Skip to content

house · Committee report

H. Rept. 118-921

RESTORING OUR UNOPENED TRAILS FOR ENJOYMENT AND SAFETY ACT

2024-12-18

Committees

Associated legislation

Text

Dissenting Views

[To accompany H.R. 6994] The Committee on Natural Resources, to whom was referred the bill (H.R. 6994) to require the reopening of covered recreation sites closed due to a natural disaster, and for other purposes, having considered the same, reports favorably thereon with an amendment and recommends that the bill as amended do pass. The amendment is as follows: Strike all after the enacting clause and insert the following: SECTION 1. SHORT TITLE. This Act may be cited as the ``Restoring Our Unopened Trails for Enjoyment and Safety Act'' or the ``ROUTES Act''. SEC. 2. REOPENING OF COVERED RECREATION SITES CLOSED DUE TO NATURAL DISASTERS. (a) Reopening Required.--In the case of a covered recreation site that is fully or partially closed due to personal injury or damage caused by a natural disaster, the Secretary concerned shall-- (1) reopen such covered recreation site not later than 3 years after the date on which such natural disaster ends, as determined by the Secretary concerned; and (2) if the covered recreation site is not reopened on or before the date described in paragraph (1), not later than 30 days after such date and every 90 days thereafter during which such site remains closed, submit to Congress a report identifying the barriers to reopening such site. (b) Categorical Exclusion for Covered Recreation Site Restoration.-- (1) Categorical exclusion established.--Activities described in paragraph (2) are a category of actions hereby designated as being categorically excluded from the preparation of an environmental assessment or an environmental impact statement under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332). (2) Activities designated for categorical exclusion.--The activities designated under this section for a categorical exclusion are activities carried out by the Secretary concerned on Interior recreational lands or National Forest System lands where the primary purpose of such activity is, consistent with the land use plan applicable to such lands, to-- (A) repair and restore covered recreation sites damaged by a natural disaster; (B) remove or mitigate hazard trees for the purpose of public safety, protection of property, or improving access to a covered recreation site; (C) mitigate and reduce soil erosion impacting a covered recreation site; (D) restore drainage patterns to support a covered recreation site; or (E) any combination of the purposes specified in subparagraphs (A) through (D). (3) Availability of categorical exclusion.--On and after the date of the enactment of this Act, the Secretary concerned may use the categorical exclusion established under paragraph (1) in accordance with this subsection. (4) Extraordinary circumstances.--The activities categorically excluded under paragraph (1) shall be subject to the extraordinary circumstances procedures established pursuant to section 1501.4 of title 40, Code of Federal Regulations (or any successor regulation). (c) Emergency Hazard Tree Removal.-- (1) National forest system lands.--With respect to the removal or mitigation of hazard trees located on a parcel of National Forest System land, during the 3-year period after a natural disaster on such parcel ends, as determined by the Secretary of Agriculture, section 220.4(b) of title 36, Code of Federal Regulations (as in effect on the date of the enactment of this Act) shall have the force and effect of law with respect to such parcel. (2) Interior recreational lands.--With respect to the removal and mitigation of hazard trees located on Interior recreational lands, during the 3-year period after a natural disaster on such parcel ends, as determined by the Secretary of the Interior, section 46.150 of title 43, Code of Federal Regulations (as in effect on the date of the enactment of this Act) shall have the force and effect of law with respect to such parcel. (d) Report.--Not later than 2 years after the date of the enactment of this Act, the Secretary concerned shall submit to Congress, and make publicly available on the website of the Department of the Interior and the Department of Agriculture, a report that includes the number of covered recreation sites-- (1) that have been reopened pursuant to subsection (a)(1); and (2) that, as of the date of such report, are closed due to damage caused by a natural disaster and the date such natural disaster ended, as determined by the Secretary concerned. (e) Definitions.--In this section: (1) Covered recreation site.--The term ``covered recreation site'' means-- (A) a campground or developed day-use recreation site that-- (i) is operated by the Secretary concerned; and (ii) is located on Interior recreational lands or National Forest System lands; or (B) a road or trail that-- (i) is under the jurisdiction of the Secretary concerned; (ii) used to access or serve a campground or developed day-use recreation site described in subparagraph (A); and (iii) is located on Interior recreational lands or National Forest System lands. (2) Hazard tree.--The term ``hazard tree'' means a standing tree that presents a visible hazard to people or property due to conditions such as the deterioration of, or damage to-- (A) the root system, trunk, stem, or limbs of the tree; or (B) the direction or lean of the tree. (3) Interior recreational lands.--The term ``Interior recreational lands'' means lands managed by the National Park Service, the United States Fish and Wildlife Service, the Bureau of Land Management, or the Bureau of Reclamation. (4) National forest system.--The term ``National Forest System'' has the meaning given that term in section 11(a) of the Forest and Rangeland Renewable Resources Planning Act of 1974 (16 U.S.C. 1609(a)). (5) Natural disaster.--The term ``natural disaster'' includes a wildfire, flood, hurricane, windstorm, erosion, and tornado. (6) Secretary concerned.--The term ``Secretary concerned'' means-- (A) the Secretary of the Interior, with respect to Interior recreational lands; or (B) the Secretary of Agriculture, with respect to National Forest System lands. PURPOSE OF THE LEGISLATION The purpose of H.R. 6994 is to require the reopening of covered recreation sites closed due to a natural disaster, and for other purposes.

Background and Need for Legislation

Wildfires, hurricanes, and other natural disasters increasingly threaten the federal lands that Americans rely upon for multiple uses, including outdoor recreation. As wildfires have grown in size, severity, and frequency in recent years, they have disproportionately affected outdoor recreation activities.\1\ Between 2020 and 2021, 1,029 U.S. Forest Service (USFS) recreation sites were damaged by wildfires, costing $126 million.\2\ Over the past five years, wildfires negatively affected 23,750 trail miles; 1,360 climbing sites; and 1,708 miles of whitewater paddling runs.\3\ Additionally, a 2023 report on camping in the United States reported that 18.1 percent of campers, or roughly 1 out of every 5, changed or cancelled plans due to the disruption caused by natural disasters.\4\ In fact, the mere threat of wildfires also consistently leads to closures at national forests, national parks, and other federal lands.\5\ This is not simply an inconvenience to Americans looking to recreate outdoors during summer months. Rather, prolonged closures and reduced recreation visits put small businesses, and the rural communities that rely upon them, in serious economic jeopardy. --------------------------------------------------------------------------- \1\U.S. Department of Agriculture, ``Wildfires in All Seasons?'', Deb Schweizer, June 27, 2019, https://www.usda.gov/media/blog/2019/06/ 27/wildfires-all-seasons. \2\Outdoor Alliance, ``Wildfire and Outdoor Recreation in the West,'' July 2023, https://static1.squarespace.com/static/ 54aabb14e4b01142027654ee/t/649dcd388c9dbf73648c777d/1688063291777/ WildfireAndRecreation-WhitePaper-OutdoorAlliance-Digital.pdf. \3\Id. \4\The Dyrt, ``2023 Camping Report'', https://reports.thedyrt.com/ 2023-camping-report/. \5\Id. Mammoth Times, ``All CA National Forests Close Aug. 31, Including Inyo'', August 31, 2021, https://www.mammothtimes.com/news/ all-ca-national-forests-close-aug-31-including-inyo/article_2787f8ee- 09f9-11ec-8341-136de779b7fa.html. --------------------------------------------------------------------------- While a wildfire can cause extensive, initial damage to recreation destinations, subsequent threats such as ``hazard trees,'' flooding, and erosion often lead to lengthy, and sometimes indefinite, closures of trails and campgrounds.\6\ These closures persist while land managers struggle to restore recreation areas for public use.\7\ Local organizations that support outdoor recreation on federal lands report that federal land management agencies often ``close mountain roads and trails for several years as the landscape heals after a fire rolls through an area.''\8\ For example, the 2018 Holy Fire, which burned more than 23,000 acres in the Cleveland National Forest in California, damaged several popular trails and recreation sites in the forest.\9\ The Holy Fire led to lengthy closures of recreation areas that were extended twice over a three year period.\10\ Although USFS reopened more than 10,000 acres of the forest in 2021, several popular trails remain closed to this day.\11\ --------------------------------------------------------------------------- \6\Id. \7\Id. \8\Crosscut and Cascade PBS, ``How wildfires are impacting outdoor recreation in Washington'', Andrew Engelson, August 24, 2023, https:// crosscut.com/environment/2023/08/how-wildfires-are-impacting-outdoor- recreation-washington. \9\U.S. Forest Service, ``Holy Fire Burned Area Closure'', https:// www.fs.usda.gov/detail/ cleveland/home/?cid=FSEPRD590615. \10\Orange County Register, ``3 years after Holy fire, 10000 more acres reopen in Cleveland National Forest'', Tess Sheets, October 22, 2021, https://www.ocregister.com/2021/10/22/thousands-of-acres-reopen- in-cleveland-national-forest-after-2018-holy-fire/. \11\Id. --------------------------------------------------------------------------- Beyond wildfires, natural disasters of all varieties can cause destruction and prevent access and enjoyment of federal lands. Most recently, extreme winds caused by Hurricane Helene resulted in catastrophic damage to federal forests in states like North Carolina, with millions of trees leveled across more than 200 miles.\12\ In 2022, historic flooding in Yellowstone National Park severely damaged roads, destroyed homes, and felled trees, leading National Park Service (NPS) officials to warn that portions of the park could remain closed for a ``substantial length of time.''\13\ Similarly, in 2019, a massive derecho, or windstorm, swept through Northern Wisconsin, leveling hundreds of thousands of trees.\14\ USFS officials in Wisconsin predicted that full recovery from the event could take up to 10 years.\15\ --------------------------------------------------------------------------- \12\Ducroquet et al., ``Where the trees once stood,'' November 9, 2024, https://www.washingtonpost.com/climate-environment/interactive/ 2024/hurricane-helene-forest-damage-north-carolina/. \13\Fox News, ``Parts of Yellowstone could remain closed for `substantial length' after flooding'', Julia Musto, June 15, 2022, https://www.foxnews.com/us/yellowstone-closed-substantial-length- flooding. \14\Milwaukee Journal Sentinel, ``It could take 10 years for Wisconsin to recover from the violent July wind storm that wrecked northern forests'', Larry Parnass, October 23, 2019, https:// www.jsonline.com/story/news/special-reports/2019/10/23/wisconsin-july- 2019-derecho-wind-storm-affect-economy-decade/4047898002/. \15\Id. --------------------------------------------------------------------------- While there are a confluence of factors contributing to these prolonged delays, the costly and burdensome National Environmental Policy Act (NEPA) process is the primary factor driving these delays. For example, in 2020 and 2021, California experienced ``expansive stretches of fire-killed or damaged trees adjacent to roads, trails, and facilities'' that posed an immediate threat to life and safety.\16\ While USFS tried to take immediate action to address these threats in October 2021, a combination of ``project planning and Endangered Species Act (ESA) consultation'' taking longer than expected, and the length of time needed for public involvement and pre-decisional administrative reviews threatened to delay action until 2023 at the earliest.\17\ Notably, funding constraints were not cited among the litany of reasons why these projects would face delays. In 2022, Region 5 of USFS (which covers California) requested emergency authority to abate hazard trees prior to the completion of the NEPA process.\18\ This allowed the Lassen, Plumas, Shasta-Trinity, and Sierra National Forests to immediately address hazard tree threats to approximately 167 miles of roads and 18 developed recreation sites.\19\ Within 5 months, the Region address nearly 80 miles of hazard trees and reopened ``2.5 recreation sites'' that would have otherwise remained closed for over a year.\20\ In November 2024, USFS announced it would again utilize this emergency authority to address ``hazards to public health and safety, critical infrastructure, and to mitigate hazards to natural resources like streams flooded with wood debris or sediments'', downed vegetation, and other fire hazards.\21\ While these actions were incredibly successful, they have not been expanded nationwide. --------------------------------------------------------------------------- \16\USFS, Decision Memorandum for the Chief, July 7, 2022, file:/// C:/Users/abutler1/Downloads/DecisionMemorandum.pdf. \17\Id. \18\Id. \19\Id. \20\USFS, ``R5 Post-disturbance Hazardous Tree Mgmt. Emergency Response Status of Implementation,'' December 20, 2022, https://usfs- public.app.box.com/v/PinyonPublic/file/1117031333691. \21\USFS, ``USDA Forest Service Uses Post-Hurricane Emergency Authority,'' November 13, 2024, https://www.fs.usda.gov/about-agency/ newsroom/releases/usda-forest-service-uses-post- hurricane-emergency-authority. --------------------------------------------------------------------------- There is a clear need to provide additional tools and direction to the federal land management agencies to increase restoration activities on federal lands impacted by natural disasters so that popular recreation destinations can reopen as soon as possible post-disturbance. H.R. 6994, the ``Restoring Our Unopened Trails for Enjoyment and Safety (ROUTES) Act,'' would require federal land managers to prioritize reopening trails, campsites, recreation areas, and roads within three years of a closure caused by a natural disaster. If a site is not successfully reopened in this timeframe, the bill requires regular reporting to Congress to hold the agencies accountable. To accomplish the reopening of recreation sites, the bill provides important streamlining tools such as a new categorical exclusion that would expedite necessary restoration activities. These restoration activities include repairing damaged sites, removing hazard trees, mitigating soil erosion, and restoring drainage patterns. This bill would also codify existing emergency authorities being used to remove hazard trees in California and the Southeast to implement this successful tool nationwide. By providing new tools on a broad scale, the ROUTES Act will ensure federal land managers prioritize efforts to reopen popular recreation areas safely and on time.

Committee Action

H.R. 6994 was introduced on January 16, 2024 by Rep. Young Kim (R-CA). The bill was referred to the Committee on Natural Resources, and within the Committee to the Subcommittee on Federal Lands. The bill was also referred to the Committee on Agriculture. On January 31, 2024, the Subcommittee on Federal Lands held a hearing on the bill. On November 20, 2024, the Committee on Natural Resources met to consider the bill. The Subcommittee on Federal Lands was discharged from further consideration of H.R. 6994 by unanimous consent. Chairman Bruce Westerman (R-AR) offered an Amendment in the Nature of a Substitute designated Westerman ANS. The amendment in the nature of a substitute was agreed to by voice vote. The bill, as amended, was ordered favorably reported to the House of Representatives by voice vote.

Hearings

For the purposes of clause 3(c)(6) of House rule XIII, the following hearing was used to develop or consider this measure: hearing by the Subcommittee on Federal Lands held on January 31, 2024.

Section-by-Section Analysis

Section 1. Short title Section 1 names the bill the ``Restoring Our Unopened Trails for Enjoyment and Safety Act'' or the ``ROUTES Act''. Section 2. Reopening of covered recreation sites closed due to natural disasters Section 2 requires the Department of the Interior (DOI) and the U.S. Forest Service to reopen federally owned and operated trails, campgrounds, developed day use recreation sites, and roads that serve a recreation site, within three years of a closure caused by a natural disaster. If a site is not reopened within three years after the natural disaster ends, Section 2 requires a quarterly report to be submitted to Congress identifying barriers to reopening such site. Section 2 creates a new categorical exclusion under the National Environmental Policy Act for repairing and restoring recreation sites damaged by a natural disaster; removing or mitigating hazard trees for the purpose of protecting public safety and property or improving access; mitigating and reducing soil erosion; and restoring drainage patterns to support recreation sites. The Secretaries of Interior and Agriculture may use the categorical exclusion starting on the date of enactment of the bill and must comply with extraordinary circumstances procedures. Furthermore, Section 2 codifies emergency regulations to remove or mitigate hazard trees on National Forest System or DOI recreational lands within three years after the end of a natural disaster. Lastly, Section 2 requires the DOI and the USFS to provide a report to Congress on recreation sites reopened under the legislation and sites that remain closed. COMMITTEE OVERSIGHT FINDINGS AND RECOMMENDATIONS Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII of the Rules of the House of Representatives, the Committee on Natural Resources' oversight findings and recommendations are reflected in the body of this report. COMPLIANCE WITH HOUSE RULE XIII AND CONGRESSIONAL BUDGET ACT 1. Cost of Legislation and the Congressional Budget Act. Pursuant to clause 3(c)(2) of House rule XIII and section 308(a) of the Congressional Budget Act of 1974, and pursuant to clause 3(c)(3) of House rule XIII and section 402 of the Congressional Budget Act of 1974, the Committee has requested but not received from the Director of the Congressional Budget Office a budgetary analysis and a cost estimate of this bill. 2. General Performance Goals and Objectives. As required by clause 3(c)(4) of rule XIII, the general performance goal or objective of this bill is to require the reopening of covered recreation sites closed due to a natural disaster, and for other purposes. EARMARK STATEMENT This bill does not contain any Congressional earmarks, limited tax benefits, or limited tariff benefits as defined under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of the House of Representatives. UNFUNDED MANDATES REFORM ACT STATEMENT An estimate of federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act was not made available to the Committee in time for the filing of this report. The Chair of the Committee shall cause such estimate to be printed in the Congressional Record upon its receipt by the Committee, if such estimate is not publicly available on the Congressional Budget Office website. EXISTING PROGRAMS Directed Rule Making. This bill does not contain any directed rule makings. Duplication of Existing Programs. This bill does not establish or reauthorize a program of the federal government known to be duplicative of another program. Such program was not included in any report from the Government Accountability Office to Congress pursuant to section 21 of Public Law 111-139 or identified in the most recent Catalog of Federal Domestic Assistance published pursuant to the Federal Program Information Act (Public Law 95-220, as amended by Public Law 98-169) as relating to other programs. APPLICABILITY TO LEGISLATIVE BRANCH The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. PREEMPTION OF STATE, LOCAL OR TRIBAL LAW Any preemptive effect of this bill over state, local, or tribal law is intended to be consistent with the bill's purposes and text and the Supremacy Clause of Article VI of the U.S. Constitution. CHANGES IN EXISTING LAW As ordered reported by the Committee on Natural Resources, H.R. 6994 would make no changes in existing law.

Dissenting Views

H.R. 6994 would require the Secretaries of the Interior and Agriculture to reopen recreation sites (trails, campgrounds, developed day-use sites or roads) that have been closed or partially closed due to damage caused by natural disasters (including hazard trees) within two years after the date of the disaster. Apparently as an attempt to facilitate this process, the bill would establish a broad categorical exclusion (CE) under the National Environmental Policy Act (NEPA) for projects that seek to restore a covered recreation site or access to a covered recreation site. H.R. 6994 would also designate hazardous tree removal activities within the two-year period after a natural disaster located on covered parcels of Forest System or Interior lands as ``emergency responses,'' which can be undertaken prior to the completion of a NEPA analysis. The use of broad CE authority established by this legislation would be the wrong approach for reopening damaged recreation sites. Existing law and regulations already allow for the administrative use and establishment of CEs if a project does not have a significant effect on the human environment. NEPA already includes guidance and regulations that allow for quick or emergency response when deemed acutely necessary. In fact, the U.S. Forest Service testimony on the bill emphasized that they already have the legal authorities needed to conduct this work, including CEs to open trails, roads, and campgrounds.\1\ Land management agencies have also demonstrated that they are willing and able to use existing authorities if doing so is safe and necessary to open recreation sites. --------------------------------------------------------------------------- \1\United States Forest Service, Statement of Greg Smith, Associate Deputy Chief of the National Forest System, Before the House Natural Resources Committee on H.R. 6994, (Jan. 2024). Available online at: https://naturalresources.house.gov/uploadedfiles/testimony_smith.pdf. --------------------------------------------------------------------------- Thus, the NEPA-related provisions in this legislation are inapt to the stated purposes for such provisions. If a site is closed for an extended period, it is typically due to outstanding safety concerns, ecological or landscape resilience concerns, or a lack of resources and staff capacity--not a lack of available permitting or environmental review options. H.R. 6994 does not include any language that requires the recreation site to be safe before reopening or that the landscape be sufficiently recovered after a natural disaster. This is a dangerous precedent. The Forest Service called the deadline for reopening sites ``arbitrary'' and suggested that such a requirement would create additional risk to federal employees and to the public--the very recreators we should be protecting.\2\ The bill would remove any flexibility that federal land managers might need in order to account for complex repairs, patron safety, or landscape health in exchange for unnecessary streamlined permitting--metrics that could normally be identified through proper environmental review. --------------------------------------------------------------------------- \2\Ibid. --------------------------------------------------------------------------- During the markup, Chair Westerman offered an Amendment in the Nature of a Substitute (ANS), which extended the deadline from the original two-year period to a three-year deadline. While it is significant that the majority is listening to the warnings that we have been raising since this bill was introduced, the ANS does not address the underlying issues with H.R. 6994. The deadline is still arbitrary and requiring such processes from federal land management agencies poses a serious threat. This bill will put the agency in the position either of prematurely opening a site that isn't restored and/or poses serious danger or of violating the law by keeping the site closed. Strangely, the majority seems aware of this serious deficiency in the bill, because the Chair's ANS itself adds a reporting scheme for land managers to explain to congress the reasons for keeping a site closed beyond this bill's mandatory three-year reopening deadline. It's a bit of a red flag when a bill promises improvements but then includes last-minute language that anticipates that the bill's own deadlines will prove to be wishful thinking. Further, H.R. 6994 would codify the use of NEPA's emergency alternative arrangements to address hazard trees located anywhere within a parcel of public land affected by a natural disaster. As written, this authority is not limited to covered recreation sites, nor is it required to be near a publicly accessible trail or road. The lack of basic limitations on this authority is concerning. There is no requirement that the Secretary identify if the tree is likely to fall and if so, cause injury or damage. There is no requirement for the tree to be within a certain number of feet from a road or trail. Under such broad authority, the hazard tree section of H.R. 6994 could result in an unchecked use of ``emergency authority'' for the purpose of salvage logging. Such broad authority is not necessary to address hazard trees, nor is it an appropriate use of NEPA's emergency process. Agencies like the Forest Service are chronically underfunded and facing extreme staffing shortages. Uncertainty in relation to the yearly budget is directly tied to project delays and management challenges. Such challenges are often mistakenly attributed--or perhaps sometimes intentionally misattributed--to the process of environmental review. H.R. 6994 would ignore the ongoing problem of these budget challenges--the real cause of delayed reopenings--and would instead place arbitrary deadlines and mandates on land managers without providing any additional resources to safely reopen recreation sites, and indeed even without a basic requirement to ensure safety at all. Raul M. Grijalva, Ranking Member. [all]

Source: https://api.congress.gov/v3/committee-report/118/hrpt/921