Minority Views
[To accompany H.R. 2289]
The Committee on Energy and Commerce, to whom was referred
the bill (H.R. 2289) to provide that an eligible facilities
request under section 6409(a) of the Middle Class Tax Relief
and Job Creation Act of 2012 is not subject to requirements to
prepare certain environmental or historical preservation
reviews, having considered the same, reports favorably thereon
with amendments and recommends that the bill as amended do
pass.
CONTENTS
Page
Purpose and Summary.............................................. 24
Background and Need for Legislation.............................. 25
Committee Action................................................. 28
Committee Votes.................................................. 29
Oversight Findings and Recommendations........................... 31
New Budget Authority, Entitlement Authority, and Tax Expenditures 31
Congressional Budget Office Estimate............................. 31
Federal Mandates Statement....................................... 31
Statement of General Performance Goals and Objectives............ 31
Duplication of Federal Programs.................................. 31
Related Committee and Subcommittee Hearings...................... 31
Committee Cost Estimate.......................................... 32
Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 32
Advisory Committee Statement..................................... 32
Applicability to Legislative Branch.............................. 32
Section-by-Section Analysis of the Legislation................... 32
Changes in Existing Law Made by the Bill, as Reported............ 39
Minority, Additional, or Dissenting Views........................ 114
Exchange of Letters With Additional Committees of Referral....... 116
The amendments are as follows:
Strike out all after the enacting clause and insert the
following:
SECTION 1. SHORT TITLE; TABLE OF CONTENTS.
(a) Short Title.--This Act may be cited as the ``American Broadband
Deployment Act of 2025''.
(b) Table of Contents.--The table of contents for this Act is as
follows:
Sec. 1. Short title; table of contents.
TITLE I--STATE AND LOCAL SITING PROCESSES
Sec. 101. Preservation of local zoning authority.
Sec. 102. Removal of barriers to entry.
Sec. 103. Requests for modification of certain existing wireless and
wireline communications facilities.
TITLE II--CABLE
Sec. 201. Request for new franchise.
Sec. 202. Request regarding placement, construction, or modification of
cable equipment.
Sec. 203. Cable franchise term and termination.
Sec. 204. Sales of cable systems.
TITLE III--ENVIRONMENTAL AND HISTORIC PRESERVATION REVIEWS
Sec. 301. Application of NEPA and NHPA to certain communications
projects.
Sec. 302. Presumption with respect to certain complete FCC forms.
Sec. 303. Rule of construction.
Sec. 304. Definitions.
TITLE IV--OTHER MATTERS
Sec. 401. Timely consideration of applications for Federal easements,
rights-of-way, and leases.
Sec. 402. Report on fees.
TITLE I--STATE AND LOCAL SITING PROCESSES
SEC. 101. PRESERVATION OF LOCAL ZONING AUTHORITY.
Section 332(c) of the Communications Act of 1934 (47 U.S.C. 332(c))
is amended by striking paragraph (7) and inserting the following:
``(7) Preservation of local zoning authority.--
``(A) General authority.--Except as provided in this
paragraph, nothing in this Act shall limit or affect
the authority of a State or local government or
instrumentality thereof over decisions regarding the
placement, construction, or modification of personal
wireless service facilities.
``(B) Limitations.--
``(i) In general.--The regulation of the
placement, construction, or modification of a
personal wireless service facility by any State
or local government or instrumentality
thereof--
``(I) shall not discriminate among
personal wireless service facilities or
providers of communications service,
including by providing exclusive or
preferential use of facilities to a
particular provider or class of
providers of personal wireless service;
and
``(II) shall not prohibit or have the
effect of prohibiting the provision,
improvement, or enhancement of personal
wireless service.
``(ii) Engineering standards; aesthetic
requirements.--It is not a violation of clause
(i) for a State or local government or
instrumentality thereof to establish for
personal wireless service facilities, or
structures that support such facilities,
objective, reasonable, and nondiscriminatory--
``(I) structural engineering
standards based on generally applicable
codes;
``(II) safety requirements (subject
to clause (vi)); or
``(III) aesthetic or concealment
requirements, unless such requirements
prohibit or have the effect of
prohibiting the installation or
modification of such facilities or
structures.
``(iii) Timeframes.--
``(I) In general.--A State or local
government or instrumentality thereof
shall grant or deny a request for
authorization to place, construct, or
modify a personal wireless service
facility not later than--
``(aa) in the case of a
request for authorization to
place, construct, or modify a
personal wireless service
facility that is not a small
personal wireless service
facility--
``(AA) if the request
is for authorization to
place, construct, or
modify such facility
using an existing
structure, including
with respect to an area
that has not previously
been zoned for personal
wireless service
facilities (other than
small personal wireless
service facilities), 90
days after the date on
which the request is
submitted by the
requesting party to the
government or
instrumentality; or
``(BB) if the request
is for any other action
relating to such
facility, 150 days
after the date on which
the request is
submitted by the
requesting party to the
government or
instrumentality; and
``(bb) in the case of a
request for authorization to
place, construct, or modify a
small personal wireless service
facility--
``(AA) if the request
is for authorization to
place, construct, or
modify such facility
using an existing
structure, including
with respect to an area
that has not previously
been zoned for personal
wireless service
facilities, 60 days
after the date on which
the request is
submitted by the
requesting party to the
government or
instrumentality; or
``(BB) if the request
is for any other action
relating to such
facility, 90 days after
the date on which the
request is submitted by
the requesting party to
the government or
instrumentality.
``(II) Treatment of batched
requests.--In the case of requests
described in subclause (I) that are
submitted as part of a single batch by
the requesting party to the government
or instrumentality on the same day, the
applicable timeframe under such
subclause for each request in the batch
shall be the longest timeframe under
such subclause that would be applicable
to any request in the batch if such
requests were submitted separately.
``(III) Applicability.--The
applicable timeframe under subclause
(I) shall apply collectively to all
proceedings, including related permits
and authorizations, required by a State
or local government or instrumentality
thereof for the approval of the
request.
``(IV) No moratoria.--A timeframe
under subclause (I) may not be tolled
by any moratorium, whether express or
de facto, imposed by a State or local
government or instrumentality thereof
on the submission, acceptance, or
consideration of any request for
authorization to place, construct, or
modify a personal wireless service
facility.
``(V) Tolling due to
incompleteness.--
``(aa) Initial request
incomplete.--
``(AA) Small personal
wireless service
facilities.--If, not
later than 10 days
after the date on which
a requesting party
submits to a State or
local government or
instrumentality thereof
a request for
authorization to place,
construct, or modify a
small personal wireless
service facility, the
government or
instrumentality
provides to the
requesting party a
written notice
described in item (cc)
with respect to the
request, the timeframe
described in subclause
(I) is tolled with
respect to the request
and shall restart at
zero on the date on
which the requesting
party submits to the
government or
instrumentality a
supplemental submission
in response to the
notice.
``(BB) Other personal
wireless service
facilities.--If, not
later than 30 days
after the date on which
a requesting party
submits to a State or
local government or
instrumentality thereof
a request for
authorization to place,
construct, or modify a
personal wireless
service facility that
is not a small personal
wireless service
facility, the
government or
instrumentality
provides to the
requesting party a
written notice
described in item (cc)
with respect to the
request, the timeframe
described in subclause
(I) is tolled with
respect to the request
until the date on which
the requesting party
submits to the
government or
instrumentality a
supplemental submission
in response to the
notice.
``(bb) Supplemental
submission incomplete.--If, not
later than 10 days after the
date on which a requesting
party submits to a State or
local government or
instrumentality thereof a
supplemental submission in
response to a written notice
described in item (cc), the
government or instrumentality
provides to the requesting
party a written notice
described in item (cc) with
respect to the supplemental
submission, the timeframe under
subclause (I) is further tolled
until the date on which the
requesting party submits to the
government or instrumentality a
subsequent supplemental
submission in response to the
notice.
Purpose and Summary
H.R. 2289, the ``American Broadband Deployment Act'' was
introduced by Representative Buddy Carter on March 24, 2025.
H.R. 2289 would streamline the broadband permitting process at
the federal, state, and local level. It would amend the
Communications Act of 1934 by establishing predictable
timeframes for state and local permitting processes related to
broadband deployment. It would also cap fees state and local
governments charge for permit application reviews and use of
public rights-of-way, requiring that those fees be based on
actual costs.
Additionally, H.R. 2289 would reform the cable franchising
process. It would establish predictable timeframes for reviews
of requests for new franchises and expansion of cable systems.
It would also clarify and make more transparent the terms for
franchises and streamline the process for transferring cable
systems.
H.R. 2289 would also exempt certain broadband-deployment
projects from environmental and historic preservation reviews
and codify the Tribal notification process for new wireless
infrastructure.
Finally, H.R. 2289 would deem granted applications to
deploy broadband on federal lands that remain pending beyond
the existing 270-day timeframe for such reviews. It would also
require the National Telecommunications and Information
Administration (NTIA) to report on fees charged by state and
local governments related to projects funded by grants from the
Broadband Equity, Access, and Deployment (BEAD) program.
Background and Need for Legislation
The United States faces a persistent digital divide.
According to the Federal Communications Commission,
approximately 5.8 million homes and businesses lack access to
fixed broadband at 25 Mbps download/3 Mbps upload, while 31
percent of the geographic area of the United States lacks 4G
LTE mobile broadband coverage at speeds of 5 Mbps/1 Mbps.\1\
The federal government has dedicated billions of dollars to
address this need, most recently through the Infrastructure
Investment and Jobs Act (IIJA) to support broadband deployment,
digital equity, and affordability needs.\2\
---------------------------------------------------------------------------
\1\FCC National Broadband Map, Fed. Commc'n. Comm'n., https://
broadbandmap.fcc.gov/home (last updated Sept. 3, 2025).
\2\Infrastructure Investment and Jobs Act, P.L. 117-58, div. F,
tit. I Sec. 60101 et seq. (2021).
---------------------------------------------------------------------------
Before a broadband provider can begin deploying (or
modifying) broadband infrastructure, however, they must secure
zoning and construction permits, pay application fees, and
conduct environmental and historic preservation reviews. This
process often requires cooperation among providers, federal
agencies, and state and local governments. But the
unpredictable timelines for permit approvals and high fees for
processing applications have made it more expensive and
burdensome to deploy broadband infrastructure.\3\ Streamlining
these regulations is essential to encourage and expedite
broadband infrastructure deployment throughout the United
States, and ensure federal funding is not wasted due to
unnecessary permitting delays or fees.
---------------------------------------------------------------------------
\3\Breaking Barriers: Streamlining Permitting to Expedite Broadband
Deployment, Hearing before the Sub. on Commc'n. and Tech., H. Comm. on
Energy and Commerce, 118th Cong. (2023) (``Permitting Hearing'')
(Written Testimony of Michael O'Rielly at 3); see, e.g., Streamlining
Federal Siting Working Group Final Report, FCC Broadband Deployment
Advisory Committee (Jan. 23-24, 2018), https://www.fcc.gov/sites/
default/files/bdac-federalsiting-01232018.pdf (discussing Federal
regulatory barriers to broadband deployment); Report Of The Removal of
State and Local Regulatory Barriers Working Group, FCC Broadband
Deployment Advisory Committee (Jan. 10, 2018); https://www.fcc.gov/
sites/default/files/bdac-regulatorybarriers-01232018.pdf (discussing
State and local barriers).
---------------------------------------------------------------------------
FEDERAL BARRIERS
The federal government manages a significant amount of land
through the Department of the Interior (Bureau of Land
Management (BLM), National Parks Service, Fish and Wildlife
Service) and the Department of Agriculture (Forest Service
(USFS), in addition to federal buildings across the country. As
a result, these agencies are responsible for reviewing and
approving applications to deploy broadband on federal property.
Federal agencies, however, often take significant time to
review these applications, which results in project delays.\4\
To address this, Congress directed the General Services
Administration to develop a common form for applications to
place communications facilities on federal property, and set a
270-day shot clock for granting or denying such
applications.\5\ Nonetheless, since establishing the shot
clock, 36 percent of BLM and USFS permit reviews took more than
270 days.\6\ And despite Congressional direction and
interagency recommendations for improvement, many challenges
remain unaddressed.\7\ For example, not all federal agencies
use an online application portal for processing broadband
installation applications, which may result in uncertainty or
unnecessary delay.
---------------------------------------------------------------------------
\4\Id.; See also U.S. Gov't Accountability Off., GAO-24-106157,
Broadband Deployment: Agencies Should Take Steps to Better Meet
Deadline for Processing Permits, at 13 (2024) (GAO Broadband Permitting
Report); See also Linda Hardesty, Whoa--The Fiber Permitting Process
Could Crush Digital Divide Dreams, Fierce Telecom (Dec. 9, 2021),
https://www.fiercetelecom.com/broadband/whoa-fiber-permitting-process-
could-crush-digital-divide-dreams (describing federal approvals needed
to deploy broadband).
\5\47 U.S.C. Sec. 1455(b)(2), (3).
\6\GAO Broadband Permitting Report, supra note 4, at 13.
\7\See Nat'l Telecomm. Info. Admin. (NTIA), Final Report on Status
of Implementation of MOBILE NOW Act Section 606(c) Requirements, at 4
(2020), https://ntia.gov/sites/default/files/publications/
mobile_now_act_section_606c_report_2022.pdf.
---------------------------------------------------------------------------
Other federal laws complicate broadband infrastructure
deployment. The National Historic Preservation Act (NHPA)\8\
and
---------------------------------------------------------------------------
\8\54 U.S.C. Sec. Sec. 300101 et seq.
---------------------------------------------------------------------------
the National Environmental Policy Act of 1969 (NEPA)\9\
create obstacles to deployment due to costly and cumbersome
required reviews,\10\ though federal agencies have attempted to
expedite these processes. For example, the National
Telecommunications and Information Administration (NTIA) has
established 30 categorical exclusions under NEPA (in addition
to 11 previously set by the Department of Commerce).\11\ NTIA
also requires states to use the Environmental Screening and
Permitting Tracking Tool to expedite NEPA approvals within two
weeks for approximately 90 percent of Broadband Equity, Access,
and Deployment (BEAD) projects and to eliminate approximately
3-6 months of environmental processing per project.\12\ But not
all streamlining efforts have succeeded. In 2018, the FCC tried
to exempt small-cell wireless antenna construction from NHPA
and NEPA reviews,\13\ but the U.S. Court of Appeals for the
District of Columbia Circuit vacated that action.\14\ In August
2025, the Commission adopted a Notice of Proposed Rulemaking
(NPRM) seeking comment on updating its NEPA and NHPA rules
related to wireless infrastructure.\15\
---------------------------------------------------------------------------
\9\42 U.S.C. Sec. Sec. 4321 et seq.
\10\Commerce OIG Report, supra note 3, at 6.
\11\NTIA, Guidance on NTIA National Environmental Policy Act
Compliance (June 2025), https://broadbandusa.ntia.gov/sites/default/
files/2025-06/NTIA_NEPA_Procedures_June_2025.pdf.
\12\NTIA, Broadband Equity, Access, and Deployment (BEAD) Program:
BEAD Restructuring Policy Notice (June 6, 2025), https://www.ntia.gov/
sites/default/files/2025-06/bead-restructuring-policy-notice.pdf.
\13\Accelerating Wireless Broadband Deployment by Removing Barriers
to Infrastructure Investment, WT Docket No. 17-79, Second Report and
Order, 33 FCC Rcd. 3102 (2018).
\14\United Keetoowah Band of Cherokee Indians in Oklahoma v. FCC,
933 F.3d 728 (D.C. Cir. 2019) (vacating an FCC order eliminating NEPA
and NHPA requirements as arbitrary and capricious for failing to
justify that public interest did not require review of small cell
deployments).
\15\Modernizing the Commission's National Environmental Policy Act
Rules, WT Docket No. 25-217, Notice of Proposed Rulemaking, FCC 25-47
(rel. Aug. 14, 2025) (available in the Federal Register at 90 Fed. Reg.
40295).
---------------------------------------------------------------------------
The FCC also addressed the Tribal notification process
under its rules implementing NHPA.\16\ The FCC's Nationwide
Programmatic Agreement Regarding the Section 106 National
Historic Preservation Act Review Process directs a provider
seeking to deploy a wireless tower to provide ``all information
reasonably necessary for [an] Indian Tribe or [Native Hawaiian
Organization] to evaluate whether Historic Properties of
religious and cultural significance may be affected'' and
provide the Tribe with a reasonable opportunity to respond.\17\
The FCC's Forms 620 and 621 provide this information--Form 620
addresses new towers and Form 621 addresses collocations.
---------------------------------------------------------------------------
\16\2018 NEPA/NHPA Order 104-113.
\17\Nationwide Programmatic Agreement for Review of Effects on
Historic Properties for Certain Undertakings Approved by the Federal
Communications Commission, 47 C.F.R. pt.1, Appx. C Sec. IV.F.
---------------------------------------------------------------------------
In the 2018 NEPA/NHPA Order, the FCC required applicants to
provide all potentially affected Tribes with a Form 620/621 and
clarified the timeframe for Tribes to respond to the
submission. The FCC established a 45-day process for moving
forward with construction in cases in which the Tribe does not
respond after having been given the opportunity to review a
Form 620/621 submission.\18\ If an applicant does not receive a
response within 30 calendar days of the date the Tribe can be
shown or may reasonably be expected to have received
notification that the Form 620/621 submission, the applicant
can refer the matter to the FCC for follow-up, and the FCC will
inform the Tribe that it has 15 calendar days to respond. If
the Tribe still does not respond, the applicant's pre-
construction obligations are discharged with respect to that
Tribe. The FCC also determined that ``the detailed information
included in the Form 620/621 submission packet constitutes a
reasonable and good faith effort to provide the information
reasonably necessary for [Tribes] to ascertain whether historic
properties of religious and cultural significance to them may
be affected by the undertaking.''\19\
---------------------------------------------------------------------------
\18\2018 NEPA/NHPA Order 111.
\19\Id. 106.
---------------------------------------------------------------------------
STATE AND LOCAL OBSTACLES
State and local governments play a key role in
facilitating, or hindering, broadband infrastructure
deployment. They regulate land use, review siting applications,
and issue relevant permits. State and local governments' review
processes can be inconsistent with each other and costly, which
can delay or even effectively prevent broadband deployment. For
example, some state and local governments charge excessive fees
for applications or to access the public rights-of-way for
construction, and they often impose no deadlines for review of
applications.\20\
---------------------------------------------------------------------------
\20\Accelerating Wireless Broadband Deployment by Removing Barriers
to Infrastructure Investment, WT Docket No. 17-79, WC Docket No. 17-84,
Declaratory Ruling and Third Report and Order, 33 FCC Rcd. 9088 (2018).
---------------------------------------------------------------------------
These challenges persist notwithstanding federal law
preempting state and local authority to regulate communications
facilities. Under Section 253 of the Communications Act of
1934, ``no State or local statute or regulation, or other State
or local legal requirement, may prohibit or have the effect of
prohibiting the ability of any entity to provide any interstate
or intrastate telecommunications service.''\21\ Section 253
requires the Commission to preempt the enforcement of any such
law.\22\ Similarly, Section 332(c)(7) of the Communications Act
states that ``[t]he regulation of the placement, construction,
and modification of personal wireless service facilities by any
State or local government or instrumentality thereof . . .
shall not prohibit or have the effect of prohibiting the
provision of personal wireless services.''\23\
---------------------------------------------------------------------------
\21\47 U.S.C. Sec. 253(a).
\22\Id. at Sec. 253(d).
\23\47 U.S.C. Sec. 332(c)(7)(B)(i).
---------------------------------------------------------------------------
The FCC has used its authority to address state and local
barriers to broadband infrastructure deployment, particularly
from 2018-2020. In 2018, the Commission streamlined state and
local government review of wireless small-cell siting
applications by limiting application fees these governments
could charge an applicant, setting new shot clocks for small-
cell wireless facilities (60 days for collocation of antennas
on existing structures and 90 days for new facilities),
codifying existing presumptive timeframes for non-small cell
wireless deployments, and adopting a new remedy for failing to
act within the shot-clock period.\24\ The FCC also declared
that state and local governments cannot ban the deployment of
telecommunications services or facilities or enact de facto
bans, such as blanket refusals to process applications,
refusals to issue permits for a category of structures, or
frequent and lengthy delays.\25\ In 2020, the FCC clarified
when shot clocks begin, how certain aspects of proposed
modifications affect eligibility for streamlined review, and
when FCC applicants need to submit environmental assessments
based only on potential impacts to historic properties.\26\
Local governments challenged these actions in federal court,
but the FCC prevailed each time.\27\
---------------------------------------------------------------------------
\24\Accelerating Wireless Broadband Deployment by Removing Barriers
to Infrastructure Investment, WT Docket No. 17-79, WC Docket No. 17-84,
Declaratory Ruling and Third Report and Order, 33 FCC Rcd. 9088 (2018).
\25\Accelerating Wireline Broadband Deployment by Removing Barriers
to Infrastructure Investment, WC Docket No. 17-84, WT Docket No. 17-79,
Third Report and Order and Declaratory Ruling, 33 FCC Rcd. 7705 (2018);
see also 47 U.S.C. Sec. 253.
\26\Id.
\27\City of Portland v. United States, 969 F.3d 1020 (9th Cir.
2020) (generally upholding the 2018 FCC infrastructure orders); League
of Calif. Cities v. FCC, 118 F.4th 995 (9th Cir. 2024) (upholding the
2020 FCC infrastructure order).
---------------------------------------------------------------------------
Although these FCC actions have helped accelerate broadband
infrastructure deployment, the litigation surrounding these
rules and the risk that they could change with new
administrations underscores the need for codification.
Committee Action
On March 5, 2025, the Subcommittee on Communications and
Technology held a hearing entitled, ``Fixing Biden's Broadband
Blunder.'' The Subcommittee received testimony from:
Grant Spellmeyer, President and CEO, ACA
Connects
Tim Donovan, President and CEO, Competitive
Carriers Association
Greg Hale, CEO, LTC Connect
Sarah Morris, Former Acting Deputy
Administrator, National Telecommunications and
Information Administration
On September 18, 2025, the Subcommittee on Communications
and Technology held a legislative hearing entitled, ``Examining
Solutions to Expedite Broadband Permitting.'' The Subcommittee
received testimony from:
Jonathan Spalter, President and CEO,
USTelecom--The Broadband Association
Patrick Halley, President and CEO, Wireless
Infrastructure Association
Staci Pies, Senior Vice President of
Government Affairs and Policy, INCOMPAS
Drew Garner, Director of Policy Engagement,
Benton Institute for Broadband & Society
On November 18, 2025, the Subcommittee on Communications
and Technology met in open markup session and forwarded H.R.
2289, as amended, to the full Committee by a record vote of 16
yeas and 12 nays. On December 3, 2025, the full Committee on
Energy and Commerce met in open markup session and ordered H.R.
2289, as amended, favorably reported to the House by a record
vote of 26 yeas and 24 nays.
Committee Votes
Clause 3(b) of rule XIII requires the Committee to list the
record votes on the motion to report legislation and amendments
thereto. The following reflects the record votes taken during
the Committee consideration:
Oversight Findings and Recommendations
Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII, the Committee held a hearing and made findings that
are reflected in this report.
New Budget Authority, Entitlement Authority, and Tax Expenditures
Pursuant to clause 3(c)(2) of rule XIII, the Committee
finds that H.R. 2289 would result in no new or increased budget
authority, entitlement authority, or tax expenditures or
revenues.
Congressional Budget Office Estimate
Pursuant to clause 3(c)(3) of rule XIII, at the time this
report was filed, the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974 was not available.
Federal Mandates Statement
The Committee adopts as its own the estimate of Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
Statement of General Performance Goals and Objectives
Pursuant to clause 3(c)(4) of rule XIII, the general
performance goal or objective of this legislation is to
expedite broadband deployment by streamlining the permitting
process at the federal, state, and local level.
Duplication of Federal Programs
Pursuant to clause 3(c)(5) of rule XIII, no provision of
H.R. 2289 is known to be duplicative of another Federal
program, including any program that was included in a report to
Congress pursuant to section 21 of Public Law 111-139 or the
most recent Catalog of Federal Domestic Assistance.
Related Committee and Subcommittee Hearings
Pursuant to clause 3(c)(6) of rule XIII, the following
related hearing was used to develop or consider H.R. 2289:
On March 5, 2025, the Subcommittee on
Communications and Technology held a hearing entitled,
``Fixing Biden's Broadband Blunder.'' The Subcommittee
received testimony from:
Grant Spellmeyer, President and
CEO, ACA Connects
Tim Donovan, President and CEO,
Competitive Carriers Association
Greg Hale, CEO, LTC Connect
Sarah Morris, Former Acting
Deputy Administrator, National
Telecommunications and Information
Administration
On September 18, 2025, the Subcommittee on
Communications and Technology held a hearing on H.R.
1665. The title of the hearing was ``Examining
Solutions to Expedite Broadband Permitting.'' The
Subcommittee received testimony from:
Jonathan Spalter, President and
CEO, USTelecom--The Broadband Association
Patrick Halley, President and
CEO, Wireless Infrastructure Association;
Patrick Halley, President and
CEO, Wireless Infrastructure Association; and,
Drew Garner, Director of Policy
Engagement, Benton Institute for Broadband &
Society
Committee Cost Estimate
Pursuant to clause 3(d)(1) of rule XIII, the Committee
adopts as its own the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974. At the time this report was
filed, the estimate was not available.
Earmark, Limited Tax Benefits, and Limited Tariff Benefits
Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the
Committee finds that H.R. 2289 contains no earmarks, limited
tax benefits, or limited tariff benefits.
Advisory Committee Statement
No advisory committees within the meaning of section 5(b)
of the Federal Advisory Committee Act were created by this
legislation.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Section-by-Section Analysis of the Legislation
Section 1. Short title
This Section designates that the short title may be cited
as the ``American Broadband Deployment Act of 2023''. It also
includes the table of contents for this legislation.
Section 101. Preservation of local zoning authority
Section 101 replaces section 332(c)(7) of the
Communications Act of 1934 with a new paragraph (c)(7)
governing State and local authority over personal wireless
service facilities. The provision preserves the general
authority of State and local governments over zoning decisions
related to the placement, construction, and modification of
personal wireless service facilities, subject to specific
federal limitations set forth in the paragraph.
The new paragraph would prohibit State and local
governments from discriminating among personal wireless service
facilities or providers of communications services, including
by granting exclusive or preferential access, and from
prohibiting or effectively prohibiting the provision,
improvement, or enhancement of personal wireless service. The
``prohibit or have the effect of prohibiting'' language matches
existing language in Section 332(c)(7), and the Committee
intends this language to be interpreted in the same way,
specifically adopting the ``materially inhibit'' standard used
in the FCC's 1997 California Payphone decision.\28\
---------------------------------------------------------------------------
\28\California Payphone Ass'n, 12 FCC Rcd 14191 31 (1997).
---------------------------------------------------------------------------
State and local governments would be permitted to establish
objective, reasonable, and nondiscriminatory structural
engineering standards, safety requirements based on generally
applicable codes, and aesthetic or concealment requirements,
provided that aesthetic requirements do not themselves prohibit
or effectively prohibit deployment.
The section would codify specific timeframes for State and
local governments to act on wireless facility siting requests.
90 days for a request to collocate a
facility that is not a small personal wireless facility
(small cell) on an existing structure;
150 days for a request to deploy a non-small
cell facility on a new structure;
60 days for a request to collocate a small
cell on an existing structure; and
90 days for a request to deploy a small cell
on a new structure.
Batched applications are subject to the longest applicable
timeframe, and these deadlines would apply collectively to all
approvals required for the request. Governments may not toll
these deadlines by imposing moratoria, whether express or de
facto. These timeframes would apply to all proceedings required
by a State or local government for approval of the request. A
request would be considered submitted on the date on which the
applicant takes the first procedural step within its control to
submit the application in accordance with the procedures
established by the government for the review and approval of
such a request or for a standard review for a similar facility
or structure. The timeframes and batching requirements are
consistent with current FCC rules.\29\
---------------------------------------------------------------------------
\29\47 C.F.R. Sec. 1.6003(c).
---------------------------------------------------------------------------
Limited tolling would be permitted for incomplete
applications, subject to detailed written notice requirements
identifying missing information and pointing to the specific
authority requiring it, with limits on follow-up notices. A
single tolling period of up to 30 days is also permitted by
mutual agreement of the parties.
If a State or local government fails to act within the
applicable timeframe, the request is deemed granted upon
written notice from the applicant, and the requested deployment
is considered authorized without further governmental action.
Any denial must be in writing, supported by substantial
evidence in a written record, and publicly released and
provided to the applicant on the same day it is issued. The
section would further reaffirm federal preemption of State or
local regulation based on the environmental effects of
radiofrequency emissions where facilities comply with FCC
standards.
State and local governments would be permitted to charge
fees associated with review of applications or use of rights-
of-way, but such fees must be competitively neutral,
technology-neutral, nondiscriminatory, established in advance,
based on actual and direct costs, limited to objectively
reasonable expenses, and clearly disclosed, including
distinctions between recurring and nonrecurring fees and
between new and existing structures. As the FCC held in its
2018 Small Cell Order, the Committee expects that only
objectively reasonable costs may be factored into these
fees.\30\
---------------------------------------------------------------------------
\30\2018 Small Cell Order 50.
---------------------------------------------------------------------------
Any person adversely affected by a final action or failure
to act would be permitted to seek expedited judicial review in
a court of competent jurisdiction. The section expressly
preserves section 6409(a) of the Middle Class Tax Relief and
Job Creation Act of 2012 and makes FCC regulations implementing
this provision binding on reviewing courts. The section
concludes by adding definitions for key terms.
Section 102. Removal of barriers to entry
Section 102 would replace Section 253 of the Communications
Act with new language governing State and local regulation of
telecommunications services and facilities. The revised section
would provide that no State or local statute, regulation, or
legal requirement may prohibit or have the effect of
prohibiting any entity from providing, improving, or enhancing
interstate or intrastate telecommunications services. As noted
in Section 101, the use of the phrase ``prohibit or have the
effect of prohibiting'' matches existing language, with the
intent that it be interpreted consistent with the ``materially
inhibit'' standard adopted in the FCC's California Payphone
decision.
With respect to telecommunications service facilities, the
section would prohibit discrimination based on technology or
services provided and bars treating telecommunications
facilities less favorably than other facilities. State and
local governments must act on applications for placement,
construction, or modification of telecommunications facilities
within 90 days when existing infrastructure is used and within
150 days for all other requests. These deadlines apply to all
related proceedings and may not be tolled by moratoria.
The section would establish detailed completeness and
tolling procedures similar to those in section 101, including
written notice requirements for incomplete applications and a
single tolling period of up to 30 days by mutual agreement.
Failure to act within the applicable timeframe results in a
deemed grant upon written notice from the applicant, with
authorization effective without further government action.
Denials must be written, supported by substantial evidence, and
publicly released and provided to the applicant the same day.
State and local governments would be permitted to assess
fees related to application review and use of rights-of-way,
provided the fees are competitively neutral, nondiscriminatory,
established in advance, and based on objectively reasonable
actual and direct costs. Enforcement is available through
expedited judicial review, subject to a 30-day filing deadline.
The section would preserve State authority over universal
service, public safety, service quality, consumer protection,
and management of public rights-of-way, subject to the new
limitations. It would also clarify the interaction of Section
253 with other provisions of the Communications Act,
specifically Section 332(c)(3) for commercial mobile providers
or Section 621 for cable operators. The section also defines
when a request is considered submitted and defines key terms.
Sec. 103. Requests for modification of certain existing wireless and
telecommunications service facilities
Section 103 would amend Section 6409 of the Middle Class
Tax Relief and Job Creation Act of 2012 by expanding its scope
from wireless facilities to communications facilities more
broadly. The amendment would require State and local
governments to approve, and not deny, eligible requests to
modify existing wireless towers, base stations, and
telecommunications service facilities supported by eligible
infrastructure, so long as the modification does not
substantially change the physical dimensions of the facility.
The section would codify a 60-day deadline for approval of
eligible requests, after which the request is deemed granted if
the government has not acted. The provision includes detailed
rules governing determinations of eligibility, completeness
review, tolling, written notices, and supplemental submissions,
closely tracking existing FCC rules adopted in the 2014
Wireless Infrastructure Order\31\ and the 2020 5G Upgrade
Order.\32\
---------------------------------------------------------------------------
\31\Acceleration of Broadband Deployment by Improving Wireless
Facilities Siting Policies, Report & Order, 29 FCC Rcd 12865 (2014); 47
C.F.R. Sec. Sec. 6100(c)(2), (4).
\32\35 FCC Rcd 5977 14-23.
---------------------------------------------------------------------------
Requests would be considered submitted when the applicant
takes the first procedural step within its control, and State
or local governments may not require pre-application processes.
Governments may request only information reasonably related to
the proposed modification. The section would authorize
expedited judicial enforcement and directs the FCC to issue
implementing rules, applying the amendments to requests
submitted on or after enactment.
It is the Committee's intent that Section 103 be read to
preserve, to the greatest extent possible, the FCC's current
rules and interpretations of Section 6409 as established in the
2014 Wireless Infrastructure Order\33\ and 2020 5G Upgrade
Order.\34\
---------------------------------------------------------------------------
\33\See note 33.
\34\See note 36.
---------------------------------------------------------------------------
Section 201. Request for new franchise
Section 201 would amend Section 621 of the Communications
Act of 1934 by adding a new subsection (g) that would govern
the timeframe for a franchising authority to review a request
for a new cable franchise.
This new subsection would establish a 120-day deadline for
a franchising authority to approve or deny a request for a new
franchise, with any failure to act resulting in the franchise
being deemed granted. The deadline would apply to all
proceedings required for approval, and franchising authorities
may not toll the deadline through moratoria. The timeframe may
be tolled only under narrowly defined circumstances, including
for incomplete applications subject to written notice and
supplemental submission rules, or through a single mutual-
agreement tolling period. Denials must be in writing, supported
by substantial evidence, and publicly released and provided to
the applicant the day they are issued. An application is
considered submitted when the applicant takes the first
procedural step within its control.
Section 202. Request regarding placement, construction, or modification
of cable equipment
Subsection (a) would amend Section 624 of the
Communications Act by adding a new subsection (j) to address
requests regarding placement, construction, or modification of
facilities by cable operators. The section would preserve
general authority over such activities but prohibits regulation
that would prohibit or effectively prohibit a cable operator
from providing, improving, or enhancing service. As with
Sections 101 and 102, the Committee intends the phrase
``prohibit or have the effect of prohibiting'' to be
interpreted consistent with California Payphone's ``materially
inhibit'' standard.
Covered entities would be required to act on requests
within 90 days for deployments involving covered easements or
eligible support infrastructure and within 150 days for all
other requests. Failure to act results in a deemed grant. These
deadlines apply to all proceedings and may not be tolled by
moratoria, though limited tolling for incomplete applications
and by mutual agreement is permitted. The section would
authorize cost-based, neutral fees for request review, clarify
that such fees are not franchise fees, define key terms, and
apply the new rules to pending requests.
Subsection (b) of Section 202 would address pending
requests. Under subparagraph (1), the amendments to Section
624, as added by subsection (a), would apply to requests
submitted to the covered entity before the date of enactment
that have not been approved or denied, and requests submitted
to the covered entity on or after the date of enactment.
Subparagraph (2) would define the date of receipt by a covered
entity of a request.
Sec. 203. Cable franchise term and termination
Section 203 would amend sections 625 and 626 of the
Communications Act to address modification, continuation, and
termination of cable franchises. Cable operators would be
permitted to request elimination or modification of franchise
requirements during the franchise term, and franchising
authorities must grant such requests within 120 days upon a
showing of good cause, including changes in law, technology,
competitive circumstances, or commercial impracticability.
Failure to act results in a deemed grant, except for
requirements related to public, educational, or governmental
access.
The section would further provide that franchises continue
in effect until revoked or terminated under specified
procedures, limits circumstances under which franchising
authorities may revoke franchises, and establishes
administrative and judicial review processes, including
potential FCC review and stays.
The amendments made by Section 203 would be effective six
months after the enactment. This section and its amendments
would apply to franchises granted on or after the effective
date, or before that date if the franchise is in effect or if
the franchise has expired but the cable operator is still
performing under the provisions of that franchise as if the
franchise had not expired.
Sec. 204. Sales of cable systems
This section would amend Section 627 of the Communications
Act to address the sales and transfers of cable systems. If a
franchising authority acquires or transfers ownership of a
cable system following revocation, the transaction must occur
at fair market value. Franchising authorities may not prevent
transfers of franchises to entities willing to accept existing
terms, though advance notice may be required. The amendments
would become effective six months after enactment and apply to
existing and future franchises.
Section 301. Application of NEPA and NHPA to certain communications
projects
This section would exempt covered projects from reviews
that would otherwise be applicable to such projects pursuant to
Section 102(2)(C) of the National Environmental Policy Act of
1969 (NEPA) or Section 300320 of title 54, United States Code
(the National Historic Preservation Act (NHPA). Covered
projects, as defined in Section 304, are:
A project to collocate a personal wireless
facility on an existing structure or to modify a
personal wireless facility;
A
Minority Views
In November 2021, President Biden signed into law the
Infrastructure Investment and Jobs Act, or the ``Bipartisan
Infrastructure Law,'' which made historic and long overdue
investments in surface transportation, energy, healthcare, and
communications infrastructure. These investments included
$42.45 billion for the Broadband Equity, Access, and Deployment
Program to deploy broadband infrastructure to Americans who
lack reliable access to high-speed internet service.
Committee Democrats do not dispute that there are barriers
in the way of deploying broadband infrastructure. H.R. 2289
addresses none of them, unfortunately. The Republican Majority
could have worked with Democrats on comprehensive legislation
that addresses the concerns that all witnesses raised at
legislative hearings--most notably, the lack of adequate
resources and qualified personnel to review permit applications
at Federal agencies. Instead, the Republican Majority ignored
the fact that President Trump ordered the firings of thousands
of federal workers, many of whom were hired under the prior
administration specifically to cut down on permit review times.
The result is this package, which is composed of dozens of
partisan bills masquerading as legislative ``solutions'' in
search of problems, rather than addressing the very real
problem of the lack of resources that agencies need to conduct
the permitting review process.
H.R. 2289 regrettably proposes to eliminate standard
environmental and historic preservation protections that simply
do not affect the overwhelming majority of communications
infrastructure projects as suggested by Republicans. For
example, H.R. 2289 proposes blanket exemptions to the National
Environmental Policy Act (NEPA). However, many projects to
deploy communications infrastructure already qualify for
expedited review and approval under existing categorical
exclusions, which Federal agencies apply to predetermined
activities that do not have a significant environmental impact.
If a project does not qualify for an existing categorical
exclusion, the project can still be approved under an
Environmental Assessment and a Finding of No Significant
Impact. There is little evidence to suggest that communications
infrastructure projects regularly trigger the highest level of
scrutiny under NEPA, which require applicants to develop and
submit an Environmental Impact Statement, let alone warrant the
proposed blanket NEPA exemptions.
Perhaps most troubling are H.R. 2289's provisions to
eliminate local communities' roles in decision-making over the
placement and construction of utility infrastructure. The bill
imposes heavy-handed ``deemed granted'' provisions on local
governments by setting narrow and arbitrary deadlines to
approve requests to install communications infrastructure in
areas managed by county or municipal governments. The 60-day
``shot clock'' to approve or deny an application implies an
unfamiliarity with the realities of local government calendars.
At the local level, construction application and review
processes are often designed to comply with ``sunshine'' laws
to ensure transparency and provide residents with sufficient
opportunity to be heard on important community matters. While
the Republican Majority seems intent on helping big
corporations evade scrutiny in communities they wish to serve,
Democrats understand that our friends and neighbors who serve
our communities as mayors, council members, and local zoning
board members represent the best interests of their
constituents, and they disagree with attempts by Republicans to
constrain their ability to do so.
Local officials are responsible for ensuring the safety and
welfare of residents. Efforts like this bill by House
Republicans to automatically approve certain construction
projects will put people in harm's way. Communications
providers that proceed with construction without the proper
approvals from state, county, or municipal governments should
recognize the liability to which they are exposing themselves.
These are just some of the reasons why H.R. 2289 is opposed by
the National League of Cities, United States Conference of
Mayors, the National Association of Counties, and the National
Association of Telecommunications Officers and Advisors.
If Committee Republicans were truly committed to expediting
the deployment of high-speed internet to rural communities,
they should have advocated that the Trump Administration carry
out the Bipartisan Infrastructure Law as intended. Instead, the
Trump Administration, with the support of Congressional
Republicans, has delayed progress by at least a year just to
change program rules that force inferior broadband technologies
onto unserved and underserved communities across the country.
Frank Pallone, Jr.,
Ranking Member.
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
[all]