Minority Views
[To accompany H.R. 6373]
The Committee on Energy and Commerce, to whom was referred
the bill (H.R. 6373) to amend the Clean Air Act to establish
authority for the President to waive the requirement for an
advanced manufacturing facility or a critical mineral facility
to offset increased emissions of any air pollutant, and for
other purposes, having considered the same, reports favorably
thereon without amendment and recommends that the bill do pass.
CONTENTS
Page
Purpose and Summary.............................................. 2
Background and Need for Legislation.............................. 2
Committee Action................................................. 3
Committee Votes.................................................. 3
Oversight Findings and Recommendations........................... 6
New Budget Authority, Entitlement Authority, and Tax Expenditures 6
Congressional Budget Office Estimate............................. 6
Federal Mandates Statement....................................... 6
Statement of General Performance Goals and Objectives............ 6
Duplication of Federal Programs.................................. 6
Related Committee and Subcommittee Hearings...................... 6
Committee Cost Estimate.......................................... 7
Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 7
Advisory Committee Statement..................................... 7
Applicability to Legislative Branch.............................. 7
Section-by-Section Analysis of the Legislation................... 7
Changes in Existing Law Made by the Bill, as Reported............ 8
Minority, Additional, or Dissenting Views........................ 12
Purpose and Summary
The purpose of H.R. 6373 is to expand the national security
waiver provided in Section 173 of the Clean Air Act, for
certain offset requirements, to advanced manufacturing
facilities and critical mineral facilities.
Background and Need for Legislation
SECTION 173 OF THE CLEAN AIR ACT
In 1990, Congress amended the Clean Air Act (CAA) to
include Section 173, a provision for waiving the offset
requirements for rocket engines or motors.
DEMAND FOR CRITICAL MANUFACTURING AND CRITICAL MINERALS
The President has identified domestic manufacturing and
supply chain security as one of his top priorities, issuing
numerous EOs related to the topic.\1\ On January 20, 2025,
President Trump declared a National Energy Emergency, noting
that the U.S.'s current production and of critical minerals was
insufficient to meet domestic demand.\2\
---------------------------------------------------------------------------
\1\Exec. Order No. 14156, 90 Fed. Reg. 8433 (Jan. 20, 2025); Exec.
Order No. 14154, 90 Fed. Reg. 8353 (Jan. 20, 2025); Exec. Order No.
14241, 90 Fed. Reg. 13673 (Mar. 20, 2025); Exec. Order No. 14213, 90
Fed. Reg. (Feb. 14, 2025); Exec. Order No. 14220, 90 Fed. Reg. 11001
(Feb. 25, 2025); Exec. Order No. 14241, 90 Fed. Reg. 13673 (Mar. 20,
2025); Exec. Order No. 14260, 90 Fed. Reg. 15513 (Apr. 8, 2025); Exec.
No. Order 14261, 90 Fed. Reg. 15517 (Apr. 8, 2025); Exec. No. Order
14272, 90 Fed. Reg. 16437 (Apr. 15, 2025).
\2\Exec. Order No. 14156, 90 Fed. Reg. 8433 (Jan. 20, 2025).
---------------------------------------------------------------------------
Promoting the domestic production of critical minerals has
remained a chief priority of the Trump Administration.
Subsequent EOs related to critical minerals focus on
identifying undue burdens that reduce incentives to invest in
U.S. critical mineral industries or hinder the ability of
companies to operate domestically.\3\
---------------------------------------------------------------------------
\3\Exec. Order No. 14154, 90 Fed. Reg. 8353 (Jan. 20, 2025).
---------------------------------------------------------------------------
H.R. 6373 creates a durable approach to increasing our
domestic manufacturing capacity for these critical sectors.
NATIONAL SECURITY CONCERNS
The U.S.'s critical mineral supply is heavily dependent on
foreign sources. Annual mineral commodity reports from the
United States Geological Survey (USGS) illustrate the widening
dependence.\4\ For example, in 1996 the USGS report concluded
that the U.S. was 100% reliant on imports for 8 minerals and
over 50% dependent on imports for 16 minerals. The 2025 USGS
report concludes that the U.S., is reliant on imports for all
51 critical minerals contained in the 2022 list. According to
the report the U.S. is 100% dependent on imports for 12 of
these minerals and more than 50% dependent on imports for
another 28.\5\
---------------------------------------------------------------------------
\4\U.S. Geological Survey, 1996, Mineral commodity summaries 1996
(Jan. 1996): U.S. Geological Survey, 194 p., https://www.usgs.gov/
centers/national-minerals-information-center/mineral-commodity-
summaries.
\5\U.S. Geological Survey, 2025, Mineral commodity summaries 2025
(ver. 1.2, Mar. 2025): U.S. Geological Survey, 212 p., https://doi.org/
10.3133/mcs2025.
---------------------------------------------------------------------------
As a result of supply chain instability, semiconductor
production has primarily shifted overseas. That shift hinders
the U.S.'s capacity to produce at scale and impacts its ability
to remain competitive. U.S. companies are limited in their
ability to expand at a time when domestic manufacturing is key.
Permitting delays stall key projects and threaten our
domestic, energy, technology, and defense industries.
Streamlining permitting, especially for critical industries
essential to national security, is essential for global
competition.
To onshore these facilities back to the U.S., we must
address the crippling permitting barriers contained in
regulatory law. H.R. 6373 facilitates that effort.
Committee Action
On June 11, 2025, the Subcommittee on Environment held a
hearing on H.R. 6373. The title of the hearing was ``Short-
Circuiting Progress: How the Clean Air Act Impacts Building
Necessary Infrastructure and Onshoring American Innovation.''
The Subcommittee received testimony from:
James W. Boylan, Chief, Air Protection
Branch, Georgia Environmental Protection Division;
Chad Whiteman, Vice President, Environment
and Regulatory Affairs, U.S. Chamber of Commerce;
Paul Noe, Vice President, Public Policy,
American Forest & Paper Association;
John Walke, Director, Federal Clean Air &
Senior Attorney, National Resources Defense Council.
On September 16, 2025 the Subcommittee on Environment held
a hearing on H.R. 6373. The title of the hearing was ``From
Gridlock to Growth: Permitting Reform Under the Clean Air
Act.'' The Subcommittee received testimony from:
Clint Woods, Commissioner, Indiana
Department of Environmental Management;
Mark Gebbia, Vice President, Environmental
and Permitting, Williams;
Ashley Kunz, Senior Director, Environmental
Health and Safety, Micron;
Danny Seiden, President and CEO, Arizona
Chamber of Commerce and Industry;
Kerri Powell, Senior Attorney for Community
Health and Air Program Leader, Southern Environmental
Law Center;
Ali Mirzakhalili, Air Quality Division
Administrator, Oregon Department of Environmental
Quality.
On December 10, 2025, the Subcommittee on Environment met
in open markup session and forwarded H.R. 6373, without
amendment, to the full Committee by a record vote of 12 yeas
and 10 nays. On January 21, 2026, the full Committee on Energy
and Commerce met in open markup session and ordered H.R. 6373,
without amendment, favorably reported to the House by a vote of
25 yeas and 23 nays.
Committee Votes
Clause 3(b) of rule XIII requires the Committee to list the
record votes on the motion to report legislation and amendments
thereto. The following reflects the record votes taken during
the Committee consideration:
Oversight Findings and Recommendations
Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII, the Committee held (a) hearing(s) and made findings
that are reflected in this report.
New Budget Authority, Entitlement Authority,
and Tax Expenditures
Pursuant to clause 3(c)(2) of rule XIII, the Committee
finds that H.R. 6373 would result in no new or increased budget
authority, entitlement authority, or tax expenditures or
revenues.
Congressional Budget Office Estimate
Pursuant to clause 3(c)(3) of rule XIII, at the time this
report was filed, the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974 was not available.
Federal Mandates Statement
The Committee adopts as its own the estimate of Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
Statement of General Performance Goals and Objectives
Pursuant to clause 3(c)(4) of rule XIII, the general
performance goal or objective of this legislation is to expand
Section 173 of the Clean Air Act, which currently contains a
provision for waiving the offset requirements for rocket
engines or motors, by adding similar provisions for advanced
manufacturing facilities and critical minerals facilities. The
bill allows the President to determine that an advanced
manufacturing facility or a critical mineral facility is exempt
from the requirement to obtain offset emissions credits. The
facility also may be exempt from obtaining offset emissions
credits if they demonstrate: (1) they used all reasonable means
to obtain and utilize offset credits for emission increases
beyond allowable levels and such credits were unavailable; or
(2) if the facility complies with an alternative offset measure
or an emissions fee paid to the state to maximize emissions
reductions.
Duplication of Federal Programs
Pursuant to clause 3(c)(5) of rule XIII, no provision of
H.R. 6373 is known to be duplicative of another Federal
program, including any program that was included in a report to
Congress pursuant to section 21 of Public Law 111-139 or the
most recent Catalog of Federal Domestic Assistance.
Related Committee and Subcommittee Hearings
Pursuant to clause 3(c)(6) of rule XIII, the following
related hearing was used to develop or consider H.R. 6373:
On June 11, 2025, the Subcommittee on
Environment held a hearing on H.R. 4218 and H.R. 4214.
The title of the hearing was ``Short-Circuiting
Progress: How the Clean Air Act Impacts Building
Necessary Infrastructure and Onshoring American
Innovation.'' The Subcommittee received testimony from:
James W. Boylan, Chief, Air
Protection Branch, Georgia Environmental
Protection Division;
Chad Whiteman, Vice President,
Environment and Regulatory Affairs, U.S.
Chamber of Commerce;
Paul Noe, Vice President, Public
Policy, American Forest & Paper Association;
John Walke, Director, Federal
Clean Air & Senior Attorney, National Resources
Defense Council.
Committee Cost Estimate
Pursuant to clause 3(d)(1) of rule XIII, the Committee
adopts as its own the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974. At the time this report was
filed, the estimate was not available.
Earmark, Limited Tax Benefits, and Limited Tariff Benefits
Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the
Committee finds that H.R. 6373 contains no earmarks, limited
tax benefits or limited tariff benefits.
Advisory Committee Statement
No advisory committees within the meaning of section 5(b)
of the Federal Advisory Committee Act were created by this
legislation.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Section-by-Section Analysis of the Legislation
Section 1. Short title
This section provides the short title, the ``Air Permitting
Improvements to Protect National Security Act of 2025''.
Section 2. Supporting critical manufacturing
This section amends Section 173 of the Clean Air Act that
gives the President the authority to determine that an advanced
manufacturing facility or a critical mineral facility is exempt
from the requirement to obtain offset emissions credits. This
provision also provides that advanced manufacturing facilities
or critical mineral facilities may be exempt from obtaining
offset emissions credits if they demonstrate: (1) they used all
reasonable means to obtain and utilize offset credits for
emission increases beyond allowable levels and such credits
were unavailable; or (2) if the facility complies with an
alternative offset measure or an emissions fee paid to the
state to maximize emissions reductions.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (new matter is
printed in italics and existing law in which no change is
proposed is shown in roman):
CLEAN AIR ACT
TITLE I--AIR POLLUTION PREVENTION AND CONTROL
* * * * * * *
Part D--Plan Requirements for Nonattainment Areas
Subpart 1--Nonattainment Areas in General
* * * * * * *
SEC. 173. PERMIT REQUIREMENTS.
(a) In General.--The permit program required by section
172(b)(6) shall provide that permits to construct and operate
may be issued if--
(1) in accordance with regulations issued by the
Administrator for the determination of baseline
emissions in a manner consistent with the assumptions
underlying the applicable implementation plan approved
under section 110 and this part, the permitting agency
determines that--
(A) by the time the source is to commence
operation, sufficient offsetting emissions
reductions have been obtained, such that total
allowable emissions from existing sources in
the region, from new or modified sources which
are not major emitting facilities, and from the
proposed source will be sufficiently less than
total emissions from existing sources (as
determined in accordance with the regulations
under this paragraph) prior to the application
for such permit to construct or modify so as to
represent (when considered together with the
plan provisions required under section 172)
reasonable further progress (as defined in
section 171); or
(B) in the case of a new or modified major
stationary source which is located in a zone
(within the nonattainment area) identified by
the Administrator, in consultation with the
Secretary of Housing and Urban Development, as
a zone to which economic development should be
targeted, that emissions of such pollutant
resulting from the proposed new or modified
major stationary source will not cause or
contribute to emissions levels which exceed the
allowance permitted for such pollutant for such
area from new or modified major stationary
sources under section 172(c);
(2) the proposed source is required to comply with
the lowest achievable emission rate;
(3) the owner or operator of the proposed new or
modified source has demonstrated that all major
stationary sources owned or operated by such person (or
by any entity controlling, controlled by, or under
common control with such person) in such State are
subject to emission limitations and are in compliance,
or on a schedule for compliance, with all applicable
emission limitations and standards under this Act; and
(4) the Administrator has not determined that the
applicable implementation plan is not being adequately
implemented for the nonattainment area in which the
proposed source is to be constructed or modified in
accordance with the requirements of this part; and
(5) an analysis of alternative sites, sizes,
production processes, and environmental control
techniques for such proposed source demonstrates that
benefits of the proposed source significantly outweigh
the environmental and social costs imposed as a result
of its location, construction, or modification.
Any emission reductions required as a precondition of the
issuance of a permit under paragraph (1) shall be federally
enforceable before such permit may be issued.
(b) Prohibition on Use of Old Growth Allowances.--Any growth
allowance included in an applicable implementation plan to meet
the requirements of section 172(b)(5) (as in effect immediately
before the date of the enactment of the Clean Air Act
Amendments of 1990) shall not be valid for use in any area that
received or receives a notice under section 110(a)(2)(H)(ii)
(as in effect immediately before the date of the enactment of
the Clean Air Act Amendments of 1990) or under section
110(k)(1) that its applicable implementation plan containing
such allowance is substantially inadequate.
(c) Offsets.--(1) The owner or operator of a new or modified
major stationary source may comply with any offset requirement
in effect under this part for increased emissions of any air
pollutant only by obtaining emission reductions of such air
pollutant from the same source or other sources in the same
nonattainment area, except that the State may allow the owner
or operator of a source to obtain such emission reductions in
another nonattainment area if (A) the other area has an equal
or higher nonattainment classification than the area in which
the source is located and (B) emissions from such other area
contribute to a violation of the national ambient air quality
standard in the nonattainment area in which the source is
located. Such emission reductions shall be, by the time a new
or modified source commences operation, in effect and
enforceable and shall assure that the total tonnage of
increased emissions of the air pollutant from the new or
modified source shall be offset by an equal or greater
reduction, as applicable, in the actual emissions of such air
pollutant from the same or other sources in the area.
(2) Emission reductions otherwise required by this Act shall
not be creditable as emissions reductions for purposes of any
such offset requirement. Incidental emission reductions which
are not otherwise required by this Act shall be creditable as
emission reductions for such purposes if such emission
reductions meet the requirements of paragraph (1).
(3) National Security Waiver.--Upon application by the owner
or operator of a new or modified advanced manufacturing
facility or critical mineral facility (as such terms are
defined in subsection (f)(2)), the President may waive, in
whole or in part, any requirement that is in effect under this
part for such advanced manufacturing facility or critical
mineral facility to offset increased emissions of any air
pollutant if the President determines it is in the national
security interests of the United States to waive such
requirement. The President may not delegate such a
determination to any other person.
(d) Control Technology Information.--The State shall provide
that control technology information from permits issued under
this section will be promptly submitted to the Administrator
for purposes of making such information available through the
RACT/BACT/LAER clearinghouse to other States and to the general
public.
(e) Rocket Engines or Motors.--The permitting authority of a
State shall allow a source to offset by alternative or
innovative means emission increases from rocket engine and
motor firing, and cleaning related to such firing, at an
existing or modified major source that tests rocket engines or
motors under the following conditions:
(1) Any modification proposed is solely for the
purpose of expanding the testing of rocket engines or
motors at an existing source that is permitted to test
such engines on the date of enactment of this
subsection.
(2) The source demonstrates to the satisfaction of
the permitting authority of the State that it has used
all reasonable means to obtain and utilize offsets, as
determined on an annual basis, for the emissions
increases beyond allowable levels, that all available
offsets are being used, and that sufficient offsets are
not available to the source.
(3) The source has obtained a written finding from
the Department of Defense, Department of
Transportation, National Aeronautics and Space
Administration or other appropriate Federal agency,
that the testing of rocket motors or engines at the
facility is required for a program essential to the
national security.
(4) The source will comply with an alternative
measure, imposed by the permitting authority, designed
to offset any emission increases beyond permitted
levels not directly offset by the source. In lieu of
imposing any alternative offset measures, the
permitting authority may impose an emissions fee to be
paid to such authority of a State which shall be an
amount no greater than 1.5 times the average cost of
stationary source control measures adopted in that area
during the previous 3 years. The permitting authority
shall utilize the fees in a manner that maximizes the
emissions reductions in that area.
(f) Alternative Requirements for Advanced Manufacturing
Facilities and Critical Mineral Facilities.--
(1) In general.--The permitting authority of a State
shall allow a new or modified major stationary source
that is an advanced manufacturing facility or a
critical mineral facility to offset emissions from such
source by alternative or innovative means under the
following conditions:
(A) The source demonstrates to the
satisfaction of the permitting authority of the
State that it has used all reasonable means to
obtain and utilize offsets, as determined on an
annual basis, for the emissions increases
beyond allowable levels, that all available
offsets are being used, and that sufficient
offsets are not available to the source.
(B) The source will comply with an
alternative measure, imposed by the permitting
authority, designed to offset any emission
increases beyond permitted levels not directly
offset by the source. In lieu of imposing any
alternative offset measures, the permitting
authority may impose an emissions fee to be
paid to such authority of a State which shall
be an amount no greater than 1.5 times the
average cost of stationary source control
measures adopted in that area during the
previous 3 years. The permitting authority
shall utilize the fees in a manner that
maximizes the emissions reductions in that
area.
(2) Definitions.--In this subsection:
(A) Advanced manufacturing facility.--The
term ``advanced manufacturing facility'' means
a facility the primary purpose of which is the
manufacturing of semiconductors or
semiconductor manufacturing equipment.
(B) Critical mineral facility.--The term
``critical mineral facility'' means a facility
primary purpose of which is the extraction,
processing, refining, or milling of a critical
mineral (as designated by the Secretary of the
Interior).
* * * * * * *
Minority Views
We oppose H.R. 6373, the ``Air Permitting Improvements to
Protect National Security Act of 2025,'' which allows the
President to exempt certain polluting facilities from Clean Air
Act (CAA) requirements, under the undefined guise of a
``national security interest.'' The bill would also set up a
pay-to-play scheme allowing certain polluting facilities to pay
state regulators a nominal fee in lieu of controlling their
harmful pollution.
Background
The CAA requires the owner or operator of any new or
expanded source of air pollution to obtain permits before
construction begins, ensuring that new and expanding facilities
will not increase pollution above levels that are safe to
breathe. The preconstruction permitting provisions achieve this
by requiring new and modified sources to use control technology
to reduce their emissions; and to assess, and if necessary,
address their remaining air quality impacts. This approach
ensures that both the facility and community can mitigate any
pollution increases before building begins, when it is most
cost-effective.
EPA's New Source Review (NSR) program includes three
different types of permitting requirements that depend on the
size of a facility and the air quality where the facility will
be located. For nonattainment areas, which already have
dangerous, unhealthy air, the facility owner or operator must
obtain a preconstruction permit under the nonattainment NSR
program. CAA Section 173 permits require the installation of
pollution controls that are sufficient to meet the lowest
achievable emission rate, emission offsets from existing
sources, and the opportunity for public involvement.\1\
---------------------------------------------------------------------------
\1\42 U.S.C. Sec. 7503.
---------------------------------------------------------------------------
The majority claims that permitting delays have stalled key
projects, and provisions of this bill will help onshore key
industries. However, they offered no specific examples of
stalled projects during the hearings, markups, or in their
report. They produced no justification for providing sweeping
exemptions from critical public health safeguards, nor any
explanation for giving the President the ability to waive CAA
requirements for favored industrial polluters, as H.R. 6373
would do.
SUMMARY OF H.R. 6373
Section 2(1) amends CAA Section 173 to allow the President
to issue a waiver to an owner or operator of a new or modified
advanced manufacturing facility, or critical mineral facility,
for any required offset of its air pollution. This section is
harmful to public health and will lead to increases in
emissions of cancer-causing pollution in communities. This
section also creates an unfair scheme where those who get a
waiver are given a free pass to ratchet up pollution, and other
facilities will need to cut more pollution to make up the
difference. Other industries, and the states and counties where
they are located, will be punished by these waivers because
they will have to do more, likely at higher cost, to ensure
healthy air quality.
During the Environment Subcommittee markup, the majority
rejected a simple anti-corruption amendment to ensure that
these national security waivers would not be used to bestow
preferential treatment on Trump Administration friends and
favored entities. An amendment to ensure this act would not
increase health harms in vulnerable communities was also
rejected by the majority.
Section 2(2) amends CAA Section 173 to create a pay-to-play
scheme in which facilities can pay state regulators 1.5 times
the average cost of emissions reduction control measures,
instead of actually controlling their pollution. Furthermore,
the bill provides no guidelines or oversight for how regulatory
bodies should use such funds to ``maximize emissions reductions
in the area.''
This subsection also establishes that the bill's
preferential treatment solely applies to advanced manufacturing
facilities--those involved in semiconductor manufacturing--and
critical mineral facilities--those involved in the extraction,
processing, refining, or milling of critical minerals (as
designated by the Secretary of the Interior). All other
industries and facilities would be forced to cut more pollution
to make up for the provisions of this bill.
CONCLUSION
Despite the majority's claims, H.R. 6373 is nothing more
than a polluter handout and pay-to-play scheme for the most
well connected. Despite attempts by Committee Democrats,
Republicans failed to address the fundamental flaws in the
bill, putting the health of Americans at risk.
For the reasons stated above, we dissent from the views
contained in the Committee's report.
Frank Pallone, Jr.,
Ranking Member.
[all]