Background and Need for Legislation
The International Boundary and Water Commission (IBWC or
Commission) was established in 1889 and is an international
body composed of the United States Section and the Mexican
Section. The IBWC is responsible for applying the boundary and
water treaties between the United States and Mexico. As part of
this responsibility, the IBWC undertakes a variety of
infrastructure projects to implement existing treaties and
international agreements, as well as to resolve new or emerging
boundary or water problems.
The United States Section of the IBWC currently operates
and maintains roughly 100 hydrologic gaging stations, 500 miles
of levees, 20,000 acres of floodplains, four diversion dams,
two international storage dams and associated hydroelectric
power plants, more than 500 hydraulic structures, two
international wastewater treatment plants, and half of all
boundary monuments and markers on the land boundary and at
ports of entry.\1\ Additionally, the IBWC conducts and reviews
environmental impact studies, water quality monitoring,
hydraulic studies, and develops design plans for construction
and renovation of water infrastructure projects.\2\
---------------------------------------------------------------------------
\1\IBWC, U.S. IBWC Organizational Structure, (Apr. 4, 2025),
available at https://www. ibwc.gov/organization/.
\2\Id.
---------------------------------------------------------------------------
H.R. 1948 authorizes the IBWC to accept funds from other
Federal agencies and non-Federal partners to study, design,
construct, operate, and maintain water resource infrastructure.
This legislation builds on the United States-Mexico-Canada
Agreement Implementation Act (P.L. 116-113), which directed the
United States Environmental Protection Agency (EPA) to work
with the IBWC to address international transboundary water
flows originating in Mexico and appropriated $300 million to
EPA for the purpose of constructing and maintaining water
infrastructure. This authority was later amended in the
Consolidated Appropriations Act, 2023 (P.L. 117-328) to
authorize the transfer of this funding from EPA to the IBWC to
carry out this work.
H.R. 1948 also aligns the IBWC's authorities with other
Federal agencies that are authorized to receive funding from
non-Federal entities. For example, the United States Army Corps
of Engineers (Corps) is eligible to receive funding from non-
Federal partners for the study, design, construction, and
operation and maintenance of infrastructure projects.\3\
---------------------------------------------------------------------------
\3\Dep't of the Army, United States Army Corps of Engineers,
Directors Policy Memorandum FY2020, (Dec. 19, 2019), available at
https://usace.contentdm.oclc.org/digital/api/
collection/p16021coll11/id/4421/download.
---------------------------------------------------------------------------
The Commissioner of the United States Section of the IBWC,
Maria-Elena Giner, testified before the Subcommittee on Water
and Environment of the Committee on Transportation and
Infrastructure during the 118th Congress. Commissioner Giner
stated that the IBWC has a $473 million deferred maintenance
backlog and that the ability to accept additional funding would
allow the Commission to better manage its infrastructure
assets, as well as partner with other agencies on critical
infrastructure projects.\4\
---------------------------------------------------------------------------
\4\Review of Fiscal Year 2024 Budget Request: Agency Perspectives
(Part II) Before the Subcomm. on Water Resources and Environment of the
H. Comm. on Transp. And Infrastructure, 118th Cong. (July 13, 2023)
(statement of IBWC Commissioner Maria-Elena Giner).
---------------------------------------------------------------------------
For example, United States Customs and Border Protection
accesses the Commission's levees and flood control structures
regularly for border security purposes.\5\ This legislation
will help the Commission address deferred maintenance and new
water infrastructure needs by collaborating with other Federal
agencies and non-Federal partners.
---------------------------------------------------------------------------
\5\IBWC, Binational Border Solutions--Strategic Plan Fiscal Years
2021-2025, (Sept. 2022), available at https://ibwc.azurewebsites.net/
wp-content/uploads/2023/03/USIBWC_Strategic_Plan_ 2021-2025.pdf.
---------------------------------------------------------------------------
Hearings
For the purposes of rule XIII, clause 3(c)(6)(A) of the
119th Congress no hearings were held to develop this
legislation. However, activity in the 118th Congress informed
this legislation.
In the 118th Congress, the Subcommittee on Water Resources
and Environment of the Committee on Transportation and
Infrastructure held a hearing entitled, ``Review of Fiscal Year
2024 Budget Request: Agency Perspectives (Part II).'' The
hearing gave Members the opportunity to review the Fiscal Year
2024 budget request, as well as the Administration's program
priorities within the jurisdiction of the Subcommittee. The
Subcommittee received testimony from the Honorable Radhika Fox,
Assistant Administrator, Office of Water, EPA; Dr. Maria-Elena
Giner, Commissioner, IWBC, United States Section; Mr. Louis
Aspey, Associate Chief, Natural Resources Conservation Service,
United States Department of Agriculture; Dr. Aaron Bernstein,
Director, Agency for Toxic Substances and Disease Registry; and
Ms. Nicole R. LeBoeuf, Assistant Administrator, National Ocean
Service, National Oceanic and Atmospheric Administration.
LEGISLATIVE HISTORY AND CONSIDERATION
H.R. 1948, ``To authorize the International Boundary and
Water Commission to accept funds for activities relating to
wastewater treatment and flood control works, and for other
purposes'', was introduced in the United States House of
Representatives on March 6, 2025, by Representative Scott
Peters of California, with Mr. Vargas of California, Mr.
Crenshaw of Texas, Ms. Jacobs of California, Mr. Van Orden of
Wisconsin, Mr. Levin of California, Mr. Ellzey of Texas, Ms.
Escobar of Texas, Mr. Zinke of Montana, and Mr. Castro of
Texas, as original cosponsors, and referred to the Committee on
Transportation and Infrastructure. Within the Committee on
Transportation and Infrastructure, H.R. 1948 was referred to
the Subcommittee on Water Resources and Environment. The
Subcommittee on Water Resources and Environment was discharged
from further consideration of H.R. 1948 on April 2, 2025.
The Committee considered H.R. 1948 on April 2, 2025, and
ordered the measure to be reported to the House with a
favorable recommendation, without amendment, by voice vote.
Committee Votes
Clause 3(b) of rule XIII of the Rules of the House of
Representatives requires each committee report to include the
total number of votes cast for and against on each record vote
on a motion to report and on any amendment offered to the
measure or matter, and the names of those members voting for
and against.
There were no recorded votes on H.R. 1948.
COMMITTEE OVERSIGHT FINDINGS AND RECOMMENDATIONS
With respect to the requirements of clause 3(c)(1) of rule
XIII of the Rules of the House of Representatives, the
Committee's oversight findings and recommendations are
reflected in this report.
NEW BUDGET AUTHORITY AND TAX EXPENDITURES
With respect to the requirements of clause 3(c)(2) of rule
XIII of the Rules of the House of Representatives and section
308(a) of the Congressional Budget Act of 1974 and with respect
to requirements of clause (3)(c)(3) of rule XIII of the Rules
of the House of Representatives and section 402 of the
Congressional Budget Act of 1974, the Committee has requested
but not received a cost estimate for this bill from the
Director of Congressional Budget Office. The Committee has
requested but not received from the Director of the
Congressional Budget Office a statement as to whether this bill
contains any new budget authority, spending authority, credit
authority, or an increase or decrease in revenues or tax
expenditures. The Chairman of the Committee shall cause such
estimate and statement to be printed in the Congressional
Record upon its receipt by the Committee.
CONGRESSIONAL BUDGET OFFICE COST ESTIMATE
With respect to the requirement of clause 3(c)(3) of rule
XIII of the Rules of the House of Representatives and section
402 of the Congressional Budget Act of 1974, the Committee has
received the enclosed cost estimate for H.R. 1948, as amended,
from the Director of the Congressional Budget Office:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
H.R. 1948 would authorize the U.S. International Boundary
and Water Commission to accept and spend contributions from
federal and certain nonfederal entities to carry out wastewater
treatment, water conservation, and flood control projects. The
bill would require the commission to report annually on how any
collections were used.
Any contributions from nonfederal entities would be
recorded in the budget as offsetting receipts, that is, as
reductions in direct spending. CBO expects that the amount the
commission would collect each year from federal and nonfederal
sources would vary depending on the needs, priorities, and
financial resources of the contributing entities. Based on
historical spending patterns of similar activities, CBO
estimates that any collections would be spent soon after they
are received. Thus, under the bill, the net effect on direct
spending would be negligible in each year and over the 2025-
2035 period.
Based on the costs of similar requirements, CBO estimates
that the annual report would cost less than $500,000 over the
2025-2030 period. Any related spending would be subject to the
availability of appropriated funds.
The CBO staff contact for this estimate is Kelly Durand.
The estimate was reviewed by H. Samuel Papenfuss, Deputy
Director of Budget Analysis.
Phillip L. Swagel,
Director, Congressional Budget Office.
PERFORMANCE GOALS AND OBJECTIVES
With respect to the requirement of clause 3(c)(4) of rule
XIII of the Rules of the House of Representatives, the
performance goal and objective of this legislation is to
authorize the International Boundary and Water Commission to
accept funds for activities relating to wastewater treatment,
water conservation projects, and flood control works, and for
other purposes.
DUPLICATION OF FEDERAL PROGRAMS
Pursuant to clause 3(c)(5) of rule XIII of the Rules of the
House of Representatives, the Committee finds that no provision
of H.R. 1948 establishes or reauthorizes a program of the
Federal government known to be duplicative of another Federal
program, a program that was included in any report from the
Government Accountability Office to Congress pursuant to
section 21 of Public Law 111-139, or a program related to a
program identified in the most recent Catalog of Federal
Domestic Assistance.
CONGRESSIONAL EARMARKS, LIMITED TAX BENEFITS, AND LIMITED
TARIFF BENEFITS
In compliance with clause 9 of rule XXI of the Rules of the
House of Representatives, this bill, as reported, contains no
congressional earmarks, limited tax benefits, or limited tariff
benefits as defined in clause 9(e), 9(f), or 9(g) of the rule
XXI.
FEDERAL MANDATES STATEMENT
An estimate of Federal mandates prepared by the Director of
the Congressional Budget Office pursuant to section 423 of the
Unfunded Mandates Reform Act was not made available to the
Committee in time for the filing of this report. The Chairman
of the Committee shall cause such estimate to be printed in the
Congressional Record upon its receipt by the Committee.
PREEMPTION CLARIFICATION
Section 423 of the Congressional Budget Act of 1974
requires the report of any Committee on a bill or joint
resolution to include a statement on the extent to which the
bill or joint resolution is intended to preempt state, local,
or tribal law. The Committee finds that H.R. 1948 does not
preempt any state, local, or tribal law.
ADVISORY COMMITTEE STATEMENT
No advisory committees within the definition of Section
5(b) of the appendix to Title 5, United States Code, are
created by this legislation.
APPLICABILITY TO LEGISLATIVE BRANCH
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act (Public Law
104-1).
SECTION-BY-SECTION ANALYSIS OF THE LEGISLATION
Section 1. International Boundary and Water Commission Authority
This section authorizes the United States Section of the
International and Boundary Water Commission to accept funds
from a Federal or non-Federal entity, including through a grant
or funding agreement, to study, design, construct, operate, or
maintain wastewater treatment works, water conservation
projects, or flood control works, and related structures.
This section requires an annual report to the House
Committee on Transportation and Infrastructure and the Senate
Committee on Foreign Relations outlining the funds that have
been accepted under this authority and the activities carried
out with such funds. It also caps the amount of funding that is
eligible for credit or reimbursement to a total of $5 million
annually.
This section also restricts the Commission from accepting
funds from any non-Federal entity that is domiciled in,
headquartered in, or organized under the laws of, or the
principal place of business of which is located in, a foreign
country of concern or that has any agreement with a foreign
country of concern.
CHANGES IN EXISTING LAW MADE BY THE BILL, AS REPORTED
As reported by the Committee, H.R. 1948 makes no changes in
existing law.
[all]