Minority Views
[To accompany H.R. 3668]
The Committee on Energy and Commerce, to whom was referred
the bill (H.R. 3668) to promote interagency coordination for
reviewing certain authorizations under section 3 of the Natural
Gas Act, and for other purposes, having considered the same,
reports favorably thereon without amendment and recommends that
the bill do pass.
CONTENTS
Page
Purpose and Summary.............................................. 2
Background and Need for Legislation.............................. 2
Committee Action................................................. 3
Committee Votes.................................................. 4
Oversight Findings and Recommendations........................... 7
New Budget Authority, Entitlement Authority, and Tax Expenditures 7
Congressional Budget Office Estimate............................. 7
Federal Mandates Statement....................................... 7
Statement of General Performance Goals and Objectives............ 7
Duplication of Federal Programs.................................. 7
Related Committee and Subcommittee Hearings...................... 7
Committee Cost Estimate.......................................... 9
Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 9
Advisory Committee Statement..................................... 9
Applicability to Legislative Branch.............................. 9
Section-by-Section Analysis of the Legislation................... 9
Changes in Existing Law Made by the Bill, as Reported............ 11
Minority, Additional, or Dissenting Views........................ 12
Exchange of Letters with Additional Committees of Referral....... 15
Purpose and Summary
H.R. 3668, the ``Improving Interagency Coordination for
Pipeline Reviews Act,'' was introduced by Representative Hudson
on June 3, 2025. The legislation would help address the
critical need to expand and modernize the nation's natural gas
pipeline infrastructure by promoting more timely and efficient
reviews.
Background and Need for Legislation
The Federal Energy Regulatory Commission (FERC) is the
principal Federal agency involved in the review of interstate
natural gas pipelines. FERC has exclusive authority under
section 7 of the Natural Gas Act (NGA)\1\ to review and grant
the certificate of public convenience and necessity required to
construct a new or expanded interstate natural gas pipeline.
FERC conducts the environmental review of each proposed natural
gas pipeline project as required under the National
Environmental Policy Act (NEPA).\2\ Under the Energy Policy Act
of 2005 (EPAct), FERC is designated as the lead agency for
coordinating necessary environmental reviews and associated
Federal authorizations.\3\ As the lead agency, FERC often
coordinates with a variety of Federal, State, and local
governments and Indian tribes to balance a wide range of
issues, including potential impacts on environmental and
wildlife resources, land-use, and property rights.
---------------------------------------------------------------------------
\1\15 U.S.C. Sec. 717f.
\2\42 U.S.C. Sec. 4321 et. seq.
\3\15 U.S.C. 717n (where the Natural Gas Act was amended by the
Energy Policy Act of 2025).
---------------------------------------------------------------------------
Multiple permits are often required for a natural gas
pipeline project, including permits under the Clean Water Act
(CWA),\4\ Endangered Species Act (ESA),\5\ and Clean Air Act
(CAA).\6\ Under current FERC regulations, Federal and State
agencies participate in the development of the NEPA analysis
for a pipeline project and then are required to complete their
respective permit application reviews no later than 90 days
after FERC issues its final environmental document, unless
another schedule is established by Federal law.\7\
---------------------------------------------------------------------------
\4\33 U.S. Code Sec. 1251.
\5\16 U.S.C. Sec. Sec. 1531-1544.
\6\42 U.S.C. Sec. 7401 et. seq.
\7\U.S. Federal Energy Regulatory Commission (FERC), Regulations
Implementing the Energy Policy Act of 2005: Coordinating the Processing
of Federal Authorizations for Applications under Sections 3 and 7 of
the Natural Gas Act and Maintaining a Complete Consolidated Record, 18
CFR Parts 153, 157, 375, and 385, Docket No. RM06-1-000 (issued May 18,
2006), https://www.ferc.gov/sites/default/files/2020-06/RM06-1-000.pdf.
---------------------------------------------------------------------------
Despite the increased authority given to FERC under EPAct,
there is growing evidence that pipeline infrastructure
approvals are being delayed unnecessarily due to a lack of
coordination or insufficient action among agencies involved in
the permitting process. It has also become apparent that
inadequate infrastructure to transport natural gas has
negatively affected electric grid reliability and electric
rates, especially in New England states, as natural gas fired
power plants have had difficulty accessing the fuel they need
to maintain operations. Furthermore, the lack of pipeline
capacity in the Northeast, especially during times of high
demand in winter months, has resulted in the region becoming
dangerously dependent on liquefied natural gas (LNG) imports.
There are numerous large natural gas pipelines that would
have carried billions of cubic feet of natural gas per day and
served tens of millions of customers that have been cancelled
in recent years due to permitting challenges and delays. While
FERC is partially responsible, some States, such as New York,
have weaponized their Federally delegated responsibilities
under CWA Section 401 to veto pipeline construction projects
for reasons unrelated to water quality.\8\
---------------------------------------------------------------------------
\8\Constitution Pipeline Co., LLC v. FERC, Docket CP18-5, (filed
Sept. 14, 2018) (see No. 18-1251 (D.C. Cir. filed 9/14/2018) Denial of
waiver of Clean Water Act authority; finding that New York DEC acted in
a timely manner, following Constitutions withdrawal and resubmittal of
its CWA application, in denying CWA permit.).
---------------------------------------------------------------------------
H.R. 3668 would improve the permitting process for natural
gas pipelines by strengthening the lead agency role of FERC and
further defining the process for participating Federal and
State agencies. The intent of these provisions is to involve
stakeholders sooner so that they can be involved in the setting
of the schedule and identify issues of concern earlier in the
process. The legislation would require agencies that may
consider an aspect of an application to participate in the
review process and comply with the schedules established by
FERC. The legislation requires that agencies conduct their
respective reviews concurrently, and in conjunction with, the
project-related review conducted by FERC in compliance with
NEPA. In considering an aspect of an application, Federal and
State agencies may accept remote aerial survey data and use
that data to grant conditional approvals, conditioned on the
onsite inspection. Remote aerial surveys are widely accepted,
proven methods of collecting environmental data, and allowing
their use will lead to better, more informed decisions.
H.R. 3668 would increase public accountability,
transparency, and efficiency by requiring FERC to publish the
schedule, a list of all actions required by each applicable
agency, and the status of all pending actions. The legislation
also contains a provision that would improve the water quality
review by shifting the responsibility from the States to FERC.
Under H.R. 3668, an applicant for a Federal authorization for
an interstate pipeline would not be required to obtain a CWA
Section 401 certification from a State. Instead, FERC would
incorporate the water quality certification into its existing
NEPA review, with necessary terms or conditions proposed by the
States participating in the review process.
Committee Action
On April 30, 2025, the Subcommittee on Energy held a
legislative hearing on 14 pieces of legislation, including H.R.
3668. The Subcommittee received testimony from:
Mike Goff, Acting Undersecretary of Energy,
U.S. Department of Energy;
David L. Morenoff, Acting General Counsel,
Federal Energy Regulatory Commission;
Terry Turpin, Director, Office of Energy
Projects, Federal Energy Regulatory Commission;
Jim Matheson, Chief Executive Officer,
National Rural Electric Cooperative Association;
Amy Andryszak, President and Chief Executive
Officer, Interstate Natural Gas Association of America;
Todd A. Snitchler, President and Chief
Executive Officer, Electric Power Supply Association
and;
Kim Smaczniak, Partner, Roselle LLP.
On June 5, 2025, the Subcommittee on Energy met in open
markup session and forwarded H.R. 3668, without amendment, to
the full Committee by a record vote of 15 yeas and 11 nays. On
June 25, 2025, the full Committee on Energy and Commerce met in
open markup session and ordered H.R. 3668, without amendment,
favorably reported to the House by a record vote of 27 yeas and
23 nays.
Committee Votes
Clause 3(b) of rule XIII requires the Committee to list the
record votes on the motion to report legislation and amendments
thereto. The following reflects the record votes taken during
the Committee consideration:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
OVERSIGHT FINDINGS AND RECOMMENDATIONS
Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII, the Committee held hearings and made findings that
are reflected in this report.
NEW BUDGET AUTHORITY, ENTITLEMENT AUTHORITY, AND TAX
EXPENDITURES
Pursuant to clause 3(c)(2) of rule XIII, the Committee
finds that H.R. 3668 would result in no new or increased budget
authority, entitlement authority, or tax expenditures or
revenues.
Congressional Budget Office Estimate
Pursuant to clause 3(c)(3) of rule XIII, at the time this
report was filed, the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974 was not available.
FEDERAL MANDATES STATEMENT
The Committee adopts as its own the estimate of Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
STATEMENT OF GENERAL PERFORMANCE GOALS AND OBJECTIVES
Pursuant to clause 3(c)(4) of rule XIII, the general
performance goal or objective of this legislation is to address
the critical need to expand and modernize the nation's natural
gas pipeline infrastructure by promoting more timely and
efficient reviews.
DUPLICATION OF FEDERAL PROGRAMS
Pursuant to clause 3(c)(5) of rule XIII, no provision of
H.R. 3668 is known to be duplicative of another Federal
program, including any program that was included in a report to
Congress pursuant to section 21 of Public Law 111-139 or the
most recent Catalog of Federal Domestic Assistance.
RELATED COMMITTEE AND SUBCOMMITTEE HEARINGS
Pursuant to clause 3(c)(6) of rule XIII, the following
related hearings were used to develop or consider H.R. 3668:
On February 5, 2025, the Subcommittee on Energy held a
hearing on H.R. 3668. The title of the hearing was ``Powering
America's Future: Unleashing American Energy.'' The
Subcommittee received testimony from:
Amanda Eversole, Executive Vice President
and Chief Advocacy Officer, American Petroleum
Institute;
Brigham McCown, Senior Fellow and Director,
Initiative on American Energy Security, The Hudson
Institute;
Gary Arnold, Business Manager, Denver
Pipefitters Local 208 and;
Tyler O'Connor, Partner, Crowell & Moring
LLP.
On March 5, 2025, the Subcommittee on Energy held a hearing
on H.R. 3668. The title of the hearing was ``Scaling for
Growth: Meeting the Demand for Reliable, Affordable
Electricity.'' The Subcommittee received testimony from:
Todd Brickhouse, CEO and General Manager,
Basin Electric Power Cooperative;
Asim Haque, Senior Vice President for
Governmental and Member Services, PJM;
Noel W. Black, Senior VP of Regulatory
Affairs, Southern Company and;
Tyler H. Norris, James B. Duke Fellow, Duke
University.
On March 25, 2025, the Subcommittee on Energy held a
hearing on H.R. 3668. The title of the hearing was ``Keeping
the Lights On: Examining the State of Regional Grid
Reliability.'' The Subcommittee received testimony from:
Gordon van Welie, President and Chief
Executive Officer, ISO New England;
Richard J. Dewey, President and Chief
Executive Officer, New York Independent System
Operator;
Manu Asthana, President and Chief Executive
Officer, PJM Interconnection LLC;
Jennifer Curran, Senior Vice President for
Planning and Operations, Midcontinent ISO;
Lanny Nickell, Chief Operating Officer,
Southwest Power Pool;
Elliot Mainzer, President and Chief
Executive Officer, California Independent System
Operator and;
Pablo Vegas, President and Chief Executive
Officer, Electric Reliability Council of Texas, Inc.
On April 9, 2025, the Committee on Energy and Commerce held
a full committee hearing on H.R. 3668. The title of the hearing
was ``Converting Energy Into Intelligence: The Future of AI
Technology, Human Discovery, and American Global
Competitiveness.'' The Committee received testimony from:
Eric Schmidt, Chair, Special Competitive
Studies Project;
Manish Bhatia, Executive Vice President of
Global Operations, Micron Technology;
Alexander Wang, Founder and Chief Executive
Officer, Scale AI, and;
David Turk, Distinguished Visiting Fellow,
Center on Global Energy Policy, Columbia University.
On April 30, 2025, the Subcommittee on Energy held a
legislative hearing on H.R. 3668. The title of the hearing was
``Assuring Abundant, Reliable American Energy to Power
Innovation.'' The Subcommittee received testimony from:
Mike Goff, Acting Undersecretary of Energy,
U.S. Department of Energy;
David L. Morenoff, Acting General Counsel,
Federal Energy Regulatory Commission;
Terry Turpin, Director, Office of Energy
Projects, Federal Energy Regulatory Commission;
Jim Matheson, Chief Executive Officer,
National Rural Electric Cooperative Association;
Amy Andryszak, President and Chief Executive
Officer, Interstate Natural Gas Association of America;
Todd A. Snitchler, President and Chief
Executive Officer, Electric Power Supply Association
and;
Kim Smaczniak, Partner, Roselle LLP.
COMMITTEE COST ESTIMATE
Pursuant to clause 3(d)(1) of rule XIII, the Committee
adopts as its own the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974. At the time this report was
filed, the estimate was not available.
EARMARK, LIMITED TAX BENEFITS, AND LIMITED TARIFF BENEFITS
Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the
Committee finds that H.R. 3668 contains no earmarks, limited
tax benefits, or limited tariff benefits.
ADVISORY COMMITTEE STATEMENT
No advisory committees within the meaning of section 5(b)
of the Federal Advisory Committee Act were created by this
legislation.
APPLICABILITY TO LEGISLATIVE BRANCH
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
SECTION-BY-SECTION ANALYSIS OF THE LEGISLATION
Section 1. Short title
This section provides the short title, the ``Improving
Interagency Coordination for Review of Natural Gas Pipelines
Act.''
Section 2. Promoting interagency coordination for review of natural gas
pipelines
Section 2(a) provides definitions for terms used throughout
this section.
Section 2(b) designates FERC as the only lead agency for
the purposes of complying with NEPA for an authorization under
section 3 of the NGA or a certificate of public convenience and
necessity under section 7 of the NGA. This section requires
FERC to coordinate as early as practicable with each agency
designated as a participating agency under subsection (d)(3)
and to take such actions as necessary and proper to facilitate
the expeditious resolution of its project-related NEPA review.
Section 2(c) directs each agency to give deference, to the
maximum extent authorized by law, to the scope of the project-
related NEPA review that FERC determines to be appropriate,
when making a decision with respect to a Federal authorization
under section 3 of the NGA or a certificate of public
convenience and necessity under section 7 of the NGA.
Section 2(d)(1) requires FERC to identify as early as
practicable, after it is notified by a person applying for an
authorization under section 3 of the NGA or a certificate of
public convenience and necessity under section 7 of the NGA,
any Federal or State agency, local government, or Indian Tribe
that may issue a Federal authorization or is required by
Federal law to consult with FERC on the issuance of a Federal
authorization.
Section 2(d)(2) requires FERC to invite the identified
agencies to participate in the review process for the
applicable Federal authorization. The invitation shall
establish a deadline for when the agency must submit a response
to FERC. FERC may extend the deadline for good cause.
Section 2(d)(3) requires FERC to designate identified
agencies as participating agencies with respect to an
application for authorization under section 3 of the NGA or
certificate of public convenience and necessity under section 7
of the NGA, unless the agency informs FERC, in writing, that
the agency does not have jurisdiction over the application, has
no special expertise relevant to the NEPA review, and does not
intend to submit comments for the record for the NEPA review
conducted by FERC.
Section 2(d)(4) provides that any agency not designated as
a participating agency may not request or conduct a NEPA review
that is supplemental to FERC's project-related NEPA review,
unless the agency (1) demonstrates that such review is legally
necessary or (2) requires information that could not have been
obtained during FERC's project-related NEPA review.
Additionally, it directs FERC not to consider any comments or
other information submitted by an agency that is not designated
as a participating agency for FERC's project-related NEPA
review and not to include any comments in the record for the
Commission's NEPA review from an agency that is not designated
as a participating agency.
Section 2(e)(1) provides that an applicant for a Federal
authorization under the NGA shall not be required to provide a
certification under Section 401 of the Federal Water Pollution
Control Act.
Section 2(e)(2) requires FERC to coordinate its NEPA review
as necessary with States where a potential discharge into
navigable waters may occur.
Section 2(e)(3) allows for States to propose conditions to
FERC to protect water resources.
Section 2(e)(4) allows for FERC to include terms or
conditions proposed by a State.
Section 2(f)(1) directs the Commission not to establish a
deadline for a Federal authorization exceeding 90 days after
the Commission completes its project-related NEPA review.
Section 2(f)(2) directs each Federal and State agency
considering a Federal authorization for an application or an
aspect of application under section 3 of the NGA or a
certificate of public convenience and necessity under section 7
of the NGA to formulate and implement a plan to ensure
completion of Federal authorizations in compliance with
schedules established by FERC. When considering an aspect of an
application for a Federal authorization, each Federal and State
agency shall carry out the obligations of that agency under
applicable law concurrently with FERC's project-related NEPA
review, and in compliance with FERC's established schedule,
unless the agency notifies FERC in writing that doing so would
impair the ability of the agency to conduct needed analysis or
otherwise carryout the agency's obligations. Each Federal and
State agency considering an aspect of a Federal authorization
shall transmit to FERC a statement acknowledging receipt of the
schedule established by FERC. The statement shall also contain
the plan formulated to ensure completion of the Federal
authorizations in compliance with FERC's schedule. Not later
than 30 days after the agency receives an application for a
Federal authorization under section 3 of the NGA or a
certificate of public convenience and necessity under section 7
of the NGA, a Federal or State agency shall transmit to the
applicant a notice indicating whether the application is ready
for processing. If the application is not ready for processing,
the agency shall provide a comprehensive description to the
applicant of the information needed for the agency to determine
that the application is ready for processing. Each Federal and
State agency shall transmit to FERC a report once every 90 days
describing the progress made in considering an application.
Section 2(e)(3) specifies that if a Federal or State agency
fails to meet a deadline for a Federal authorization set forth
in FERC's schedule, the head of the relevant Federal agency
shall notify Congress and FERC of such failure and set forth a
recommended implementation plan to ensure completion of the
action.
Section 2(g)(1) directs Federal and State agencies
considering an aspect of an application for a Federal
authorization to identify any issues of concern that may delay
or prevent an agency from working with FERC to resolve the
identified issues and grant the authorization. FERC may forward
any identified issue of concern to the heads of relevant
agencies for resolution.
Section 2(g)(2) instructs Federal or State agencies
considering an aspect of an application for a Federal
authorization to consider any data gathered by aerial or other
remote means submitted by the applicant. The agency may grant a
conditional approval for the Federal authorization based on
data gathered by aerial or remote means, conditioned on the
verification of such data by subsequent onsite inspection.
Section 2(g)(3) specifies that FERC, and Federal and State
agencies, may allow a person applying for a Federal
authorization to fund a third-party contractor to assist in
reviewing an application.
Section 2(h) directs FERC, with input from any Federal or
State agency considering an aspect of an application, to track
and make available to the public on the Commission's website
information related to the actions required to complete a
Federal authorization.
CHANGES IN EXISTING LAW MADE BY THE BILL, AS REPORTED
This legislation does not amend any existing Federal
statute.
Minority Views
H.R. 3668, the Improving Interagency Coordination for
Pipeline Reviews Act H.R. 3668 would dismantle the ability of
states to keep their waters clean. The bill would introduce
requirements into the pipeline permitting process that are at
best duplicative and at worst would actually slow down the
process of building pipelines. It would remove states' rights
under section 401 of the Federal Water Pollution Control Act
(commonly known as the Clean Water Act, or CWA) (33 U.S.C.
1341) to issue Water Quality Certificates to natural gas
pipeline projects that discharge into their navigable waters.
Subsection 2(e) of the bill would transfer CWA section 401
authority from states to the Federal Energy Regulatory
Commission (FERC) for the purposes of permitting natural gas
pipelines. It would then merely allow states to propose terms
or conditions upon which FERC could insist in a certificate for
a natural gas pipeline pursuant to section 7 of the Natural Gas
Act (NGA) or an authorization for a liquified natural gas (LNG)
facility pursuant to section 3 of the NGA, but would restrict
the circumstances under which FERC could accept such a
condition.\1\ The bill would put the onus of CWA section 401
compliance on FERC, which currently lacks the expertise and
staffing necessary.\2\ Forcing FERC to be responsible for CWA
section 401 compliance will either delay pipelines, as FERC
acquires the necessary expertise and experience, or expose
pipelines to litigation risk on a potentially unsound permit.
---------------------------------------------------------------------------
\1\H.R. 3668 Sec. 2(e).
\2\House Committee on Energy and Commerce, Responses to Questions
for the Record from Terry Turpin, Director, Office of Energy Projects,
Federal Energy Regulatory Commission, Hearing on Assuring Abundant,
Reliable American Energy to Power Innovation, 119th Cong. (Apr. 30,
2024).
---------------------------------------------------------------------------
During a legislative hearing on H.R. 3668, the Committee
heard testimony from Kim Smaczniak that ``under existing law,
states have the ability to review discharges that result from
construction of these projects and determine whether it is
going to impact their state waters . . . The states
are the ones who are closest to the needs of their residents.
They can consider the public health impacts and the livelihood
impacts of those discharges.''\3\ These concerns are not
hypothetical. In 2020, the state of New York denied a Water
Quality Certificate to Williams' Northeast Supply Enhancement
Project, a pipeline project that would have installed 17 miles
of natural gas pipelines into New York state waters because it
found that the pipeline applicant was unable to demonstrate
compliance with New York's water quality standards. In
particular, the state doubted that Williams would be able to
comply with mercury standards.\4\ If H.R. 3668 had been law at
the time of Williams' application, New York would have been
unable to enforce its own clean water laws. The majority is
often fond of talking about states' rights, particularly when
it comes to the ability of states to set their own policies for
electricity generation. It appears they hold no such regard for
state clean water laws.
---------------------------------------------------------------------------
\3\House Committee on Energy and Commerce, Testimony of Kim
Smaczniak, Partner, Roselle LLP, Hearing on Assuring Abundant, Reliable
American Energy to Power Innovation, 119th Cong. (Apr. 30, 2024).
\4\Letter from Daniel Whitehead, Director, Division of
Environmental Permits, New York State Department of Environmental
Conservation, to Joseph Dean, Manager, Environmental Health and Safety,
Transcontinental Gas Pipe Line Company, LLC (May 15, 2020).
---------------------------------------------------------------------------
Moreover, the bill is a bad solution in search of a
problem. The majority's report alleges that ``there is growing
evidence that pipeline infrastructure approvals are being
delayed unnecessarily due to a lack of coordination or
insufficient action among agencies involved in the permitting
process''' but offers no evidence to support its assertion. In
fact, the Committee received contrary testimony from Terry
Turpin, who testified that:
``. . . the Commission's current processes are
thorough and have resulted in the timely approval of
necessary interstate natural gas pipeline and storage
facilities as well as natural gas import or export
facilities. These processes ensure legally durable
Commission decision-making and orders. Since 2015, the
Commission has authorized over 8,100 miles of
interstate natural gas pipeline totaling more than 132
billion cubic feet per day of transportation capacity
and over 180 billion cubic feet of interstate storage
capacity. Over that same period, the Commission has
issued 44 orders authorizing LNG facility construction,
expansions, or capacity uprates. The Commission has
also issued 23 NGA section 3 authorizations and
Presidential Permits for border crossing facilities
over the last ten years.''\5\
---------------------------------------------------------------------------
\5\House Committee on Energy and Commerce, Testimony of Terry
Turpin, Director, Office of Energy Projects, Federal Energy Regulatory
Commission, Hearing on Assuring Abundant, Reliable American Energy to
Power Innovation, 119th Cong. (Apr. 30, 2024).
This aligns with previous testimony the Committee has
received that FERC has processed 88 percent of pipeline
projects applying for a certificate within a year, and
testimony then-FERC Chairman Richard Glick gave before the
Senate Committee on Energy and Natural Resources that the time
to approve pipeline certificates had not significantly departed
from prior years.\6\\7\ Even to the extent that one believes
the majority's argument that pipeline approval timelines are a
significant barrier to expanding pipeline capacity, it is clear
that CWA section 401 approvals are typically not a limiting
factor. In response to a direct question by Rep. Allen (R GA)
on section 401 permits, Mr. Turpin responded that, ``I think,
historically, we haven't seen much problem with the 401s.''\8\
In response to this testimony, Rep. Menendez (D-NJ) offered an
amendment at the Subcommittee markup that would have struck
section 2(e) and clarified that nothing in the bill would
impact a state's right to issue a section 401 Water Quality
Certification under the CWA. The amendment was defeated on a
party-line vote.\9\
---------------------------------------------------------------------------
\6\House Committee on Energy and Commerce, Testimony of Terry
Turpin, Director, Office of Energy Projects, Federal Energy Regulatory
Commission, Hearing on Legislation Addressing Pipeline and Hydropower
Infrastructure Modernization, 117th Cong. (May 3, 2017).
\7\Congressional Research Service, Interstate Natural Gas Pipeline
Siting: FERC Policy and Issues for Congress (June 9, 2022) (R45239).
\8\See note 5.
\9\House Committee on Energy and Commerce, Subcommittee on Energy,
Markup of 13 Bills, 119th Cong. (June 5, 2025).
---------------------------------------------------------------------------
The focus on section 2(e) is not meant to imply that the
other portions of the bill are acceptable. They broadly seem
duplicative of current FERC practice, especially as modified by
the amendments made to the National Environmental Policy Act in
2023 and with the recent Supreme Court decision in Seven County
Infrastructure Coalition v. Eagle County. Furthermore, the
requirement in section 2(f) that a final decision on any
Federal authorization required for a natural gas certificate or
LNG facility authorization be made within 90 days of FERC's
finalizing its environmental review could conflict with current
practices by pipeline developers to stagger or sequence their
applications for necessary authorizations.\10\
---------------------------------------------------------------------------
\10\See note 5.
---------------------------------------------------------------------------
This is the fourth time in a decade that Republicans have
attempted to move this bill, or similar language, through the
Committee.\11\ It has yet to become law. If Republicans are
truly interested in ``energy dominance'' or any durable change
to our energy statutes to broadly make energy in this country
more affordable, they must recognize that is a bigger
conversation than just pipelines and natural gas. It would
involve substantial fixes to the way we plan, permit, and pay
for our power grid, and would require the Trump Administration
to cease its attacks on sources of clean energy.
---------------------------------------------------------------------------
\11\H.R. 8, 114th Cong. (2015); H.R. 2910, 115th Cong. (2017); H.R.
1115, 117th Cong. (2023).
---------------------------------------------------------------------------
For the reasons stated above, I oppose this legislation.
Frank Pallone, Jr.,
Ranking Member.
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
[all]