Background and Need for Legislation
The Fort Peck Reservation Rural Water System Act of 2000\1\
authorized the construction of two interconnected water
systems--the Assiniboine and Sioux Rural Water System and the
Dry Prairie Rural Water System--collectively known as the Fort
Peck Reservation Rural Water System (System).\2\ One of
Montana's four regional water systems, the System is designed
to supply municipal, rural, and industrial water from the
Missouri River to the Fort Peck Reservation (Reservation) and
surrounding communities in northeastern Montana that
historically relied on limited groundwater sources or poor-
quality surface water.\3\
---------------------------------------------------------------------------
\1\P.L. 106-382.
\2\H. Rep. No. 106-823, Fort Peck Reservation Rural Water System
Act of 2000, 106th Congress, https://www.congress.gov/committee-report/
106th-congress/house-report/823/1.
\3\``Get to Know Montana's Regional Water Systems,'' Montana
Department of Natural Resources and Conservation, January 2021, https:/
/dnrc.mt.gov/_docs/conservation/Regional-Water/DNRC-Regional-Water-
Systems.pdf.
---------------------------------------------------------------------------
The System's cost-sharing structure divides federal
responsibilities between the Bureau of Reclamation
(Reclamation) and the Bureau of Indian Affairs (BIA) based on
project phase rather than on a proportional cost split.\4\ For
the Assiniboine and Sioux System Rural Water System, which
serves the Reservation, Reclamation is responsible for
financing and constructing the infrastructure, while BIA
assumes responsibility for funding the operation and
maintenance (O&M) of the system once it becomes operational.\5\
Unlike the Assiniboine and Sioux Rural Water System, whose
federal cost-share is 100 percent, the federal share for
construction of the Dry Prairie Rural Water System, which
serves non-Tribal rural communities, is capped at 76
percent.\6\ The non-federal project operator of this component
is also responsible for covering all future O&M costs.\7\
---------------------------------------------------------------------------
\4\H. Rep. No. 106-823, Fort Peck Reservation Rural Water System
Act of 2000, 106th Congress, https://www.congress.gov/committee-report/
106th-congress/house-report/823/1.
\5\Id.
\6\Id.
\7\Id.
---------------------------------------------------------------------------
Major features of the System have already been completed,
including a Missouri River raw-water intake and a water
treatment plant, which started delivering water in 2012.\8\ As
construction has progressed, the system has expanded service to
thousands of users, delivering water to approximately 3,800
service connections and 1,800 rural connections across multiple
communities.\9\ Although a substantial portion of the
infrastructure is already operational, the System has not been
fully completed.\10\ Remaining work primarily involves
finishing additional transmission pipelines, storage
facilities, and rural distribution connections. Current
estimates place final completion in 2028.\11\
---------------------------------------------------------------------------
\8\``Get to Know Montana's Regional Water Systems,'' Montana
Department of Natural Resources and Conservation, January 2021, https:/
/dnrc.mt.gov/_docs/conservation/Regional-Water/DNRC-Regional-Water-
Systems.pdf.
\9\Id.
\10\Id.
\11\Buy America General Applicability Public Interest Waiver for
Rural Water Program Previously Planned Projects, U.S. Department of the
Interior, Bureau of Reclamation, May 2, 2024, https://www.doi.gov/
sites/default/files/documents/2024-05/doi-usbr-rural-water-program-
public-
interest-waiver.pdf.
---------------------------------------------------------------------------
Introduced by Representative Troy Downing (R-MT-02), H.R.
7250 amends the Fort Peck Reservation Rural Water System Act of
2000 to extend the project's authorization from 2026 to 2028,
allowing continued federal support for the System's
construction and maintenance.\12\ The completed System will
consist of over 3,200 miles of pipeline and deliver drinking
water to more than 20 communities and nearly 4,000 farms,
ranches, and rural homes.\13\
---------------------------------------------------------------------------
\12\H.R. 7250, 119th Congress, https://www.congress.gov/119/bills/
hr7250/BILLS-119hr7250ih.pdf.
\13\``Get to Know Montana's Regional Water Systems,'' Montana
Department of Natural Resources and Conservation, January 2021, https:/
/dnrc.mt.gov/_docs/conservation/Regional-Water/DNRC-Regional-Water-
Systems.pdf.
---------------------------------------------------------------------------
Committee Action
H.R. 7250 was introduced on January 27, 2026, by
Representative Downing (R-MT-02). The bill was referred to the
Committee on Natural Resources, and within the Committee to the
Subcommittee on Water, Wildlife and Fisheries. On March 26,
2026, the Subcommittee on Water, Wildlife and Fisheries held a
hearing on the bill. On May 14, 2026, the Committee on Natural
Resources met to consider the bill. The Subcommittee on Water,
Wildlife and Fisheries was discharged from further
consideration of H.R. 7250 by unanimous consent. The bill was
ordered favorably reported to the House of Representatives by
unanimous consent.
Hearings
For the purposes of clause 3(c)(6) of House rule XIII, the
following hearing was used to develop or consider this measure:
hearing by the Subcommittee on Water, Wildlife and Fisheries
held on March 26, 2026.
Section-by-Section Analysis
Section 1. Reauthorization
Section 1 extends the authorization for the construction
and maintenance of the Fort Peck Reservation Rural Water System
from 2026 to 2028.
Committee Oversight Findings and Recommendations
Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII of the Rules of the House of Representatives, the
Committee on Natural Resources' oversight findings and
recommendations are reflected in the body of this report.
Compliance With House Rule XIII and Congressional Budget Act
1. Cost of Legislation and the Congressional Budget Act.
Pursuant to clause 3(c)(2) of House rule XIII and section
308(a) of the Congressional Budget Act of 1974, and pursuant to
clause 3(c)(3) of House rule XIII and section 402 of the
Congressional Budget Act of 1974, the Committee has requested
but not received from the Director of the Congressional Budget
Office a budgetary analysis and a cost estimate of this bill.
2. General Performance Goals and Objectives. As required by
clause 3(c)(4) of rule XIII, the general performance goal or
objective of this bill is to reauthorize the Fort Peck
Reservation Rural Water System Act of 2000.
Earmark Statement
This bill does not contain any Congressional earmarks,
limited tax benefits, or limited tariff benefits as defined
under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of
the House of Representatives.
Unfunded Mandates Reform Act Statement
An estimate of federal mandates prepared by the Director of
the Congressional Budget Office pursuant to section 423 of the
Unfunded Mandates Reform Act was not made available to the
Committee in time for the filing of this report. The Chair of
the Committee shall cause such estimate to be printed in the
Congressional Record upon its receipt by the Committee, if such
estimate is not publicly available on the Congressional Budget
Office website.
Existing Programs
Directed Rule Making. This bill does not contain any
directed rule makings.
Duplication of Existing Programs. This bill does not
establish or reauthorize a program of the federal government
known to be duplicative of another program. Such program was
not included in any report from the Government Accountability
Office to Congress pursuant to section 21 of Public Law 111-139
or identified in the most recent Catalog of Federal Domestic
Assistance published pursuant to the Federal Program
Information Act (Public Law 95-220, as amended by Public Law
98-169) as relating to other programs.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Preemption of State, Local or Tribal Law
Any preemptive effect of this bill over state, local, or
tribal law is intended to be consistent with the bill's
purposes and text and the Supremacy Clause of Article VI of the
U.S. Constitution.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (existing law
proposed to be omitted is enclosed in black brackets, new
matter is printed in italics, and existing law in which no
change is proposed is shown in roman):
FORT PECK RESERVATION RURAL WATER SYSTEM ACT OF 2000
* * * * * * *
SEC. 9. AUTHORIZATION OF APPROPRIATIONS.
(a) Assiniboine and Sioux Rural Water System.--There are
authorized to be appropriated--
(1) to the Bureau of Reclamation through fiscal year
[2026] 2028, $124,000,000 for the planning, design, and
construction of the Assiniboine and Sioux Rural Water
System; and
(2) to the Bureau of Indian Affairs such sums as are
necessary for the operation and maintenance of the
Assiniboine and Sioux Rural Water System.
(b) Dry Prairie Rural Water System.--There is authorized to
be appropriated, through fiscal year [2026] 2028, $51,000,000
for the planning, design, and construction of the Dry Prairie
Rural Water System.
(c) Cost Indexing.--The funds authorized to be appropriated
may be increased or decreased by such amounts as are justified
by reason of ordinary fluctuations in development costs
incurred after October 1, 1998, as indicated by engineering
cost indices applicable for the type of construction involved.
[all]