Skip to content

house · Committee report

H. Rept. 119-675

TO REAUTHORIZE THE FORT PECK RESERVATION RURAL WATER SYSTEM ACT OF 2000

2026-06-02

Committees

Associated legislation

Text

Background and Need for Legislation

The Fort Peck Reservation Rural Water System Act of 2000\1\ authorized the construction of two interconnected water systems--the Assiniboine and Sioux Rural Water System and the Dry Prairie Rural Water System--collectively known as the Fort Peck Reservation Rural Water System (System).\2\ One of Montana's four regional water systems, the System is designed to supply municipal, rural, and industrial water from the Missouri River to the Fort Peck Reservation (Reservation) and surrounding communities in northeastern Montana that historically relied on limited groundwater sources or poor- quality surface water.\3\ --------------------------------------------------------------------------- \1\P.L. 106-382. \2\H. Rep. No. 106-823, Fort Peck Reservation Rural Water System Act of 2000, 106th Congress, https://www.congress.gov/committee-report/ 106th-congress/house-report/823/1. \3\``Get to Know Montana's Regional Water Systems,'' Montana Department of Natural Resources and Conservation, January 2021, https:/ /dnrc.mt.gov/_docs/conservation/Regional-Water/DNRC-Regional-Water- Systems.pdf. --------------------------------------------------------------------------- The System's cost-sharing structure divides federal responsibilities between the Bureau of Reclamation (Reclamation) and the Bureau of Indian Affairs (BIA) based on project phase rather than on a proportional cost split.\4\ For the Assiniboine and Sioux System Rural Water System, which serves the Reservation, Reclamation is responsible for financing and constructing the infrastructure, while BIA assumes responsibility for funding the operation and maintenance (O&M) of the system once it becomes operational.\5\ Unlike the Assiniboine and Sioux Rural Water System, whose federal cost-share is 100 percent, the federal share for construction of the Dry Prairie Rural Water System, which serves non-Tribal rural communities, is capped at 76 percent.\6\ The non-federal project operator of this component is also responsible for covering all future O&M costs.\7\ --------------------------------------------------------------------------- \4\H. Rep. No. 106-823, Fort Peck Reservation Rural Water System Act of 2000, 106th Congress, https://www.congress.gov/committee-report/ 106th-congress/house-report/823/1. \5\Id. \6\Id. \7\Id. --------------------------------------------------------------------------- Major features of the System have already been completed, including a Missouri River raw-water intake and a water treatment plant, which started delivering water in 2012.\8\ As construction has progressed, the system has expanded service to thousands of users, delivering water to approximately 3,800 service connections and 1,800 rural connections across multiple communities.\9\ Although a substantial portion of the infrastructure is already operational, the System has not been fully completed.\10\ Remaining work primarily involves finishing additional transmission pipelines, storage facilities, and rural distribution connections. Current estimates place final completion in 2028.\11\ --------------------------------------------------------------------------- \8\``Get to Know Montana's Regional Water Systems,'' Montana Department of Natural Resources and Conservation, January 2021, https:/ /dnrc.mt.gov/_docs/conservation/Regional-Water/DNRC-Regional-Water- Systems.pdf. \9\Id. \10\Id. \11\Buy America General Applicability Public Interest Waiver for Rural Water Program Previously Planned Projects, U.S. Department of the Interior, Bureau of Reclamation, May 2, 2024, https://www.doi.gov/ sites/default/files/documents/2024-05/doi-usbr-rural-water-program- public- interest-waiver.pdf. --------------------------------------------------------------------------- Introduced by Representative Troy Downing (R-MT-02), H.R. 7250 amends the Fort Peck Reservation Rural Water System Act of 2000 to extend the project's authorization from 2026 to 2028, allowing continued federal support for the System's construction and maintenance.\12\ The completed System will consist of over 3,200 miles of pipeline and deliver drinking water to more than 20 communities and nearly 4,000 farms, ranches, and rural homes.\13\ --------------------------------------------------------------------------- \12\H.R. 7250, 119th Congress, https://www.congress.gov/119/bills/ hr7250/BILLS-119hr7250ih.pdf. \13\``Get to Know Montana's Regional Water Systems,'' Montana Department of Natural Resources and Conservation, January 2021, https:/ /dnrc.mt.gov/_docs/conservation/Regional-Water/DNRC-Regional-Water- Systems.pdf. ---------------------------------------------------------------------------

Committee Action

H.R. 7250 was introduced on January 27, 2026, by Representative Downing (R-MT-02). The bill was referred to the Committee on Natural Resources, and within the Committee to the Subcommittee on Water, Wildlife and Fisheries. On March 26, 2026, the Subcommittee on Water, Wildlife and Fisheries held a hearing on the bill. On May 14, 2026, the Committee on Natural Resources met to consider the bill. The Subcommittee on Water, Wildlife and Fisheries was discharged from further consideration of H.R. 7250 by unanimous consent. The bill was ordered favorably reported to the House of Representatives by unanimous consent.

Hearings

For the purposes of clause 3(c)(6) of House rule XIII, the following hearing was used to develop or consider this measure: hearing by the Subcommittee on Water, Wildlife and Fisheries held on March 26, 2026.

Section-by-Section Analysis

Section 1. Reauthorization Section 1 extends the authorization for the construction and maintenance of the Fort Peck Reservation Rural Water System from 2026 to 2028. Committee Oversight Findings and Recommendations Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII of the Rules of the House of Representatives, the Committee on Natural Resources' oversight findings and recommendations are reflected in the body of this report. Compliance With House Rule XIII and Congressional Budget Act 1. Cost of Legislation and the Congressional Budget Act. Pursuant to clause 3(c)(2) of House rule XIII and section 308(a) of the Congressional Budget Act of 1974, and pursuant to clause 3(c)(3) of House rule XIII and section 402 of the Congressional Budget Act of 1974, the Committee has requested but not received from the Director of the Congressional Budget Office a budgetary analysis and a cost estimate of this bill. 2. General Performance Goals and Objectives. As required by clause 3(c)(4) of rule XIII, the general performance goal or objective of this bill is to reauthorize the Fort Peck Reservation Rural Water System Act of 2000. Earmark Statement This bill does not contain any Congressional earmarks, limited tax benefits, or limited tariff benefits as defined under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of the House of Representatives. Unfunded Mandates Reform Act Statement An estimate of federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act was not made available to the Committee in time for the filing of this report. The Chair of the Committee shall cause such estimate to be printed in the Congressional Record upon its receipt by the Committee, if such estimate is not publicly available on the Congressional Budget Office website. Existing Programs Directed Rule Making. This bill does not contain any directed rule makings. Duplication of Existing Programs. This bill does not establish or reauthorize a program of the federal government known to be duplicative of another program. Such program was not included in any report from the Government Accountability Office to Congress pursuant to section 21 of Public Law 111-139 or identified in the most recent Catalog of Federal Domestic Assistance published pursuant to the Federal Program Information Act (Public Law 95-220, as amended by Public Law 98-169) as relating to other programs. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. Preemption of State, Local or Tribal Law Any preemptive effect of this bill over state, local, or tribal law is intended to be consistent with the bill's purposes and text and the Supremacy Clause of Article VI of the U.S. Constitution. Changes in Existing Law Made by the Bill, as Reported In compliance with clause 3(e) of rule XIII of the Rules of the House of Representatives, changes in existing law made by the bill, as reported, are shown as follows (existing law proposed to be omitted is enclosed in black brackets, new matter is printed in italics, and existing law in which no change is proposed is shown in roman): FORT PECK RESERVATION RURAL WATER SYSTEM ACT OF 2000 * * * * * * * SEC. 9. AUTHORIZATION OF APPROPRIATIONS. (a) Assiniboine and Sioux Rural Water System.--There are authorized to be appropriated-- (1) to the Bureau of Reclamation through fiscal year [2026] 2028, $124,000,000 for the planning, design, and construction of the Assiniboine and Sioux Rural Water System; and (2) to the Bureau of Indian Affairs such sums as are necessary for the operation and maintenance of the Assiniboine and Sioux Rural Water System. (b) Dry Prairie Rural Water System.--There is authorized to be appropriated, through fiscal year [2026] 2028, $51,000,000 for the planning, design, and construction of the Dry Prairie Rural Water System. (c) Cost Indexing.--The funds authorized to be appropriated may be increased or decreased by such amounts as are justified by reason of ordinary fluctuations in development costs incurred after October 1, 1998, as indicated by engineering cost indices applicable for the type of construction involved. [all]

Source: https://api.congress.gov/v3/committee-report/119/hrpt/675