Background and Need for Legislation
Abandoned Hardrock Mines
Hardrock minerals include gold, lead, copper, silver, and
uranium and are widely used in smart phones computers,
automobiles, renewable energy infrastructure, and defense
technologies.\1\ Before modern applications of hardrock
minerals, the historic mining of these minerals was a strong
economic incentive that drove the exploration and settlement of
the western region of the United States in the 19th century,
prior to environmental laws and regulations.\2\ Once mines
became unproductive, many were abandoned, leaving behind
potentially hazardous structures and contaminated land and
water.\3\
---------------------------------------------------------------------------
\1\U.S. Gov't Accountability Off, GAO-21-298, Hardrock Mining
Management: Selected Countries, U.S. States, and Tribes Have Different
Governance Structures but Primarily Use Leasing (2021).
\2\See e.g., Bureau of Land Management, BLM-WO-GI-07-013-3720,
Abandoned Mine Lands: A Decade of Progress Reclaiming Hardrock Mines
(2007), available at https://www.gao.gov/assets/gao-21-298.pdf.
\3\Id.
---------------------------------------------------------------------------
Currently, an estimated 550,000 abandoned mine sites exist
on both private and public lands across the United States.\4\
With regard to Federal lands, Federal agencies have identified
that there are at least 140,000 abandoned hardrock mine
features, such as tunnels, on Federal lands.\5\ Approximately
67,000 of these sites pose physical safety hazards and
approximately 22,500 pose environmental risks.\6\ There are no
comprehensive estimates of potentially hazardous abandoned
mines on privately owned lands.
---------------------------------------------------------------------------
\4\Claudia Copeland, Cong. Rsch Serv. (R44286), Cleanup at Inactive
and Abandoned Mines: Issues in ``Good Samaritan'' Legislation in the
114th Congress, (March 4, 2016), available at https://
crsreports.congress.gov/product/pdf/R/R44285. [Hereinafter CRS Report
R44286].
\5\U.S. Gov't Accountability Off, GAO-20-238, Abandoned Hardrock
Mines: Information on Number of Mines, Expenditures, and Factors That
Limit Efforts to Address Hazards (2020), available at https://
www.gao.gov/assets/gao-20-238.pdf. [Hereinafter GAO-20-238].
\6\Id.
---------------------------------------------------------------------------
One of the primary environmental concerns with abandoned
hardrock mines is acid mine drainage (AMD), which is highly
acidic water that is also rich in heavy metals and pollutants,
such as arsenic, mercury, and lead.\7\ When AMD is mixed with
groundwater, surface water, or soil, it may have potentially
harmful effects on humans, animals, and plants.\8\ For example,
in August 2015, approximately 3 million gallons of AMD
wastewater was released into a tributary of the Animas River
from the Gold King Mine, an abandoned gold mine site in
Colorado.\9\ This release resulted in elevated levels of some
metals, which impacted downstream communities in New Mexico,
Utah, and the Navajo Nation, as well as agricultural
operations, recreational tourism, and other natural
resources.\10\
---------------------------------------------------------------------------
\7\U.S. Gov't Accountability Off, GAO-23-105408, Abandoned Hardrock
Mines: Land Management Agencies Should Improve Reporting of Total
Cleanup Costs (2023), available at https://www.gao.gov/assets/gao-23-
105408.pdf. [Hereinafter GAO-23-105408].
\8\U.S. Environmental Protection Agency, Abandoned Mine Drainage,
(October 25, 2024), available at https://www.epa.gov/nps/abandoned-
mine-drainage#::text=Acid%20mine%20drain
age%20is%20the,on%20humans%2C%20animals%20and%20plants.
\9\CRS Report, supra note 4.
\10\E.g., State of New Mexico Office of Natural Resources Trustee,
Gold King Mine (2024), available at https://onrt.env.nm.gov/blog/2022/
03/25/gold-king-mine/.
---------------------------------------------------------------------------
Hardrock Mine Remediation
Remediating abandoned hardrock mines requires varying
levels and types of work, largely based on the kind, extent,
and concentration of contaminants present at a site. These
efforts may involve treating contaminated water on a short- or
long-term basis, covering disturbed areas with soil and
vegetation, removing hazardous substances, or implementing
other remedial actions.\11\
---------------------------------------------------------------------------
\11\GAO-23-105408, supra note 7.
---------------------------------------------------------------------------
Remediation costs of abandoned hardrock mine sites are
estimated to be $50 billion.\12\ Federal agencies, such as the
United States Departments of the Interior and Agriculture, can
remediate abandoned mines on lands they oversee; however, their
efforts are constrained by limited funding. For example,
between fiscal year (FY) 2017 and FY 2021, the Department of
the Interior spent approximately $109 million, while the
Department of Agriculture allocated about $10 million on
remediation projects.\13\ Additionally, the Infrastructure
Investment and Jobs Act authorized, from FY 2022 through FY
2036, approximately $11 billion in grants for states and tribes
to address abandoned hardrock mine lands, but the program is
subject to the availability of appropriations.\14\
---------------------------------------------------------------------------
\12\Priority Notice of Action, 74 Fed. Reg. 37213 (July 28, 2009).
\13\GAO-23-105408, supra note 7.
\14\30 U.S.C. Sec. 1231a.
---------------------------------------------------------------------------
There is interest from ``Good Samaritan'' entities in
remediating legacy pollution at abandoned mine sites. These
Good Samaritans are generally states, non-governmental
organizations, and mining companies that did not cause
pollution at the mine site and bear no legal responsibility for
remediating it.\15\ However, many Good Samaritans are dissuaded
from engaging in cleanup activities because of potential
liability under the Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) and the Clean Water
Act (CWA).\16\
---------------------------------------------------------------------------
\15\E.g., CRS Report R44286, supra note 4.
\16\GAO-20-238, supra note 5.
---------------------------------------------------------------------------
Comprehensive Environmental Response, Compensation, and Liability Act
Liability
CERCLA, administered by the Environmental Protection Agency
(EPA), is the Federal Government's principal law for addressing
the cleanup of sites contaminated with hazardous substances,
pollutants, or contaminants.\17\ CERCLA establishes a framework
for the EPA to compel potentially responsible parties to clean
up contaminated sites, recover cleanup costs from those
parties, and assess and recover damages to natural resources
caused by such a release.\18\
---------------------------------------------------------------------------
\17\David M. Bearden, Cong. Rsch Serv. (R41039), Comprehensive
Environmental Response, Compensation, and Liability Act: A Summary of
Superfund Cleanup Authorities and Related Provisions of the Act, (June
14, 2012), available at https://www.crs.gov/reports/pdf/R41039/
R41039.pdf. [Hereinafter CRS Report R41039].
\18\Id.
---------------------------------------------------------------------------
Section 107 of CERCLA identifies four categories of
potentially responsible parties: (1) any current owner or
operator; (2) any past owner or operator; (3) any person who
arranged for the disposal or treatment of hazardous substance;
and (4) any person who transported hazardous substances for
disposal or treatment.\19\ Liability for potentially
responsible parties is triggered if there has been an actual or
threatened release of a hazardous substance that causes the
incurrence of responsible costs.\20\
---------------------------------------------------------------------------
\19\42 U.S.C.Sec. 9607.
\20\There are currently about 800 CERCLA hazardous substances. The
CERCLA list of hazardous substances can be found at 40 CFR part 302.4
in Table 302.4 ``List of Hazardous Substances and Reportable
Quantities''.
---------------------------------------------------------------------------
Courts have interpreted CERCLA liability to be retroactive
(parties may be liable for the release of hazardous substances
prior to the enactment of CERCLA on December 11, 1980), strict
(a party may be liable regardless of whether their conduct was
negligent), and joint and several (a party may be liable for
all cleanup costs at a site, regardless of the scope of their
involvement on the site).\21\ If potentially liable parties can
be identified and are able to finance a cleanup, the Federal
government can enforce cleanup liability through CERCLA in
several ways, through: (1) a judicial or administrative order;
(2) cost-recovery actions through administrative or judicial
proceedings; or (3) voluntary settlement agreements.\22\
---------------------------------------------------------------------------
\21\E.g., CRS Report R44286, supra note 4.
\22\EPA, Comprehensive Environmental Response, Compensation, and
Liability Act (CERCLA) and Federal Facilities, available at https://
www.epa.gov/enforcement/comprehensive-environ mental-response-
compensation-and-liability-act-cercla-and-federal.
---------------------------------------------------------------------------
Good Samaritans contend that current CERCLA liability
provisions discourage their involvement in abandoned mine site
remediation projects.\23\
---------------------------------------------------------------------------
\23\GAO-20-238, supra note 5.
---------------------------------------------------------------------------
Clean Water Act Liability
The CWA is the primary law governing water quality of the
Nation's surface waters and is predicated on the principle that
discharges into waters of the United States (WOTUS) are only
lawful if authorized by a permit.\24\ The CWA establishes two
permitting regimes: (1) the section 404 permit to regulate the
discharge of dredged or fill materials into navigable waters
and (2) the section 402 National Pollution Elimination
Discharge Permit (NPDES) to regulate discharges of pollutants
from point sources into navigable waters.\25\
---------------------------------------------------------------------------
\24\Laura Gatz, Cong. Rsch. Serv. (RL30030), Clean Water Act: A
Summary of the Law, (Updated Oct. 18, 2016), available at https://
www.crs.gov/Reports/RL30030 [hereinafter CRS Report RL30030].
\25\CWA, Pub. L. 92-500, 86 Stat. 816 [hereinafter CWA].
---------------------------------------------------------------------------
NPDES permits require the point source to attain
technology-based effluent limits, while specifying the
numerical effluent limitations that sources must meet in order
to guarantee water quality when required, and a deadline for
compliance.\26\ Complying with such permit requirements at mine
sites can be expensive and may require continuous water
treatment because of naturally occurring heavy metals and
continual drainage from the mines.\27\
---------------------------------------------------------------------------
\26\EPA, Permit Limits--TBELs and WQBELs, available at https://
www.epa.gov/npdes/permitlimits-tbels-and-wqbels.
\27\GAO-20-238, supra note 5.
---------------------------------------------------------------------------
The CWA authorizes the EPA to approve individual states and
tribes to manage their own NPDES permitting programs. Nearly
all states have assumed administration of their own NPDES
permitting programs, with only three exceptions: Massachusetts,
New Hampshire, and New Mexico.\28\ Because states issue the
majority of permits, the majority of enforcement actions under
the CWA are undertaken by states.\29\ Although the Federal
Government generally lacks the resources for day-to-day CWA
monitoring and enforcement, the EPA maintains oversight of
state enforcement actions and may intervene to enforce criminal
violations of Federal law or if a state has failed to act or
requests EPA involvement.\30\
---------------------------------------------------------------------------
\28\Id.
\29\Id.
\30\Id.
---------------------------------------------------------------------------
Additionally, individuals may bring a citizen suit in a
United States district court against any person who is alleged
to be in violation of an effluent standard or limitation under
the CWA if they are being adversely affected or may be
adversely affected by the violation.\31\ Similar to CERCLA
liability concerns, Good Samaritans cite potential liabilities
under the CWA as a reason not to pursue abandoned mine
remediation projects.
---------------------------------------------------------------------------
\31\33 U.S.C. Sec. 1365.
---------------------------------------------------------------------------
EPA Administrative Actions
The EPA has previously attempted to address the liability
concerns raised by potential Good Samaritans and incentivize
cleanup activities at abandoned mine sites through certain
administrative actions. In 2007, the EPA issued ``Interim
Guiding Principles for Good Samaritan Projects at Orphan Mine
Sites and Transmittal of CERCLA Administrative Tools for Good
Samaritans,'' which outlines and provides templates for a
comfort/status letter and a Good Samaritan Settlement
Agreement.\32\ These are agreements between the EPA and a Good
Samaritan that include a Federal covenant protecting Good
Samaritans for cleanup actions.
---------------------------------------------------------------------------
\32\Memorandum, from Granta Nakayama, Assistant Administrator,
Office of Enforcement and Compliance Assurance, EPA, et al., to
Regional Administrators, Regions I-X, et al., Interim Guiding
Principles for Good Samaritan Projects at Orphan Mine Sites and
Transmittal of CERCLA Administrative Tools for Good Samaritans, (June
6, 2007), available at https://www.epa.gov/sites/default/files/2017-10/
documents/cercla-goodsam-principles-memo-ed2015.pdf.
---------------------------------------------------------------------------
Additionally, in 2012, the EPA issued additional Good
Samaritan guidance for NPDES permit requirements that outlines
the circumstances when a Good Samaritan completes cleanup
actions under the existing 2007 administrative tools would not
be required to obtain a discharge permit.\33\
---------------------------------------------------------------------------
\33\Environmental Protection Agency, Clean Water Act Sec. 402
National Pollutant Discharge Elimination System Permit Requirements for
``Good Samaritans'' at Orphan Mine Sites (Dec. 12, 2012).
---------------------------------------------------------------------------
While some stakeholders have reported that the existing EPA
administrative tools alleviate some of the CERCLA liability
concerns, the NPDES guidance does not protect Good Samaritans
from citizen suits.\34\ Because of these concerns, these
administrative tools have only been used in a handful of
instances since they were developed. As of January 2020, EPA
had issued four comfort letters and entered into three
settlement agreements, generally to address hazards at sites
that did not require a NPDES permit.\35\
---------------------------------------------------------------------------
\34\GAO-20-238, supra note 5.
\35\Id.
---------------------------------------------------------------------------
H.R. 7779, the Good Samaritan Remediation of Abandoned Hardrock Mines
Act of 2024
H.R. 7779 seeks to provide Good Samaritans with a more
comprehensive liability shield from potential CERCLA and CWA
liabilities at abandoned hardrock mine sites by establishing a
new Good Samaritan permit program at the EPA. Specifically,
this legislation establishes a pilot program to issue up to 15
Good Samaritan permits within seven years for remediation
projects on both Federal and non-Federal lands.
Good Samaritan permits are authorized for remediation
projects that are low-risk and are required to be issued a
Finding of No Significant Impact under the National
Environmental Policy Act. A conditional liability shield for
CERCLA and the CWA is provided to permit holders and
cooperating persons who remain in compliance with their permit
terms.
The Committee directs the EPA to report annually to the
House Committee on Transportation and Infrastructure, the House
Committee on Energy and Commerce, the House Committee on
Natural Resources, the Senate Environment and Public Works
Committee, and the Senate Energy and Natural Resources
Committee about any permit applications that are considered to
be denied pursuant to section 4(m)(2)(B), including the
applicant, the abandoned hardrock mine site that is the subject
of the permit application, any activity the Administrator or
the Agency has taken with respect to the permit application,
and why the Administrator did not grant or deny the permit
before section 4(m)(2)(B) took effect.
Hearings
For the purposes of rule XIII, clause 3(c)(6)(A) of the
118th Congress--
The Subcommittee on Water Resources and Environment of the
Committee on Transportation and Infrastructure held a hearing
entitled, ``The Next Fifty Years of the Clean Water Act:
Examining the Law and Infrastructure Project Completion,'' on
May 16, 2023, which informed the Committee's consideration of
H.R. 7779. The Subcommittee received testimony from Dr. Andrea
Travnicek, Director, Department of Water Resources, State of
North Dakota; The Honorable Serena Coleman McIlwain, Secretary
of the Environment, State of Maryland; Mr. Mickey Conway, CEO,
Metro Water Recovery, Denver, Colorado, on behalf of the
National Association of Clean Water Agencies; and Mr. Brandon
Farris, Vice President, Energy and Resources Policy, National
Association of Manufacturers.
LEGISLATIVE HISTORY AND CONSIDERATION
H.R. 7779, the ``Good Samaritan Remediation of Abandoned
Hardrock Mines Act of 2024'', was introduced in the United
States House of Representatives of March 21, 2024, by Ms. Maloy
of Utah, Mrs. Peltola of Alaska, Mr. Curtis of Utah, Ms. Lee of
Nevada, Mr. Fulcher of Idaho, Mr. Costa of California, and Mr.
Moore of Utah and referred to the Committee on Transportation
and Infrastructure, the Committee on Energy and Commerce, and
the Committee on Natural Resources. Within the Committee on
Transportation and Infrastructure, H.R. 7779 was referred to
the Subcommittee Water Resources and the Environment. The
Subcommittee on Water Resources and the Environment was
discharged from further consideration of H.R. 7779 on September
18, 2024.
The Committee considered H.R. 7779 on September 18, 2024,
and ordered the measure to be reported to the House with a
favorable recommendation, with amendment, by voice vote.
Committee Votes
Clause 3(b) of rule XIII of the Rules of the House of
Representatives requires each committee report to include the
total number of votes cast for and against on each record vote
on a motion to report and on any amendment offered to the
measure or matter, and the names of those members voting for
and against.
No recorded votes were requested during consideration of
H.R. 7779.
COMMITTEE OVERSIGHT FINDINGS AND RECOMMENDATIONS
With respect to the requirements of clause 3(c)(1) of rule
XIII of the Rules of the House of Representatives, the
Committee's oversight findings and recommendations are
reflected in this report.
NEW BUDGET AUTHORITY AND TAX EXPENDITURES
Clause 3(c)(2) of rule XIII of the Rules of the House of
Representatives does not apply where a cost estimate and
comparison prepared by the Director of the Congressional Budget
Office under section 402 of the Congressional Budget Act of
1974 has been timely submitted prior to the filing of the
report and is included in the report. Such a cost estimate is
included in this report.
CONGRESSIONAL BUDGET OFFICE COST ESTIMATE
With respect to the requirement of clause 3(c)(3) of rule
XIII of the Rules of the House of Representatives and section
402 of the Congressional Budget Act of 1974, the Committee has
received the enclosed cost estimate for H.R. 7779 from the
Director of the Congressional Budget Office:
The Congressional Budget Act of 1974 requires the
Congressional Budget Office, to the extent practicable, to
prepare estimates of the budgetary effects of legislation
ordered reported by Congressional authorizing committees. In
order to provide the Congress with as much information as
possible, the attached table summarizes information about the
estimated direct spending and revenue effects of some of the
legislation that has been ordered reported by the House
Committee on Transportation and Infrastructure during the 118th
Congress. The legislation listed in this table generally would
have small effects, if any, on direct spending or revenues, CBO
estimates. Where possible, the table also provides information
about the legislation's estimated effects on spending subject
to appropriation and on intergovernmental and private-sector
mandates as defined in the Unfunded Mandates Reform Act.
ESTIMATED BUDGETARY EFFECTS AND MANDATES INFORMATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Spending
Last Budget Direct Revenues, subject to Pay-as-you-go Budgetary
Bill number Title Status action function spending, 2025- 2025-2034 appropriation, procedures effects after Mandates Contact
2034 2025-2029 apply? 2034
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
H.R. 1586... Forest Protection Ordered reported.. 11/15/23 300 0 0 Not estimated No No Yes Lilia Ledezma
and Wildland
Firefighter
Safety Act of
2023.
H.R. 1586 would authorize federal, state, local, and tribal firefighting agencies to use approved fire retardants to prevent and suppress wildfires without first obtaining a
National Pollutant Discharge Elimination System permit. The bill also would prohibit state courts from issuing injunctions against state or tribal entities' dispersal of aerial
fire retardants as part of wildfire suppression or control. CBO estimates that enacting H.R. 1586 would not affect direct spending or revenues. CBO has not estimated the bill's
effects on spending subject to appropriation. The bill would impose an intergovernmental mandate as defined in the Unfunded Mandates Reform Act (UMRA) that would not exceed the
annual threshold established in UMRA ($100 million in 2024, adjusted annually for inflation). The bill contains no private-sector mandates as defined in UMRA.
H.R. 1720... Ocean Pollution Ordered reported.. 09/18/24 300 0 0 Not estimated No No No Aurora Swanson
Reduction Act II.
H.R. 1720 would allow the Point Loma Wastewater Treatment Plant in San Diego, California, to discharge water without applying for an exemption from the secondary treatment
standards of the National Pollutant Discharge Elimination System if plant meets certain conditions specified in the bill. CBO estimates that enacting H.R. 1720 would not affect
direct spending or revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no intergovernmental or private-sector mandates as
defined in the Unfunded Mandates Reform Act.
H.R. 2892... WARN Act.......... Ordered reported.. 09/18/24 800 0 0 Between zero No No No Matthew Pickford
and $500,000
H.R. 2892 would require the Government Accountability Office within 18 months of enactment to study and report on the effectiveness of the nation's weather emergency alert
systems. CBO estimates that enacting H.R. 2892 would not affect direct spending or revenues. CBO estimates that implementing the bill would increase spending subject to
appropriation by less than $500,000 over the 2025-2029 period. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 3149... A bill to Ordered reported.. 09/18/24 400 0 0 Between zero No No No Kelly Durand
designate United and $500,000
States Route 20
in the States of
Oregon, Idaho,
Montana, Wyoming,
Nebraska, Iowa,
Illinois,
Indiana, Ohio,
Pennsylvania, New
York, and
Massachusetts as
the ``National
Medal of Honor
Highway,'' and
for other
purposes.
H.R. 3149 would designate U.S. Route 20 as the National Medal of Honor Highway. CBO estimates that enacting H.R. 3149 would not affect direct spending or revenues. CBO estimates
that implementing the bill would increase spending subject to appropriation by less than $500,000 over the 2025-2029 period. The bill contains no intergovernmental or private-
sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 3988... ARTICLE ONE Act... Ordered reported.. 09/18/24 800 Between - 0 Not estimated Yes No No Kelly Durand
$500,000 and
zero
H.R. 3988 would amend the National Emergencies Act to limit to 30 days the duration of any national emergency declared by the President unless the Congress subsequently approves
or extends the declaration. The bill also would require the President to report to the Congress periodically on the need for and status of declared emergencies. CBO cannot
predict the number or timing of future declarations but expects that most would be approved by the Congress. Under H.R. 3988 emergency declarations could have a shorter duration
than under current law. If that happens direct spending related to such emergencies would decline; CBO estimates any reduction in direct spending would be insignificant. CBO
estimates that enacting the bill would not affect revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no intergovernmental
or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 4043... H.R. 4043, a bill Ordered reported.. 09/18/24 300 0 0 Not estimated No No No Aurora Swanson
to amend the Save
Our Seas 2.0 Act
to expand
eligibility for
certain
wastewater
infrastructure
grants, and for
other purposes.
H.R. 4043 would expand eligibility for certain wastewater infrastructure grants administered by the Environmental Protection Agency. CBO estimates that enacting H.R. 4043 would
not affect direct spending or revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no intergovernmental or private-sector
mandates as defined in the Unfunded Mandates Reform Act.
H.R. 6241... FULL Act.......... Ordered reported.. 11/15/23 800 Between zero 0 Not estimated No No No Matthew Pickford
and $500,000
H.R. 6241 would require federal agencies that have lease agreements with the General Services Administration (GSA) to annually report to GSA on their monthly use and occupancy
rates. Under the bill, agencies would be required to return space to GSA if occupancy falls below 60 percent for six months over any one-year period. Enacting H.R. 6241 could
increase direct spending by some agencies that are allowed to use fees, receipts from the sale of goods, and other collections to cover operating costs. CBO estimates that any
net changes in direct spending by those agencies would be negligible because most of them can adjust amounts collected to reflect changes in operating costs. CBO estimates that
enacting H.R. 6241 would have no effect on revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no intergovernmental or
private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 6984... A bill to Ordered reported.. 09/18/24 800 0 0 Between zero No No No Matthew Pickford
designate the and $500,000
Federal building
located at 300 E.
3rd Street in
North Platte,
Nebraska, as the
``Virginia Smith
Federal
Building,'' and
for other
purposes.
H.R. 6984 would designate the federal building located at 300 E. 3rd Street in North Platte, Nebraska, as the Virginia Smith Federal Building. CBO estimates that enacting H.R.
6984 would not affect direct spending or revenues. CBO estimates that implementing the bill would increase spending subject to appropriation by less than $500,000 over the 2025-
2029 period. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 7671... Disaster Ordered reported.. 09/25/24 450 0 0 Not estimated No No No Jon Sperl
Management Costs
Modernization Act.
H.R. 7671 would allow state and local governments that receive disaster assistance from the Federal Emergency Management Agency to repurpose unused funds that originally were
allocated for management costs. State and local governments could use the funds to increase their administrative capacity to prepare for, recover from, or mitigate the effects
of disasters. Under current law, unused funds are returned to the Disaster Relief Fund. Under the bill, those governments could retain unused funds for up to five years for
disasters that are declared on or after the bill's enactment date. CBO estimates that enacting H.R. 7671 would not affect direct spending or revenues. CBO has not estimated the
bill's effects on spending subject to appropriation. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 7779... Good Samaritan Ordered reported.. 09/18/24 300 Between zero 0 Not estimated Yes Insignificant No Aurora Swanson
Remediation of and $500,000
Abandoned
Hardrock Mines
Act of 2024.
H.R. 7779 would establish a Good Samaritan pilot program and authorize the Environmental Protection Agency to issue permits for projects to remediate mine residue at abandoned
hardrock mine sites. The bill would establish a remediation fund for federal agencies to administer projects carried out by Good Samaritans (entities that are not current owners
or operators of an abandoned site; had no role in the creation of the mine residue; and are not potentially liable under any law for the remediation, treatment, or control of
the mine residue). The spending would be funded by appropriations and by deposits from nonfederal sources, such as donations, agreements for long-term operations and maintenance
costs, and insurance proceeds if a Good Samaritan fails to complete a project. The bill also would waive the applicability of all other laws with respect to the use of the fund,
including the Antideficiency Act, which could allow amounts to be obligated before expected deposits into the fund are received. However, CBO expects that spending of any such
advance obligations would be constrained by amounts ultimately deposited into the fund. On that basis, CBO estimates that enacting H.R. 7779 would increase net direct spending
by less than $500,000 over the 2025-2034 period and have no effect on revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains
no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 8505... Household Goods Ordered reported.. 09/18/24 400 0 Between Not estimated Yes No No Zunara Naeem
Shipping Consumer zero and
Protection Act. $500,000
H.R. 8505 would allow the Federal Motor Carrier Safety Administration to assess penalties for entities that illegally ship household goods. The bill also would allow states to
enforce and collect fines on such entities. As a result, CBO estimates that enacting H.R. 8505 could increase revenues because those penalties are recorded in the budget as
revenues. Because the number of entities affected is likely to be small, CBO estimates that the increase in revenues would be less than $500,000 over the 2025-2034 period. CBO
estimates that enacting the bill would have no effect on direct spending. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no
intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 8530... Improving Federal Ordered reported.. 09/18/24 800 Between zero 0 Not estimated Yes No No Matthew Pickford
Building Security and $500,000
Act of 2024.
H.R. 8530 would require federal agencies to respond within 90 days to recommendations by the Federal Protective Service, within the Department of Homeland Security (DHS),
concerning building security. Agencies could adopt or reject those recommendations but would need to explain their rejections. The bill would require DHS to track
recommendations and responses and to report annually to the Congress concerning all recommendations. Enacting H.R. 8530 could increase direct spending by some agencies that are
allowed to use fees, receipts from the sale of goods, and other collections to cover operating costs. CBO estimates that any net changes in direct spending by those agencies
would be negligible because most of them can adjust amounts collected to reflect changes in operating costs. CBO estimates that enacting would have no effect on revenues. CBO
has not estimated the bill's effects on spending subject to appropriation. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates
Reform Act.
H.R. 8692... The Amtrak Ordered reported.. 09/18/24 400 0 0 0 No No Yes Zunara Naeem
Transparency and
Accountability
for Passengers
and Taxpayer Act.
H.R. 8692 would require Amtrak to hold open meetings in accordance with current requirements for most federal agencies. Because Amtrak is considered a nonfederal entity, CBO
estimates that enacting H.R. 8692 would have no effect on the federal budget. The bill would impose a private-sector mandate as defined in the Unfunded Mandates Reform Act
(UMRA) that would not exceed the annual threshold established in UMRA ($200 million in 2024, adjusted annually for inflation). The bill contains no intergovernmental mandates as
defined in UMRA.
H.R. 8995... Baby Changing on Ordered reported.. 09/18/24 400 0 0 0 No No Yes Kelly Durand
Board Act.
H.R. 8995 would require Amtrak trains purchased after the bill's enactment to include baby-changing tables in all train restrooms that are subject to the requirements of the
Americans With Disabilities Act of 1990. Because Amtrak is considered a nonfederal entity, CBO estimates that enacting H.R. 8995 would hav