Background and Need for Legislation
H.R. 1720 seeks to clarify that the City of San Diego,
California, can utilize the standard Clean Water Act National
Pollutant Discharge Elimination System (NPDES) permit renewal
process and does not need a variance application to continue
operating the E.W. Blom Point Loma Metropolitan Wastewater
Treatment Plant (``Point Loma Plant'') and the Point Loma Ocean
Outfall, subject to the implementation of the permitting
requirements specified in the bill.
The Clean Water Act
The Federal Water Pollution Control Act, more commonly
known as the Clean Water Act (CWA), prohibits the discharge of
pollutants into navigable waters unless such discharges are
covered by a Federal permit, as well as establishes national
minimum standards for certain discharges, including discharges
from publicly owned treatment works.\1\ Section 301(b)(1)(B)\2\
of the CWA requires that all publicly owned treatment works in
existence as of July 1, 1977, achieve effluent limitations
based on secondary treatment standards, established by the
Administrator of the United States Environmental Protection
Agency (EPA), and defined pursuant to section 304(d)(1) of the
Act.\3\ These limitations and standards are implemented through
an NPDES permit, issued either by the EPA Administrator or an
approved state program, pursuant to section 402 of the CWA.\4\
The State of California is currently approved to implement the
CWA NPDES program in the state.\5\
---------------------------------------------------------------------------
\1\See 33 U.S.C. Sec. 1311(a).
\2\See 33 U.S.C. Sec. 1311(b)(1)(B).
\3\See U.S. Envtl. Prot. Agency, Secondary Treatment Standards,
available at https://www.epa.gov/npdes/secondary-treatment-standards.
Secondary treatment is defined in the regulation (40 C.F.R. Part 133)
in terms of effluent quality for total suspended solids (TSS),
biochemical oxygen demand (BOD), and pH; see also 33 U.S.C.
Sec. 1314(d)(1).
\4\See 33 U.S.C. Sec. 1342.
\5\See U.S. Envtl. Prot. Agency, NPDES State Program Authority,
available at https://www.epa.gov/npdes/npdes-state-program-authority.
---------------------------------------------------------------------------
Section 301(h) of the CWA also includes a process for
certain publicly owned treatment works that discharge into
marine waters to continue to operate under a NPDES permit with
a limited variance from the secondary treatment standards.
Section 301(h) authorizes the EPA Administrator, with state
concurrence, to issue such an NPDES variance for discharges
that meet the requirements of that subsection.\6\ EPA
regulations implementing section 301(h) require that NPDES
variances under section 301(h) must also comply with applicable
provisions of state, local, or other Federal laws or Executive
Orders, including the Coastal Zone Management Act of 1972 (16
U.S.C. Sec. 1451 et seq.); the Endangered Species Act of 1973
(16 U.S.C. Sec. 1531 et seq.); and Title III of the Marine
Protection, Research and Sanctuaries Act (16 U.S.C. Sec. 1431
et seq.).\7\ NPDES permits, including those issued with a
301(h) variance, have a duration of five years and must be
renewed.\8\
---------------------------------------------------------------------------
\6\33 U.S.C. Sec. 1311(h); the statutory requirements for a 301(h)
variance are that:
(1) there is an applicable water quality standard specific to the
pollutant for which the modification is requested;
(2) the discharge of pollutants in accordance with such modified
requirements will not interfere, alone or in combination with
pollutants from other sources, with the attainment or maintenance of
that water quality which assures protection of public water supplies
and the protection and propagation of a balanced, indigenous population
of shellfish, fish, and wildlife, and allows recreational activities,
in and on the water;
(3) the applicant has established a system for monitoring the
impact of such discharge on a representative sample of aquatic biota,
to the extent practicable, and the scope of such monitoring is limited
to include only those scientific investigations which are necessary to
study the effects of the proposed discharge;
(4) such modified requirements will not result in any additional
requirements on any other point or nonpoint source;
(5) all applicable pretreatment requirements for sources
introducing waste into such treatment works will be enforced;
(6) in the case of any treatment works serving a population of
50,000 or more, with respect to any toxic pollutant introduced into
such works by an industrial discharger for which pollutant there is no
applicable pretreatment requirement in effect, sources introducing
waste into such works are in compliance with all applicable
pretreatment requirements, the applicant will enforce such
requirements, and the applicant has in effect a pretreatment program
which, in combination with the treatment of discharges from such works,
removes the same amount of such pollutant as would be removed if such
works were to apply secondary treatment to discharges and if such works
had no pretreatment program with respect to such pollutant;
(7) to the extent practicable, the applicant has established a
schedule of activities designed to eliminate the entrance of toxic
pollutants from nonindustrial sources into such treatment works;
(8) here will be no new or substantially increased discharges
from the point source of the pollutant to which the modification
applies above that volume of discharge specified in the permit; and
(9) the applicant at the time such modification becomes effective
will be discharging effluent which has received at least primary or
equivalent treatment and which meets the criteria established under
section 304(a)(1) of the Act after initial mixing in the waters
surrounding or adjacent to the point at which such effluent is
discharged.
\7\See 40 CFR 125, Subpart G.
\8\See 33 U.S.C. Sec. 1342(b)(1)(B).
---------------------------------------------------------------------------
The Point Loma Wastewater Treatment Plant
The Point Loma Plant, located in San Diego, California,
began operations in 1963.\9\ The Plant treats approximately 175
million gallons of wastewater per day, generated in a 450-
square-mile area by more than 2.2 million residents.\10\ The
Point Loma Plant operates as a chemically-assisted primary
treatment plant, and is the terminal treatment facility
discharging to the Point Loma Ocean Outfall--a 4.5 mile pipe
that extends outward from the Point Loma Plant and discharges
treated wastewater into the Pacific Ocean at a depth of more
than 300 feet.\11\ In 1979, the City of San Diego applied for a
301(h) variance, which was approved by EPA and the state.\12\
Since that time, the Point Loma Plant has generally operated,
and is currently operating, under a section 301(h) permit
variance\13\ to discharge their wastewater with less than full
secondary treatment through the Ocean Outfall to the nearby
coastal waters.
---------------------------------------------------------------------------
\9\City of San Diego, Digital Archives, Point Loma Wastewater
Treatment Plant (1963), available at https://www.sandiego.gov/digital-
archives-photos/point-loma-wastewater-treatment-plant-1963.
\10\Id.
\11\Id.
\12\See United States of America v. City of San Diego, U.S.
District Court for the Southern District of California, March 31, 1994;
1994 U.S. Dist. LEXIS 19501 *; 38 ERC (BNA) 1718.
\13\See Waste Discharge Requirements and National Pollutant
Discharge Elimination System Permit for the City of San Diego E.W. Blom
Point Loma Wastewater Treatment Plant Discharge for the Pacific Ocean
Through the Point Loma Ocean Outfall (NPDES No. CA0107409), U.S. Envtl.
Prot. Agency, Order No. R9-2024-0004, NPDES Permit No. CA0107409, San
Diego EW Blom WWTP Pt. Loma (2024), available at https://www.epa.gov/
system/files/documents/2024-03/order-r9-2024-0004-npdes-ca0107409-san-
diego-ew-blom-wwtp-pt-loma-2024.pdf.
---------------------------------------------------------------------------
According to the city of San Diego, because it is
impracticable for the Point Loma Plant to meet the secondary
treatment requirements of the CWA, the Point Loma Plant must
obtain a section 301(h) variance for its continued
operation.\14\ The city of San Diego is also engaged in a long-
term effort to reduce discharges from the Point Loma Plant to
coastal waters, while reclaiming treated wastewater for
eventual potable and nonpotable reuse in the area.\15\ For
example, in connection with enactment of the Ocean Pollution
Reduction Act (Pub. L. 103-431), the city has constructed
treatment facilities with the capacity for 45,000,000 gallons
of reclaimed wastewater per day, which has also resulted in a
reduction in the discharge of total suspended solids and
biochemical oxygen demand by the facility.
---------------------------------------------------------------------------
\14\The City has expressed concern that local geographic
limitations, including the adjacency of the Point Loma Wastewater
Treatment Plant to the Cabrillo National Monument, the Point Loma
Ecological Reserve, and the U.S. Naval Base at Point Loma, California,
preventing the construction of treatment facilities that would be
required to achieve full compliance with the secondary treatment
requirements of the CWA. The City has also expressed the view that
establishing a standard that allows for greater use of reclaimed
wastewater to address the long-term water supply needs of the region
makes more practical sense than requiring the treatment of wastewater
that would ultimately be discharged into the Pacific Ocean.
\15\See `Application for Renewal of NPDES CA0107409 and 301(h)
Modified Secondary Treatment Requirements,' City of San Diego Public
Utilities, Water and Wastewater, available at https://www.sandiego.gov/
sites/default/files/ploovol2_15.pdf.
---------------------------------------------------------------------------
In May 2020, the San Diego Regional Water Quality Control
Board issued a new NPDES permit for the North City Water
Reclamation and Pure Water Facility (part of San Diego's Pure
Water program) to combine tertiary treated recycled water and
additional highly advanced treatment (reverse osmosis,
oxidation, ultrafiltration, etc.), and then discharge to the
Miramar reservoir for eventual drinking water use.\16\ Once
fully operating, this will re-direct a portion of the Point
Loma discharge to the North City/Pure Water facility. However,
while the ocean discharges from the Point Loma Plant will be
reduced, such discharges will not be eliminated in the
foreseeable future.
---------------------------------------------------------------------------
\16\Cal. Water Boards, San Diego Region, Board Decisions, Adopted
Orders (2020), available at https://www.waterboards.ca.gov/sandiego/
board_decisions/adopted_orders/orders2020.html.
---------------------------------------------------------------------------
H.R. 1720, the Ocean Pollution Reduction Act II
The purpose of H.R. 1720 is to address the long-term CWA
permitting requirements for the city of San Diego and other
cities that feed into Point Loma Plant for wastewater
treatment. H.R. 1720 provides for an alternative process for
the Point Loma Plant to achieve compliance with NPDES
permitting requirements, other than the existing 301(h)
variance conditions, while ensuring continued reductions of
pollutant discharges and greater use of reclaimed wastewater
associated with the plant. The legislation also eliminates the
need to reapply for the variance, specifically for the Point
Loma Plant, and provides direction to EPA for including minimum
treatment levels for the NPDES permit to be issued to Point
Loma Plant.
Hearings
For the purposes of rule XIII, clause 3(c)(6)(A) of the
118th Congress--
No hearings were held to develop or consider H.R. 1720 in
the 118th Congress; however, the Committee held the following
hearing in the 116th Congress: On February 27, 2020, the
Subcommittee on Water Resources and Environment held a hearing
titled ``Proposals for a Water Resources Development Act of
2020: Members'' Day Hearing.''\17\ Representative Scott Peters
testified before the Subcommittee on the issues addressed
within the legislation.
---------------------------------------------------------------------------
\17\Proposals for a Water Resources Development Act of 2020:
Members' Day Hearing: Hearing Before the H. Comm. on Transp. and
Infrastructure, Subcomm. on Water Resources and Environment, 116th
Cong. (Feb. 27, 2020).
---------------------------------------------------------------------------
LEGISLATIVE HISTORY AND CONSIDERATION
H.R. 1720, the ``Ocean Pollution Reduction Act II'', was
introduced in the United States House of Representatives on
March 22, 2023, by Mr. Peters and referred to the Committee on
Transportation and Infrastructure. Within the Committee on
Transportation and Infrastructure, H.R. 1720 was referred to
the Subcommittee on Water Resources and Environment. The
Subcommittee on Water Resources and Environment was discharged
from further consideration of H.R. 1720 on September 18, 2024.
H.R. 1720 is substantially similar to legislation (H.R.
587) introduced in the 117th Congress, which was approved by
the Committee (House Report 117-41) and the House of
Representatives by voice vote; however, no further action was
taken on H.R. 587.
The Committee considered H.R. 1720 on September 18, 2024,
and ordered the measure to be reported to the House with a
favorable recommendation, with amendment, by recorded vote of
57 yeas to 7 nays.
Committee Votes
Clause 3(b) of rule XIII of the Rules of the House of
Representatives requires each committee report to include the
total number of votes cast for and against on each record vote
on a motion to report and on any amendment offered to the
measure or matter, and the names of those members voting for
and against.
The following recorded vote was requested:
Vote: 54.
Final passage: H.R. 1720, as amended.
Yea 57; Nay 7.
----------------------------------------------------------------------------------------------------------------
Member Vote Member Vote
----------------------------------------------------------------------------------------------------------------
Mr. Graves of MO................................ Y Mr. Larsen of WA.................. Y
Mr. Crawford.................................... Y Ms. Norton ....................... Y
Mr. Webster of FL............................... Y Mrs. Napolitano................... Y
Mr. Massie...................................... Y Mr. Cohen......................... Y
Mr. Perry....................................... N Mr. Garamendi..................... Y
Mr. Babin....................................... Y Mr. Johnson of GA................. Y
Mr. Graves of LA................................ Y Mr. Carson........................ Y
Mr. Rouzer...................................... Y Ms. Titus......................... Y
Mr. Bost........................................ N Mr. Huffman....................... Y
Mr. LaMalfa..................................... Y Ms. Brownley...................... Y
Mr. Westerman................................... Y Ms. Wilson of FL.................. Y
Mr. Mast........................................ N Mr. DeSaulnier.................... Y
Mrs. Gonzalez-Colon............................. Y Mr. Carbajal...................... Y
Mr. Stauber..................................... Y Mr. Stanton....................... Y
Mr. Burchett.................................... N Mr. Allred........................ Y
Mr. Johnson of SD............................... Y Ms. Davids of KS.................. Y
Mr. Van Drew.................................... Y Mr. Garcia of IL.................. Y
Mr. Nehls....................................... Y Mr. Pappas........................ Y
Mr. Mann........................................ Y Mr. Moulton....................... Y
Mr. Owens....................................... Y Mr. Auchincloss................... Y
Mr. Yakym....................................... Y Ms. Strickland.................... Y
Mrs. Chavez-DeRemer............................. Y Mr. Carter of LA.................. Y
Mr. Kean of NJ.................................. Y Mr. Ryan.......................... Y
Mr. D'Esposito.................................. ............ Mrs. Peltola...................... Y
Mr. Burlison.................................... N Mr. Menendez...................... Y
Mr. Van Orden................................... Y Ms. Hoyle of OR................... Y
Mr. Williams of NY.............................. Y Mrs. Sykes........................ Y
Mr. Molinaro.................................... Y Ms. Scholten...................... Y
Mr. Collins..................................... N Mrs. Foushee...................... Y
Mr. Ezell....................................... Y Mr. Deluzio....................... Y
Mr. Duarte...................................... Y
Mr. Bean of FL.................................. N
Ms. Maloy....................................... Y
Mr. Kiley....................................... Y
Mr. Fong........................................ Y
----------------------------------------------------------------------------------------------------------------
COMMITTEE OVERSIGHT FINDINGS AND RECOMMENDATIONS
With respect to the requirements of clause 3(c)(1) of rule
XIII of the Rules of the House of Representatives, the
Committee's oversight findings and recommendations are
reflected in this report.
NEW BUDGET AUTHORITY AND TAX EXPENDITURES
Clause 3(c)(2) of rule XIII of the Rules of the House of
Representatives does not apply where a cost estimate and
comparison prepared by the Director of the Congressional Budget
Office under section 402 of the Congressional Budget Act of
1974 has been timely submitted prior to the filing of the
report and is included in the report. Such a cost estimate is
included in this report.
CONGRESSIONAL BUDGET OFFICE COST ESTIMATE
With respect to the requirement of clause 3(c)(3) of rule
XIII of the Rules of the House of Representatives and section
402 of the Congressional Budget Act of 1974, the Committee has
received the enclosed cost estimate for H.R. 1720 from the
Director of the Congressional Budget Office:
The Congressional Budget Act of 1974 requires the
Congressional Budget Office, to the extent practicable, to
prepare estimates of the budgetary effects of legislation
ordered reported by Congressional authorizing committees. In
order to provide the Congress with as much information as
possible, the attached table summarizes information about the
estimated direct spending and revenue effects of some of the
legislation that has been ordered reported by the House
Committee on Transportation and Infrastructure during the 118th
Congress. The legislation listed in this table generally would
have small effects, if any, on direct spending or revenues, CBO
estimates. Where possible, the table also provides information
about the legislation's estimated effects on spending subject
to appropriation and on intergovernmental and private-sector
mandates as defined in the Unfunded Mandates Reform Act.
ESTIMATED BUDGETARY EFFECTS AND MANDATES INFORMATION
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Spending
Last Budget Direct Revenues, Subject to Pay-As-You-Go Budgetary
Bill Number Title Status Action Function Spending, 2025-2034 Appropriation, Procedures Effects After Mandates Contact
2025-2034 2025-2029 Apply? 2034
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
H.R. 1586................... Forest Ordered 11/15/23 300 0 0 Not estimated.. No No Yes Lilia Ledezma
Protection and reported.
Wildland
Firefighter
Safety Act of
2023.
H.R. 1586 would authorize federal, state, local, and tribal firefighting agencies to use approved fire retardants to prevent and suppress wildfires without first
obtaining a National Pollutant Discharge Elimination System permit. The bill also would prohibit state courts from issuing injunctions against state or tribal
entities' dispersal of aerial fire retardants as part of wildfire suppression or control. CBO estimates that enacting H.R. 1586 would not affect direct spending
or revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill would impose an intergovernmental mandate as defined in the
Unfunded Mandates Reform Act (UMRA) that would not exceed the annual threshold established in UMRA ($100 million in 2024, adjusted annually for inflation). The
bill contains no private-sector mandates as defined in UMRA.
H.R. 1720................... Ocean Pollution Ordered 09/18/24 300 0 0 Not estimated.. No No No Aurora Swanson
Reduction Act reported.
II.
H.R. 1720 would allow the Point Loma Wastewater Treatment Plant in San Diego, California, to discharge water without applying for an exemption from the secondary
treatment standards of the National Pollutant Discharge Elimination System if plant meets certain conditions specified in the bill. CBO estimates that enacting
H.R. 1720 would not affect direct spending or revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no
intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 2892................... WARN Act....... Ordered 09/18/24 800 0 0 Between zero No No No Matthew
reported. and $500,000. Pickford
H.R. 2892 would require the Government Accountability Office within 18 months of enactment to study and report on the effectiveness of the nation's weather
emergency alert systems. CBO estimates that enacting H.R. 2892 would not affect direct spending or revenues. CBO estimates that implementing the bill would
increase spending subject to appropriation by less than $500,000 over the 2025-2029 period. The bill contains no intergovernmental or private-sector mandates as
defined in the Unfunded Mandates Reform Act.
H.R. 3149................... A bill to Ordered 09/18/24 400 0 0 Between zero No No No Kelly Durand
designate reported. and $500,000.
United States
Route 20 in
the States of
Oregon, Idaho,
Montana, Wyomi
ng, Nebraska,
Iowa, Illinois
, Indiana,
Ohio, Pennsylv
ania, New
York, and
Massachusetts
as the
``National
Medal of Honor
Highway,'' and
for other
purposes.
H.R. 3149 would designate U.S. Route 20 as the National Medal of Honor Highway. CBO estimates that enacting H.R. 3149 would not affect direct spending or
revenues. CBO estimates that implementing the bill would increase spending subject to appropriation by less than $500,000 over the 2025-2029 period. The bill
contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 3988................... ARTICLE ONE Act Ordered 09/18/24 800 Between - 0 Not estimated.. Yes No No Kelly Durand
reported. $500,000 and
zero
H.R. 3988 would amend the National Emergencies Act to limit to 30 days the duration of any national emergency declared by the President unless the Congress
subsequently approves or extends the declaration. The bill also would require the President to report to the Congress periodically on the need for and status of
declared emergencies. CBO cannot predict the number or timing of future declarations but expects that most would be approved by the Congress. Under H.R. 3988
emergency declarations could have a shorter duration than under current law. If that happens direct spending related to such emergencies would decline; CBO
estimates any reduction in direct spending would be insignificant. CBO estimates that enacting the bill would not affect revenues. CBO has not estimated the
bill's effects on spending subject to appropriation. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform
Act.
H.R. 4043................... H.R. 4043, a Ordered 09/18/24 300 0 0 Not estimated.. No No No Aurora Swanson
bill to amend reported.
the Save Our
Seas 2.0 Act
to expand
eligibility
for certain
wastewater
infrastructure
grants, and
for other
purposes.
H.R. 4043 would expand eligibility for certain wastewater infrastructure grants administered by the Environmental Protection Agency. CBO estimates that enacting
H.R. 4043 would not affect direct spending or revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no
intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 6241................... FULL Act....... Ordered 11/15/23 800 Between zero 0 Not estimated.. No No No Matthew
reported. and $500,000 Pickford
H.R. 6241 would require federal agencies that have lease agreements with the General Services Administration (GSA) to annually report to GSA on their monthly use
and occupancy rates. Under the bill, agencies would be required to return space to GSA if occupancy falls below 60 percent for six months over any one-year
period. Enacting H.R. 6241 could increase direct spending by some agencies that are allowed to use fees, receipts from the sale of goods, and other collections
to cover operating costs. CBO estimates that any net changes in direct spending by those agencies would be negligible because most of them can adjust amounts
collected to reflect changes in operating costs. CBO estimates that enacting H.R. 6241 would have no effect on revenues. CBO has not estimated the bill's effects
on spending subject to appropriation. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 6984................... A bill to Ordered 09/18/24 800 0 0 Between zero No No No Matthew
designate the reported. and $500,000. Pickford
Federal
building
located at 300
E. 3rd Street
in North
Platte, Nebras
ka, as the
``Virginia
Smith Federal
Building,''
and for other
purposes.
H.R. 6984 would designate the federal building located at 300 E. 3rd Street in North Platte, Nebraska, as the Virginia Smith Federal Building. CBO estimates that
enacting H.R. 6984 would not affect direct spending or revenues. CBO estimates that implementing the bill would increase spending subject to appropriation by
less than $500,000 over the 2025-2029 period. The bill contains no intergovernmental or private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 7671................... Disaster Ordered 09/25/24 450 0 0 Not estimated.. No No No Jon Sperl
Management reported.
Costs
Modernization
Act.
H.R. 7671 would allow state and local governments that receive disaster assistance from the Federal Emergency Management Agency to repurpose unused funds that
originally were allocated for management costs. State and local governments could use the funds to increase their administrative capacity to prepare for, recover
from, or mitigate the effects of disasters. Under current law, unused funds are returned to the Disaster Relief Fund. Under the bill, those governments could
retain unused funds for up to five years for disasters that are declared on or after the bill's enactment date. CBO estimates that enacting H.R. 7671 would not
affect direct spending or revenues. CBO has not estimated the bill's effects on spending subject to appropriation. The bill contains no intergovernmental or
private-sector mandates as defined in the Unfunded Mandates Reform Act.
H.R. 7779................... Good Sam