[To accompany H.R. 6482] The Committee on Natural Resources, to whom was referred the bill (H.R. 6482) to amend the Geothermal Steam Act of 1970 to promote timely exploration for geothermal resources under geothermal leases, and for other purposes, having considered the same, reports favorably thereon with an amendment and recommends that the bill as amended do pass. The amendment is as follows: Strike all after the enacting clause and insert the following: SECTION 1. SHORT TITLE. This Act may be cited as the ``Enhancing Geothermal Production on Federal Lands Act''. SEC. 2. GEOTHERMAL PRODUCTION ON FEDERAL LANDS. The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) is amended by adding at the end the following: ``SEC. 30. GEOTHERMAL EXPLORATION PROJECTS. ``(a) Definitions.--In this section: ``(1) Geothermal exploration project.--The term `geothermal exploration project' means the drilling of a temperature gradient well, monitoring well, calibration well, or another geothermal exploratory well, including construction or making improvements for such activities, on lands for which the Secretary has issued a geothermal lease-- ``(A) that is carried out by the holder of the lease; ``(B) for which-- ``(i) the last cemented casing string has an outer diameter of less than 13 inches; and ``(ii) the total unreclaimed surface disturbance at any one time within the project area is less than 5 acres, not including the area of a permanent or temporary access road; ``(C) that is completed in less than 120 days, including the removal of any surface infrastructure from the project area; and ``(D) that requires the restoration of the project area within 3 years of the date of first exploration drilling to approximately the condition that existed at the time the project began, unless the project area is subsequently used as part of energy development under the lease. ``(2) Covered activity.--The term `covered activity' includes, with respect to exploration, development, or production (including direct use) of geothermal resources-- ``(A) a geotechnical investigation; ``(B) off-road travel in a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan; and ``(C) construction, maintenance, realignment, and repair of an existing permanent or temporary access road within a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan. ``(b) Non-Major Federal Action.--Geothermal exploration projects and covered activities shall not be considered major Federal actions under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). ``(c) Requirement To Provide Notice.--The holder of a geothermal lease shall provide to the Secretary notice of their intent to carry out a geothermal exploration project at least 30 days before the start of drilling under the project.''. SEC. 3. GEOTHERMAL LEASING PRIORITY AREAS. The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) is further amended by adding at the end the following: ``SEC. 31. GEOTHERMAL LEASING PRIORITY AREAS. ``(a) Definition of Covered Land.--In this section, the term `covered land' means land that is-- ``(1) Federal land; and ``(2) not excluded from the development of geothermal energy under-- ``(A) a land use plan established under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); or ``(B) any other Federal law. ``(b) Designation of Geothermal Leasing Priority Areas.--The Secretary, in consultation with the Secretary of Energy, shall designate portions of covered land as geothermal leasing priority areas as soon as practicable, but not later than 5 years, after the date of enactment of this section. ``(c) Criteria for Selection.--In determining which covered lands to designate as geothermal leasing priority areas under subsection (b), the Secretary, in consultation with the Secretary of Energy, shall consider if-- ``(1) the covered land is preferable for geothermal leasing; ``(2) production of geothermal energy on such land is economically viable, including if such land has access to methods of energy transmission; and ``(3) the designation would be in compliance with section 202 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712), including subsection (c)(9) of such section. ``(d) Review and Modification.--Not less frequently than once every 5 years, the Secretary shall-- ``(1) review covered land and, if appropriate, make additional designations of geothermal leasing priority areas; and ``(2) review each area designated as a geothermal leasing priority area under this section, and, if appropriate, remove such designation. ``(e) Programmatic Environmental Impact Statement.-- ``(1) Initial designations.--Not later than one year after the initial designation of a geothermal leasing priority area, the Secretary shall prepare a supplement to any final programmatic environmental impact statement for geothermal leasing that is the most recently finalized such statement with respect to covered land designated as a geothermal leasing priority area under subsection (b). ``(2) Subsequent designations.--Each designation of a geothermal leasing priority area under subsection (b) shall be included in a programmatic environmental impact statement for geothermal leasing or in a supplement to such a statement. ``(3) Consultations.--In developing any programmatic environmental impact statement for geothermal leasing or supplement to such a statement under this section, the Secretary shall consult, on an ongoing basis, with appropriate State, Tribal, and local governments, transmission infrastructure owners and operators, developers, and other appropriate entities. ``(4) Procedure.--The Secretary may not delay issuing a permit or holding a lease sale under this Act because the supplement required under paragraph (1) has not been finalized by the Secretary. ``(f) Compliance With NEPA.--If the Secretary determines that the designation of a geothermal leasing priority area has been sufficiently analyzed by a programmatic environmental impact statement, the Secretary shall not prepare any additional analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to geothermal lease sales for such geothermal leasing priority area.''. SEC. 4. FINDINGS. Congress finds that-- (1) pursuant to section 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c), as amended by section 321(b) of the Fiscal Responsibility Act of 2023 (Public Law 118-5), the Bureau of Land Management announced on April 15, 2024, it had adopted categorical exclusions from the Department of the Navy and the United States Forest Service for geothermal exploration; and (2) if appropriately used, these categorical exclusions are expected to expedite the review and approval of geothermal exploration proposals on Bureau of Land Management lands. Purpose of the Legislation The purpose of H.R. 6482 is to amend the Geothermal Steam Act of 1970 to promote timely exploration for geothermal resources under geothermal leases, and for other purposes.

Background and Need for Legislation

Geothermal power is considered a renewable energy resource and is derived by capturing heat from an underground water reservoir or naturally generated steam under high pressure.\1\ The Department of Energy (DOE) projects that enhanced geothermal systems could provide 60 gigawatts (GW) of electricity by 2050 (8.5% of U.S. generation capacity).\2\ However, the multiple environmental reviews and associated time and costs result in longer development timelines than those of many other power production projects.\3\ --------------------------------------------------------------------------- \1\Congressional Research Service, Enhanced Geothermal Systems: Introduction and Issues for Congress, Sept. 29, 2022, https:// crsreports.congress.gov/product/pdf/R/R47256. \2\U.S. Department of Energy, Geothermal Technologies Office, GeoVision: Harnessing the Heat Beneath Our Feet, May 2019, https:// www.energy.gov/sites/default/files/2019/06/f63/GeoVision-full-report- opt.pdf. \3\Congressional Research Service, Enhanced Geothermal Systems: Introduction and Issues for Congress, Sept. 29, 2022, https:// crsreports.congress.gov/product/pdf/R/R47256. --------------------------------------------------------------------------- H.R. 6482 aims to streamline the permitting process for geothermal energy by exempting geothermal exploration wells (temperature gradient wells, monitoring wells, and calibration wells) from review under the National Environmental Policy Act (NEPA).\4\ To be eligible for the streamlining provisions, the exploration well itself must be under 13 inches in diameter, the surface disturbance must be less than 5 acres, activities must be completed in 120 days, and the site must be reclaimed within three years. The bill would also clarify that geotechnical investigations and road construction and maintenance (within existing rights-of-way) do not require additional NEPA reviews. Additionally, the bill would direct the Department of the Interior (DOI) to designate geothermal leasing priority areas on federal lands that are economically viable for geothermal energy production and are not excluded from geothermal energy production under a land use plan. DOI would be required to reevaluate the covered lands every five years. --------------------------------------------------------------------------- \4\42 U.S.C. Sec. 4321. ---------------------------------------------------------------------------

Committee Action

H.R. 6482 was introduced on November 28, 2023, by Rep. Russ Fulcher (R-ID). The bill was referred to the Committee on Natural Resources, and within the Committee to the Subcommittee on Energy and Mineral Resources. On March 6, 2024, the Subcommittee on Energy and Mineral Resources held a hearing on the bill. On April 16, 2024, the Committee on Natural Resources met to consider the bill. The Subcommittee on Energy and Mineral Resources was discharged from further consideration of H.R. 6482 by unanimous consent. Representative Jared Huffman (D-CA) offered an amendment designated Huffman #1. The amendment offered by Rep. Huffman was not agreed to by a roll call vote of 17 yeas to 21 nays, as follows: [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Rep. Garret Graves (R-LA) offered an amendment designated Graves #1. The amendment offered by Rep. Graves was agreed to by voice vote. The bill, as amended, was ordered favorably reported to the House of Representatives by voice vote.

Hearings

For the purposes of clause 3(c)(6) of House rule XIII, the following hearing was used to develop or consider this measure: hearing by the Subcommittee on Energy and Mineral Resources held on March 6, 2024.

Section-by-Section Analysis

Section 1. Short title Designates the bill as the ``Enhancing Geothermal Production on Federal Lands Act''. Section 2. Geothermal production on Federal lands Section 2 would exempt certain geothermal exploration projects, geotechnical investigations, and road construction in existing rights-of-way from review under NEPA. Eligible geothermal exploration projects include the drilling of temperature gradient wells, monitoring wells, calibration wells, or another geothermal exploratory wells so long as they are under 5 acres, less than 13 inches in diameter, completed in 120 days and reclaimed within 3 years. Operators would have to provide notice to the DOI Secretary 30 days before the activity begins. Section 3. Geothermal leasing priority areas Section 3 would require the Secretary of DOI to designate federal land that is open to geothermal leasing as geothermal leasing priority areas within 5 years of enactment. The Secretary would have to review these areas every 5 years. Additionally, the Secretary would be required to develop and maintain a programmatic environmental impacts statement for these areas which could be used in order to satisfy NEPA for a subsequent geothermal project. Section 4. Findings Section 4 sets forth Congressional findings. Committee Oversight Findings and Recommendations Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII of the Rules of the House of Representatives, the Committee on Natural Resources' oversight findings and recommendations are reflected in the body of this report. Compliance With House Rule XIII and Congressional Budget Act 1. Cost of Legislation and the Congressional Budget Act. Pursuant to clause 3(c)(2) of House rule XIII and section 308(a) of the Congressional Budget Act of 1974, and pursuant to clause 3(c)(3) of House rule XIII and section 402 of the Congressional Budget Act of 1974, the Committee has requested but not received from the Director of the Congressional Budget Office a budgetary analysis and a cost estimate of this bill. 2. General Performance Goals and Objectives. As required by clause 3(c)(4) of rule XIII, the general performance goal or objective of this bill is to amend the Geothermal Steam Act of 1970 to promote timely exploration for geothermal resources under geothermal leases, and for other purposes. Earmark Statement This bill does not contain any Congressional earmarks, limited tax benefits, or limited tariff benefits as defined under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of the House of Representatives. Unfunded Mandates Reform Act Statement An estimate of federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act was not made available to the Committee in time for the filing of this report. The Chair of the Committee shall cause such estimate to be printed in the Congressional Record upon its receipt by the Committee, if such estimate is not publicly available on the Congressional Budget Office website. Existing Programs Directed Rule Making. This bill does not contain any directed rule makings. Duplication of Existing Programs. This bill does not establish or reauthorize a program of the federal government known to be duplicative of another program. Such program was not included in any report from the Government Accountability Office to Congress pursuant to section 21 of Public Law 111-139 or identified in the most recent Catalog of Federal Domestic Assistance published pursuant to the Federal Program Information Act (Public Law 95-220, as amended by Public Law 98-169) as relating to other programs. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. Preemption of State, Local or Tribal Law Any preemptive effect of this bill over state, local, or tribal law is intended to be consistent with the bill's purposes and text and the Supremacy Clause of Article VI of the U.S. Constitution. Changes in Existing Law Made by the Bill, as Reported In compliance with clause 3(e) of rule XIII of the Rules of the House of Representatives, changes in existing law made by the bill, as reported, are shown as follows (new matter is printed in italics and existing law in which no change is proposed is shown in roman): GEOTHERMAL STEAM ACT OF 1970 * * * * * * * SEC. 30. GEOTHERMAL EXPLORATION PROJECTS. (a) Definitions.--In this section: (1) Geothermal exploration project.--The term ``geothermal exploration project'' means the drilling of a temperature gradient well, monitoring well, calibration well, or another geothermal exploratory well, including construction or making improvements for such activities, on lands for which the Secretary has issued a geothermal lease-- (A) that is carried out by the holder of the lease; (B) for which-- (i) the last cemented casing string has an outer diameter of less than 13 inches; and (ii) the total unreclaimed surface disturbance at any one time within the project area is less than 5 acres, not including the area of a permanent or temporary access road; (C) that is completed in less than 120 days, including the removal of any surface infrastructure from the project area; and (D) that requires the restoration of the project area within 3 years of the date of first exploration drilling to approximately the condition that existed at the time the project began, unless the project area is subsequently used as part of energy development under the lease. (2) Covered activity.--The term ``covered activity'' includes, with respect to exploration, development, or production (including direct use) of geothermal resources-- (A) a geotechnical investigation; (B) off-road travel in a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan; and (C) construction, maintenance, realignment, and repair of an existing permanent or temporary access road within a right-of-way established by Congress, granted by a Federal agency, or included in a land use plan. (b) Non-major Federal Action.--Geothermal exploration projects and covered activities shall not be considered major Federal actions under section 102(2)(C) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)). (c) Requirement to Provide Notice.--The holder of a geothermal lease shall provide to the Secretary notice of their intent to carry out a geothermal exploration project at least 30 days before the start of drilling under the project. SEC. 31. GEOTHERMAL LEASING PRIORITY AREAS. (a) Definition of Covered Land.--In this section, the term ``covered land'' means land that is-- (1) Federal land; and (2) not excluded from the development of geothermal energy under-- (A) a land use plan established under the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 et seq.); or (B) any other Federal law. (b) Designation of Geothermal Leasing Priority Areas.--The Secretary, in consultation with the Secretary of Energy, shall designate portions of covered land as geothermal leasing priority areas as soon as practicable, but not later than 5 years, after the date of enactment of this section. (c) Criteria for Selection.--In determining which covered lands to designate as geothermal leasing priority areas under subsection (b), the Secretary, in consultation with the Secretary of Energy, shall consider if-- (1) the covered land is preferable for geothermal leasing; (2) production of geothermal energy on such land is economically viable, including if such land has access to methods of energy transmission; and (3) the designation would be in compliance with section 202 of the Federal Land Policy and Management Act of 1976 (43 U.S.C. 1712), including subsection (c)(9) of such section. (d) Review and Modification.--Not less frequently than once every 5 years, the Secretary shall-- (1) review covered land and, if appropriate, make additional designations of geothermal leasing priority areas; and (2) review each area designated as a geothermal leasing priority area under this section, and, if appropriate, remove such designation. (e) Programmatic Environmental Impact Statement.-- (1) Initial designations.--Not later than one year after the initial designation of a geothermal leasing priority area, the Secretary shall prepare a supplement to any final programmatic environmental impact statement for geothermal leasing that is the most recently finalized such statement with respect to covered land designated as a geothermal leasing priority area under subsection (b). (2) Subsequent designations.--Each designation of a geothermal leasing priority area under subsection (b) shall be included in a programmatic environmental impact statement for geothermal leasing or in a supplement to such a statement. (3) Consultations.--In developing any programmatic environmental impact statement for geothermal leasing or supplement to such a statement under this section, the Secretary shall consult, on an ongoing basis, with appropriate State, Tribal, and local governments, transmission infrastructure owners and operators, developers, and other appropriate entities. (4) Procedure.--The Secretary may not delay issuing a permit or holding a lease sale under this Act because the supplement required under paragraph (1) has not been finalized by the Secretary. (f) Compliance With NEPA.--If the Secretary determines that the designation of a geothermal leasing priority area has been sufficiently analyzed by a programmatic environmental impact statement, the Secretary shall not prepare any additional analysis under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to geothermal lease sales for such geothermal leasing priority area.

Dissenting Views

H.R. 6482 would amend the Geothermal Steam Act of 1970 by creating a new categorical exclusion (CE) for geothermal test projects. It would also direct the Secretary to designate geothermal leasing priority areas and to prepare a programmatic environmental impact statement for those priority areas. Replenished by natural heat sources deep in the Earth, geothermal energy is a renewable resource that generates 24/7 electricity with minimal carbon emissions. The United States leads the world in utility-scale geothermal electricity generation.\1\ Today, there are 51 operating power plants producing geothermal energy from public lands, with a combined total of more than 2.6 gigawatts (GW) of installed capacity. Six additional projects are in various stages of the National Environmental Policy Act (NEPA) review.\2\ Nearly 70 percent of installed utility-scale geothermal capacity in the U.S. is on Bureau of Land Management lands. --------------------------------------------------------------------------- \1\U.S. EIA, Geothermal Explained, https://www.eia.gov/ energyexplained/geothermal/use-of- geothermal-energy.php. \2\U.S. Bureau of Land Management, Active Renewables Projects https://www.blm.gov/ programs/energy-and-minerals/renewable-energy/active-renewable- projects. --------------------------------------------------------------------------- Recent advances in technology present exciting opportunities for the U.S. to increase its geothermal energy production. Enhanced geothermal systems (EGS) increase access to heat sources that may be deeper or less conventional than those accessed by conventional geothermal systems in a much broader range of places. EGS has significant ``potential to contribute to U.S. energy needs--both in terms of total energy resources and their widespread availability.''\3\ --------------------------------------------------------------------------- \3\Congressional Research Service, Enhanced Geothermal Systems: Introduction and Issues for Congress, September 29, 2022, https:// sgp.fas.org/crs/misc/R47256.pdf. --------------------------------------------------------------------------- Committee Democrats support efforts to develop priority areas for geothermal leasing and conduct thorough programmatic environmental reviews. Committee Democrats have also engaged in bipartisan efforts throughout this Congress to increase geothermal energy production, including by supporting the House passage of H.R. 7422 by Representative Ocasio-Cortez, H.R. 7370 by Representative Curtis, and H.R. 6474 by Representative Steel. These bills support the efficient approval of geothermal permit applications without sacrificing environmental and community review. Democrats have proven we are willing to work across the aisle to advance responsible and well-balanced geothermal and other renewable energy development on federal lands. Although I support certain aspects of this bill, I am not supportive of the categorical exclusion introduced in this legislation. The CE created by this legislation is broader than previous versions of the bill. It waives NEPA requirements for drilling geothermal test wells under a specific size, the construction of roads, and other activities. H.R. 6482 does not contain any exceptions to this waiver for extraordinary circumstances, an exception that previously existed in H.R. 5350 from the 117th Congress and exists in administratively adopted CEs. Geothermal energy, like all large-scale energy projects, has the potential for significant environmental impacts. In the case of geothermal, there should be thorough consideration of potential emissions, waste, water impacts, and seismic activity before moving forward.\4\ For all infrastructure projects, it is imperative to consult tribal communities and protect sacred sites as well as access to hunting, fishing, and gathering rights. Local communities must also be consulted to ensure their concerns are taken into account for such projects. By waiving NEPA under certain circumstances, H.R. 6482 would remove these important opportunities for consultation, which could lead to unintended negative impacts on ecosystems and communities in the long run. --------------------------------------------------------------------------- \4\Congressional Research Service, Oil and Gas Technology and Geothermal Energy Development, January 31, 2023, https:// crsreports.congress.gov/product/pdf/R/R47405. --------------------------------------------------------------------------- The Bureau of Land Management has testified that while they support enhancing and expediting permitting for geothermal energy, including developing new CEs when appropriate, they believe these CEs are better developed through agency processes rather than legislatively. BLM also testified that they are in the process of developing administrative CEs for geothermal, which Committee Democrats believe is the proper procedure for developing CEs. While Republicans argue that geothermal energy development on BLM lands needs categorical exclusions to speed up the permitting process, they are overlooking these facts. Furthermore, several CEs exist for geothermal exploration at other federal agencies, including the Department of the Navy and the Department of Agriculture. Section 109 of the Fiscal Responsibility Act of 2023 allows federal agencies to adopt CEs from other federal agencies, meaning BLM could adopt these categorical exclusions in their practice if the agency determines it is appropriate. To establish efficient permitting for geothermal energy and other energy development, Committee Democrats support fully funding agencies to ensure they have adequate staffing for efficient permitting. This is especially an issue with geothermal permitting. In federal agencies, there is a need for more knowledge and experience with geothermal development, alongside staffing issues that cause delays. As the potential for geothermal development expands with EGS technology, we must address these issues as well to ensure responsible development on federal lands, not legislate categorical exclusions as H.R. 6482 does. Raul M. Grijalva, Ranking Member. [all]