house · Committee report

H. Rept. 119-614

AMERICAN BROADBAND DEPLOYMENT ACT OF 2025

2026-04-15

Committees

Associated legislation

Text

Minority Views

[To accompany H.R. 2289] The Committee on Energy and Commerce, to whom was referred the bill (H.R. 2289) to provide that an eligible facilities request under section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012 is not subject to requirements to prepare certain environmental or historical preservation reviews, having considered the same, reports favorably thereon with amendments and recommends that the bill as amended do pass. CONTENTS Page Purpose and Summary.............................................. 24 Background and Need for Legislation.............................. 25 Committee Action................................................. 28 Committee Votes.................................................. 29 Oversight Findings and Recommendations........................... 31 New Budget Authority, Entitlement Authority, and Tax Expenditures 31 Congressional Budget Office Estimate............................. 31 Federal Mandates Statement....................................... 31 Statement of General Performance Goals and Objectives............ 31 Duplication of Federal Programs.................................. 31 Related Committee and Subcommittee Hearings...................... 31 Committee Cost Estimate.......................................... 32 Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 32 Advisory Committee Statement..................................... 32 Applicability to Legislative Branch.............................. 32 Section-by-Section Analysis of the Legislation................... 32 Changes in Existing Law Made by the Bill, as Reported............ 39 Minority, Additional, or Dissenting Views........................ 114 Exchange of Letters With Additional Committees of Referral....... 116 The amendments are as follows: Strike out all after the enacting clause and insert the following: SECTION 1. SHORT TITLE; TABLE OF CONTENTS. (a) Short Title.--This Act may be cited as the ``American Broadband Deployment Act of 2025''. (b) Table of Contents.--The table of contents for this Act is as follows: Sec. 1. Short title; table of contents. TITLE I--STATE AND LOCAL SITING PROCESSES Sec. 101. Preservation of local zoning authority. Sec. 102. Removal of barriers to entry. Sec. 103. Requests for modification of certain existing wireless and wireline communications facilities. TITLE II--CABLE Sec. 201. Request for new franchise. Sec. 202. Request regarding placement, construction, or modification of cable equipment. Sec. 203. Cable franchise term and termination. Sec. 204. Sales of cable systems. TITLE III--ENVIRONMENTAL AND HISTORIC PRESERVATION REVIEWS Sec. 301. Application of NEPA and NHPA to certain communications projects. Sec. 302. Presumption with respect to certain complete FCC forms. Sec. 303. Rule of construction. Sec. 304. Definitions. TITLE IV--OTHER MATTERS Sec. 401. Timely consideration of applications for Federal easements, rights-of-way, and leases. Sec. 402. Report on fees. TITLE I--STATE AND LOCAL SITING PROCESSES SEC. 101. PRESERVATION OF LOCAL ZONING AUTHORITY. Section 332(c) of the Communications Act of 1934 (47 U.S.C. 332(c)) is amended by striking paragraph (7) and inserting the following: ``(7) Preservation of local zoning authority.-- ``(A) General authority.--Except as provided in this paragraph, nothing in this Act shall limit or affect the authority of a State or local government or instrumentality thereof over decisions regarding the placement, construction, or modification of personal wireless service facilities. ``(B) Limitations.-- ``(i) In general.--The regulation of the placement, construction, or modification of a personal wireless service facility by any State or local government or instrumentality thereof-- ``(I) shall not discriminate among personal wireless service facilities or providers of communications service, including by providing exclusive or preferential use of facilities to a particular provider or class of providers of personal wireless service; and ``(II) shall not prohibit or have the effect of prohibiting the provision, improvement, or enhancement of personal wireless service. ``(ii) Engineering standards; aesthetic requirements.--It is not a violation of clause (i) for a State or local government or instrumentality thereof to establish for personal wireless service facilities, or structures that support such facilities, objective, reasonable, and nondiscriminatory-- ``(I) structural engineering standards based on generally applicable codes; ``(II) safety requirements (subject to clause (vi)); or ``(III) aesthetic or concealment requirements, unless such requirements prohibit or have the effect of prohibiting the installation or modification of such facilities or structures. ``(iii) Timeframes.-- ``(I) In general.--A State or local government or instrumentality thereof shall grant or deny a request for authorization to place, construct, or modify a personal wireless service facility not later than-- ``(aa) in the case of a request for authorization to place, construct, or modify a personal wireless service facility that is not a small personal wireless service facility-- ``(AA) if the request is for authorization to place, construct, or modify such facility using an existing structure, including with respect to an area that has not previously been zoned for personal wireless service facilities (other than small personal wireless service facilities), 90 days after the date on which the request is submitted by the requesting party to the government or instrumentality; or ``(BB) if the request is for any other action relating to such facility, 150 days after the date on which the request is submitted by the requesting party to the government or instrumentality; and ``(bb) in the case of a request for authorization to place, construct, or modify a small personal wireless service facility-- ``(AA) if the request is for authorization to place, construct, or modify such facility using an existing structure, including with respect to an area that has not previously been zoned for personal wireless service facilities, 60 days after the date on which the request is submitted by the requesting party to the government or instrumentality; or ``(BB) if the request is for any other action relating to such facility, 90 days after the date on which the request is submitted by the requesting party to the government or instrumentality. ``(II) Treatment of batched requests.--In the case of requests described in subclause (I) that are submitted as part of a single batch by the requesting party to the government or instrumentality on the same day, the applicable timeframe under such subclause for each request in the batch shall be the longest timeframe under such subclause that would be applicable to any request in the batch if such requests were submitted separately. ``(III) Applicability.--The applicable timeframe under subclause (I) shall apply collectively to all proceedings, including related permits and authorizations, required by a State or local government or instrumentality thereof for the approval of the request. ``(IV) No moratoria.--A timeframe under subclause (I) may not be tolled by any moratorium, whether express or de facto, imposed by a State or local government or instrumentality thereof on the submission, acceptance, or consideration of any request for authorization to place, construct, or modify a personal wireless service facility. ``(V) Tolling due to incompleteness.-- ``(aa) Initial request incomplete.-- ``(AA) Small personal wireless service facilities.--If, not later than 10 days after the date on which a requesting party submits to a State or local government or instrumentality thereof a request for authorization to place, construct, or modify a small personal wireless service facility, the government or instrumentality provides to the requesting party a written notice described in item (cc) with respect to the request, the timeframe described in subclause (I) is tolled with respect to the request and shall restart at zero on the date on which the requesting party submits to the government or instrumentality a supplemental submission in response to the notice. ``(BB) Other personal wireless service facilities.--If, not later than 30 days after the date on which a requesting party submits to a State or local government or instrumentality thereof a request for authorization to place, construct, or modify a personal wireless service facility that is not a small personal wireless service facility, the government or instrumentality provides to the requesting party a written notice described in item (cc) with respect to the request, the timeframe described in subclause (I) is tolled with respect to the request until the date on which the requesting party submits to the government or instrumentality a supplemental submission in response to the notice. ``(bb) Supplemental submission incomplete.--If, not later than 10 days after the date on which a requesting party submits to a State or local government or instrumentality thereof a supplemental submission in response to a written notice described in item (cc), the government or instrumentality provides to the requesting party a written notice described in item (cc) with respect to the supplemental submission, the timeframe under subclause (I) is further tolled until the date on which the requesting party submits to the government or instrumentality a subsequent supplemental submission in response to the notice.

Purpose and Summary

H.R. 2289, the ``American Broadband Deployment Act'' was introduced by Representative Buddy Carter on March 24, 2025. H.R. 2289 would streamline the broadband permitting process at the federal, state, and local level. It would amend the Communications Act of 1934 by establishing predictable timeframes for state and local permitting processes related to broadband deployment. It would also cap fees state and local governments charge for permit application reviews and use of public rights-of-way, requiring that those fees be based on actual costs. Additionally, H.R. 2289 would reform the cable franchising process. It would establish predictable timeframes for reviews of requests for new franchises and expansion of cable systems. It would also clarify and make more transparent the terms for franchises and streamline the process for transferring cable systems. H.R. 2289 would also exempt certain broadband-deployment projects from environmental and historic preservation reviews and codify the Tribal notification process for new wireless infrastructure. Finally, H.R. 2289 would deem granted applications to deploy broadband on federal lands that remain pending beyond the existing 270-day timeframe for such reviews. It would also require the National Telecommunications and Information Administration (NTIA) to report on fees charged by state and local governments related to projects funded by grants from the Broadband Equity, Access, and Deployment (BEAD) program.

Background and Need for Legislation

The United States faces a persistent digital divide. According to the Federal Communications Commission, approximately 5.8 million homes and businesses lack access to fixed broadband at 25 Mbps download/3 Mbps upload, while 31 percent of the geographic area of the United States lacks 4G LTE mobile broadband coverage at speeds of 5 Mbps/1 Mbps.\1\ The federal government has dedicated billions of dollars to address this need, most recently through the Infrastructure Investment and Jobs Act (IIJA) to support broadband deployment, digital equity, and affordability needs.\2\ --------------------------------------------------------------------------- \1\FCC National Broadband Map, Fed. Commc'n. Comm'n., https:// broadbandmap.fcc.gov/home (last updated Sept. 3, 2025). \2\Infrastructure Investment and Jobs Act, P.L. 117-58, div. F, tit. I Sec. 60101 et seq. (2021). --------------------------------------------------------------------------- Before a broadband provider can begin deploying (or modifying) broadband infrastructure, however, they must secure zoning and construction permits, pay application fees, and conduct environmental and historic preservation reviews. This process often requires cooperation among providers, federal agencies, and state and local governments. But the unpredictable timelines for permit approvals and high fees for processing applications have made it more expensive and burdensome to deploy broadband infrastructure.\3\ Streamlining these regulations is essential to encourage and expedite broadband infrastructure deployment throughout the United States, and ensure federal funding is not wasted due to unnecessary permitting delays or fees. --------------------------------------------------------------------------- \3\Breaking Barriers: Streamlining Permitting to Expedite Broadband Deployment, Hearing before the Sub. on Commc'n. and Tech., H. Comm. on Energy and Commerce, 118th Cong. (2023) (``Permitting Hearing'') (Written Testimony of Michael O'Rielly at 3); see, e.g., Streamlining Federal Siting Working Group Final Report, FCC Broadband Deployment Advisory Committee (Jan. 23-24, 2018), https://www.fcc.gov/sites/ default/files/bdac-federalsiting-01232018.pdf (discussing Federal regulatory barriers to broadband deployment); Report Of The Removal of State and Local Regulatory Barriers Working Group, FCC Broadband Deployment Advisory Committee (Jan. 10, 2018); https://www.fcc.gov/ sites/default/files/bdac-regulatorybarriers-01232018.pdf (discussing State and local barriers). --------------------------------------------------------------------------- FEDERAL BARRIERS The federal government manages a significant amount of land through the Department of the Interior (Bureau of Land Management (BLM), National Parks Service, Fish and Wildlife Service) and the Department of Agriculture (Forest Service (USFS), in addition to federal buildings across the country. As a result, these agencies are responsible for reviewing and approving applications to deploy broadband on federal property. Federal agencies, however, often take significant time to review these applications, which results in project delays.\4\ To address this, Congress directed the General Services Administration to develop a common form for applications to place communications facilities on federal property, and set a 270-day shot clock for granting or denying such applications.\5\ Nonetheless, since establishing the shot clock, 36 percent of BLM and USFS permit reviews took more than 270 days.\6\ And despite Congressional direction and interagency recommendations for improvement, many challenges remain unaddressed.\7\ For example, not all federal agencies use an online application portal for processing broadband installation applications, which may result in uncertainty or unnecessary delay. --------------------------------------------------------------------------- \4\Id.; See also U.S. Gov't Accountability Off., GAO-24-106157, Broadband Deployment: Agencies Should Take Steps to Better Meet Deadline for Processing Permits, at 13 (2024) (GAO Broadband Permitting Report); See also Linda Hardesty, Whoa--The Fiber Permitting Process Could Crush Digital Divide Dreams, Fierce Telecom (Dec. 9, 2021), https://www.fiercetelecom.com/broadband/whoa-fiber-permitting-process- could-crush-digital-divide-dreams (describing federal approvals needed to deploy broadband). \5\47 U.S.C. Sec. 1455(b)(2), (3). \6\GAO Broadband Permitting Report, supra note 4, at 13. \7\See Nat'l Telecomm. Info. Admin. (NTIA), Final Report on Status of Implementation of MOBILE NOW Act Section 606(c) Requirements, at 4 (2020), https://ntia.gov/sites/default/files/publications/ mobile_now_act_section_606c_report_2022.pdf. --------------------------------------------------------------------------- Other federal laws complicate broadband infrastructure deployment. The National Historic Preservation Act (NHPA)\8\ and --------------------------------------------------------------------------- \8\54 U.S.C. Sec. Sec. 300101 et seq. --------------------------------------------------------------------------- the National Environmental Policy Act of 1969 (NEPA)\9\ create obstacles to deployment due to costly and cumbersome required reviews,\10\ though federal agencies have attempted to expedite these processes. For example, the National Telecommunications and Information Administration (NTIA) has established 30 categorical exclusions under NEPA (in addition to 11 previously set by the Department of Commerce).\11\ NTIA also requires states to use the Environmental Screening and Permitting Tracking Tool to expedite NEPA approvals within two weeks for approximately 90 percent of Broadband Equity, Access, and Deployment (BEAD) projects and to eliminate approximately 3-6 months of environmental processing per project.\12\ But not all streamlining efforts have succeeded. In 2018, the FCC tried to exempt small-cell wireless antenna construction from NHPA and NEPA reviews,\13\ but the U.S. Court of Appeals for the District of Columbia Circuit vacated that action.\14\ In August 2025, the Commission adopted a Notice of Proposed Rulemaking (NPRM) seeking comment on updating its NEPA and NHPA rules related to wireless infrastructure.\15\ --------------------------------------------------------------------------- \9\42 U.S.C. Sec. Sec. 4321 et seq. \10\Commerce OIG Report, supra note 3, at 6. \11\NTIA, Guidance on NTIA National Environmental Policy Act Compliance (June 2025), https://broadbandusa.ntia.gov/sites/default/ files/2025-06/NTIA_NEPA_Procedures_June_2025.pdf. \12\NTIA, Broadband Equity, Access, and Deployment (BEAD) Program: BEAD Restructuring Policy Notice (June 6, 2025), https://www.ntia.gov/ sites/default/files/2025-06/bead-restructuring-policy-notice.pdf. \13\Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment, WT Docket No. 17-79, Second Report and Order, 33 FCC Rcd. 3102 (2018). \14\United Keetoowah Band of Cherokee Indians in Oklahoma v. FCC, 933 F.3d 728 (D.C. Cir. 2019) (vacating an FCC order eliminating NEPA and NHPA requirements as arbitrary and capricious for failing to justify that public interest did not require review of small cell deployments). \15\Modernizing the Commission's National Environmental Policy Act Rules, WT Docket No. 25-217, Notice of Proposed Rulemaking, FCC 25-47 (rel. Aug. 14, 2025) (available in the Federal Register at 90 Fed. Reg. 40295). --------------------------------------------------------------------------- The FCC also addressed the Tribal notification process under its rules implementing NHPA.\16\ The FCC's Nationwide Programmatic Agreement Regarding the Section 106 National Historic Preservation Act Review Process directs a provider seeking to deploy a wireless tower to provide ``all information reasonably necessary for [an] Indian Tribe or [Native Hawaiian Organization] to evaluate whether Historic Properties of religious and cultural significance may be affected'' and provide the Tribe with a reasonable opportunity to respond.\17\ The FCC's Forms 620 and 621 provide this information--Form 620 addresses new towers and Form 621 addresses collocations. --------------------------------------------------------------------------- \16\2018 NEPA/NHPA Order 104-113. \17\Nationwide Programmatic Agreement for Review of Effects on Historic Properties for Certain Undertakings Approved by the Federal Communications Commission, 47 C.F.R. pt.1, Appx. C Sec. IV.F. --------------------------------------------------------------------------- In the 2018 NEPA/NHPA Order, the FCC required applicants to provide all potentially affected Tribes with a Form 620/621 and clarified the timeframe for Tribes to respond to the submission. The FCC established a 45-day process for moving forward with construction in cases in which the Tribe does not respond after having been given the opportunity to review a Form 620/621 submission.\18\ If an applicant does not receive a response within 30 calendar days of the date the Tribe can be shown or may reasonably be expected to have received notification that the Form 620/621 submission, the applicant can refer the matter to the FCC for follow-up, and the FCC will inform the Tribe that it has 15 calendar days to respond. If the Tribe still does not respond, the applicant's pre- construction obligations are discharged with respect to that Tribe. The FCC also determined that ``the detailed information included in the Form 620/621 submission packet constitutes a reasonable and good faith effort to provide the information reasonably necessary for [Tribes] to ascertain whether historic properties of religious and cultural significance to them may be affected by the undertaking.''\19\ --------------------------------------------------------------------------- \18\2018 NEPA/NHPA Order 111. \19\Id. 106. --------------------------------------------------------------------------- STATE AND LOCAL OBSTACLES State and local governments play a key role in facilitating, or hindering, broadband infrastructure deployment. They regulate land use, review siting applications, and issue relevant permits. State and local governments' review processes can be inconsistent with each other and costly, which can delay or even effectively prevent broadband deployment. For example, some state and local governments charge excessive fees for applications or to access the public rights-of-way for construction, and they often impose no deadlines for review of applications.\20\ --------------------------------------------------------------------------- \20\Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment, WT Docket No. 17-79, WC Docket No. 17-84, Declaratory Ruling and Third Report and Order, 33 FCC Rcd. 9088 (2018). --------------------------------------------------------------------------- These challenges persist notwithstanding federal law preempting state and local authority to regulate communications facilities. Under Section 253 of the Communications Act of 1934, ``no State or local statute or regulation, or other State or local legal requirement, may prohibit or have the effect of prohibiting the ability of any entity to provide any interstate or intrastate telecommunications service.''\21\ Section 253 requires the Commission to preempt the enforcement of any such law.\22\ Similarly, Section 332(c)(7) of the Communications Act states that ``[t]he regulation of the placement, construction, and modification of personal wireless service facilities by any State or local government or instrumentality thereof . . . shall not prohibit or have the effect of prohibiting the provision of personal wireless services.''\23\ --------------------------------------------------------------------------- \21\47 U.S.C. Sec. 253(a). \22\Id. at Sec. 253(d). \23\47 U.S.C. Sec. 332(c)(7)(B)(i). --------------------------------------------------------------------------- The FCC has used its authority to address state and local barriers to broadband infrastructure deployment, particularly from 2018-2020. In 2018, the Commission streamlined state and local government review of wireless small-cell siting applications by limiting application fees these governments could charge an applicant, setting new shot clocks for small- cell wireless facilities (60 days for collocation of antennas on existing structures and 90 days for new facilities), codifying existing presumptive timeframes for non-small cell wireless deployments, and adopting a new remedy for failing to act within the shot-clock period.\24\ The FCC also declared that state and local governments cannot ban the deployment of telecommunications services or facilities or enact de facto bans, such as blanket refusals to process applications, refusals to issue permits for a category of structures, or frequent and lengthy delays.\25\ In 2020, the FCC clarified when shot clocks begin, how certain aspects of proposed modifications affect eligibility for streamlined review, and when FCC applicants need to submit environmental assessments based only on potential impacts to historic properties.\26\ Local governments challenged these actions in federal court, but the FCC prevailed each time.\27\ --------------------------------------------------------------------------- \24\Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment, WT Docket No. 17-79, WC Docket No. 17-84, Declaratory Ruling and Third Report and Order, 33 FCC Rcd. 9088 (2018). \25\Accelerating Wireline Broadband Deployment by Removing Barriers to Infrastructure Investment, WC Docket No. 17-84, WT Docket No. 17-79, Third Report and Order and Declaratory Ruling, 33 FCC Rcd. 7705 (2018); see also 47 U.S.C. Sec. 253. \26\Id. \27\City of Portland v. United States, 969 F.3d 1020 (9th Cir. 2020) (generally upholding the 2018 FCC infrastructure orders); League of Calif. Cities v. FCC, 118 F.4th 995 (9th Cir. 2024) (upholding the 2020 FCC infrastructure order). --------------------------------------------------------------------------- Although these FCC actions have helped accelerate broadband infrastructure deployment, the litigation surrounding these rules and the risk that they could change with new administrations underscores the need for codification.

Committee Action

On March 5, 2025, the Subcommittee on Communications and Technology held a hearing entitled, ``Fixing Biden's Broadband Blunder.'' The Subcommittee received testimony from: Grant Spellmeyer, President and CEO, ACA Connects Tim Donovan, President and CEO, Competitive Carriers Association Greg Hale, CEO, LTC Connect Sarah Morris, Former Acting Deputy Administrator, National Telecommunications and Information Administration On September 18, 2025, the Subcommittee on Communications and Technology held a legislative hearing entitled, ``Examining Solutions to Expedite Broadband Permitting.'' The Subcommittee received testimony from: Jonathan Spalter, President and CEO, USTelecom--The Broadband Association Patrick Halley, President and CEO, Wireless Infrastructure Association Staci Pies, Senior Vice President of Government Affairs and Policy, INCOMPAS Drew Garner, Director of Policy Engagement, Benton Institute for Broadband & Society On November 18, 2025, the Subcommittee on Communications and Technology met in open markup session and forwarded H.R. 2289, as amended, to the full Committee by a record vote of 16 yeas and 12 nays. On December 3, 2025, the full Committee on Energy and Commerce met in open markup session and ordered H.R. 2289, as amended, favorably reported to the House by a record vote of 26 yeas and 24 nays.

Committee Votes

Clause 3(b) of rule XIII requires the Committee to list the record votes on the motion to report legislation and amendments thereto. The following reflects the record votes taken during the Committee consideration: Oversight Findings and Recommendations Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII, the Committee held a hearing and made findings that are reflected in this report. New Budget Authority, Entitlement Authority, and Tax Expenditures Pursuant to clause 3(c)(2) of rule XIII, the Committee finds that H.R. 2289 would result in no new or increased budget authority, entitlement authority, or tax expenditures or revenues.

Congressional Budget Office Estimate

Pursuant to clause 3(c)(3) of rule XIII, at the time this report was filed, the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974 was not available. Federal Mandates Statement The Committee adopts as its own the estimate of Federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act. Statement of General Performance Goals and Objectives Pursuant to clause 3(c)(4) of rule XIII, the general performance goal or objective of this legislation is to expedite broadband deployment by streamlining the permitting process at the federal, state, and local level. Duplication of Federal Programs Pursuant to clause 3(c)(5) of rule XIII, no provision of H.R. 2289 is known to be duplicative of another Federal program, including any program that was included in a report to Congress pursuant to section 21 of Public Law 111-139 or the most recent Catalog of Federal Domestic Assistance. Related Committee and Subcommittee Hearings Pursuant to clause 3(c)(6) of rule XIII, the following related hearing was used to develop or consider H.R. 2289: On March 5, 2025, the Subcommittee on Communications and Technology held a hearing entitled, ``Fixing Biden's Broadband Blunder.'' The Subcommittee received testimony from: Grant Spellmeyer, President and CEO, ACA Connects Tim Donovan, President and CEO, Competitive Carriers Association Greg Hale, CEO, LTC Connect Sarah Morris, Former Acting Deputy Administrator, National Telecommunications and Information Administration On September 18, 2025, the Subcommittee on Communications and Technology held a hearing on H.R. 1665. The title of the hearing was ``Examining Solutions to Expedite Broadband Permitting.'' The Subcommittee received testimony from: Jonathan Spalter, President and CEO, USTelecom--The Broadband Association Patrick Halley, President and CEO, Wireless Infrastructure Association; Patrick Halley, President and CEO, Wireless Infrastructure Association; and, Drew Garner, Director of Policy Engagement, Benton Institute for Broadband & Society Committee Cost Estimate Pursuant to clause 3(d)(1) of rule XIII, the Committee adopts as its own the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974. At the time this report was filed, the estimate was not available. Earmark, Limited Tax Benefits, and Limited Tariff Benefits Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the Committee finds that H.R. 2289 contains no earmarks, limited tax benefits, or limited tariff benefits. Advisory Committee Statement No advisory committees within the meaning of section 5(b) of the Federal Advisory Committee Act were created by this legislation. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. Section-by-Section Analysis of the Legislation Section 1. Short title This Section designates that the short title may be cited as the ``American Broadband Deployment Act of 2023''. It also includes the table of contents for this legislation. Section 101. Preservation of local zoning authority Section 101 replaces section 332(c)(7) of the Communications Act of 1934 with a new paragraph (c)(7) governing State and local authority over personal wireless service facilities. The provision preserves the general authority of State and local governments over zoning decisions related to the placement, construction, and modification of personal wireless service facilities, subject to specific federal limitations set forth in the paragraph. The new paragraph would prohibit State and local governments from discriminating among personal wireless service facilities or providers of communications services, including by granting exclusive or preferential access, and from prohibiting or effectively prohibiting the provision, improvement, or enhancement of personal wireless service. The ``prohibit or have the effect of prohibiting'' language matches existing language in Section 332(c)(7), and the Committee intends this language to be interpreted in the same way, specifically adopting the ``materially inhibit'' standard used in the FCC's 1997 California Payphone decision.\28\ --------------------------------------------------------------------------- \28\California Payphone Ass'n, 12 FCC Rcd 14191 31 (1997). --------------------------------------------------------------------------- State and local governments would be permitted to establish objective, reasonable, and nondiscriminatory structural engineering standards, safety requirements based on generally applicable codes, and aesthetic or concealment requirements, provided that aesthetic requirements do not themselves prohibit or effectively prohibit deployment. The section would codify specific timeframes for State and local governments to act on wireless facility siting requests. 90 days for a request to collocate a facility that is not a small personal wireless facility (small cell) on an existing structure; 150 days for a request to deploy a non-small cell facility on a new structure; 60 days for a request to collocate a small cell on an existing structure; and 90 days for a request to deploy a small cell on a new structure. Batched applications are subject to the longest applicable timeframe, and these deadlines would apply collectively to all approvals required for the request. Governments may not toll these deadlines by imposing moratoria, whether express or de facto. These timeframes would apply to all proceedings required by a State or local government for approval of the request. A request would be considered submitted on the date on which the applicant takes the first procedural step within its control to submit the application in accordance with the procedures established by the government for the review and approval of such a request or for a standard review for a similar facility or structure. The timeframes and batching requirements are consistent with current FCC rules.\29\ --------------------------------------------------------------------------- \29\47 C.F.R. Sec. 1.6003(c). --------------------------------------------------------------------------- Limited tolling would be permitted for incomplete applications, subject to detailed written notice requirements identifying missing information and pointing to the specific authority requiring it, with limits on follow-up notices. A single tolling period of up to 30 days is also permitted by mutual agreement of the parties. If a State or local government fails to act within the applicable timeframe, the request is deemed granted upon written notice from the applicant, and the requested deployment is considered authorized without further governmental action. Any denial must be in writing, supported by substantial evidence in a written record, and publicly released and provided to the applicant on the same day it is issued. The section would further reaffirm federal preemption of State or local regulation based on the environmental effects of radiofrequency emissions where facilities comply with FCC standards. State and local governments would be permitted to charge fees associated with review of applications or use of rights- of-way, but such fees must be competitively neutral, technology-neutral, nondiscriminatory, established in advance, based on actual and direct costs, limited to objectively reasonable expenses, and clearly disclosed, including distinctions between recurring and nonrecurring fees and between new and existing structures. As the FCC held in its 2018 Small Cell Order, the Committee expects that only objectively reasonable costs may be factored into these fees.\30\ --------------------------------------------------------------------------- \30\2018 Small Cell Order 50. --------------------------------------------------------------------------- Any person adversely affected by a final action or failure to act would be permitted to seek expedited judicial review in a court of competent jurisdiction. The section expressly preserves section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012 and makes FCC regulations implementing this provision binding on reviewing courts. The section concludes by adding definitions for key terms. Section 102. Removal of barriers to entry Section 102 would replace Section 253 of the Communications Act with new language governing State and local regulation of telecommunications services and facilities. The revised section would provide that no State or local statute, regulation, or legal requirement may prohibit or have the effect of prohibiting any entity from providing, improving, or enhancing interstate or intrastate telecommunications services. As noted in Section 101, the use of the phrase ``prohibit or have the effect of prohibiting'' matches existing language, with the intent that it be interpreted consistent with the ``materially inhibit'' standard adopted in the FCC's California Payphone decision. With respect to telecommunications service facilities, the section would prohibit discrimination based on technology or services provided and bars treating telecommunications facilities less favorably than other facilities. State and local governments must act on applications for placement, construction, or modification of telecommunications facilities within 90 days when existing infrastructure is used and within 150 days for all other requests. These deadlines apply to all related proceedings and may not be tolled by moratoria. The section would establish detailed completeness and tolling procedures similar to those in section 101, including written notice requirements for incomplete applications and a single tolling period of up to 30 days by mutual agreement. Failure to act within the applicable timeframe results in a deemed grant upon written notice from the applicant, with authorization effective without further government action. Denials must be written, supported by substantial evidence, and publicly released and provided to the applicant the same day. State and local governments would be permitted to assess fees related to application review and use of rights-of-way, provided the fees are competitively neutral, nondiscriminatory, established in advance, and based on objectively reasonable actual and direct costs. Enforcement is available through expedited judicial review, subject to a 30-day filing deadline. The section would preserve State authority over universal service, public safety, service quality, consumer protection, and management of public rights-of-way, subject to the new limitations. It would also clarify the interaction of Section 253 with other provisions of the Communications Act, specifically Section 332(c)(3) for commercial mobile providers or Section 621 for cable operators. The section also defines when a request is considered submitted and defines key terms. Sec. 103. Requests for modification of certain existing wireless and telecommunications service facilities Section 103 would amend Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012 by expanding its scope from wireless facilities to communications facilities more broadly. The amendment would require State and local governments to approve, and not deny, eligible requests to modify existing wireless towers, base stations, and telecommunications service facilities supported by eligible infrastructure, so long as the modification does not substantially change the physical dimensions of the facility. The section would codify a 60-day deadline for approval of eligible requests, after which the request is deemed granted if the government has not acted. The provision includes detailed rules governing determinations of eligibility, completeness review, tolling, written notices, and supplemental submissions, closely tracking existing FCC rules adopted in the 2014 Wireless Infrastructure Order\31\ and the 2020 5G Upgrade Order.\32\ --------------------------------------------------------------------------- \31\Acceleration of Broadband Deployment by Improving Wireless Facilities Siting Policies, Report & Order, 29 FCC Rcd 12865 (2014); 47 C.F.R. Sec. Sec. 6100(c)(2), (4). \32\35 FCC Rcd 5977 14-23. --------------------------------------------------------------------------- Requests would be considered submitted when the applicant takes the first procedural step within its control, and State or local governments may not require pre-application processes. Governments may request only information reasonably related to the proposed modification. The section would authorize expedited judicial enforcement and directs the FCC to issue implementing rules, applying the amendments to requests submitted on or after enactment. It is the Committee's intent that Section 103 be read to preserve, to the greatest extent possible, the FCC's current rules and interpretations of Section 6409 as established in the 2014 Wireless Infrastructure Order\33\ and 2020 5G Upgrade Order.\34\ --------------------------------------------------------------------------- \33\See note 33. \34\See note 36. --------------------------------------------------------------------------- Section 201. Request for new franchise Section 201 would amend Section 621 of the Communications Act of 1934 by adding a new subsection (g) that would govern the timeframe for a franchising authority to review a request for a new cable franchise. This new subsection would establish a 120-day deadline for a franchising authority to approve or deny a request for a new franchise, with any failure to act resulting in the franchise being deemed granted. The deadline would apply to all proceedings required for approval, and franchising authorities may not toll the deadline through moratoria. The timeframe may be tolled only under narrowly defined circumstances, including for incomplete applications subject to written notice and supplemental submission rules, or through a single mutual- agreement tolling period. Denials must be in writing, supported by substantial evidence, and publicly released and provided to the applicant the day they are issued. An application is considered submitted when the applicant takes the first procedural step within its control. Section 202. Request regarding placement, construction, or modification of cable equipment Subsection (a) would amend Section 624 of the Communications Act by adding a new subsection (j) to address requests regarding placement, construction, or modification of facilities by cable operators. The section would preserve general authority over such activities but prohibits regulation that would prohibit or effectively prohibit a cable operator from providing, improving, or enhancing service. As with Sections 101 and 102, the Committee intends the phrase ``prohibit or have the effect of prohibiting'' to be interpreted consistent with California Payphone's ``materially inhibit'' standard. Covered entities would be required to act on requests within 90 days for deployments involving covered easements or eligible support infrastructure and within 150 days for all other requests. Failure to act results in a deemed grant. These deadlines apply to all proceedings and may not be tolled by moratoria, though limited tolling for incomplete applications and by mutual agreement is permitted. The section would authorize cost-based, neutral fees for request review, clarify that such fees are not franchise fees, define key terms, and apply the new rules to pending requests. Subsection (b) of Section 202 would address pending requests. Under subparagraph (1), the amendments to Section 624, as added by subsection (a), would apply to requests submitted to the covered entity before the date of enactment that have not been approved or denied, and requests submitted to the covered entity on or after the date of enactment. Subparagraph (2) would define the date of receipt by a covered entity of a request. Sec. 203. Cable franchise term and termination Section 203 would amend sections 625 and 626 of the Communications Act to address modification, continuation, and termination of cable franchises. Cable operators would be permitted to request elimination or modification of franchise requirements during the franchise term, and franchising authorities must grant such requests within 120 days upon a showing of good cause, including changes in law, technology, competitive circumstances, or commercial impracticability. Failure to act results in a deemed grant, except for requirements related to public, educational, or governmental access. The section would further provide that franchises continue in effect until revoked or terminated under specified procedures, limits circumstances under which franchising authorities may revoke franchises, and establishes administrative and judicial review processes, including potential FCC review and stays. The amendments made by Section 203 would be effective six months after the enactment. This section and its amendments would apply to franchises granted on or after the effective date, or before that date if the franchise is in effect or if the franchise has expired but the cable operator is still performing under the provisions of that franchise as if the franchise had not expired. Sec. 204. Sales of cable systems This section would amend Section 627 of the Communications Act to address the sales and transfers of cable systems. If a franchising authority acquires or transfers ownership of a cable system following revocation, the transaction must occur at fair market value. Franchising authorities may not prevent transfers of franchises to entities willing to accept existing terms, though advance notice may be required. The amendments would become effective six months after enactment and apply to existing and future franchises. Section 301. Application of NEPA and NHPA to certain communications projects This section would exempt covered projects from reviews that would otherwise be applicable to such projects pursuant to Section 102(2)(C) of the National Environmental Policy Act of 1969 (NEPA) or Section 300320 of title 54, United States Code (the National Historic Preservation Act (NHPA). Covered projects, as defined in Section 304, are: A project to collocate a personal wireless facility on an existing structure or to modify a personal wireless facility; A

Minority Views

In November 2021, President Biden signed into law the Infrastructure Investment and Jobs Act, or the ``Bipartisan Infrastructure Law,'' which made historic and long overdue investments in surface transportation, energy, healthcare, and communications infrastructure. These investments included $42.45 billion for the Broadband Equity, Access, and Deployment Program to deploy broadband infrastructure to Americans who lack reliable access to high-speed internet service. Committee Democrats do not dispute that there are barriers in the way of deploying broadband infrastructure. H.R. 2289 addresses none of them, unfortunately. The Republican Majority could have worked with Democrats on comprehensive legislation that addresses the concerns that all witnesses raised at legislative hearings--most notably, the lack of adequate resources and qualified personnel to review permit applications at Federal agencies. Instead, the Republican Majority ignored the fact that President Trump ordered the firings of thousands of federal workers, many of whom were hired under the prior administration specifically to cut down on permit review times. The result is this package, which is composed of dozens of partisan bills masquerading as legislative ``solutions'' in search of problems, rather than addressing the very real problem of the lack of resources that agencies need to conduct the permitting review process. H.R. 2289 regrettably proposes to eliminate standard environmental and historic preservation protections that simply do not affect the overwhelming majority of communications infrastructure projects as suggested by Republicans. For example, H.R. 2289 proposes blanket exemptions to the National Environmental Policy Act (NEPA). However, many projects to deploy communications infrastructure already qualify for expedited review and approval under existing categorical exclusions, which Federal agencies apply to predetermined activities that do not have a significant environmental impact. If a project does not qualify for an existing categorical exclusion, the project can still be approved under an Environmental Assessment and a Finding of No Significant Impact. There is little evidence to suggest that communications infrastructure projects regularly trigger the highest level of scrutiny under NEPA, which require applicants to develop and submit an Environmental Impact Statement, let alone warrant the proposed blanket NEPA exemptions. Perhaps most troubling are H.R. 2289's provisions to eliminate local communities' roles in decision-making over the placement and construction of utility infrastructure. The bill imposes heavy-handed ``deemed granted'' provisions on local governments by setting narrow and arbitrary deadlines to approve requests to install communications infrastructure in areas managed by county or municipal governments. The 60-day ``shot clock'' to approve or deny an application implies an unfamiliarity with the realities of local government calendars. At the local level, construction application and review processes are often designed to comply with ``sunshine'' laws to ensure transparency and provide residents with sufficient opportunity to be heard on important community matters. While the Republican Majority seems intent on helping big corporations evade scrutiny in communities they wish to serve, Democrats understand that our friends and neighbors who serve our communities as mayors, council members, and local zoning board members represent the best interests of their constituents, and they disagree with attempts by Republicans to constrain their ability to do so. Local officials are responsible for ensuring the safety and welfare of residents. Efforts like this bill by House Republicans to automatically approve certain construction projects will put people in harm's way. Communications providers that proceed with construction without the proper approvals from state, county, or municipal governments should recognize the liability to which they are exposing themselves. These are just some of the reasons why H.R. 2289 is opposed by the National League of Cities, United States Conference of Mayors, the National Association of Counties, and the National Association of Telecommunications Officers and Advisors. If Committee Republicans were truly committed to expediting the deployment of high-speed internet to rural communities, they should have advocated that the Trump Administration carry out the Bipartisan Infrastructure Law as intended. Instead, the Trump Administration, with the support of Congressional Republicans, has delayed progress by at least a year just to change program rules that force inferior broadband technologies onto unserved and underserved communities across the country. Frank Pallone, Jr., Ranking Member. [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] [all]