), the definition of the
terms ``multiple use'' and ``sustained yield'' as
provided in the Multiple-Use Sustained-Yield Act of
1960, and the availability of lands and their
suitability for resources management.
(f) Plans developed in accordance with this section shall--
(1) form one integrated plan for each unit of the
National Forest System, incorporating in one document
or one set of documents, available to the public at
convenient locations, all of the features required by
this section;
(2) be embodied in appropriate written material,
including maps and other descriptive documents,
reflecting proposed and possible actions, including the
planned timber sale program and the proportion of
probable methods of timber harvest within the unit
necessary to fulfill the plan;
(3) be prepared by an interdisciplinary team. Each
team shall prepare its plan based on inventories of the
applicable resources of the forest;
(4) be amended in any manner whatsoever after final
adoption after public notice, and, if such amendment
would result in a significant change in such plan, in
accordance with the provisions of subsections (e) and
(f) of this section and public involvement comparable
to that required by subsection (d) of this section; and
(5) be revised (A) from time to time when the
Secretary finds conditions in a unit have significantly
changed, but at least every fifteen years, and (B) in
accordance with the provisions of subsections (e) and
(f) of this section and public involvement comparable
to that required by subsection (d) of this section.
(g) As soon as practicable, but not later than two years
after enactment of this subsection, the Secretary shall in
accordance with the procedures set forth in section 553 of
title 5, United States Code, promulgate regulations, under the
principles of the Multiple-Use Sustained-Yield Act of 1960,
that set out the process for the development and revision of
the land management plans, and the guidelines and standards
prescribed by this subsection. The regulations shall include,
but not be limited to--
(1) specifying procedures to insure that land
management plans are prepared in accordance with the
National Environmental Policy Act of 1969, including,
but not limited to, direction on when and for what
plans an environmental impact statement required under
section 102(2)(C) of that Act shall be prepared;
(2) specifying guidelines which--
(A) require the identification of the
suitability of lands for resource management;
(B) provide for obtaining inventory data on
the various renewable resources, and soil and
water, including pertinent maps, graphic
material, and explanatory aids; and
(C) provide for methods to identify special
conditions or situations involving hazards to
the various resources and their relationship to
alternative activities:
(3) specifying guidelines for land management plans
developed to achieve the goals of the Program which--
(A) insure consideration of the economic and
environmental aspects of various systems of
renewable resource management, including the
related systems of silviculture and protection
of forest resources, to provide for outdoor
recreation (including wilderness), range,
timber, watershed, wildlife, and and fish;
(B) provide for diversity of plant and animal
communities based on the suitability and
capability of the specific land area in order
to meet overall multiple-use objectives, and
within the multiple-use objectives of a land
management plan adopted pursuant to this
section, provide, where appropriate, to the
degree practicable, for steps to be taken to
preserve the diversity of tree species similar
to that existing in the region controlled by
the plan;
(C) insure research on and (based on
continuous monitoring and assessment in the
field) evaluation of the effects of each
management system to the end that it will not
produce substantial and permanent impairment of
the productivity of the land;
(D) permit increases in harvest levels based
on intensified management practices, such as
reforestation, thinning, and tree improvement
if (i) such practices justify increasing the
harvests in accordance with the Multiple-Use
Sustained-Yield Act of 1960, and (ii) such
harvest levels are decreased at the end of each
planning period if such practices cannot be
successfully implemented or funds are not
received to permit such practices to continue
substantially as planned;
(E) insure that timber will be harvested from
National Forest System lands only where--
(i) soil, slope, or other watersheld
conditions will not be irreversibly
damaged;
(ii) there is assurance that such
lands can be adequately restocked
within five years after harvest;
(iii) protection is provided for
streams, streambanks, shorelines,
lakes, wetlands, and other bodies of
water from detrimental changes in water
temperatures, blockages of water
courses, and deposits of sediment,
where harvests are likely to seriously
and adversely affect water conditions
or fish habitat; and
(iv) the harvesting system to be used
is not selected primarily because it
will give the greatest dollar return or
the greatest unit output of timber; and
(F) insure that clearcutting, seed tree
cutting, shelterwood cutting, and other cuts
designed to regenerate an evenaged stand of
timber will be used as a cutting method on
National Forest System lands only where--
(i) for clearcutting, it is
determined to be the optimum method,
and for other such cuts it is