Minority Views
[To accompany H.R. 3898]
The Committee on Transportation and Infrastructure, to whom
was referred the bill (H.R. 3898) to amend the Federal Water
Pollution Control Act to ma.ke targeted reforms with respect to
waters of the United States and other matters, and for other
purposes, having considered the same, reports favorably thereon
with an amendment and recommends that the bill as amended do
pass.
CONTENTS
Page
Purpose of Legislation........................................... 11
Background and Need for Legislation.............................. 11
Hearings......................................................... 24
Legislative History and Consideration............................ 26
Committee Votes.................................................. 33
Committee Oversight Findings and Recommendations................. 50
New Budget Authority and Tax Expenditures........................ 50
Congressional Budget Office Cost Estimate........................ 50
Performance Goals and Objectives................................. 50
Duplication of Federal Programs.................................. 50
Congressional Earmarks, Limited Tax Benefits, and Limited Tariff
Benefits....................................................... 50
Federal Mandates Statement....................................... 51
Preemption Clarification......................................... 51
Advisory Committee Statement..................................... 51
Applicability to Legislative Branch.............................. 51
Section-by-Section Analysis of The Legislation................... 51
Changes in Existing Law Made by the Bill, as Reported............ 53
Committee Correspondence......................................... 104
Supplemental, Minority, Additional, or Dissenting Views.......... 109
The amendment is as follows:
Strike all after the enacting clause and insert the
following:
SECTION 1. SHORT TITLE; TABLE OF CONTENTS.
(a) Short Title.--This Act may be cited as the ``Promoting Efficient
Review for Modern Infrastructure Today Act'' or the ``PERMIT Act''.
(b) Table of Contents.--The table of contents for this Act is as
follows:
Sec. 1. Short title; table of contents.
Sec. 2. Water quality standards attainability.
Sec. 3. Water quality criteria development and transparency.
Sec. 4. Water quality technology availability.
Sec. 5. Improving water quality certifications and American energy
infrastructure.
Sec. 6. Clarifying Federal general permits.
Sec. 7. NPDES permit terms.
Sec. 8. Confidence in clean water permits.
Sec. 9. Forest protection and wildland firefighter safety.
Sec. 10. Agricultural stormwater discharge.
Sec. 11. Reducing regulatory burdens.
Sec. 12. Reducing permitting uncertainty.
Sec. 13. Nationwide permitting improvement.
Sec. 14. Deadline for request for submission of additional information
for permit programs for dredged or fill material.
Sec. 15. Judicial review timeline clarity.
Sec. 16. Restoring federalism in clean water permitting.
Sec. 17. Jurisdictional determination backlog reduction.
Sec. 18. Definition of navigable waters.
Sec. 19. Applicability of Spill Prevention, Control, and Countermeasure
rule.
Sec. 20. Coordination with Federal Permitting Improvement Steering
Council.
Sec. 21. Sense of Congress on Chesapeake Bay Watershed Agreement.
SEC. 2. WATER QUALITY STANDARDS ATTAINABILITY.
(a) State Water Quality Standards.--Section 303(c) (33 U.S.C.
1313(c)) of the Federal Water Pollution Control Act is amended--
(1) in paragraph (1)--
(A) by striking ``The Governor of a State'' and
inserting ``(A) The Governor of a State''; and
(B) by striking ``Results of such review shall be
made available to the Administrator.'' and inserting
the following:
``(B) Reviews under this paragraph shall include review, for purposes
of ensuring that combined sewer overflow controls are cost effective,
of any water quality standard applicable to a body of water into which,
pursuant to a permit, order, or decree issued pursuant to this Act, a
municipal combined storm and sanitary sewer discharges.
``(C) Results of each review under this paragraph shall be made
available to the Administrator.''; and
(2) in paragraph (2)(A)--
(A) by inserting ``(i)'' before ``their use and value
for public water supplies'';
(B) by striking ``, and also taking into
consideration'' and inserting ``; (ii)''; and
(C) by inserting before the period at the end the
following: ``; and (iii) the cost and commercial
availability in the United States of treatment
technologies (including whether the technologies have
been demonstrated at an applicable scale) that may be
required to be applied to point sources in order to
result in compliance with such standards''.
(b) State Water Quality Criteria.--Section 304(a) of the Federal
Water Pollution Control Act (33 U.S.C. 1314(a)) is amended by adding at
the end the following new paragraph:
``(10) Consideration of treatment technologies.--In
developing or revising water quality criteria under this
subsection, the Administrator shall take into consideration the
cost and commercial availability in the United States of
treatment technologies (including whether the technologies have
been demonstrated at an applicable scale) that may be required
to be applied to point sources in order to result in compliance
with water quality standards adopted or promulgated under
section 303.''.
SEC. 3. WATER QUALITY CRITERIA DEVELOPMENT AND TRANSPARENCY.
(a) Information and Guidelines.--Section 304(a) of the Federal Water
Pollution Control Act (33 U.S.C. 1314(a)) is further amended by adding
at the end the following:
``(11) Administrative procedure.--After the date of enactment
of this paragraph, the Administrator shall issue any new or
revised water quality criteria under paragraph (1) or (9) by
rule.''.
(b) Administrative Procedure and Judicial Review.--Section 509(b)(1)
of the Federal Water Pollution Control Act (33 U.S.C. 1369(b)(1)) is
amended--
(1) by striking ``section 402, and'' and inserting ``section
402,''; and
(2) by inserting ``and (H) in issuing any criteria for water
quality pursuant to section 304(a)(11),'' after ``strategy
under section 304(l),''.
SEC. 4. WATER QUALITY TECHNOLOGY AVAILABILITY.
Section 304(b) of the Federal Water Pollution Control Act (33 U.S.C.
1314(b)) is amended--
(1) in paragraph (1)(B), by inserting ``the commercial
availability in the United States of the technology (including
whether the technology has been demonstrated at an applicable
scale),'' before ``and such other factors'';
(2) in paragraph (2)(B), by inserting ``the commercial
availability in the United States of the technology (including
whether the technology has been demonstrated at an applicable
scale),'' before ``and such other factors''; and
(3) in paragraph (4)(B), by inserting ``the commercial
availability in the United States of the technology (including
whether the technology has been demonstrated at an applicable
scale),'' before ``and such other factors''.
SEC. 5. IMPROVING WATER QUALITY CERTIFICATIONS AND AMERICAN ENERGY
INFRASTRUCTURE.
Section 401 of the Federal Water Pollution Control Act (33 U.S.C.
1341) is amended--
(1) in subsection (a)--
(A) in paragraph (1)--
(i) in the first sentence, by striking ``may
result'' and inserting ``may directly result'';
(ii) in the second sentence, by striking
``activity'' and inserting ``discharge'';
(iii) in the third sentence, by striking
``applications'' each place it appears and
inserting ``requests'';
(iv) in the fifth sentence, by striking ``act
on a request for certification, within a
reasonable period of time (which shall not
exceed one year) after receipt of such request,
the certification requirements of this
subsection'' and inserting ``grant the request
for certification with or without conditions,
deny the request for certification, or waive
the requirement for certification under this
subsection with respect to such Federal
application, within a reasonable period of time
to be determined by the licensing or permitting
agency (which shall not exceed one year) after
receipt of such request, the requirement for
certification under this subsection'';
(v) in the sixth sentence, by striking
``waived as provided in the preceding
sentence'' and inserting ``waived under this
paragraph''; and
(vi) by inserting after the fourth sentence
the following: ``Not later than 30 days after
the date of enactment of the PERMIT Act, each
State and interstate agency that has authority
to give such a certification, and the
Administrator, shall publish requirements for
certification to demonstrate to such State,
such interstate agency, or the Administrator,
as the case may be, compliance with the
applicable provisions of sections 301, 302,
303, 306, and 307. A decision to grant or deny
a request for certification shall be based only
on compliance with the applicable provisions of
sections 301, 302, 303, 306, and 307, and the
grounds for the decision shall be set forth in
writing and provided to the applicant. Not
later than 90 days after receipt of a request
for certification, the State, interstate
agency, or Administrator, as the case may be,
shall identify in writing all specific
additional materials or information necessary
for the request for certification to be
complete, as described in subsection (g). The
State, interstate agency, or the Administrator,
as the case may be, may grant a request for
certification with or without conditions, deny
a request for certification, or waive the
requirement for certification under this
subsection with respect to such Federal
application.'';
(B) in paragraph (2)--
(i) in the second sentence, by striking
``notice of application for such Federal
license or permit'' and inserting ``receipt of
a notice under the preceding sentence'';
(ii) in the third sentence--
(I) by striking ``any water quality
requirement in such State'' and
inserting ``any water quality standard
in effect for the State under section
303''; and
(II) by inserting before the period
``at a time that is agreed to by such
State and the applicant'';
(iii) in the fifth sentence, by striking
``insure compliance with applicable water
quality requirements.'' and inserting ``ensure
compliance with the applicable provisions of
sections 301, 302, 303, 306, and 307.'';
(iv) in the final sentence, by striking
``insure'' and inserting ``ensure'';
(v) by striking the first sentence and
inserting ``On receipt of a request for
certification, the certifying State or
interstate agency, as applicable, shall
immediately notify the Administrator of the
request.''; and
(vi) by inserting after the second sentence
the following: ``If the Administrator
determines under the preceding sentence that
such a discharge will not affect the waters of
any other State, no such notification is
required.'';
(C) in paragraph (3)--
(i) in the first sentence, by striking
``there will be compliance'' and inserting
``any such discharge will comply''; and
(ii) in the second sentence, by striking
``section'' and inserting ``any applicable
provision of section'';
(D) in paragraph (4)--
(i) in the first sentence--
(I) by inserting ``directly'' before
``result in any discharge''; and
(II) by striking ``applicable
effluent limitations or other
limitations or other applicable water
quality requirements will not be
violated'' and inserting ``no
applicable provision of section 301,
302, 303, 306, or 307 will be
violated'';
(ii) in the second sentence, by striking
``will violate applicable effluent limitations
or other limitations or other water quality
requirements'' and inserting ``will directly
result in a discharge that violates an
applicable provision of section 301, 302, 303,
306, or 307,''; and
(iii) in the third sentence, by striking
``such facility or activity will not violate
the applicable provisions'' and inserting
``operation of such facility or activity will
not directly result in a discharge that
violates any applicable provision''; and
(E) in paragraph (5), by striking ``the applicable
provisions'' and inserting ``any applicable
provision'';
(2) in subsection (b), by striking ``Nothing in this
section'' and inserting ``Except as provided in subsection (e),
nothing in this section'';
(3) in subsection (d), by striking ``applicant for a Federal
license or permit will comply with any applicable effluent
limitations and other limitations, under section 301 or 302 of
this Act, standard of performance under section 306 of this
Act, or prohibition, effluent standard, or pretreatment
standard under section 307 of this Act, and with any other
appropriate requirement of State law set forth in such
certification, and shall become a condition on any Federal
license or permit subject to the provisions of this section''
and inserting ``discharge subject to this section will comply
with the applicable provisions of sections 301, 302, 303, 306,
and 307, and any such limitations or requirements shall be
imposed by the licensing or permitting agency as a condition on
any Federal license or permit subject to the provisions of this
section''; and
(4) by adding at the end the following:
``(e) Notwithstanding section 505, any condition imposed on a Federal
license or permit by a licensing or permitting agency under this
section may be enforced only by such licensing or permitting agency.
``(f) For purposes of this section, the applicable provisions of
sections 301, 302, 303, 306, and 307 are any applicable effluent
limitations and other limitations under section 301 or 302, any water
quality standard in effect for a State under section 303, any standard
of performance under section 306, and any prohibition, effluent
standard, or pretreatment standard under section 307.
``(g) A request for certification under this section shall be made in
writing to the State, interstate agency, or Administrator, as the case
may be. A complete request for certification shall consist of the
following:
``(1) Identification of each applicant for the Federal
license or permit with respect to which the certification is
requested.
``(2) A statement that information included in the request
for certification is truthful, accurate, and complete, to the
best knowledge of each such applicant.
``(3) In the case of a request for certification with respect
to an individual permit or license--
``(A) identification of the Federal license or permit
that is the subject of the application with respect to
which the certification is requested;
``(B) identification of any activity the conduct of
which is subject to such Federal license or permit;
``(C) identification of the location and nature of
any discharge that may directly result from such
activity, and the location of the receiving waters;
``(D) a description of means that may be used to
monitor, control, or manage any such discharge; and
``(E) a list of all other Federal, interstate
Background and Need for Legislation
The Clean Water Act (CWA) is the primary law governing
water quality of the Nation's surface waters.\1\ Congress
enacted the 1972 amendments to the Federal Water Pollution
Control Act, which is commonly referred to as the CWA, with the
objective to ``restore and maintain the chemical, physical, and
biological integrity of the Nation's waters.''\2\
---------------------------------------------------------------------------
\1\H. Comm. on Transp. & Infrastructure, Jurisdiction and
Activities of the Subcomm. on Water Resources and Environment, 119th
Cong., (2025) (on file with Comm.).
\2\CWA, Pub. L. 92-500, 86 Stat. 816 [hereinafter CWA].
---------------------------------------------------------------------------
The CWA consists of two major parts: (1) the authorization
of financial assistance for construction of municipal
wastewater treatment plants, and (2) the regulatory
requirements that apply to those who discharge into navigable
waters, including for industrial and municipal actors.\3\
Planning, financial, and technical assistance for various
regions and issues are also addressed.\4\ Title III of the CWA
establishes the authority for the technological and water
quality-based effluent limitation guidelines that must be
abided by point source dischargers.\5\ Whereas Title III of the
CWA largely focuses on the creation of water quality guidelines
and limitations, Title IV primarily deals with application of
the regulatory program, informed by the guidelines created
pursuant to Title III, through which dischargers must receive
permits or certifications.\6\
---------------------------------------------------------------------------
\3\See Laura Gatz, CONG. RSCH. SERV. (RL30030), Clean Water Act: A
Summary of the Law, (Updated Oct. 18, 2016), available at https://
www.crs.gov/Reports/RL30030 [hereinafter CRS Report RL30030].
\4\Id.
\5\See CRS Report RL30030, supra note 3; see also CWA, supra note
2, Sec. Sec. 301-320.
\6\See CRS Report RL30030, supra note 3; see also CWA, supra note
2, Sec. Sec. 301, 402, 404.
---------------------------------------------------------------------------
In order to achieve its objectives, the CWA is predicated
on the principle that discharges into waters of the United
States are only lawful if authorized by a permit.\7\ Therefore,
the application of various CWA components require a regulatory
program. While certain regulatory programs under the law may
only be carried out by the Federal Government, through either
the Environmental Protection Agency (EPA) or the United States
Army Corps of Engineers (Corps), certain responsibilities can
be assumed by states approved by the EPA.\8\
---------------------------------------------------------------------------
\7\See CRS Report RL30030, supra note 3.
\8\See e.g. CWA, supra note 2, Sec. Sec. 401, 402, 404.
---------------------------------------------------------------------------
Broadly, H.R. 3898, as amended, strives to once again find
balance within the regulatory and permitting process originally
envisioned by the CWA by providing a comprehensive package of
commonsense reforms to support energy producers, the
agriculture sector, builders, and utilities. The bill includes
necessary reforms to promote regulatory efficiency, increase
transparency, avoid frivolous litigation, and protect and
promote clean water, all while balancing states' rights.
Prior to enactment of the CWA, water quality was seen as an
issue primarily concerning states and localities, except where
interstate waters were concerned.\9\ As such, the CWA continued
this recognition that states and localities play an essential
role in maintaining the quality of their own waters, rather
than only the Federal Government.\10\ At the Federal level, EPA
is the primary agency tasked with carrying out the CWA, while
the Corps is also tasked with certain responsibilities.
Additionally, the various permitting and environmental
protection statutes in the CWA were meant to be shared between
the Federal Government and state and local governments.\11\ The
CWA is a law predicated on the principle of cooperative
Federalism, with the Federal Government and states each playing
a role in protecting water quality.
---------------------------------------------------------------------------
\9\CRS Report RL30030, supra note 3.
\10\Id.
\11\See e.g. Brief of Sen. Shelley Moore Capito, Rep. Sam Graves,
and a Coalition of 199 Members of Congress as Amici Curiae supporting
Petitioners, Sackett v. EPA, No. 21-154, (Oct. 3, 2022).
---------------------------------------------------------------------------
In keeping with the Federal-state goals of the CWA, Section
401 requires an applicant for a Federal license or permit that
may result in a discharge into navigable waters to obtain a
water quality certification from the state or Tribe (or EPA, in
the case of tribal lands where a tribe has not been granted
treatment as a state) in which a discharge is to take
place.\12\ The purpose of the water quality certification
issued by the state or Tribe is to certify that any discharges
from a Federally permitted activity will comply with certain
water quality requirements of the CWA, including effluent
limitations and performance standards, water quality standards,
and toxic pretreatment standards.\13\
---------------------------------------------------------------------------
\12\Laura Gatz & Kate R. Bowers, Cong. Rsch. Serv. (R46615), Clean
Water Act Section 401: Overview and Recent Developments, (updated Feb.
7, 2025), available at https://www.crs.gov/Reports/R46615 [hereinafter
CRS Report R46615].
\13\Eric Christensen & Allyn Stern, The Biden Boomerang Effect
Reaches Clean Water Act Section 401, National Law Review, (Sept. 21,
2023); see CWA, supra note 2 at Sec. 401.
---------------------------------------------------------------------------
Examples of Federally licensed or permitted projects
commonly requiring water quality certification include those
requiring discharge permits under sections 402 and 404 of the
CWA, or sections 9 and 10 of the Rivers and Harbors Act,
licenses from the Federal Energy Regulatory Commission (FERC),
bridge permits from the Coast Guard, shoreline permits from the
Tennessee Valley Authority, and more.\14\ These statutes cover
a wide variety of projects, including hydropower projects,
wastewater treatment plants, pipeline projects, infrastructure
development, mining projects, water resource development
projects, and residential or commercial development.\15\
---------------------------------------------------------------------------
\14\See EPA, Overview of CWA Section 401 Certification, available
at https://www.epa.gov/cwa-401/overview-cwa-section-401-certification.
\15\Id.
---------------------------------------------------------------------------
Current implementation practices of section 401, however,
have been shaped by decades-worth of litigation and unclear
guidance. Until 2020, implementation regulations for section
401 published in 1971 were in effect.\16\ These regulations
implemented the certification provisions of section 21(b) of
the Federal Water Pollution Control Act of 1948, but EPA did
not update the regulations to reflect the changes in the
statutory text for nearly fifty years.\17\ During this time,
many processes evolved in practice that were not reflected in
the statute. H.R. 3898, as amended, codifies certain practices
and clarifies others, to balance the role of state and Federal
Government, and provide certainty and predictability to
permittees and licensees that depend on a clear and useable 401
process.
---------------------------------------------------------------------------
\16\State Certification of Activities Requiring a Federal Permit or
License, 36 Fed. Reg. 22487 (Nov. 25, 1971) (formerly codified at 40
C.F.R. Sec. 121).
\17\Id.; CRS Report R46615, supra note 12.
---------------------------------------------------------------------------
In particular, some stakeholders have raised concerns that
states have misused the section 401 process, specifically
weaponizing section 401 to prevent important energy projects
from obtaining certification and halting their progress in
construction.\18\ For example, some states have cited non-water
quality related reasons in the 401 process to delay projects,
expanded the scope of review beyond the direct effects of a
discharge, and circumvented the timelines set out in statute.
---------------------------------------------------------------------------
\18\See e.g. Letter from Interstate Natural Gas Association of
America to Reps. Mike Collins & Frederica Wilson (Feb. 10, 2025) (on
file with Comm.).
---------------------------------------------------------------------------
In 2017, the Washington Department of Ecology denied water
quality certification with prejudice for a proposed energy
export terminal project, meaning that the applicants could not
reapply in the future. In doing so, the Department cited nine
adverse impacts for denial--air quality, vehicle
transportation, noise and vibration, social and community
resources, rail transportation, rail safety, vessel
transportation, cultural resources, and tribal resources--none
of which affected water quality.\19\
---------------------------------------------------------------------------
\19\See Letter from Maia D. Bello, Director, Washington Department
of Ecology, to Kristin Gaines, Millennium Bulk Terminals-Longview, LLC,
(Sept. 26, 2017), available at https://ecology .wa.gov/getattachment/
8349469b-a94f-492b-acca-d8277e1ad237/MBTL-Denial.pdf.
---------------------------------------------------------------------------
In 2020, the New York Department of Environmental
Protection denied water quality certification to a proposed
natural gas pipeline expansion project into Raritan Bay,
despite FERC in 2019 determining that with project proponent's
``plan of impact avoidance, minimization and mitigation
measures . . . all project effects would be reduced to less-
than-significant levels.''\20\
---------------------------------------------------------------------------
\20\Letter from Daniel Whitehead to Joseph Dean, Transcontinental
Gas Pipe Line Company, LLC, (May 15, 2020), available at https://
extapps.dec.ny.gov/docs/permits_ej_operations_pdf/
nesewqcdenial05152020.pdf; Transcontinental Gas Pipe Line Company, LLC;
Notice of Final General Conformity Determination for the Proposed
Northeast Supply Enhancement Project, 84 Fed. Reg. 5078, (Feb. 20,
2019), available at https://www.federalregister.gov/documents/2019/
02/20/2019-02830/transcontinental-gas-pipe-line-company-llc-notice-of-
final-general-conformity-determination-for-the.
---------------------------------------------------------------------------
The State of Oregon delayed a proposed LNG export terminal
by requesting more information from project proponents before
eventually denying certification.\21\ By citing the need for
additional information, the state was able to argue that the
one-year ``shot clock'' for review of a request for
certification should start over once a request is
resubmitted.\22\
---------------------------------------------------------------------------
\21\Oregon Department of Environmental Quality, Jordan Cove Energy
Project: Current Actions, available at https://www.oregon.gov/deq/
Programs/Pages/Jordan-Cove.aspx.
\22\Id.
---------------------------------------------------------------------------
In California, some hydropower relicensing projects have
been delayed for decades due to the State's various attempts to
circumvent the one-year timeline for review. For example, at a
Water Resources and Environment Subcommittee hearing in
February 2025, the Committee received testimony for the record
from the Modesto Irrigation District and Turlock Irrigation
District that explained the State ``has abused and expanded
this opportunity, using it not as the opportunity to ensure
that any federally authorized discharge complies with
applicable water quality, but rather as an opportunity to seize
control and oversight of the [Don Pedro irrigation] Project as
a whole to achieve policy goals that are often only
tangentially related to water quality and which have nothing to
do with the licensed activity itself.''\23\
---------------------------------------------------------------------------
\23\America Builds: Clean Water Act Permitting and Project
Delivery, Before the Subcomm. On Water Resources and Environment of the
H. Comm. On Transp. And Infrastructure, 119th Cong. (Feb. 10, 2025)
(Testimony for the Record from Modesto Irrigation District and Turlock
Irrigation District) (on file with Comm.).
---------------------------------------------------------------------------
Section five of H.R. 3898, as amended, aims to mitigate the
problems of permitting uncertainty and weaponization of Section
401 under the CWA. This section promotes the development of the
Nation's energy infrastructure and myriad other projects by
clarifying the scope of review to include only water quality
reasons from the discharge at issue, defines what is required
to be included in a request for certification, codifies what
actions states may take after receipt of a request for
certification, and clarifies the entity in charge of enforcing
conditions added in through the 401 process.
Another key aspect of the CWA's framework of cooperative
Federalism is the ability for States to carry out the
permitting programs set up by sections 402 and 404 of the CWA.
While 47 states have assumed the ability to carry out the
National Pollution Discharge Elimination System (NPDES)
programs under section 402, only two states (Michigan and New
Jersey) have been delegated authority to administer their own
404 dredge and fill programs.\24\ Florida had begun
administering its own 404 permitting program after the program
was approved in December 2020; currently, however, the program
has been divested of its authority due to a Federal judicial
order.\25\ Other states have acknowledged interest in
implementing their own 404 program, but concerns about taking
on the costs of running such a program are often a barrier.\26\
---------------------------------------------------------------------------
\24\Id.
\25\EPA, State and Tribal Assumption of Section 404 of the Clean
Water Act, available at https://www.epa.gov/cwa404g/us-interactive-map-
state-and-tribal-assumption-under-cwa-section-404; see also State of
Florida, State 404 Program, available at https://floridadep.gov/water/
submerged-lands-environmental-resources-coordination/content/state-404-
program.
\26\America Builds: The State of the Nation's Transportation
System: Hearing Before the H. Comm. on Transp. and Infrastructure,
119th Cong. (Jan. 15, 2025), (Testimony of Hon. Jeff Landry, Governor,
State of Louisiana).
---------------------------------------------------------------------------
Sections 14 and 16 of H.R. 3898, as amended, are focused on
providing clarity to the process of state assumption of dredge
and fill permitting under section 404 of the CWA. Section 16
requires EPA to complete a review of the applicable regulations
to state assumption of the section 404 program and implement
revisions necessary to encourage state assumption. Section 14
establishes a deadline relating to EPA's review of a state's
application to assume section 404 permitting. Section 20 of
H.R. 3898, as amended, encourages states with delegated
permitting authorities under the CWA to utilize the Federal
Permitting Improvement Steering Council to improve coordination
across relevant Federal and state agencies. In general, H.R.
3898, as amended, furthers the goals of cooperative Federalism
that the CWA is based upon by encouraging states to take the
lead in administering CWA permits.
Furthermore, CWA section 303(c) directs states to adopt
water quality standards (WQS) for navigable waters. The EPA is
charged with approving the state-developed standards. WQS serve
as the basis for several CWA programs, including the
development of total maximum daily loads (TMDLs),
certifications of Federal licenses and permits under section
401, NPDES permits under section 402, and dredge and fill
permits under section 404.
Currently, CWA section 402(q) requires municipalities with
combined sewer overflows to develop long-term control plans
(LTCPs) to minimize or eliminate discharges. It also instructs
states to review and, as appropriate, modify existing WQS while
municipalities are developing and implementing LTCPs to support
compliance with the CWA. Those reviews, however, have largely
not happened, and despite municipalities investing millions of
dollars in upgrading their facilities, many are no closer to
being deemed in compliance with the CWA.\27\ Many stakeholders
have also raised concerns about states developing WQS that are
not attainable based on available technology.\28\ For example,
the State of Washington has set WQS that are so low many
industries are concerned they will not be able to comply with
the CWA.\29\
---------------------------------------------------------------------------
\27\National Association of Clean Water Agencies, Comments on EPA's
Draft Guidance for Future NPDES Permitting of Combined Sewer Systems
(Docket ID No. EPA-HQ-OW-2023-0475).
\28\Id.
\29\Brief of the American Exploration & Mining Association,
American Farm Bureau Association, Fertilizer Institute, National
Association of Home Builders, National Association of Manufacturers,
and National Mining Association as Amici Curiae supporting Plaintiffs'
motion for summary judgement, Association of Washington Business, et
al. v. EPA (May 20, 2024).
---------------------------------------------------------------------------
While the CWA protects ``navigable waters,'' which are
broadly defined in the CWA as the ``waters of the United
States, including the territorial seas,''\30\ the CWA does not
further define the term ``waters of the United States''
(WOTUS). Ultimately, the CWA grants authority to the EPA and
the Corps to implement the CWA, and EPA and the Corps have
promulgated several sets of rules defining WOTUS as it governs
the scope of CWA authority. There has been a substantial amount
of regulation and litigation in the Federal Courts on the scope
of CWA jurisdiction over the years, including multiple United
States Supreme Court cases. In May 2023, the Supreme Court
concluded in Sackett v. EPA (Sackett) that the CWA's
jurisdiction encompasses waters that are ``relatively
permanent, standing or continuously flowing bodies of water
`forming geographical features' that are described in ordinary
parlance as `streams, oceans, rivers, and lakes.'''\31\ The
Supreme Court also held that jurisdictional wetlands ``must be
indistinguishably part of a body of water that itself
constitutes `waters'' under the CWA.''\32\
---------------------------------------------------------------------------
\30\CWA, supra note 2.
\31\Sackett v. Environmental Protection Agency, 598 U.S. 651 (2023)
[Hereinafter Sackett].
\32\Id.
---------------------------------------------------------------------------
The recent Sackett decision provided additional direction
on the WOTUS definition, and therefore, the jurisdiction of the
CWA. However, the conforming rule issued by the EPA and the
Corps during the Biden Administration did not include or
c
Hearings
For the purposes of rule XIII, clause 3(c)(6)(A) of the
119th Congress, the following related hearings were held to
develop or consider H.R. 3898, as amended:
On February 11, 2025, the Subcommittee on Water Resources
and Environment of the Committee on Transportation and
Infrastructure held a hearing entitled, ``America Builds: Clean
Water Act permitting and Project Delivery.'' At the hearing,
Members received testimony from Mr. Robert Singletary,
Executive Director, Oklahoma Department of Environmental
Quality; the Honorable Shawn LaTourette, Commissioner, New
Jersey Department of Environmental Protection; Mr. Noah
Hanners, Executive Vice President, Nucor Corporation, on behalf
of the National Association of Manufacturers; and Mr. Buddy
Hasten, President and Chief Executive officer, Arkansas
Electric Cooperative Corporation, on behalf of the National
Rural Electric Cooperative Association. This examined how
Congress can ensure that the Clean Water Act (CWA) balances the
goals of protecting water quality and ensuring project
completion, reducing supply chain challenges, and promoting
commerce.
On January 15, 2025, the Committee on Transportation and
Infrastructure held a hearing entitled ``America Builds: The
State of the Nation's Transportation System.' At the hearing,
Members received testimony from Hon. Jeff Landry, Governor,
State of Louisiana; Hon. Vanessa Fuentes, Council Member and
Mayor Pro Tem, City of Austin, TX, and Chair, National League
of Cities Transportation and Infrastructure Services Committee,
on behalf of the National League of Cities; Ms. Sarah Galicia,
Vice President, Transportation, The Home Depot; and Mr. Seth
Schulgen, Vice President, Williams Brothers Construction, on
behalf of The Associated General Contractors of America. The
hearing examined the state of our Nation's transportation
system, investing in the country's infrastructure, and
challenges facing the supply chain, including Clean Water Act
permitting.
For the purposes of rule XIII, clause 3(c)(6)(A) of the
118th Congress, the following related hearings were held to
develop or consider H.R. 3898, as amended:
On September 11, 2024, the Subcommittee on Water Resources
and Environment of the Committee on Transportation and
Infrastructure held a hearing entitled, ``Waters of the United
States Implementation Post-Sackett Decision: Experiences and
Perspectives.'' At the hearing, Members received testimony from
Ms. Emma Pokon, Commissioner, Alaska Department of
Environmental Conservation; Nicole Rowan, Director, Water
Quality Control Division Colorado Department of Public Health
and Environment; Courtney Briggs, Chairman, Waters Advocacy
Coalition, on behalf of the American Farm Bureau Federation;
Vincent E. Messerly, P.E., President and CEO, Stream and
Wetlands Foundation, on behalf of the National Association of
Home Builders. The hearing examined implementation of the
Administration's conforming rule on the definition of the
definition of ``waters of the United States'' (WOTUS) under the
Clean Water Act (CWA), following the 2023 Supreme Court
decision in Sackett v. EPA (Sackett).\96\
---------------------------------------------------------------------------
\96\Sackett, supra note 31.
---------------------------------------------------------------------------
On Wednesday, January 17, 2024, the Full Committee on
Transportation and Infrastructure held a hearing entitled,
``The State of Transportation.'' At the hearing, Members
received testimony from Mr. Stephen A. Edwards, CEO and
Executive Director, Virginia Port Authority; Mr. Roger Millar,
Secretary of Transportation, Washington State Department of
Transportation; Mr. Jeffrey G. Tucker, CEO, Tucker Company
Worldwide, on behalf of Transportation Intermediaries
Association (TIA); and Ms. Lauren Benford, Controller, Reiman
Corporation, on behalf of Associated General Contractors of
America (AGC). The hearing provided a forum for Members to
discuss the current state of transportation infrastructure and
supply chain challenges, along with potential improvements that
could be made, including streamlining permitting process to
provide certainty and efficiency.
On February 8, 2023, the Subcommittee on Water Resources
and Environment of the Committee on Transportation and
Infrastructure held a hearing entitled, ``Stakeholder
Perspectives on the Impacts of the Biden Administration's
Waters of the United States (WOTUS) Rule.'' At the hearing
Members received testimony from Mr. Garrett Hawkins, President,
Missouri Farm Bureau; Ms. Alicia Huey, Chairman, National
Association of Home Builders; Mr. Mark Williams, Environmental
Manager, Luck Companies, on behalf of National Stone, Sand &
Gravel Association; Ms. Susan Parker Bodine, Partner, Earth &
Water Law LLC; and Mr. Dave Owen, Professor of Law and Faculty
Director of Scholarly Publications, UC College of the Law, San
Francisco. This hearing examined the EPA and the Corps defining
``waters of the United States'' under the CWA, and its
regulatory impact on stakeholders. During the hearing,
witnesses also broadly discussed the need for permitting and
regulatory reform under the CWA.
On Tuesday, May 16, 2023, the Subcommittee on Water
Resources and Environment of the Committee on Transportation
and Infrastructure held a hearing entitled, ``The Next Fifty
Years of the Clean Water Act: Examining the Law and
Infrastructure Project Completion.'' The Subcommittee received
testimony from Dr. Andrea Travnicek, Director, Department of
Resources, State of North Dakota; Hon. Serena Coleman McIlwain,
Secretary of the Environment, State of Maryland; Mr. Mickey
Conway, CEO, Metro Water Recovery, Denver, Colorado on behalf
of the National Association of Clean Water Agencies; and Mr.
Brandon Farris, Vice President, Energy and Resources Policy,
National Association of Manufacturers. This hearing examined
proposals on how to modernize the CWA to ensure the completion
of infrastructure and energy projects, reduce supply chain
challenges, and promote commerce, while protecting water
quality.
On Thursday, June 22, 2023, the Subcommittee on Water
Resources and Environment of the Committee on Transportation
and Infrastructure held a hearing entitled, ``Review of Fiscal
Year 2024 Budget Request: Agency Perspectives (Part I). The
Subcommittee received testimony from The Honorable Michael L.
Connor, Assistant Secretary of the Army for Civil Works,
Department of the Army; Major General William ``Butch'' H.
Graham, Deputy Chief of Engineers and Deputy Commanding
General, United States Army Corps of Engineers; Mr. Jeff Lyash,
President and CEO, Tennessee Valley Authority; and Mr. Adam
Tindall-Schlicht, Administrator, Great Lakes St. Lawrence
Seaway Development Corporation. This hearing provided Members
with an opportunity to review the President's Fiscal Year 2024
Budget Request, as well as the Administration's program
priorities within the jurisdiction of the Subcommittee,
including permitting issues pursuant to the CWA.
On July 13, 2023, the Subcommittee on Water Resources and
Environment of the Committee on Transportation and
Infrastructure held a hearing entitled, ``Review of Fiscal Year
2024 Budget Request: Agency Perspectives (Part II).'' The
hearing gave Members the opportunity to review the Fiscal Year
2024 budget request, as well as the Administration's program
priorities within the jurisdiction of the Subcommittee,
including permitting issues pursuant to the CWA. The
Subcommittee received testimony from the Honorable Radhika Fox,
Assistant Administrator, Office of Water, EPA; Dr. Maria-Elena
Giner, Commissioner, IWBC, United States Section; Mr. Louis
Aspey Associate Chief, Natural Resources Conservation Service,
United States Department of Agriculture; Dr. Aaron Bernstein,
Director, Agency for Toxic Substances and Disease Registry; and
Ms. Nicole R. LeBoeuf, Assistant Administrator, National Ocean
Service, National Oceanic and Atmospheric Administration.
On December 5, 2023, the Subcommittee on Water Resources
and Environment of the Committee on Transportation and
Infrastructure held a hearing entitled, ``Water Resources
Development Acts: Status of Past Provisions and Future Needs.''
At the hearing Members received testimony from The Honorable
Michael L. Connor, Assistant Secretary of the Army for Civil
Works, Department of the Army and Lieutenant General Scott A.
Spellmon, Commanding General and Chief of Engineers, United
States Army Corps of Engineers. The hearing gave Members the
opportunity to review past provisions in Water Resources
Development Acts (WRDAs) and discuss needs for future WRDAs.
Also at the hearing, Members discussed various CWA permitting
processes, including implementation of the post-Sackett WOTUS
rule.
Legislative History and Consideration
H.R. 3898, the ``Promoting Efficient Review for Modern
Infrastructure Today Act'' or ``PERMIT Act,'' was introduced in
the United States House of Representatives on June 11, 2025, by
Mr. Collins of Georgia, with Mr. Graves as an original
cosponsor, and referred to the Committee on Transportation and
Infrastructure. Within the Committee on Transportation and
Infrastructure, H.R. 3898 was referred to the Subcommittee on
Water Resources and Environment. The Subcommittee on Water
Resources on Environment was discharged from further
consideration of H.R. 3898 on June 25, 2025.
The Committee considered H.R. 3898 on June 25, 2025, and
ordered the measure to be reported to the House with a
favorable recommendation, as amended, by a recorded vote of 34
yeas to 30 nays.
The following amendments were offered:
An Amendment in the Nature of a Substitute to H.R. 3898,
offered by Mr. Collins of Georgia; was AGREED TO by voice vote.
A Manager's Amendment to the Amendment in the Nature of a
Substitute to H.R. 3898, offered by Chairman Graves of Missouri
(Graves 01): Page 3, line 4, insert ``(including whether the
technologies have been demonstrated at an applicable scale)''
after ``treatment technologies''. Page 3, line 15, strike
``availability of treatment technologies'' and insert
``availability in the United States of treatment technologies
(including whether the technologies have been demonstrated at
an applicable scale)''. Page 4, line 19, strike ``comparable''
and insert ``an applicable''. Page 4, line 24, strike
``comparable'' and insert ``an applicable''. Page 5, line 4,
strike ``comparable'' and insert ``an applicable''. Page 8,
strike lines 3 through 7 and insert the following: (ii) in the
third sentence-- (I) by striking ``any water quality
requirement in such State'' and inserting ``any water quality
standard in effect for the State under section 303''; and (II)
by inserting before the period ``at a time that is agreed to by
such State and the applicant''; After section 13, insert the
following: SEC. ll9. DEADLINE FOR REQUEST FOR SUBMISSION OF
ADDITIONAL INFORMATION FOR PERMIT PROGRAMS FOR DREDGED OR FILL
MATERIAL. Section 404 of the Federal Water Pollution Control
Act (33 U.S.C. 1344) is amended-- (1) in subsection (g)-- (A)
by redesignating paragraph (3) as paragraph (4); and (B) by
inserting after paragraph (2) the following: ``(3) If the
Administrator determines that additional information is
necessary for the description of a program submitted by a State
to be full and complete under paragraph (1), the Administrator
shall, not later than 45 days after the date of the receipt of
the program and statement submitted by the State under such
paragraph, submit to the State a written request for all such
information.''; and (2) in subsection (h)(1), by striking
``paragraph (1) of this subsection'' and inserting ``subsection
(g)(1)''. Strike section 19 and insert the following: SEC. __.
COORDINATION WITH FEDERAL PERMITTING IMPROVEMENT STEERING
COUNCIL. With respect to any covered project (as defined under
section 41001 of the FAST Act (42 U.S.C. 4370m)) for which a
certification or permit from a State under section 401, 402, or
404 of the Federal Water Pollution Control Act is required, the
State is encouraged to choose to participate, to the maximum
extent practicable, in the environmental review and
authorization process under section 41003(c) of the FAST Act
(42 U.S.C. 4370m-2(c)), pursuant to paragraph (3)(A) of such
section.; was AGREED TO by voice vote.
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Ranking Member Larsen of Washington
(Larsen 01): Strike sections 2, 3, and 5.; was NOT AGREED TO by
a recorded vote of 30 Yeas and 35 Nays (RC#45).
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Mr. Garamendi of California (Garamendi
036): Strike section 7 and insert the following: SEC. 7.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM TERMS. (a) IN
GENERAL.--Section 402(b)(1)(B) of the Federal Water Pollution
Control Act (33 U.S.C. 1342(b)(1)(B)) is amended to read as
follows: ``(B) are for fixed terms-- (i) not exceeding 10
years, for a permit issued to a State or municipality; and (ii)
not exceeding 5 years, for a permit issued to any person not
described in clause (i); and''. (b) TECHNICAL CORRECTIONS.--
Section 402(l)(3) of the Federal Water Pollution Control Act
(33 U.S.C. 1342(1)(3)) is amended-- (1) in subparagraph (B)--
(A) by striking ``section 402'' and inserting ``this section'';
and (B) by striking ``federal'' and inserting ``Federal''; and
(2) in subparagraph (C)-- (A) by striking ``Section'' and
inserting ``section''; (B) by striking ``402(p)(6)'' and
inserting ``subsection (p)(6)''; (C) by striking
``402(l)(3)(A),'' and inserting ``subparagraph (A),''; and (D)
by striking ``402(1)(3)(A).'' and inserting ``such
subparagraph.''.; was WITHDRAWN.
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Ms. Titus of Nevada (Titus 173): Page
34, line 2, strike ``Section 502(7)'' and insert ``(a) IN
GENERAL.--Section 502(7)''. Page 36, after line 12, insert the
following: (b) SAVINGS CLAUSE.--This section, including the
amendments made by this section, shall not take effect until
the date on which the Administrator of the Environmental
Protection Agency issues a determination that the
implementation of this section, including the amendments made
by this section, will not result in 70 percent or more of the
waters in any State losing any protection that such waters were
provided under the Federal Water Pollution Control Act (33
U.S.C. 1251 et seq.) before May 25, 2023.; was NOT AGREED TO by
a recorded vote of 30 Yeas and 35 Nays (RC#46).
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Ms. Wilson of Florida (Wilson 037):
Add at the end the following: SEC. __. STUDY ON DISPARATE
IMPACTS. Not later than 60 days after the date of enactment of
this Act, the Administrator of the Environmental Protection
Agency and the Secretary of the Army, acting through the Chief
of Engineers, shall submit to Congress a report on any
disparate impacts on minority, rural, disadvantaged, and Tribal
communities, including impacts to human health, environmental
quality, and local economies, that may result from the
implementation of this Act, including the amendments made by
this Act.; was NOT AGREED TO by voice vote.
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Ms. Titus of Nevada on behalf of Mr.
Stanton of Arizona (Stanton 031): Add at the end the following:
SEC. __. DETERMINATION ON WATER SUPPLY SOURCES. This Act,
including the amendments made by this Act, shall not take
effect until the date on which the Administrator of the
Environmental Protection Agency issues a determination that the
implementation of this Act, including the amendments made by
this Act, will not-- (1) result in a surface water body failing
to meet its State-designated uses under the Federal Water
Pollution Control Act, including use as a source of public
water supply; or (2) adversely affect the availability and
quality of surface water for communities in arid regions or
drought-prone areas.; was NOT AGREED TO by a recorded vote of
30 Yeas and 35 Nays (RC#47).
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Mr. Garamendi of California, on behalf
of Ms. Hoyle of Oregon (Hoyle 013): Strike section 9 and insert
the following: SEC. 9. SAFE HARBOR FOR CERTAIN DISCHARGES OF
WILDLAND FIRE CHEMICALS. (a) IN GENERAL.--Subject to subsection
(b), no court may enjoin under the Federal Water Pollution
Control Act (33 U.S.C. 1251 et seq.) a covered entity from
conducting an aerial application of a covered fire retardant
and water enhancer for wildfire suppression, control, or
prevention activities that results in a discharge, if such
aerial application is conducted in accordance with the
requirements of the Federal Facility Compliance Agreement
between the Environmental Protection Agency and the U.S. Forest
Service, as agreed to on February 16, 2023. (b) PERIOD OF
APPLICATION.--Subsection (a) shall apply to any aerial
application described in such subsection that is conducted
before the effective date of a permit issued by the
Administrator of the Environmental Protection Agency or a
State, as applicable, under section 402 of the Federal Water
Pollution Control Act (33 U.S.C. 1342) that authorizes the
discharge, from such aerial application, of a covered fire
retardant and water enhancer for wildfire suppression, control,
or prevention activities. (c) EFFECT.--Nothing in this section
affects the authority of any court under the Federal Water
Pollution Control Act with respect to any discharge resulting
from an aerial application not conducted in accordance with the
requirements described in subsection (a). (d) DEFINITIONS.--In
this section: (1) COVERED ENTITY.--The term ``covered entity''
means--(A) any Federal agency, agency of a State or political
subdivision thereof, or Tribal agency, authorized by law to
conduct an aerial application of fire retardants and water
enhancers for wildfire suppression, control, or prevention
activities; and (B) any contractor, subcontractor, or other
agent of an agency described in subparagraph (A). (2) COVERED
FIRE RETARDANT AND WATER ENHANCER.--The term ``covered fire
retardant and water enhancer'' means a fire retardant and water
enhancer that-- (A) has been evaluated, qualified, and approved
by the Secretary of Agriculture; and (B) appears on the most
current Forest Service Qualified Products List. (3) DISCHARGE;
STATE.--The terms ``discharge'' and ``State'' have the meanings
given those terms in section 502 of the Federal Water Pollution
Control Act (33 U.S.C. 1362). (e) SUNSET.--This section shall
cease to be effective on the date that is 5 years after the
date of enactment of this section.; was NOT AGREED TO by a
recorded vote of 30 Yeas and 35 Nays (RC#48).
An Amendment to the Amendment in the Nature of a Substitute
to H.R. 3898, offered by Ms. Sykes of Ohio (Sykes 046): Strike
section 17 and insert the following: SEC. 17. NO NET LOSS OF
WETLANDS. Not later than 180 days after the date of enactme
Committee Votes
Clause 3(b) of rule XIII of the Rules of the House of
Representatives requires each committee report to include the
total number of votes cast for and against on each record vote
on a motion to report and on any amendment offered to the
measure or matter, and the names of those members voting for
and against.
Committee Oversight Findings and Recommendations
With respect to the requirements of clause 3(c)(1) of rule
XIII of the Rules of the House of Representatives, the
Committee's oversight findings and recommendations are
reflected in this report.
New Budget Authority and Tax Expenditures
With respect to the requirements of clause 3(c)(2) of rule
XIII of the Rules of the House of Representatives and section
308(a) of the Congressional Budget Act of 1974 and with respect
to requirements of clause (3)(c)(3) of rule XIII of the Rules
of the House of Representatives and section 402 of the
Congressional Budget Act of 1974, the Committee has requested
but has not received a cost estimate for this bill from the
Director of Congressional Budget Office. The Committee has also
requested but not received from the Director of the
Congressional Budget Office a statement as to whether this bill
contains any new budget authority, spending authority, credit
authority, or an increase or decrease in revenues or tax
expenditures. The Chairman of the Committee shall cause such
estimate and statement to be printed in the Congressional
Record upon its receipt by the Committee.
Congressional Budget Office Cost Estimate
With respect to the requirement of clause 3(c)(3) of rule
XIII of the Rules of the House of Representatives, a cost
estimate provided by the Congressional Budget Office pursuant
to section 402 of the Congressional Budget Act of 1974 was not
made available to the Committee in time for the filing of this
report. The Chairman of the Committee shall cause such estimate
to be printed in the Congressional Record upon its receipt by
the Committee.
Performance Goals and Objectives
With respect to the requirement of clause 3(c)(4) of rule
XIII of the Rules of the House of Representatives, the
performance goal and objective of this legislation is to
provide regulatory and judicial certainty for regulated
entities and communities, increase transparency, and promote
water quality, and for other purposes.
Duplication of Federal Programs
Pursuant to clause 3(c)(5) of rule XIII of the Rules of the
House of Representatives, the Committee finds that no provision
of H.R. 3898, as amended, establishes or reauthorizes a program
of the Federal government known to be duplicative of another
Federal program, a program that was included in any report from
the Government Accountability Office to Congress pursuant to
section 21 of Public Law 111-139, or a program related to a
program identified in the most recent Catalog of Federal
Domestic Assistance.
Congressional Earmarks, Limited Tax Benefits,
and Limited Tariff Benefits
In compliance with clause 9 of rule XXI of the Rules of the
House of Representatives, this bill, as reported, contains no
congressional earmarks, limited tax benefits, or limited tariff
benefits as defined in clause 9(e), 9(f), or 9(g) of the rule
XXI.
Federal Mandates Statement
An estimate of Federal mandates prepared by the Director of
the Congressional Budget Office pursuant to section 423 of the
Unfunded Mandates Reform Act was not made available to the
Committee in time for the filing of this report. The Chairman
of the Committee shall cause such estimate to be printed in the
Congressional Record upon its receipt by the Committee.
Preemption Clarification
Section 423 of the Congressional Budget Act of 1974
requires the report of any Committee on a bill or joint
resolution to include a statement on the extent to which the
bill or joint resolution is intended to preempt state, local,
or tribal law. The Committee finds that H.R. 3898, as amended,
does not preempt any state, local, or tribal law.
Advisory Committee Statement
No advisory committees within the definition of Section
5(b) of the appendix to Title 5, United States Code, are
created by this legislation.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act (Public Law
104-1).
Section-by-Section Analysis of the Legislation
Section 1. Short title; table of contents
This section lays out the table of contents for the bill,
and states that the bill may be referred to as the ``Promoting
Efficient Review for Modern Infrastructure Today Act'' or
``PERMIT Act''.
Section 2. Water quality standards attainability
This section requires water quality standards, developed
under Clean Water Act (CWA) section 303(c), to consider
municipal combined sewer storm and sanitary sewer long-term
control plans, as well as the ability of a permit holder to
maintain compliance with the standards through commercially
available technologies.
Section 3. Water quality criteria development and transparency
This section establishes a more transparent procedure for
the development of water quality criteria by the Environmental
Protection Agency (EPA) for National Pollutant Discharge
Elimination System (NPDES) permits, which provides additional
opportunities for public participation and limited judicial
review.
Section 4. Water quality technology availability
This section requires that the technology used to develop
effluent limitation guidelines wastewater discharges is viably
commercially available in the United States.
Section 5. Improving water quality certifications and American energy
infrastructure
This section modernizes and clarifies the water quality
certification process and scope of review under CWA section
401.
Section 6. Clarifying Federal general permits
This section codifies EPA's practice of issuing general
permits under CWA section 402 and requires EPA to provide a
two-year notice if a general permit will not be renewed.
Section 7. NPDES permit terms
This section amends CWA section 402 to authorize NPDES
permits to be issued for up to ten years
Section 8. Confidence in clean water permits
This section requires NPDES permit writers to use clear
limits and terms when writing permits. It also codifies
longstanding EPA policy related to when permit holders are
shielded from liability.
Section 9. Forest protection and wildland firefighter safety
This section amends CWA section 402 to clarify that aerial
discharges of fire retardants that appear on the Forest Service
Qualified Products List do not require a NPDES permit.
Section 10. Agricultural stormwater discharge
This section amends CWA section 402 to clarify that
agricultural stormwater discharges do not require a NPDES
permit.
Section 11. Reducing regulatory burdens
This section amends CWA section 402 to clarify that
pesticides regulated under the Federal Insecticide, Fungicide,
and Rodenticide Act (FIFRA) do not require a NPDES permit.
Section 12. Reducing permitting uncertainty
This section clarifies that EPA cannot veto a CWA section
404 dredge and fill permit before an application is filed or
after a permit has been issued by the United States Army Corps
of Engineers (Corps).
Section 13. Nationwide permitting improvement
This section codifies and sets standards for Corps-issued
Nationwide permits.
Section 14. Deadline for request for submission of additional
information for permit programs for dredged or fill material
This section puts in place a timeline for the EPA to adhere
to in the event more information from a State seeking authority
to administer a CWA section 404 dredge and fill permitting
program is required.
Section 15. Judicial review timeline clarity
This section sets judicial review timelines for CWA section
404 dredge and fill permits, as well as for the EPA's approval
of state assumptions of 404 permit programs.
Section 16. Restoring federalism in clean water permitting
This section directs EPA to complete a review of the
regulations applicable to state assumption of the CWA section
404 dredge and fill permitting program and identify revisions
necessary to streamline the process.
Section 17. Jurisdictional determination backlog reduction
This section directs the Corps to reduce the backlog of
jurisdictional determinations, wetlands delineations, and
permit applications.
Section 18. Definition of navigable waters
This section codifies longstanding exclusions from the
definition of ``waters of the United States'' for waste
treatment systems, ephemeral features, prior converted
cropland, and groundwater.
Section 19. Applicability of Spill Prevention, Control, and
Countermeasure rule
This section increases the aggregate exemption level for
oil tanks on certain farms under EPA's Spill Prevention,
Control, and Countermeasure Rule under CWA section 311.
Section 20. Coordination with Federal Permitting Improvement Steering
Council
This section directs the EPA, the Corps, and states, to the
maximum extent practicable, to coordinate with the Federal
Permitting Improvement Steering Council on the status of permit
applications and requests for certification under sections 401,
402 and 404 of the CWA.
Section 21. Sense of Congress on Chesapeake Bay Watershed Agreement
This section provides the Sense of Congress that the
Chesapeake Bay Watershed Agreement is a voluntary, cooperative
agreement.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (existing law
proposed to be omitted is enclosed in black brackets, new
matter is printed in italic, existing law in which no change is
proposed is shown in roman):
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (existing law
proposed to be omitted is enclosed in black brackets, new
matter is printed in italics, and existing law in which no
change is proposed is shown in roman):
FEDERAL WATER POLLUTION CONTROL ACT
* * * * * * *
TITLE III--STANDARDS AND ENFORCEMENT
* * * * * * *
water quality standards and implementation plans
Sec. 303. (a)(1) In order to carry out the purpose of this
Act, any water quality standard applicable to interstate waters
which was adopted by any State and submitted to, and approved
by, or is awaiting approval by, the Administrator pursuant to
this Act as in effect immediately prior to the date of
enactment of the Federal Water Pollution Control Act Amendments
of 1972, shall remain in effect unless the Administrator
determined that such standard is not consistent with the
applicable requirements of this Act as in effect immediately
prior to the date of enactment of the Federal Water Pollution
Control Act Amendments of 1972. If the Administrator makes such
a determination he shall, within three months after the date of
enactment of the Federal Water Pollution Control Act Amendments
of 1972, notify the State and specify the changes needed to
meet such requirements. If such changes are not adopted by the
State within ninety days after the date of such notification,
the Administrator shall promulgate such changes in accordance
with subsection (b) of this section.
(2) Any State which, before the date of enactment of the
Federal Water Pollution Control Act Amendments of 1972, has
adopted, pursuant to its own law, water quality standards
applicable to intrastate waters shall submit such standards to
the Administrator within thirty days after the date of
enactment of the Federal Water Pollution Control Act Amendments
of 1972. Each such standard shall remain in effect, in the same
manner and to the same extent as any other water quality
standard established under this Act unless the Administrator
determines that such standard is inconsistent with the
applicable requirements of this Act as in effect immediately
prior to the date of enactment of the Federal Water Pollution
Control Act Amendments of 1972. If the Administrator makes such
a determination he shall not later than the one hundred and
twentieth day after the date of submission of such standards,
notify the State and specify the changes needed to meet such
requirements. If such changes are not adopted by the State
within ninety days after such notification, the Administrator
shall promulgate such changes in accordance with subsection (b)
of this section.
(3)(A) Any State which prior to the date of enactment of the
Federal Water Pollution Control Act Amendments of 1972 has not
adopted pursuant to its own laws water quality standards
applicable to intrastate waters shall, not later than one
hundred and eighty days after the date of enactment of the
Federal Water Pollution Control Act Amendments of 1972, adopt
and submit such standards to the Administrator.
(B) If the Administrator determines that any such standards
are consistent with the applicable requirements of this Act as
in effect immediately prior to the date of enactment of the
Federal Water Pollution Control Act Amendments of 1972, he
shall approve such standards.
(C) If the Administrator determines that any such standards
are not consistent with the applicable requirements of this Act
as in effect immediately prior to the date of enactment of the
Federal Water Pollution Control Act Amendments of 1972, he
shall, not later than the ninetieth day after the date of
submission of such standards, notify the State and specify the
changes to meet such requirements. If such changes are not
adopted by the State within ninety days after the date of
notification, the Administrator shall promulgate such standards
pursuant to subsection (b) of this section.
(b)(1) The Administrator shall promptly prepare and publish
proposed regulations setting forth water quality standards for
a State in accordance with the applicable requirements of this
Act as in effect immediately prior to the date of enactment of
the Federal Water Pollution Control Act Amendments of 1972,
if--
(A) the State fails to submit water quality standards
within the times prescribed in subsection (a) of this
section,
(B) a water quality standard submitted by such State
under subsection (a) of this section is determined by
the Administrator not to be consistent with the
applicable requirements of subsection (a) of this
section.
(2) The Administrator shall promulgate any water quality
standard published in a proposed regulation not later than one
hundred and ninety days after the date he publishes any such
proposed standard, unless prior to such promulgation, such
State has adopted a water quality standard which the
Administrator determines to be in accordance with subsection
(a) of this section.
(c)(1) [The Governor of a State] (A) The Governor of a State
or the State water pollution control agency of such State shall
from time to time (but at least once each three year period
beginning with the date of enactment of the Federal Water
Pollution Control Act Amendments of 1972) hold public hearings
for the purpose of reviewing applicable water quality standards
and, as appropriate, modifying and adopting standards. [Results
of such review shall be made available to the Administrator.]
(B) Reviews under this paragraph shall include review, for
purposes of ensuring that combined sewer overflow controls are
cost effective, of any water quality standard applicable to a
body of water into which, pursuant to a permit, order, or
decree issued pursuant to this Act, a municipal combined storm
and sanitary sewer discharges.
(C) Results of each review under this paragraph shall be made
available to the Administrator.
(2)(A) Whenever the State revises or adopts a new standard,
such revised or new standard shall be submitted to the
Administrator. Such revised or new water quality standard shall
consist of the designated uses of the navigable waters involved
and the water quality criteria for such waters based upon such
uses. Such standards shall be such as to protect the public
health or welfare, enhance the quality of water and serve the
purposes of this Act. Such standards shall be established
taking into consideration (i) their use and value for public
water supplies, propagation of fish and wildlife, recreational
purposes, and agricultural, industrial, and other purposes[,
and also taking into consideration]; (ii) their use and value
for navigation; and (iii) the cost and commercial availability
in the United States of treatment technologies (including
whether the technologies have been demonstrated at an
applicable scale) that may be required to be applied to point
sources in order to result in compliance with such standards.
(B) Whenever a State reviews water quality standards pursuant
to paragraph (1) of this subsection, or revises or adopts new
standards pursuant to this paragraph, such State shall adopt
criteria for all toxic pollutants listed pursuant to section
307(a)(1) of this Act for which criteria have been published
under section 304(a), the discharge or presence of which in the
affected waters could reasonably be expected to interfere with
those designated uses adopted by the State, as necessary to
support such designated uses. Such criteria shall be specific
numerical criteria for such toxic pollutants. Where such
numerical criteria are not available, whenever a State reviews
water quality standards pursuant to paragraph (1), or revises
or adopts new standards pursuant to this paragraph, such State
shall adopt criteria based on biological monitoring or
assessment methods consistent with information published
pursuant to section 304(a)(8). Nothing in this section shall be
construed to limit or delay the use of effluent limitations or
other permit conditions based on or involving biological
monitoring or assessment methods or previously adopted
numerical criteria.
(3) If the Administrator, within sixty days after the date of
submission of the revised or new standard, determines that such
standard meets the requirements of this Act, such standard
shall thereafter be the water quality standard for the
applicable waters of that State. If the Administrator
determines that any such revised or new standard is not
consistent with the applicable requirements of this Act, he
shall not later than the ninetieth day after the date of
submission of such standard notify the State and specify the
changes to meet such requirements. If such changes are not
adopted by the State within ninety days after the date of
notification, the Administrator shall promulgate such standard
pursuant to paragraph (4) of this subsection.
(4) The Administrator shall promptly prepare and publish
proposed regulations setting forth a revised or new water
quality standard for the navigable waters involved--
(A) i
Minority Views
We oppose H.R. 3898. The Clean Water Act (CWA) is the
nation's bedrock environmental law for ``restoring and
maintaining the chemical, physical, and biological integrity of
the Nation's waters.'' H.R. 3898 defies the Act's overarching
intent to keep our nation's water clean, guts the authority of
federal agencies to minimize the impact that projects have on
water resources, and undermines the authority of states and
Tribes to protect locally important waterbodies.
This bill significantly restricts U.S. Environmental
Protection Agency (EPA) and U.S. Army Corps of Engineers
(Corps) oversight and regulatory authorities under the Act,
which, when paired with the Trump Administration's efforts to
eviscerate federal funding and purge agency personnel, will
leave the federal agencies powerless to fulfill their
responsibilities under the law. This bill also undermines the
``cooperative federalism'' partnership the federal government
has with states and Tribes to prevent pollution under the Clean
Water Act, weakening the ability of states and Tribes to defend
local waterbodies.
Simply put, this partisan bill makes it easier to release
harmful and toxic pollution into our nation's rivers, streams,
lakes, and other waterbodies through loopholes, legal shields,
and limited oversight of polluters. The bill eviscerates over
50 years of Clean Water Act success that has doubled the
percentage of waters that are safe for fishing, swimming, and
use as drinking water. H.R. 3898 undermines permitting
requirements; eliminates judicial review and public engagement;
rolls back oversight of mining companies and industrial
polluters; slows down permit processing with increased
bureaucracy; and weakens state-led decisions on locally
important waters.
Congressional Republicans offer these overarching, anti-
Clean Water Act changes as their response to specific projects
that have been blocked or to address the grievances of special
interests and polluters rather than provide a sustainable
solution for reasonable permitting efforts or to ensure the
protection of water quality for current or future generations.
For example, large-scale mining proposals, such as Pebble
Mine in Alaska or Spruce Mine in West Virginia, or ecologically
devastating flood control projects, such as the Yazoo Pumps in
Mississippi, were blocked by presidential administrations from
both parties under the EPA's Section 404(c) authority once the
impacts were thoroughly documented and publicly evaluated.
Although EPA has utilized this authority very sparingly (only
14 times among the tens-of-millions of permitted activities
since 1972), H.R. 3898 will effectively eliminate the authority
altogether.
Similarly, for over 50 years, states and Tribes have
judiciously used section 401 of the CWA to ensure that projects
or activities carried out within their jurisdictions are
consistent with state water quality standards and other
relevant state and Tribal laws. Yet, in response to two
specific instances where states legitimately used this
authority to prevent the construction of fossil fuel-related
facilities within their borders, H.R. 3898 changes the law to
allow special interests to override state and Tribal concerns
over potential development within their own borders.
In a multitude of ways, H.R. 3898 will weaken federal,
state, and local efforts to restore, maintain, or clean up
local waterbodies. The bill tells communities of all sizes,
especially rural, minority, and economically-disadvantaged
communities, that clean water is simply too costly for them to
have. At the same time, the bill increases the likelihood that
American families will have to spend more for safe drinking
water for their homes or to access water-related recreational
areas, if such resources are still available. For example, H.R.
3898 increases the likelihood for discharges of toxic chemicals
and pesticides, such as PFAS, mercury, and arsenic--chemicals
that, once in a local drinking water source, are extremely
expensive, and potentially impossible, to remove completely.
Under this bill, permittees are discouraged from investigating
what toxic chemicals might be in their waste-stream, which
increases the likelihood of exposure to American families,
including vulnerable populations, such as pregnant women,
infants, and children. Yet, even the Trump Administration's
Make America Healthy Again Commission's report recognizes the
obvious risk to human health from increased exposure to toxic
chemicals and pesticides.\1\
---------------------------------------------------------------------------
\1\See https://www.whitehouse.gov/wp-content/uploads/2025/05/WH-
The-MAHA-Report-Assess
ment.pdf.
---------------------------------------------------------------------------
The bill also exacerbates the likelihood of downstream
contamination and flooding as upstream waters and wetlands are
developed or destroyed--increasing the risk and the cost to
American families, businesses, and economies. H.R. 3898 rewards
polluters and special interests by reducing their
responsibility to prevent or treat their waste--shifting the
cost from polluters to American families who will be forced to
pay more for clean water.
H.R. 3898 also allows private industry and development to
steamroll through towns and states, polluting waterbodies due
to minimal review and disregarding local perspectives. The bill
greenlights large projects with minimal review while also
limiting opportunities for public comment or challenges to
ecologically damaging permits or projects. The bill also
prevents judicial review by vastly shortening the statute of
limitations; limiting standing to file suit; and limiting the
Court's options for recourse.
If H.R. 3898 is enacted, the potential adverse impacts to
waterbodies (such as reduced water quality or availability); to
the environment (such as increased greenhouse gas emissions or
other contamination); and to residents (such as perpetuating
environmental justice concerns) will be borne by the local and
surrounding communities without a voice or venue to have their
concerns heard. This legislation puts polluters over people.
Ironically, H.R. 3898 also contradicts itself by slowing
down permitting processes, sowing uncertainty, and decreasing
flexibility. For example, H.R. 3898 will add a formal
rulemaking process in place of an existing and more efficient
guidance process. This will slow down the issuance of water
quality criteria without increasing transparency or public
participation and remove flexibility for updates. It will also
open the criteria to judicial review, allowing aggrieved
polluters another opportunity to challenge state and local
efforts to protect local waterbodies and human health.
Proponents of H.R. 3898 contend that it will speed up
jurisdictional determinations and wetland permits following the
U.S. Supreme Court's decision in Sackett v. EPA. That decision
severely restricted what waters remain subject to CWA
protection and is estimated to have removed such protection on
at least 50% of wetlands and at least 60% of streams
nationwide. Yet, section 17 seeks to, again, redefine what
waters and wetlands remain subject to federal protection. When
combined with the Trump Administration's efforts to redefine by
rulemaking the scope of federally protected waters and
eliminate federal employees responsible for permitting
requirements, the net result will be more confusion and
uncertainty and longer wait times for necessary permits.
Congressional Republicans can claim, over and over, that
they support clean water and healthy communities; however,
their support for this bill tells the real story. If
Republicans were serious about protecting our water resources,
our families, and our water-related economy, they would look
comprehensively at the remaining sources of impairment to our
rivers, streams, lakes, wetlands, and coastal areas, and take
the necessary steps and make the necessary investment to
address these challenges. When Democrats last controlled the
U.S. House of Representatives, we not only enacted the single
largest investment in wastewater infrastructure ever through
the Bipartisan Infrastructure Law, but we initiated efforts to
repair the damage to the Clean Water Act caused by a
conservative Supreme Court and worked towards finally achieving
the elusive goal of ``fishable and swimmable'' waters for all
Americans.
The litany of loopholes, legal shields, and limited
oversight contained in H.R. 3898 are the opposite of what
Congress needs to be doing to protect our water resources.
Exposing the waters and wetlands that remain under Clean Water
Act protections to unrestricted and unchallengeable pollution
or destruction will do nothing to restore and maintain clean
water.
During consideration of H.R. 3898, several Committee
Democrats sought to lessen the negative impacts of this
legislation and require EPA to verify that the changes in the
bill would not adversely impact the health, safety, and
availability of clean water in communities nationwide.
Ranking Member Rick Larsen (WA-02) offered an amendment to
remove several provisions from the bill which undermine the
``cooperative federalism'' partnership the federal government
has with states and Tribes to protect against the pollution of
local waterbodies. The amendment would have restored the
ability of states and Tribes to make locally important
decisions related to the protection of locally important
waterbodies. In many instances, states are better suited to
understand the unique needs, demands, and importance on local
waterbodies; this amendment would allow states to continue to
lead local efforts to protect clean water.
Representative Dina Titus (NV-01) offered an amendment to
highlight how the bill's attempt to codify the draconian losses
of Clean Water Act protections from the Sackett decision will
disproportionately and adversely affect certain states. For
example, in the state of Nevada, the loss of Clean Water Act
protections for ephemeral streams will mean that close to 88
percent of the stream miles covered before the Sackett decision
will no longer be federally protected.\2\ Similarly, under the
most damaging scenario, 92 percent of wetland area in the State
of Washington has likely lost federal protection under the
rationale of the Supreme Court and this legislation.
---------------------------------------------------------------------------
\2\See Mapping Destruction: Using GIS Modeling to Show the
Disastrous Impacts of Sackett v. EPA on America's Wetlands, accessed at
https://www.nrdc.org/sites/default/files/2025-03/
Wetlands_Report_R_25-03-B_05_locked.pdf.
---------------------------------------------------------------------------
Representatives Emilia Sykes (OH-13) and Shomari Figures
(AL-02) each offered an amendment to ensure that the loopholes,
legal shields, and limited oversight of polluters contained in
H.R. 3898 do not disproportionately impact rural, economically-
disadvantaged, and Tribal communities. Nine out of 10 Americans
receive their drinking water from public water systems that
rely on a network of surface and subsurface waters to provide
the water entering our homes and businesses. The Sykes and
Figures amendments sought to prevent any increase in the
volume, toxicity, or concentration of pollution entering our
waters and to prevent any corresponding increase in local
utility rates that would be required to remove increased
pollution levels caused by this bill. We cannot continue to
allow the economic and human health burdens of increased
pollution to be placed on those communities that are least able
to bear these burdens.
Representatives Hillary Scholten (MI-03), Laura Gillen (NY-
04), and Pat Ryan (NY-18) each offered an amendment to protect
communities, families, and individuals from increased exposure
to pollution that would result from the changes in H.R. 3898.
The Scholten amendment sought to retain existing Clean Water
Act protections for the use of pesticides that could adversely
affect the health of pregnant women, fetal development,
infants, or children. The Gillen amendment sought to protect
communities and individuals from the increased likelihood of
exposure to chemicals and materials linked to cancer, such as
PFAS, arsenic, nitrates, nitrites, pesticides, chromium,
radium, and uranium that would result from the changes in this
bill. The Ryan amendment delays the effective date of the bill
until the EPA Administrator determines that the changes will
not result in increased discharges of forever chemicals (such
as PFAS) or nutrients that cause harmful algal blooms. The
amendment would have ensured that communities are not left with
the environmental and economic burden of cleaning up and
removing such pollutants.
Representative Kristen McDonald Rivet (MI-08) offered an
amendment that would protect the Great Lakes and other Clean
Water Act geographic programs from the potential for increased
discharges of pollution because of this bill. The Great Lakes
are the largest source of freshwater in the United States,
containing 21 percent of the world's surface freshwater by
volume. This amendment would prevent the changes contained in
H.R. 3898 from resulting in increased discharges of pollution
to the Great Lakes, and other critical regional waterbodies,
which could degrade the human, ecological, and economic health
of the region that depends on clean water.
Representative Laura Friedman (CA-30) offered an amendment
that sought to minimize the discharge of pollutants into
waterbodies that states, especially western states, are using
to augment local water supplies through water recapture, water
reuse and recycling, and groundwater recharge. The availability
of safe, reliable, and affordable water is critical, not only
to the survival of life, but also to the economic health of
communities and regions, contributing to the success of
industry, manufacturing, agriculture, transportation, and
recreation. This amendment would have ensured that forward-
looking states and Tribes, which are rightly preparing for the
future through maximizing efforts to conserve, reuse, and
replenish every drop of water, are not hindered by increased
levels of pollution resulting from the changes in H.R. 3898.
Representative Nellie Pou (NJ-09) offered an amendment that
sought to prevent this bill from increasing the discharge of
raw or partially treated sewage into our waters. The Clean
Water Act currently requires dischargers of wastewater to take
every step possible to treat sewage before it is released into
the environment. H.R. 3898 would weaken those requirements,
calling into question whether polluters will still be required
to implement treatment technologies sufficient to prevent the
discharge of raw or partially treated sewage into our nation's
waters, especially if a polluter suggests that such
technologies are ``too expensive'' or ``not commercially
available in the United States . . . at comparable scale.'' The
Pou amendment would have prevented these new loopholes from
resulting in an increase in combined and sanitary sewer
overflows or an increase in the risk (and economic
consequences) of flooding associated with the discharge of
increased volumes of industrial or municipal stormwater.
The Clean Water Act has been an effective tool for
improving the health of our rivers, streams, lakes, and
wetlands. Unfortunately, progress restoring impaired
waterbodies has slowed and, in some areas, reversed.
Communities face new challenges from emerging contaminants and
impacts of climate change, and an increased need for affordable
federal assistance--especially rural, minority, and
economically-disadvantaged communities; yet the Trump
Administration proposes to decimate funding for federal and
state clean water agencies, as well as critical infrastructure
funding for communities of all sizes. An activist conservative
court has reinterpreted the CWA to protect significantly fewer
waterbodies and prevent fewer discharges of pollutants. Rather
than address these growing challenges to fishable and swimmable
water for all Americans, H.R. 3898 provides additional
loopholes, legal shields, and limited oversight for special
interests and polluters.
In our view, this legislation is unnecessary, unwarranted,
and a dangerous attack on clean water nationwide. For these
reasons, we oppose H.R. 3898.
Rick Larsen,
Ranking Member.
Frederica Wilson,
Emilia Sykes,
Hillary Scholten,
Eleanor Holmes Norton,
Jerrold Nadler,
Steve Cohen,
John Garamendi,
Henry ``Hank'' Johnson,
Andre Carson,
Dina Titus,
Jared Huffman,
Julia Brownley,
Mark DeSaulnier,
Salud Carbajal,
Greg Stanton,
Sharice Davids,
Jesus ``Chuy'' Garcia,
Chris Pappas,
Seth Moulton,
Marilyn Strickland,
Pat Ryan,
Val Hoyle,
Valerie Foushee,
Chris Deluzio,
Robert Garcia,
Nellie Pou,
Kristen McDonald Rivet,
Laura Friedman,
Laura Gillen,
Shomari Figures,
Members of Congress.
[all]