house · Committee report

H. Rept. 119-627

AIR PERMITTING IMPROVEMENTS TO PROTECT NATIONAL SECURITY ACT OF 2025

2026-04-28

Committees

Associated legislation

Text

Minority Views

[To accompany H.R. 6373] The Committee on Energy and Commerce, to whom was referred the bill (H.R. 6373) to amend the Clean Air Act to establish authority for the President to waive the requirement for an advanced manufacturing facility or a critical mineral facility to offset increased emissions of any air pollutant, and for other purposes, having considered the same, reports favorably thereon without amendment and recommends that the bill do pass. CONTENTS Page Purpose and Summary.............................................. 2 Background and Need for Legislation.............................. 2 Committee Action................................................. 3 Committee Votes.................................................. 3 Oversight Findings and Recommendations........................... 6 New Budget Authority, Entitlement Authority, and Tax Expenditures 6 Congressional Budget Office Estimate............................. 6 Federal Mandates Statement....................................... 6 Statement of General Performance Goals and Objectives............ 6 Duplication of Federal Programs.................................. 6 Related Committee and Subcommittee Hearings...................... 6 Committee Cost Estimate.......................................... 7 Earmark, Limited Tax Benefits, and Limited Tariff Benefits....... 7 Advisory Committee Statement..................................... 7 Applicability to Legislative Branch.............................. 7 Section-by-Section Analysis of the Legislation................... 7 Changes in Existing Law Made by the Bill, as Reported............ 8 Minority, Additional, or Dissenting Views........................ 12

Purpose and Summary

The purpose of H.R. 6373 is to expand the national security waiver provided in Section 173 of the Clean Air Act, for certain offset requirements, to advanced manufacturing facilities and critical mineral facilities.

Background and Need for Legislation

SECTION 173 OF THE CLEAN AIR ACT In 1990, Congress amended the Clean Air Act (CAA) to include Section 173, a provision for waiving the offset requirements for rocket engines or motors. DEMAND FOR CRITICAL MANUFACTURING AND CRITICAL MINERALS The President has identified domestic manufacturing and supply chain security as one of his top priorities, issuing numerous EOs related to the topic.\1\ On January 20, 2025, President Trump declared a National Energy Emergency, noting that the U.S.'s current production and of critical minerals was insufficient to meet domestic demand.\2\ --------------------------------------------------------------------------- \1\Exec. Order No. 14156, 90 Fed. Reg. 8433 (Jan. 20, 2025); Exec. Order No. 14154, 90 Fed. Reg. 8353 (Jan. 20, 2025); Exec. Order No. 14241, 90 Fed. Reg. 13673 (Mar. 20, 2025); Exec. Order No. 14213, 90 Fed. Reg. (Feb. 14, 2025); Exec. Order No. 14220, 90 Fed. Reg. 11001 (Feb. 25, 2025); Exec. Order No. 14241, 90 Fed. Reg. 13673 (Mar. 20, 2025); Exec. Order No. 14260, 90 Fed. Reg. 15513 (Apr. 8, 2025); Exec. No. Order 14261, 90 Fed. Reg. 15517 (Apr. 8, 2025); Exec. No. Order 14272, 90 Fed. Reg. 16437 (Apr. 15, 2025). \2\Exec. Order No. 14156, 90 Fed. Reg. 8433 (Jan. 20, 2025). --------------------------------------------------------------------------- Promoting the domestic production of critical minerals has remained a chief priority of the Trump Administration. Subsequent EOs related to critical minerals focus on identifying undue burdens that reduce incentives to invest in U.S. critical mineral industries or hinder the ability of companies to operate domestically.\3\ --------------------------------------------------------------------------- \3\Exec. Order No. 14154, 90 Fed. Reg. 8353 (Jan. 20, 2025). --------------------------------------------------------------------------- H.R. 6373 creates a durable approach to increasing our domestic manufacturing capacity for these critical sectors. NATIONAL SECURITY CONCERNS The U.S.'s critical mineral supply is heavily dependent on foreign sources. Annual mineral commodity reports from the United States Geological Survey (USGS) illustrate the widening dependence.\4\ For example, in 1996 the USGS report concluded that the U.S. was 100% reliant on imports for 8 minerals and over 50% dependent on imports for 16 minerals. The 2025 USGS report concludes that the U.S., is reliant on imports for all 51 critical minerals contained in the 2022 list. According to the report the U.S. is 100% dependent on imports for 12 of these minerals and more than 50% dependent on imports for another 28.\5\ --------------------------------------------------------------------------- \4\U.S. Geological Survey, 1996, Mineral commodity summaries 1996 (Jan. 1996): U.S. Geological Survey, 194 p., https://www.usgs.gov/ centers/national-minerals-information-center/mineral-commodity- summaries. \5\U.S. Geological Survey, 2025, Mineral commodity summaries 2025 (ver. 1.2, Mar. 2025): U.S. Geological Survey, 212 p., https://doi.org/ 10.3133/mcs2025. --------------------------------------------------------------------------- As a result of supply chain instability, semiconductor production has primarily shifted overseas. That shift hinders the U.S.'s capacity to produce at scale and impacts its ability to remain competitive. U.S. companies are limited in their ability to expand at a time when domestic manufacturing is key. Permitting delays stall key projects and threaten our domestic, energy, technology, and defense industries. Streamlining permitting, especially for critical industries essential to national security, is essential for global competition. To onshore these facilities back to the U.S., we must address the crippling permitting barriers contained in regulatory law. H.R. 6373 facilitates that effort.

Committee Action

On June 11, 2025, the Subcommittee on Environment held a hearing on H.R. 6373. The title of the hearing was ``Short- Circuiting Progress: How the Clean Air Act Impacts Building Necessary Infrastructure and Onshoring American Innovation.'' The Subcommittee received testimony from: James W. Boylan, Chief, Air Protection Branch, Georgia Environmental Protection Division; Chad Whiteman, Vice President, Environment and Regulatory Affairs, U.S. Chamber of Commerce; Paul Noe, Vice President, Public Policy, American Forest & Paper Association; John Walke, Director, Federal Clean Air & Senior Attorney, National Resources Defense Council. On September 16, 2025 the Subcommittee on Environment held a hearing on H.R. 6373. The title of the hearing was ``From Gridlock to Growth: Permitting Reform Under the Clean Air Act.'' The Subcommittee received testimony from: Clint Woods, Commissioner, Indiana Department of Environmental Management; Mark Gebbia, Vice President, Environmental and Permitting, Williams; Ashley Kunz, Senior Director, Environmental Health and Safety, Micron; Danny Seiden, President and CEO, Arizona Chamber of Commerce and Industry; Kerri Powell, Senior Attorney for Community Health and Air Program Leader, Southern Environmental Law Center; Ali Mirzakhalili, Air Quality Division Administrator, Oregon Department of Environmental Quality. On December 10, 2025, the Subcommittee on Environment met in open markup session and forwarded H.R. 6373, without amendment, to the full Committee by a record vote of 12 yeas and 10 nays. On January 21, 2026, the full Committee on Energy and Commerce met in open markup session and ordered H.R. 6373, without amendment, favorably reported to the House by a vote of 25 yeas and 23 nays.

Committee Votes

Clause 3(b) of rule XIII requires the Committee to list the record votes on the motion to report legislation and amendments thereto. The following reflects the record votes taken during the Committee consideration: Oversight Findings and Recommendations Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII, the Committee held (a) hearing(s) and made findings that are reflected in this report. New Budget Authority, Entitlement Authority, and Tax Expenditures Pursuant to clause 3(c)(2) of rule XIII, the Committee finds that H.R. 6373 would result in no new or increased budget authority, entitlement authority, or tax expenditures or revenues.

Congressional Budget Office Estimate

Pursuant to clause 3(c)(3) of rule XIII, at the time this report was filed, the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974 was not available. Federal Mandates Statement The Committee adopts as its own the estimate of Federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act. Statement of General Performance Goals and Objectives Pursuant to clause 3(c)(4) of rule XIII, the general performance goal or objective of this legislation is to expand Section 173 of the Clean Air Act, which currently contains a provision for waiving the offset requirements for rocket engines or motors, by adding similar provisions for advanced manufacturing facilities and critical minerals facilities. The bill allows the President to determine that an advanced manufacturing facility or a critical mineral facility is exempt from the requirement to obtain offset emissions credits. The facility also may be exempt from obtaining offset emissions credits if they demonstrate: (1) they used all reasonable means to obtain and utilize offset credits for emission increases beyond allowable levels and such credits were unavailable; or (2) if the facility complies with an alternative offset measure or an emissions fee paid to the state to maximize emissions reductions. Duplication of Federal Programs Pursuant to clause 3(c)(5) of rule XIII, no provision of H.R. 6373 is known to be duplicative of another Federal program, including any program that was included in a report to Congress pursuant to section 21 of Public Law 111-139 or the most recent Catalog of Federal Domestic Assistance. Related Committee and Subcommittee Hearings Pursuant to clause 3(c)(6) of rule XIII, the following related hearing was used to develop or consider H.R. 6373: On June 11, 2025, the Subcommittee on Environment held a hearing on H.R. 4218 and H.R. 4214. The title of the hearing was ``Short-Circuiting Progress: How the Clean Air Act Impacts Building Necessary Infrastructure and Onshoring American Innovation.'' The Subcommittee received testimony from: James W. Boylan, Chief, Air Protection Branch, Georgia Environmental Protection Division; Chad Whiteman, Vice President, Environment and Regulatory Affairs, U.S. Chamber of Commerce; Paul Noe, Vice President, Public Policy, American Forest & Paper Association; John Walke, Director, Federal Clean Air & Senior Attorney, National Resources Defense Council. Committee Cost Estimate Pursuant to clause 3(d)(1) of rule XIII, the Committee adopts as its own the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974. At the time this report was filed, the estimate was not available. Earmark, Limited Tax Benefits, and Limited Tariff Benefits Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the Committee finds that H.R. 6373 contains no earmarks, limited tax benefits or limited tariff benefits. Advisory Committee Statement No advisory committees within the meaning of section 5(b) of the Federal Advisory Committee Act were created by this legislation. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. Section-by-Section Analysis of the Legislation Section 1. Short title This section provides the short title, the ``Air Permitting Improvements to Protect National Security Act of 2025''. Section 2. Supporting critical manufacturing This section amends Section 173 of the Clean Air Act that gives the President the authority to determine that an advanced manufacturing facility or a critical mineral facility is exempt from the requirement to obtain offset emissions credits. This provision also provides that advanced manufacturing facilities or critical mineral facilities may be exempt from obtaining offset emissions credits if they demonstrate: (1) they used all reasonable means to obtain and utilize offset credits for emission increases beyond allowable levels and such credits were unavailable; or (2) if the facility complies with an alternative offset measure or an emissions fee paid to the state to maximize emissions reductions. Changes in Existing Law Made by the Bill, as Reported In compliance with clause 3(e) of rule XIII of the Rules of the House of Representatives, changes in existing law made by the bill, as reported, are shown as follows (new matter is printed in italics and existing law in which no change is proposed is shown in roman): CLEAN AIR ACT TITLE I--AIR POLLUTION PREVENTION AND CONTROL * * * * * * * Part D--Plan Requirements for Nonattainment Areas Subpart 1--Nonattainment Areas in General * * * * * * * SEC. 173. PERMIT REQUIREMENTS. (a) In General.--The permit program required by section 172(b)(6) shall provide that permits to construct and operate may be issued if-- (1) in accordance with regulations issued by the Administrator for the determination of baseline emissions in a manner consistent with the assumptions underlying the applicable implementation plan approved under section 110 and this part, the permitting agency determines that-- (A) by the time the source is to commence operation, sufficient offsetting emissions reductions have been obtained, such that total allowable emissions from existing sources in the region, from new or modified sources which are not major emitting facilities, and from the proposed source will be sufficiently less than total emissions from existing sources (as determined in accordance with the regulations under this paragraph) prior to the application for such permit to construct or modify so as to represent (when considered together with the plan provisions required under section 172) reasonable further progress (as defined in section 171); or (B) in the case of a new or modified major stationary source which is located in a zone (within the nonattainment area) identified by the Administrator, in consultation with the Secretary of Housing and Urban Development, as a zone to which economic development should be targeted, that emissions of such pollutant resulting from the proposed new or modified major stationary source will not cause or contribute to emissions levels which exceed the allowance permitted for such pollutant for such area from new or modified major stationary sources under section 172(c); (2) the proposed source is required to comply with the lowest achievable emission rate; (3) the owner or operator of the proposed new or modified source has demonstrated that all major stationary sources owned or operated by such person (or by any entity controlling, controlled by, or under common control with such person) in such State are subject to emission limitations and are in compliance, or on a schedule for compliance, with all applicable emission limitations and standards under this Act; and (4) the Administrator has not determined that the applicable implementation plan is not being adequately implemented for the nonattainment area in which the proposed source is to be constructed or modified in accordance with the requirements of this part; and (5) an analysis of alternative sites, sizes, production processes, and environmental control techniques for such proposed source demonstrates that benefits of the proposed source significantly outweigh the environmental and social costs imposed as a result of its location, construction, or modification. Any emission reductions required as a precondition of the issuance of a permit under paragraph (1) shall be federally enforceable before such permit may be issued. (b) Prohibition on Use of Old Growth Allowances.--Any growth allowance included in an applicable implementation plan to meet the requirements of section 172(b)(5) (as in effect immediately before the date of the enactment of the Clean Air Act Amendments of 1990) shall not be valid for use in any area that received or receives a notice under section 110(a)(2)(H)(ii) (as in effect immediately before the date of the enactment of the Clean Air Act Amendments of 1990) or under section 110(k)(1) that its applicable implementation plan containing such allowance is substantially inadequate. (c) Offsets.--(1) The owner or operator of a new or modified major stationary source may comply with any offset requirement in effect under this part for increased emissions of any air pollutant only by obtaining emission reductions of such air pollutant from the same source or other sources in the same nonattainment area, except that the State may allow the owner or operator of a source to obtain such emission reductions in another nonattainment area if (A) the other area has an equal or higher nonattainment classification than the area in which the source is located and (B) emissions from such other area contribute to a violation of the national ambient air quality standard in the nonattainment area in which the source is located. Such emission reductions shall be, by the time a new or modified source commences operation, in effect and enforceable and shall assure that the total tonnage of increased emissions of the air pollutant from the new or modified source shall be offset by an equal or greater reduction, as applicable, in the actual emissions of such air pollutant from the same or other sources in the area. (2) Emission reductions otherwise required by this Act shall not be creditable as emissions reductions for purposes of any such offset requirement. Incidental emission reductions which are not otherwise required by this Act shall be creditable as emission reductions for such purposes if such emission reductions meet the requirements of paragraph (1). (3) National Security Waiver.--Upon application by the owner or operator of a new or modified advanced manufacturing facility or critical mineral facility (as such terms are defined in subsection (f)(2)), the President may waive, in whole or in part, any requirement that is in effect under this part for such advanced manufacturing facility or critical mineral facility to offset increased emissions of any air pollutant if the President determines it is in the national security interests of the United States to waive such requirement. The President may not delegate such a determination to any other person. (d) Control Technology Information.--The State shall provide that control technology information from permits issued under this section will be promptly submitted to the Administrator for purposes of making such information available through the RACT/BACT/LAER clearinghouse to other States and to the general public. (e) Rocket Engines or Motors.--The permitting authority of a State shall allow a source to offset by alternative or innovative means emission increases from rocket engine and motor firing, and cleaning related to such firing, at an existing or modified major source that tests rocket engines or motors under the following conditions: (1) Any modification proposed is solely for the purpose of expanding the testing of rocket engines or motors at an existing source that is permitted to test such engines on the date of enactment of this subsection. (2) The source demonstrates to the satisfaction of the permitting authority of the State that it has used all reasonable means to obtain and utilize offsets, as determined on an annual basis, for the emissions increases beyond allowable levels, that all available offsets are being used, and that sufficient offsets are not available to the source. (3) The source has obtained a written finding from the Department of Defense, Department of Transportation, National Aeronautics and Space Administration or other appropriate Federal agency, that the testing of rocket motors or engines at the facility is required for a program essential to the national security. (4) The source will comply with an alternative measure, imposed by the permitting authority, designed to offset any emission increases beyond permitted levels not directly offset by the source. In lieu of imposing any alternative offset measures, the permitting authority may impose an emissions fee to be paid to such authority of a State which shall be an amount no greater than 1.5 times the average cost of stationary source control measures adopted in that area during the previous 3 years. The permitting authority shall utilize the fees in a manner that maximizes the emissions reductions in that area. (f) Alternative Requirements for Advanced Manufacturing Facilities and Critical Mineral Facilities.-- (1) In general.--The permitting authority of a State shall allow a new or modified major stationary source that is an advanced manufacturing facility or a critical mineral facility to offset emissions from such source by alternative or innovative means under the following conditions: (A) The source demonstrates to the satisfaction of the permitting authority of the State that it has used all reasonable means to obtain and utilize offsets, as determined on an annual basis, for the emissions increases beyond allowable levels, that all available offsets are being used, and that sufficient offsets are not available to the source. (B) The source will comply with an alternative measure, imposed by the permitting authority, designed to offset any emission increases beyond permitted levels not directly offset by the source. In lieu of imposing any alternative offset measures, the permitting authority may impose an emissions fee to be paid to such authority of a State which shall be an amount no greater than 1.5 times the average cost of stationary source control measures adopted in that area during the previous 3 years. The permitting authority shall utilize the fees in a manner that maximizes the emissions reductions in that area. (2) Definitions.--In this subsection: (A) Advanced manufacturing facility.--The term ``advanced manufacturing facility'' means a facility the primary purpose of which is the manufacturing of semiconductors or semiconductor manufacturing equipment. (B) Critical mineral facility.--The term ``critical mineral facility'' means a facility primary purpose of which is the extraction, processing, refining, or milling of a critical mineral (as designated by the Secretary of the Interior). * * * * * * *

Minority Views

We oppose H.R. 6373, the ``Air Permitting Improvements to Protect National Security Act of 2025,'' which allows the President to exempt certain polluting facilities from Clean Air Act (CAA) requirements, under the undefined guise of a ``national security interest.'' The bill would also set up a pay-to-play scheme allowing certain polluting facilities to pay state regulators a nominal fee in lieu of controlling their harmful pollution.

Background

The CAA requires the owner or operator of any new or expanded source of air pollution to obtain permits before construction begins, ensuring that new and expanding facilities will not increase pollution above levels that are safe to breathe. The preconstruction permitting provisions achieve this by requiring new and modified sources to use control technology to reduce their emissions; and to assess, and if necessary, address their remaining air quality impacts. This approach ensures that both the facility and community can mitigate any pollution increases before building begins, when it is most cost-effective. EPA's New Source Review (NSR) program includes three different types of permitting requirements that depend on the size of a facility and the air quality where the facility will be located. For nonattainment areas, which already have dangerous, unhealthy air, the facility owner or operator must obtain a preconstruction permit under the nonattainment NSR program. CAA Section 173 permits require the installation of pollution controls that are sufficient to meet the lowest achievable emission rate, emission offsets from existing sources, and the opportunity for public involvement.\1\ --------------------------------------------------------------------------- \1\42 U.S.C. Sec. 7503. --------------------------------------------------------------------------- The majority claims that permitting delays have stalled key projects, and provisions of this bill will help onshore key industries. However, they offered no specific examples of stalled projects during the hearings, markups, or in their report. They produced no justification for providing sweeping exemptions from critical public health safeguards, nor any explanation for giving the President the ability to waive CAA requirements for favored industrial polluters, as H.R. 6373 would do. SUMMARY OF H.R. 6373 Section 2(1) amends CAA Section 173 to allow the President to issue a waiver to an owner or operator of a new or modified advanced manufacturing facility, or critical mineral facility, for any required offset of its air pollution. This section is harmful to public health and will lead to increases in emissions of cancer-causing pollution in communities. This section also creates an unfair scheme where those who get a waiver are given a free pass to ratchet up pollution, and other facilities will need to cut more pollution to make up the difference. Other industries, and the states and counties where they are located, will be punished by these waivers because they will have to do more, likely at higher cost, to ensure healthy air quality. During the Environment Subcommittee markup, the majority rejected a simple anti-corruption amendment to ensure that these national security waivers would not be used to bestow preferential treatment on Trump Administration friends and favored entities. An amendment to ensure this act would not increase health harms in vulnerable communities was also rejected by the majority. Section 2(2) amends CAA Section 173 to create a pay-to-play scheme in which facilities can pay state regulators 1.5 times the average cost of emissions reduction control measures, instead of actually controlling their pollution. Furthermore, the bill provides no guidelines or oversight for how regulatory bodies should use such funds to ``maximize emissions reductions in the area.'' This subsection also establishes that the bill's preferential treatment solely applies to advanced manufacturing facilities--those involved in semiconductor manufacturing--and critical mineral facilities--those involved in the extraction, processing, refining, or milling of critical minerals (as designated by the Secretary of the Interior). All other industries and facilities would be forced to cut more pollution to make up for the provisions of this bill. CONCLUSION Despite the majority's claims, H.R. 6373 is nothing more than a polluter handout and pay-to-play scheme for the most well connected. Despite attempts by Committee Democrats, Republicans failed to address the fundamental flaws in the bill, putting the health of Americans at risk. For the reasons stated above, we dissent from the views contained in the Committee's report. Frank Pallone, Jr., Ranking Member. [all]