Skip to content

senate · Committee report

S. Rept. 118-182

ACCELERATING DEPLOYMENT OF VERSATILE, ADVANCED NUCLEAR FOR CLEAN ENERGY ACT OF 2023

2024-06-17

Committees

Associated legislation

Text

Section-by-Section Analysis

SECTION 1. SHORT TITLE; TABLE OF CONTENTS Sec. 1. Short title; table of contents This section gives the Act the short title of the ``Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2023'' or ``ADVANCE Act of 2023'' and provides the table of contents. Sec. 2. Definitions This section defines the terms used in this Act. TITLE I--AMERICAN NUCLEAR LEADERSHIP Sec. 101. International nuclear reactor export and innovation activities This section requires the Nuclear Regulatory Commission (Commission) to coordinate all work of the Commission relating to: (1) nuclear reactor import and export licensing; and (2) international regulatory cooperation and assistance relating to nuclear reactors. The Commission must also coordinate international activities with respect to the establishment of: (1) certain technical standards; (2) nuclear regulatory organizations and legal frameworks; and (3) exchange programs and training to other countries. The section further provides that the Commission's fee recovery requirements do not apply to these activities. The Commission is authorized to establish the International Nuclear Reactor Export and Innovation Branch within the Commission's Office of International Programs. Sec. 102. Denials of certain domestic licenses for national security purposes This section defines ``covered fuel'' as enriched uranium that is fabricated into fuel assemblies by an entity that is: (1) owned or controlled by Russia or China; or (2) organized under the laws of Russia or China. The section prohibits the possession or ownership of covered fuel, unless the Commission specifically authorizes such possession or ownership. This section also directs the Commission to notify the Secretary of Energy and Secretary of State within 30 days of receipt of an application to possess or own covered fuel. The Commission may not issue a license if the Secretary of Energy and Secretary of State jointly determine, within 180 days, that possession or ownership of covered fuel poses a threat to the national security of the United States. Sec. 103. Export license requirements This section ensures advanced nuclear technologies approved for export are in compliance with nonproliferation standards. Sec. 104. Coordinated international engagement This section requires the Secretary of Commerce and Secretary of Energy to establish an initiative to modernize civil nuclear outreach to embarking civil nuclear energy nations. Qualifying nations are nations that do not have a civil nuclear program, are developing or expanding a civil nuclear program, or are pursuing the development of advanced nuclear reactor technology, and which are not listed in this section as excluded from the qualification. The initiative requires the Secretary of Commerce to: (1) coordinate outreach to the private investment community to create public-private financing relationships to help to export civil nuclear technology to embarking civil nuclear energy nations; (2) coordinate the work of the Executive Branch; and (3) improve the regulatory framework for exporting and importing of items under the jurisdiction of the Secretary of Commerce. The initiative requires the Secretary of Energy to: (1) assist nongovernmental organizations and Federal agencies to provide education and training to foreign governments for nuclear safety, security and safeguards; (2) assist the International Atomic Energy Agency to expand support to embarking civil nuclear energy nations for nuclear safety, security, and safeguards; and (3) assist U.S. nuclear energy companies to integrate security and safeguards into their international outreach. TITLE II--DEVELOPING AND DEPLOYING NEW NUCLEAR TECHNOLOGIES Sec. 201. Fees for advanced nuclear reactor application review This section amends the Nuclear Energy Innovation and Modernization Act to set a specific rate for fees assessed and charged to an entity that has: (1) submitted to the Commission a license application for an advanced nuclear reactor; or (2) submitted to the Commission a licensing project plan describing pre-application activities for a future license application for an advanced nuclear reactor. The revised rate for pre- application activities sunsets on September 30, 2029. The rate equals the hourly rate calculated by the Commission for mission-direct program salaries and benefits for the nuclear reactor safety program. Mission-indirect program support and agency support expenses that would otherwise be charged to the applicant are excluded from the Commission's fee recovery requirements. Sec. 202. Advanced nuclear reactor prizes This section authorizes the Secretary of Energy to award a prize in an amount equal to the fees assessed by the Commission for activities related to the review and approval of the first operating license or combined operating license with a finding issued pursuant to 10 C.F.R. 52.103g for an advanced nuclear reactor issued to a non-Federal entity or the Tennessee Valley Authority. The Secretary is authorized to make additional awards for the first advanced reactor that: (1) uses isotopes derived from spent nuclear fuel as fuel for the reactor; (2) is part of a nuclear integrated energy system; (3) is used for nonelectric application; or (4) is licensed under the new technology- inclusive regulatory framework required by the Nuclear Energy Innovation and Modernization Act. An eligible entity that receives an award is not required to repay that award or pay a dividend or interest on the award. Sec. 203. Report on unique licensing considerations relating to the use of nuclear energy for nonelectric applications This section directs the Commission to submit a report to Congress, not later than nine months after the date of enactment, identifying unique licensing issues or requirements related to the: (1) flexible operation of nuclear reactors; (2) use of nuclear reactors for nonelectric applications; and (3) colocation of nuclear reactors with industrial plants or other facilities. Nonelectric applications include hydrogen or other liquid and gaseous fuel or chemical production; water desalination and wastewater treatment; heat for industrial processes; district heating; energy storage; industrial or medical isotope production; and other applications identified by the Commission. Sec. 204. Enabling preparations for the demonstration of advanced nuclear reactors on Department of Energy sites or critical national security infrastructure sites This section provides that the Commission's fee recovery requirements do not apply to costs of pre-application proceedings relating to an early site permit or the review of an early site permit associated with advanced nuclear reactor demonstrations to be located on DOE or critical national security infrastructure sites. Sec. 205. Clarification on fusion regulation This section amends the Nuclear Energy Innovation and Modernization Act to exclude fusion reactors from the technology-inclusive regulatory framework for advanced nuclear fission reactors. Sec. 206. Regulatory issues for nuclear facilities at brownfield sites This section directs the Commission to identify and report on regulations, guidance, or policy necessary to license and oversee nuclear facilities at brownfield sites, including sites with retired fossil fuel facilities. The Commission must consider how existing site infrastructure can be reused and how early site permits, plant parameter envelopes, or standardized applications for similar sites may be used in licensing nuclear facilities at brownfield sites. The Commission must also develop and implement strategies or initiate a rulemaking to enable and support the licensing of nuclear facilities at brownfield sites. The Commission shall consider: existing site infrastructure; existing emergency preparedness organizations and planning; the availability of historical site-specific environmental data; previously approved environmental reviews; potential decommissioning activities; and community engagement and experience with energy production. Sec. 207. Appalachian Regional Commission nuclear energy development This section authorizes the Appalachian Regional Commission to provide assistance to individuals or entities in the Appalachian region to: (1) conduct research to support siting, constructing, and operating a nuclear facility at a brownfield site; (2) assist with workforce training or retraining for a nuclear facility at a brownfield site; and (3) engage with the Commission, the DOE, and other Federal agencies. This section authorizes $5 million per year for fiscal years 2023 through 2026 to carry out this program. TITLE III--PRESERVING EXISTING NUCLEAR ENERGY GENERATION Sec. 301. Investment by allies This section allows certain foreign entities to receive a license described in sections 103(d) or 104(d) of the Atomic Energy Act of 1954 for a nuclear utilization facility if the Commission determines that issuing such license is not inimical to the common defense and security or the health and safety of the public. This section applies to: (1) an entity that is owned, controlled, or dominated by the Republic of India or a government of a country that is a member of Organisation for Economic Co-operation and Development on the date of enactment; (2) a corporation that is incorporated in those countries; or (3) an alien who is a national of those countries. An entity that has been subject to sanctions under the Countering America's Adversaries Through Sanctions Act is still subject to the existing licensing prohibition. Sec. 302. Extension of the Price-Anderson Act This section extends section 170 of the Atomic Energy Act of 1954, commonly known as the Price-Anderson Act, from the current expiration date of December 31, 2025, to December 31, 2045. TITLE IV--NUCLEAR FUEL CYCLE, SUPPLY CHAIN, INFRASTRUCTURE, AND WORKFORCE Sec. 401. Report on advanced methods of manufacturing and construction for nuclear energy applications This section directs the Commission to submit a report to Congress, not later than 180 days after the date of enactment, on licensing and safety issues for innovative nuclear energy applications related to manufacturing and construction. Sec. 402. Nuclear energy traineeship This section establishes a new traineeship subprogram under the University Nuclear Leadership Program to provide focused training to meet critical mission needs of the Commission and other nuclear workforce needs relating to nuclear safety and tradecraft. Sec. 403. Report on Commission readiness and capacity to license additional conversion and enrichment capacity to reduce reliance on uranium from Russia This section directs the Commission to submit a report to Congress, not later than 180 days after the date of enactment, on the readiness and capacity of the Commission to license additional conversion and enrichment capacity and fuel cycle facilities to reduce reliance on Russian nuclear fuel. The report must analyze how the Commission's capacity to license additional conversion and enrichment capabilities at new and existing fuel cycle facilities may restrict the Commission's readiness to review advanced nuclear reactor applications. Sec. 404. Annual report on the spent nuclear fuel and high-level radioactive waste inventory in the United States This section directs the Secretary of Energy to annually submit a report to Congress that describes the annual and cumulative payments made by the United States to the holder of a standard contract due to a partial breach of the contract under the Nuclear Waste Policy Act of 1982\46\ resulting in financial damages to the holder. The report must also quantify the amount spent to reduce projected legal payments, account for actions taken in the prior fiscal year with respect to interim storage, and describe activities to develop and deploy technologies and fuels that enhance the safe transportation and storage of spent nuclear fuel and high-level radioactive waste. --------------------------------------------------------------------------- \46\42 U.S.C. 10101 et seq. --------------------------------------------------------------------------- Sec. 405. Authorization of appropriations for superfund actions at abandoned mining sites on Tribal land This section authorizes appropriations for the Administrator of the Environmental Protection Agency (EPA) to conduct response actions, including removal and remedial planning activities, studies and other actions taken pursuant to Superfund authorities at abandoned mine land on Tribal land. It also authorizes appropriations for the Administrator to conduct remedial and removal actions under Superfund at similarly located eligible non-National Priorities List sites and sites listed on the National Priorities list. This section also directs the Agency for Toxic Substances and Disease Registry to perform health assessments at each eligible non- National Priority List site located on Tribal land. The Administrator may provide financial assistance to Tribal governments and other specified Tribal entities. Grant funds may be used for technical assistance or response actions. The Administrator shall coordinate with any applicable Indian Tribe when selecting and prioritizing sites and carrying out response actions. Sec. 406. Development, qualification, and licensing of advanced nuclear fuel concepts This section directs the Commission to establish an initiative to enhance preparedness and coordination to qualify and license advanced nuclear fuel. The Commission must, within 180 days of enactment, enter into a memorandum of understanding with the Secretary of Energy to: (1) share technical expertise and knowledge to support the testing and safety analysis of advanced nuclear fuel; and (2) ensure that DOE and the Commission have sufficient technical expertise and facilities to support the evaluation of regulatory approval for advanced nuclear fuel. The Commission must, within one year of enactment, submit a report to Congress on the Commission's preparedness to review and qualify advanced nuclear fuels, activities undertaken under the memorandum of understanding, necessary research, and other challenges or considerations with respect to advanced nuclear fuels. TITLE V--IMPROVING COMMISSION EFFICIENCY Sec. 501. Commission workforce This section authorizes the appointment, without regard to the civil service laws, of up to 15 permanent positions for fiscal year 2024 and 10 permanent positions for each fiscal year thereafter with highly specialized scientific, engineering, and technical competencies and 15 term-limited positions for fiscal year 2024 and 10 term-limited positions for each fiscal year thereafter for the same competencies. It also authorizes the appointment of 15 permanent positions for fiscal year 2024 and 10 permanent positions for each fiscal year thereafter to be filled by exceptionally well-qualified individuals necessary to fulfill the mission of the Commission and 15 term-limited positions for fiscal year 2024 and 10 term- limited positions for each fiscal year thereafter for the same exceptionally well-qualified individuals. The positions appointed under this section may receive hiring bonuses. The hiring authority under this section is to be used to fill entry, mid, and senior levels of positions to the extent practicable. This section also allows the Commission to establish and fill positions compensated at the basic rate of pay equal to level III of the Executive Schedule for up to 10 positions per fiscal year, not to exceed 50 positions total, with highly specialized scientific, engineering, and technical competencies, and up to 10 positions per fiscal year, not to exceed 50 positions total, to be filled by exceptionally well- qualified individuals necessary to fulfill the mission of the Commission. Employees who demonstrate exceptional performance may receive a one-time performance bonus no less frequently than once every six years. In filling these positions and awarding the one-time performance bonus, the Commission must follow the Merit Systems Principles in section 2301 of title 5 of the United States Code to the maximum extent practicable. The Commission must delegate the authority under this subsection to establish and fill positions to the Executive Director for Operations, pursuant to the Reorganization Plan No. 1 of 1980. The Commission must annually report on the total number and positions of persons appointed and compensated, including the use of one-time performance bonuses, under the authority provided in this section. The annual report must also include an assessment of critical workforce needs, other skillsets necessary for the Commission, and plans to assess, develop, and implement staff performance standards, training procedures, and schedules. Not later than September 30, 2032, the Commission must submit a report to Congress with the Commission's views on the effectiveness of the authorities in this section and make recommendations with respect to whether the authorities provided should be continued, modified, or discontinued. Section 502. Commission corporate support funding This section directs the Commission to submit a report to Congress, not later than three years after the date of enactment, describing: (1) the Commission's implementation of the budgetary authority caps for corporate support established under section 102(a)(3) of the Nuclear Energy Innovation and Modernization Act (42 U.S.C. 2215(a)(3)); and (2) whether the Commission is meeting and is expected to meet the total caps under that section. This section also freezes corporate support limitations at 30 percent and excludes costs associated with unused office space or for salaries, travel, and support of the Office of the Commission from the corporate support cost definition. Section 503. Performance and reporting update This section requires the Commission to periodically review and assess performance metrics and milestone schedules. The Commission must revise the metrics and schedules to be the most efficient as is reasonably achievable. TITLE VI --MISCELLANEOUS Section 601. Nuclear closure communities This section authorizes appropriations for the Secretary of Commerce to establish a grant program to assist with economic development and fund community advisory boards in communities impacted by a nuclear power plant that, as of the date of enactment, has ceased or plans to cease operations. Sec. 602. Technical correction This section makes a technical correction to the Atomic Energy Act to permit the Commission to issue a license for a research and test reactor if not more than 75 percent of the annual costs to the licensee of owning and operating the facility are devoted to the sale of non-energy services, energy services, or a combination of non-energy services and energy services. Sec. 603. Report on engagement with the Government of Canada with respect to nuclear waste issues in the Great Lakes Basin This section requires the Commission to submit a report to Congress describing any engagement between the Commission and the Government of Canada with respec

Hearings

In the 117th Congress, the Committee held a legislative hearing on February 9, 2022, entitled, ``A Legislative Haring to Examine S. 2373, the American Nuclear Infrastructure Act of 2021, and S. 1290, the STRANDED Act of 2021.'' The purpose of this hearing was to allow committee members to consider stakeholder testimony regarding two pieces of legislation within the Committee's jurisdiction related to nuclear energy and materials. In the 116th Congress, the Committee on Environment and Public Works held a legislative hearing on August 5, 2020, entitled ``Hearing to Examine a Discussion Draft Bill, S. _, American Nuclear Infrastructure Act of 2020.'' These hearings informed the development of the ADVANCE Act. Committee Consideration and Roll Call Votes On May 31, 2023, the Committee met to consider S. 1111. During the business meeting, the Committee approved by voice vote with a quorum present an amendment in the nature of a substitute offered by Chairman Carper and Ranking Member Capito. The Committee on Environment and Public Works reported the bill, as amended, favorably by a roll call vote of 16 ayes and 3 nays. Voting in favor were Senators Carper, Capito, Cardin, Whitehouse, Kelly, Padilla, Fetterman, Stabenow, Boozman, Wicker, Graham, Ricketts, Lummis, Sullivan, Cramer, and Mullin. Voting against were Senators Markey, Merkley, and Sanders. Regulatory Impact Statement In compliance with section 11(b) of rule XXVI of the Standing Rules of the Senate, the Committee finds that S. 1111 does not create any additional regulatory burdens, nor will it cause any adverse impact on the personal privacy of individuals. Mandates Assessment In compliance with the Unfunded Mandates Reform Act of 1995 (UMRA; Public Law 104-4), the Committee finds that S. 1111 contains no intergovernmental or private-sector mandates as defined in UMRA and would impose costs on state, local, or Tribal governments. Cost of Legislation The Congressional Budget Office estimate of the cost of S. 1111 has been requested but was not received at the time the report was filed. When available, the Chairman will request that it be printed in the Congressional Record for the advice of the Senate. Changes in Existing Law In compliance with section 12 of rule XXVI of the Standing Rules of the Senate, changes in existing law made by the bill as reported are shown as follows: Existing law proposed to be omitted is enclosed in [black brackets], new matter is printed in italic, existing law in which no change is proposed is shown in roman: Nuclear Energy Innovation and Modernization Act * * * * * * * SECTION 1. [42 U.S.C. 2011 NOTE] SHORT TITLE; TABLE OF CONTENTS. (a) Short Title.-- This Act may be cited as the ``Nuclear Energy Innovation and Modernization Act''. * * * * * * * SEC. 3. [42 U.S.C. 2215 NOTE] DEFINITIONS. In this Act: (1) Advanced nuclear reactor.--* * * * * * * * * * (2) Advanced nuclear reactor applicant.--The term `advanced nuclear reactor applicant' means an entity that has submitted to the Commission an application to receive a license for an advanced nuclear reactor under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.). [(2)] (3) Advanced nuclear reactor fuel.--The term ``advanced nuclear reactor fuel'' means fuel for use in an advanced nuclear reactor or a research and test reactor, including fuel with a low uranium enrichment level of not greater than 20 percent. (4) Advanced nuclear reactor pre-applicant.--The term `advanced nuclear reactor pre-applicant' means an entity that has submitted to the Commission a licensing project plan for the purposes of submitting a future application to receive a license for an advanced nuclear reactor under the Atomic Energy Act of 1954 (42 U.S.C. 2011 et seq.) (5) Agency support.--The term `agency support' means the resources of the Commission that are located in executive, administrative, and other support offices of the Commission, as described in the document of the Commission entitled `FY 2022 Final Fee Rule Work Papers' (or a successor document). [(3)] (6) Agreement state.--The term ``Agreement State'' means any State with which the Commission has entered into an effective agreement under section 274 b. of the Atomic Energy Act of 1954 (42 U.S.C. 2021(b)). [(4)] (7) Appropriate congressional committees.--The term ``appropriate congressional committees'' means the Committee on Environment and Public Works of the Senate and the Committee on Energy and Commerce of the House of Representatives. [(5)] (8) Commission.--The term ``Commission'' means the Nuclear Regulatory Commission. [(6)] (9) Conceptual design assessment.-- [The term] (A) In general.--The term (B) Exclusions.--The term `corporate support costs' does not include-- (i) costs for rent and utilities relating to any and all space in the Three White Flint North building that is not occupied by the Commission; or (ii) costs for salaries, travel, and other support for the Office of the Commission.''. ``conceptual design assessment'' means an early-stage review by the Commission that-- (A) assesses preliminary design information for consistency with applicable regulatory requirements of the Commission; (B) is performed on a set of topic areas agreed to in the licensing project plan; and (C) is performed at a cost and schedule agreed to in the licensing project plan. [(7)] (10) Corporate support costs.--The term ``corporate support costs'' means expenditures for acquisitions, administrative services, financial management, human resource management, information management, information technology, policy support, outreach, and training, as those categories are described and calculated in Appendix A of the Congressional Budget Justification for Fiscal Year 2018 of the Commission. (11) Hourly rate for mission-direct program salaries and benefits for the nuclear reactor safety program.-- The term `hourly rate for mission-direct program salaries and benefits for the Nuclear Reactor Safety Program' means the quotient obtained by dividing-- (A) the full-time equivalent rate (within the meaning of the document of the Commission entitled `FY 2022 Final Fee Rule Work Papers' (or a successor document)) for mission-direct program salaries and benefits for the Nuclear Reactor Safety Program (as determined by the Commission) for a fiscal year; by (B) the productive hours assumption for that fiscal year, determined in accordance with the formula established in the document referred to in subparagraph (A) (or a successor document). [(8)] (12) Licensing project plan.--The term ``licensing project plan'' means a plan that describes-- (A) the interactions between an applicant and the Commission; and (B) project schedules and deliverables in specific detail to support long-range resource planning undertaken by the Commission and an applicant. (13) Mission-direct program salaries and benefits for the nuclear reactor safety program.--The term `mission- direct program salaries and benefits for the Nuclear Reactor Safety Program' means the resources of the Commission that are allocated to the Nuclear Reactor Safety Program (as determined by the Commission) to perform core work activities committed to fulfilling the mission of the Commission, as described in the document of the Commission entitled `FY 2022 Final Fee Rule Work Papers' (or a successor document). (14) Mission-indirect program support.--The term `mission-indirect program support' means the resources of the Commission that support the core mission-direct activities for the Nuclear Reactor Safety Program of the Commission (as determined by the Commission), as described in the document of the Commission entitled `FY 2022 Final Fee Rule Work Papers' (or a successor document). [(9)] (15) Regulatory framework.-- The term ``regulatory framework'' means the framework for reviewing requests for certifications, permits, approvals, and licenses for nuclear reactors. [(10)] (16) Requested activity of the commission.-- The term ``requested activity of the Commission'' means-- (A) the processing of applications for-- (i) design certifications or approvals; (ii) licenses; (iii) permits; (iv) license amendments; (v) license renewals; (vi) certificates of compliance; and (vii) power uprates; and (B) any other activity requested by a licensee or applicant. [(11)] (17) Research and test reactor.-- (A) In general.-- The term ``research and test reactor'' means a reactor that-- (i) falls within the licensing and related regulatory authority of the Commission under section 202 of the Energy Reorganization Act of 1974 (42 U.S.C. 5842); and (ii) is useful in the conduct of research and development activities as licensed under section 104 c. of the Atomic Energy Act (42 U.S.C. 2134(c)). (B) Exclusion.-- The term ``research and test reactor'' does not include a commercial nuclear reactor. [(12)] (18) Secretary.--The term ``Secretary'' means the Secretary of Energy. [(13)] (19) Standard design approval.--The term ``standard design approval'' means the approval of a final standard design or a major portion of a final design standard as described in subpart E of part 52 of title 10, Code of Federal Regulations (as in effect on the date of enactment of this Act). [(14)] (20) Technology-inclusive regulatory framework.--The term ``technology-inclusive regulatory framework'' means a regulatory framework developed using methods of evaluation that are flexible and practicable for application to a variety of reactor technologies, including, where appropriate, the use of risk-informed and performance-based techniques and other tools and methods. [(15)] (21) Topical report.-- SEC. 102. NUCLEAR REGULATORY COMMISSION USER FEES AND ANNUAL CHARGES FOR FISCAL YEAR 2021 AND EACH FISCAL YEAR THEREAFTER. (a) Annual Budget Justification.-- (1) In general.-- * * * * * * * * * * (3) Limitation on corporate support costs.--With respect to the annual budget justification submitted to Congress, corporate support costs, to the maximum extent practicable, shall not exceed the following percentages of the total budget authority of the Commission requested in the annual budget justification: (A) 30 percent for each of fiscal years 2021 and 2022. [(B) 29 percent for each of fiscal years 2023 and 2024.] [(C) 28 percent for fiscal year 2025 and each fiscal year thereafter.] (B) 30 percent for fiscal year 2024 and each fiscal year thereafter. (4) International nuclear reactor export and innovation activities.--The Commission shall identify in the annual budget justification international nuclear reactor export and innovation activities described in section 101(a) of the ADVANCE Act of 2023. * * * * * * * (b) Fees and Charges.-- (1) Annual assessment.-- (A) In general.--* * * * * * * * * * (B) Excluded activities described.-- The activities referred to in subparagraph (A)(ii) are the following: (i) Any fee relief activity, as identified by the Commission. (ii) * * * * * * * * * * (iii) Costs for activities related to the development of regulatory infrastructure for advanced nuclear reactor technologies, including activities required under section 103. (iv) Costs for international nuclear reactor export and innovation activities described in section 101(a) of the ADVANCE Act of 2023. (v) The total costs of mission-indirect program support and agency support that, under paragraph (2)(B), may not be included in the hourly rate charged for fees assessed to advanced nuclear reactor applicants. [(vi) The total costs of mission-indirect program support and agency support that, under paragraph (2)(C), may not be included in the hourly rate charged for fees assessed to advanced nuclear reactor pre-applicants.] (vi) Costs for-- (I) activities to review and approve or disapprove an application for an early site permit (as defined in section 52.1 of title 10, Code of Federal Regulations (or a successor regulation)) to demonstrate an advanced nuclear reactor on a Department of Energy site or critical national security infrastructure (as defined in section 327(d) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115-232; 132 Stat. 1722)) site; and (II) pre-application activities relating to an early site permit (as defined in section 52.1 of title 10, Code of Federal Regulations (or a successor regulation)) to demonstrate an advanced nuclear reactor on a Department of Energy site or critical national security infrastructure (as defined in section 327(d) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115-232; 132 Stat. 1722)) site. [(2) Fees for service or thing of value.--In accordance with section 9701 of title 31, United States Code, the Commission shall assess and collect fees from any person who receives a service or thing of value from the Commission to cover the costs to the Commission of providing the service or thing of value.] (2) Fees for service or thing of value.-- (A) In general.--In accordance with section 9701 of title 31, United States Code, the Commission shall assess and collect fees from any person who receives a service or thing of value from the Commission to cover the costs to the Commission of providing the service or thing of value. (B) Advanced nuclear reactor applicants.--The hourly rate charged for fees assessed to advanced nuclear reactor applicants under this paragraph relating to the review of a submitted application described in section 3(1) shall not exceed the hourly rate for mission-direct program salaries and benefits for the Nuclear Reactor Safety Program. (C) Advanced nuclear reactor pre-applicants.--The hourly rate charged for fees assessed to advanced nuclear reactor pre-applicants under this paragraph relating to the review of submitted materials as described in the licensing project plan of an advanced nuclear reactor pre-applicant shall not exceed the hourly rate for mission-direct program salaries and benefits for the Nuclear Reactor Safety Program. (c) Performance and Reporting.-- (1) In general.--Not later than 180 days after the date of enactment of this Act, the Commission shall develop for the requested activities of the Commission-- (A) performance metrics; and (B) milestone schedules. (2) Delays in issuance of final safety evaluation.-- The Executive Director for Operations of the Commission shall inform the Commission of a delay in issuance of the final safety evaluation for a requested activity of the Commission by the completion date required by the performance metrics or milestone schedule under paragraph (1) by not later than 30 days after the completion date. (3) Delays in issuance of final safety evaluation exceeding [180] 90 days.--If the final safety evaluation for the requested activity of the Commission described in paragraph (2) is not completed by the date that is [180]90 days after the completion date required by the performance metrics or milestone schedule under paragraph (1), the Commission shall submit to the appropriate congressional committees a timely report describing the delay, including a detailed explanation accounting for the delay and a plan for timely completion of the final safety evaluation. (4) Periodic updates to metrics and schedules.-- (A) Review and assessment.--Not less frequently than once every 3 years, the Commission shall review and assess, based on the licensing and regulatory activities of the Commission, the performance metrics and milestone schedules established under paragraph (1). (B) Revisions.--After each review and assessment under subparagraph (A), the Commission shall revise and improve, as appropriate, the performance metrics and milestone sche

Source: https://api.congress.gov/v3/committee-report/118/srpt/182