H. Rept. 119-775

RURAL JOBS AND HYDROPOWER EXPANSION ACT

2026-08-27

Committees

Associated legislation

Text

Dissenting Views

[To accompany H.R. 7487] The Committee on Natural Resources, to whom was referred the bill (H.R. 7487) to amend the Reclamation Project Act of 1939 to encourage non-Federal hydropower development with respect to Bureau of Reclamation projects, having considered the same, reports favorably thereon with an amendment and recommends that the bill as amended do pass. The amendment is as follows: Strike all after the enacting clause and insert the following: SECTION 1. SHORT TITLE. This Act may be cited as the ``Rural Jobs and Hydropower Expansion Act''. SEC. 2. AMENDMENTS TO RECLAMATION PROJECT ACT. Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C. 485h(c); 53 Stat. 1194) is amended-- (1) by striking the subsection designation and inserting the following: ``(c) Furnishing Water to Municipalities; Sale of Electric Power; Lease of Power Privileges.--''; (2) in paragraph (1), by striking ``small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs'' and inserting ``hydropower using all Bureau of Reclamation facilities''; (3) in paragraph (2)(A)-- (A) by striking ``applicable transferred conduit'' and inserting ``applicable transferred works facility''; (B) by striking ``applicable reserved conduit'' and inserting ``applicable reserved works facility''; and (C) by striking ``power privilege offer for a small conduit'' and inserting ``power privilege offer for the''; (4) in paragraph (3), by striking ``small conduit'' and inserting ``applicable''; (5) in paragraph (4), by striking ``small conduit hydropower''; (6) in paragraph (6)-- (A) by inserting ``, or the management of Bureau of Reclamation facilities specially authorized for hydropower generation'' before ``, as water used''; (B) by striking ``conduit'' before ``hydropower generation''; (C) by striking ``shall be deemed incidental to'' inserting ``shall be deemed secondary to''; and (D) by striking ``transferred conduit'' and inserting ``transferred works facility''; (7) in paragraph (7), by striking ``conduit''; (8) in paragraph (8)-- (A) by inserting ``(referred to in this section as an `authorization')'' before ``issued by the Federal Energy Regulatory Commission''; (B) by striking ``August 9, 2013,'' and inserting ``the date of the enactment of the Rural Jobs and Hydropower Expansion Act''; and (C) by adding at the end ``Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively.''; (9) by redesignating paragraph (9) as paragraph (10); (10) by inserting after paragraph (8) the following: ``(9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary.''; and (11) in paragraph (10), as so redesignated-- (A) by striking subparagraphs (A), (C), (D), and (E); (B) by redesignating subparagraph (B) as subparagraph (A); and (C) by adding at the end the following: ``(B) Reserved works facility.--The term `reserved works facility' means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities. ``(C) Transferred works facility.--The term `transferred works facility' means a project facility where the operations and maintenance of that facility is carried out by a non- Federal entity under the provisions of a formal operations and maintenance transfer contract.''. Purpose of the Legislation The purpose of H.R. 7487 is to amend the Reclamation Project Act of 1939 to encourage non-Federal hydropower development with respect to Bureau of Reclamation projects.

Background and Need for Legislation

The permitting processes for non-federal hydropower development located within a Bureau of Reclamation (Reclamation) project fall under Reclamation's Lease of Power Privilege (LOPP) Contract, the Federal Energy Regulatory Commission (FERC) License, or, in some instances, both.\1\ Unless otherwise specified by law, Reclamation projects authorized for federal hydropower development are within Reclamation's jurisdiction, requiring a LOPP for non-federal development. A LOPP is a contractual authorization that Reclamation issues to a non-federal entity to use a Reclamation facility for electric power generation, consistent with Reclamation project purposes. If a Reclamation project is not authorized for federal hydropower development, however, current law places that development within FERC's jurisdiction, requiring a FERC license for non-federal development. --------------------------------------------------------------------------- \1\Lease of Power Privilege: Permitting Process Overview, U.S. Department of the Interior, Bureau of Reclamation, May 2023, https:// naturalresources.house.gov/uploadedfiles/lopp_ usbr_sei_5-2023.pdf. --------------------------------------------------------------------------- This jurisdictional split has subjected roughly 69 non- federal projects to dual permitting processes (both LOPP and FERC).\2\ There are also about 12 projects in the development stages that would need dual permits.\3\ H.R. 7487 amends the Reclamation Project Act of 1939 to give Reclamation the exclusive authority to develop hydropower within a Reclamation project. This legislation builds upon the work done in the 113th Congress through P.L. 113-24, which authorized Reclamation to contract to develop small conduit hydropower. --------------------------------------------------------------------------- \2\Id. \3\Id. ---------------------------------------------------------------------------

Committee Action

H.R. 7487 was introduced on February 11, 2026, by Representative Lauren Boebert (R-CO). The bill was referred to the Committee on Natural Resources. On May 14, 2026, the Committee on Natural Resources met to consider the bill. Representative Lauren Boebert (R-CO) offered an Amendment in the Nature of a Substitute designated Boebert_050 ANS. The Amendment in the Nature of a Substitute was agreed to by voice vote. Ranking Member Jared Huffman (D-CA) offered an amendment to the Amendment in the Nature of a Substitute designated Huffman #1. The amendment was not agreed to by a roll call vote of 14 yeas to 21 nays, as follows: [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] The bill, as amended, was ordered favorably reported to the House of Representatives by a roll call vote of 21 yeas to 14 nays, as follows: [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]

Hearings

For the purposes of clause 3(c)(6) of House rule XIII, the following hearing was used to develop or consider this measure: hearing in the 118th Congress by the Subcommittee on Water, Wildlife and Fisheries held on May 22, 2024.

Section-by-Section Analysis

Section 1. Short title Section 1 names the bill the ``Rural Jobs and Hydropower Expansion Act''. Section 2. Amendments to Reclamation Project Act Section 2 amends the Reclamation Project Act of 1939 to give Reclamation the exclusive authority to develop hydropower within a Reclamation project. Committee Oversight Findings and Recommendations Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII of the Rules of the House of Representatives, the Committee on Natural Resources' oversight findings and recommendations are reflected in the body of this report. Performance Goals and Objectives As required by clause 3(c)(4) of rule XIII, the general performance goal or objective of this bill is to amend the Reclamation Project Act of 1939 to encourage non-Federal hydropower development with respect to Bureau of Reclamation projects. New Budget Authority, Entitlement Authority, and Tax Expenditures In compliance with clause 3(c)(2) of rule XIII of the Rules of the House of Representatives, the Committee adopts as its own the estimate of new budget authority, entitlement authority, or tax expenditures or revenues contained in the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974. Congressional Budget Office Estimates Pursuant to clause 3(d)(1) of House rule XIII, the Committee adopts as its own the cost estimate prepared by the Director of the Congressional Budget Office pursuant to the Congressional Budget Act of 1974. Earmark Statement This bill does not contain any Congressional earmarks, limited tax benefits, or limited tariff benefits as defined under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of the House of Representatives. Unfunded Mandates Reform Act Statement The Committee adopts as its own the estimate of the Federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act. Existing Programs Directed Rule Making. This bill does not contain any directed rule makings. Duplication of Existing Programs. This bill does not establish or reauthorize a program of the federal government known to be duplicative of another program. Such program was not included in any report from the Government Accountability Office to Congress pursuant to section 21 of Public Law 111-139 or identified in the most recent Catalog of Federal Domestic Assistance published pursuant to the Federal Program Information Act (Public Law 95-220, as amended by Public Law 98-169) as relating to other programs. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. Preemption of State, Local or Tribal Law Any preemptive effect of this bill over state, local, or tribal law is intended to be consistent with the bill's purposes and text and the Supremacy Clause of Article VI of the U.S. Constitution. Changes in Existing Law Made by the Bill, as Reported In compliance with clause 3(e) of rule XIII of the Rules of the House of Representatives, changes in existing law made by the bill, as reported, are shown as follows (existing law proposed to be omitted is enclosed in black brackets, new matter is printed in italics, and existing law in which no change is proposed is shown in roman): RECLAMATION PROJECT ACT OF 1939 * * * * * * * Sec. 9. (a) No expenditures for the construction of any new project, new division of a project, or new supplemental works on a project shall be made, nor shall estimates be submitted therefor, by the Secretary until after he has made an investigation thereof and has submitted to the President and to the Congress his report and findings on-- (1) the engineering feasibility of the proposed construction; (2) the estimated cost of the proposed construction; (3) the part of the estimated cost which can properly be allocated to irrigation and probably be repaid by the water users; (4) the part of the estimated cost which can properly be allocated to power and probably be returned to the United States in net power revenues; (5) the part of the estimated cost which can properly be allocated to municipal water supply or other miscellaneous purposes and probably be returned to the United States. If the proposed construction is found by the Secretary to have engineering feasibility and if the repayable and returnable allocations to irrigation, power, and municipal water supply or other miscellaneous purposes found by the Secretary to be proper, together with any allocation to flood control or navigation made under subsection (b) of this section, equal the total estimated cost of construction as determined by the Secretary, then the new project, new division of a project, or supplemental works on a project, covered by his findings, shall be deemed authorized and may be undertaken by the Secretary. If all such allocations do not equal said total estimated cost, then said new project, new division, or new supplemental works may be undertaken by the Secretary only after provision therefor has been made by Act of Congress enacted after the Secretary has submitted to the President and the Congress the report and findings involved. (b) In connection with any new project, new division of a project, or supplemental works on a project there may be allocated to flood control or navigation the part of said total estimated cost which the Secretary may find to be proper. Items for any such allocations made in connection with projects which may be undertaken pursuant to subsection (a) of this section shall be included in the estimates of appropriations submitted by the Secretary for said projects, and funds for such portions of the projects shall not become available except as directly appropriated or allotted to the Department of the Interior. In connection with the making of such an allocation, the Secretary shall consult with the Chief of Engineers and the Secretary of the Army, and may perform any of the necessary investigations or studies under a cooperative agreement with the Secretary of the Army. In the event of such an allocation the Secretary of the Interior shall operate the project for purposes of flood control or navigation, to the extent justified by said allocation therefor. (c) Furnishing Water to Municipalities; Sale of Electric Power; Lease of Power Privileges._ (1) The Secretary is authorized to enter into contracts to furnish water for municipal water supply or miscellaneous purposes: Provided, That any such contract either (A) shall require repayment to the United States, over a period of not to exceed forty years from the year in which water is first delivered for the use of the contracting party, with interest not exceeding the rate of 3\1/2\ per centum per annum if the Secretary determines an interest charge to be proper, of an appropriate share as determined by the Secretary of that part of the construction costs allocated by him to municipal water supply or other miscellaneous purposes; or (B) shall be for such periods, not to exceed forty years, and at such rates as in the Secretary's judgment will produce revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost and an appropriate share of such fixed charges as the Secretary deems proper, and shall require the payment of said rates each year in advance of delivery of water for said year. Any sale of electric power or lease of power privileges, made by the Secretary in connection with the operation of any project or division of a project, shall be for such periods, not to exceed forty years, and at such rates as in his judgment will produce power revenues at least sufficient to cover an appropriate share of the annual operation and maintenance cost, interest on an appropriate share of the construction investment at not less than 3 per centum per annum, and such other fixed charges as the Secretary deems proper: Provided further, That in said sales or leases preference shall be given to municipalities and other public corporations or agencies; and also to cooperatives and other nonprofit organizations financed in whole or in part by loans made pursuant to the Rural Electrification Act of 1936 and any amendments thereof. Nothing in this subsection shall be applicable to provisions in existing contracts, made pursuant to law, for the use of power and miscellaneous revenues of a project for the benefit of users of water from such project. The provisions of this subsection respecting the sales of electric power and leases of power privileges shall be an authorization in addition to and alternative to any authority in existing laws related to particular projectsand reserve to the Secretary the exclusive authority to develop [small conduit hydropower using Bureau of Reclamation facilities and pumped storage hydropower exclusively using Bureau of Reclamation reservoirs] hydropower using all Bureau of Reclamation facilities. No contract relating to municipal water supply or miscellaneous purposes or to electric power or power privileges shall be made unless, in the judgment of the Secretary, it will not impair the efficiency of the project for irrigation purposes. (2)(A) When carrying out this subsection, the Secretary shall first offer the lease of power privilege to an irrigation district or water users association operating the [applicable transferred conduit] applicable transferred works facility, or to the irrigation district or water users association receiving water from the [applicable reserved conduit] applicable reserved works facility. The Secretary shall determine a reasonable time frame for the irrigation district or water users association to accept or reject a lease of [power privilege offer for a small conduit] power privilege offer for the hydropower project. (B) If the irrigation district or water users association elects not accept a lease of power privilege offer under subparagraph (A), the Secretary shall offer the lease of power privilege to other parties in accordance with this subsection. (3) The Bureau of Reclamation shall apply its categorical exclusion process under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) to [small conduit] applicable hydropower development under this subsection, excluding siting of associated transmission facilities on Federal lands. (4) The Power Resources Office of the Bureau of Reclamation shall be the lead office of [small conduit hydropower] policy and procedure-setting activities conducted under this subsection. (5) Nothing in this subsection shall obligate the Western Area Power Administration, the Bonneville Power Administration, or the Southwestern Power Administration to purchase or market any of the power produced by the facilities covered under this subsection and none of the costs associated with production or delivery of such power shall be assigned to project purposes for inclusion in project rates. (6) Nothing in this subsection shall alter or impede the delivery and management of water by Bureau of Reclamation facilities, or the management of Bureau of Reclamation facilities specially authorized for hydropower generation, as water used for [conduit] hydropower generation [shall be deemed incidental to] shall be deemed secondary to use of water for the original project purposes. Lease of power privilege shall be made only when, in the judgment of the Secretary, the exercise of the lease will not be incompatible with the purposes of the project or division involved, nor shall it create any unmitigated financial or physical impacts to the project or division involved. The Secretary shall notify and consult with the irrigation district or water users association operating the [transferred conduit] transferred works facility before offering the lease of power privilege and shall prescribe terms and conditions that will adequately protect the planning, design, construction, operation, maintenance, and other interests of the United States and the project or division involved. (7) Nothing in this subsection shall alter or affect any existing agreements for the development of [conduit] hydropower projects or disposition of revenues. (8) Nothing in this subsection shall alter or affect any existing preliminary permit, license, or exemption (referred to in this section as an ``authorization'') issued by the Federal Energy Regulatory Commission under Part I of the Federal Power Act (16 U.S.C. 792 et seq.) or any project for which an application was filed with the Federal Energy Regulatory Commission before [August 9, 2013,] the date of the enactment of the Rural Jobs and Hydropower Expansion Act and is still pending. Any authorization issued by the Federal Energy Regulatory Commission with respect to a project shall remain in place until such authorization becomes inactive. As allowed by the Federal Energy Regulatory Commission, an authorization may be renewed and remain active. Once the authorization becomes inactive, project site jurisdiction shall shift to the Bureau of Reclamation exclusively. (9) Nothing in this section shall expand or otherwise amend the Bureau of Reclamation lease of power privilege authorities outside the project boundary. [(9)] (10) In this subsection: [(A) Conduit.--The term ``conduit'' means any Bureau of Reclamation tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.] [(B)] (A) Irrigation district.--The term ``irrigation district'' means any irrigation, water conservation or conservancy, multicounty water conservation or conservancy district, or any separate public entity composed of two or more such districts and jointly exercising powers of its member districts. [(C) Reserved conduit.--The term ``reserved conduit'' means any conduit that is included in project works the care, operation, and maintenance of which has been reserved by the Secretary, through the Commissioner of the Bureau of Reclamation. [(D) Transferred conduit.--The term ``transferred conduit'' means any conduit that is included in project works the care, operation, and maintenance of which has been transferred to a legally organized water users association or irrigation district. [(E) Small conduit hydropower.--The term ``small conduit hydropower'' means a facility capable of producing 5 megawatts or less of electric capacity.] (B) Reserved works facility.--The term ``reserved works facility'' means those facilities owned by the Bureau of Reclamation where the Bureau of Reclamation has retained responsibility for carrying out operation and maintenance activities. (C) Transferred works facility.--The term ``transferred works facility'' means a project facility where the operations and maintenance of that facility is carried out by a non- Federal entity under the provisions of a formal operations and maintenance transfer contract. (d) No water may be delivered for irrigation of lands in connection with any new project, new division of a project, or supplemental works on a project until an organization, satisfactory in form and powers to the Secretary, has entered into a repayment contract with the United States, in a form satisfactory to the Secretary, providing among other things-- (1) That the Secretary may fix a development period for each irrigation block, if any, of not to exceed ten years from and including the first calendar year in which water is delivered for the lands in said block; and that during the development period w

Dissenting Views

H.R. 7487, the Rural Jobs and Hydropower Expansion Act, would amend the Reclamation Project Act of 1939, authorizing all non-federal hydropower development projects associated with Bureau of Reclamation (Reclamation) facilities to utilize the Department of the Interior's Lease of Power Privilege (LOPP) permitting process in lieu of the permitting and licensing process used by the Federal Energy Regulatory Commission (FERC). Congress tasked FERC with overseeing most non-federal hydropower development in the United States and designed the Federal Power Act (FPA) licensing process to balance energy production with other important public interests, including the protection of Tribal reservations, federal public lands, and fish and wildlife resources. The Interior Department's hydropower permitting process does not provide clear equivalents to the FPA in statute. Under current law, the development of hydropower by non-federal entities on Reclamation projects is permitted by both Reclamation and FERC. Jurisdiction is defined under Memorandums of Understanding, with Reclamation maintaining exclusive jurisdiction over Reclamation facilities authorized by Congress for federal hydropower purposes, while FERC is responsible for permitting at Reclamation facilities not originally authorized for federal hydropower development. H.R. 7487 would significantly expand the use of the Interior Department's statutorily less protective permitting process for non-federal hydropower development at Reclamation water facilities, including many projects that would otherwise be licensed by FERC under the FPA. Specifically, FPA section 4(e) requires FERC, before licensing or relicensing a hydropower project affecting a federal reservation--including Tribal trust lands and many federal public lands--to determine that a project will not interfere or be inconsistent with the purposes for which a federal reservation was created. FERC is also required to include hydropower license conditions prescribed by the federal agency with jurisdiction over that reservation to ensure its adequate protection and use. FPA section 18 also gives the U.S. Fish and Wildlife Service and the National Marine Fisheries Service authority to prescribe mandatory fishway conditions for projects that would affect fish passage. FPA section 10(j) also requires FERC to include license conditions to protect, mitigate damage to, and enhance fish and wildlife affected by a licensed hydropower project, based on recommendations from federal and state fish and wildlife agencies, unless FERC determines those recommendations are inconsistent with the FPA or other law. Together, these provisions give Tribes, federal land managers, and resource agencies enforceable tools to protect Tribal rights and resources, federal reservations, fish passage, recreation and other environmental resources during the hydropower licensing process. While Reclamation regulations may incorporate similar protections into the permitting process, the Reclamation Project Act of 1939 does not provide the same protection as the FPA. H.R. 7487 would remove many non-federal hydropower projects from the enforceable statutory protections of the FPA and place them under the Interior Department's less protective permitting process without requiring similar safeguards. Congress can support hydropower development and improve the licensing process without weakening major existing safeguards for Tribes, public lands, and our native fish and wildlife. In an effort to work with the Majority, the Minority offered an amendment that would preserve existing FPA safeguards for non- federal hydropower development projects affecting Tribes, treaty rights, fish and wildlife and other public resources, while still allowing the bill to consolidate licensing at the Interior Department. Unfortunately, our amendment was not adopted. For these reasons, I oppose this legislation. Jared Huffman, Ranking Member. [all]