Dissenting Views
[To accompany H.R. 7487]
The Committee on Natural Resources, to whom was referred
the bill (H.R. 7487) to amend the Reclamation Project Act of
1939 to encourage non-Federal hydropower development with
respect to Bureau of Reclamation projects, having considered
the same, reports favorably thereon with an amendment and
recommends that the bill as amended do pass.
The amendment is as follows:
Strike all after the enacting clause and insert the
following:
SECTION 1. SHORT TITLE.
This Act may be cited as the ``Rural Jobs and Hydropower Expansion
Act''.
SEC. 2. AMENDMENTS TO RECLAMATION PROJECT ACT.
Section 9(c) of the Reclamation Project Act of 1939 (43 U.S.C.
485h(c); 53 Stat. 1194) is amended--
(1) by striking the subsection designation and inserting the
following:
``(c) Furnishing Water to Municipalities; Sale of Electric Power;
Lease of Power Privileges.--'';
(2) in paragraph (1), by striking ``small conduit hydropower
using Bureau of Reclamation facilities and pumped storage
hydropower exclusively using Bureau of Reclamation reservoirs''
and inserting ``hydropower using all Bureau of Reclamation
facilities'';
(3) in paragraph (2)(A)--
(A) by striking ``applicable transferred conduit''
and inserting ``applicable transferred works
facility'';
(B) by striking ``applicable reserved conduit'' and
inserting ``applicable reserved works facility''; and
(C) by striking ``power privilege offer for a small
conduit'' and inserting ``power privilege offer for
the'';
(4) in paragraph (3), by striking ``small conduit'' and
inserting ``applicable'';
(5) in paragraph (4), by striking ``small conduit
hydropower'';
(6) in paragraph (6)--
(A) by inserting ``, or the management of Bureau of
Reclamation facilities specially authorized for
hydropower generation'' before ``, as water used'';
(B) by striking ``conduit'' before ``hydropower
generation'';
(C) by striking ``shall be deemed incidental to''
inserting ``shall be deemed secondary to''; and
(D) by striking ``transferred conduit'' and inserting
``transferred works facility'';
(7) in paragraph (7), by striking ``conduit'';
(8) in paragraph (8)--
(A) by inserting ``(referred to in this section as an
`authorization')'' before ``issued by the Federal
Energy Regulatory Commission'';
(B) by striking ``August 9, 2013,'' and inserting
``the date of the enactment of the Rural Jobs and
Hydropower Expansion Act''; and
(C) by adding at the end ``Any authorization issued
by the Federal Energy Regulatory Commission with
respect to a project shall remain in place until such
authorization becomes inactive. As allowed by the
Federal Energy Regulatory Commission, an authorization
may be renewed and remain active. Once the
authorization becomes inactive, project site
jurisdiction shall shift to the Bureau of Reclamation
exclusively.'';
(9) by redesignating paragraph (9) as paragraph (10);
(10) by inserting after paragraph (8) the following:
``(9) Nothing in this section shall expand or otherwise amend
the Bureau of Reclamation lease of power privilege authorities
outside the project boundary.''; and
(11) in paragraph (10), as so redesignated--
(A) by striking subparagraphs (A), (C), (D), and (E);
(B) by redesignating subparagraph (B) as subparagraph
(A); and
(C) by adding at the end the following:
``(B) Reserved works facility.--The term
`reserved works facility' means those
facilities owned by the Bureau of Reclamation
where the Bureau of Reclamation has retained
responsibility for carrying out operation and
maintenance activities.
``(C) Transferred works facility.--The term
`transferred works facility' means a project
facility where the operations and maintenance
of that facility is carried out by a non-
Federal entity under the provisions of a formal
operations and maintenance transfer
contract.''.
Purpose of the Legislation
The purpose of H.R. 7487 is to amend the Reclamation
Project Act of 1939 to encourage non-Federal hydropower
development with respect to Bureau of Reclamation projects.
Background and Need for Legislation
The permitting processes for non-federal hydropower
development located within a Bureau of Reclamation
(Reclamation) project fall under Reclamation's Lease of Power
Privilege (LOPP) Contract, the Federal Energy Regulatory
Commission (FERC) License, or, in some instances, both.\1\
Unless otherwise specified by law, Reclamation projects
authorized for federal hydropower development are within
Reclamation's jurisdiction, requiring a LOPP for non-federal
development. A LOPP is a contractual authorization that
Reclamation issues to a non-federal entity to use a Reclamation
facility for electric power generation, consistent with
Reclamation project purposes. If a Reclamation project is not
authorized for federal hydropower development, however, current
law places that development within FERC's jurisdiction,
requiring a FERC license for non-federal development.
---------------------------------------------------------------------------
\1\Lease of Power Privilege: Permitting Process Overview, U.S.
Department of the Interior, Bureau of Reclamation, May 2023, https://
naturalresources.house.gov/uploadedfiles/lopp_
usbr_sei_5-2023.pdf.
---------------------------------------------------------------------------
This jurisdictional split has subjected roughly 69 non-
federal projects to dual permitting processes (both LOPP and
FERC).\2\ There are also about 12 projects in the development
stages that would need dual permits.\3\ H.R. 7487 amends the
Reclamation Project Act of 1939 to give Reclamation the
exclusive authority to develop hydropower within a Reclamation
project. This legislation builds upon the work done in the
113th Congress through P.L. 113-24, which authorized
Reclamation to contract to develop small conduit hydropower.
---------------------------------------------------------------------------
\2\Id.
\3\Id.
---------------------------------------------------------------------------
Section-by-Section Analysis
Section 1. Short title
Section 1 names the bill the ``Rural Jobs and Hydropower
Expansion Act''.
Section 2. Amendments to Reclamation Project Act
Section 2 amends the Reclamation Project Act of 1939 to
give Reclamation the exclusive authority to develop hydropower
within a Reclamation project.
Committee Oversight Findings and Recommendations
Regarding clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII of the Rules of the House of Representatives, the
Committee on Natural Resources' oversight findings and
recommendations are reflected in the body of this report.
Performance Goals and Objectives
As required by clause 3(c)(4) of rule XIII, the general
performance goal or objective of this bill is to amend the
Reclamation Project Act of 1939 to encourage non-Federal
hydropower development with respect to Bureau of Reclamation
projects.
New Budget Authority, Entitlement Authority, and
Tax Expenditures
In compliance with clause 3(c)(2) of rule XIII of the Rules
of the House of Representatives, the Committee adopts as its
own the estimate of new budget authority, entitlement
authority, or tax expenditures or revenues contained in the
cost estimate prepared by the Director of the Congressional
Budget Office pursuant to section 402 of the Congressional
Budget Act of 1974.
Congressional Budget Office Estimates
Pursuant to clause 3(d)(1) of House rule XIII, the
Committee adopts as its own the cost estimate prepared by the
Director of the Congressional Budget Office pursuant to the
Congressional Budget Act of 1974.
Earmark Statement
This bill does not contain any Congressional earmarks,
limited tax benefits, or limited tariff benefits as defined
under clause 9(e), 9(f), and 9(g) of rule XXI of the Rules of
the House of Representatives.
Unfunded Mandates Reform Act Statement
The Committee adopts as its own the estimate of the Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
Existing Programs
Directed Rule Making. This bill does not contain any
directed rule makings.
Duplication of Existing Programs. This bill does not
establish or reauthorize a program of the federal government
known to be duplicative of another program. Such program was
not included in any report from the Government Accountability
Office to Congress pursuant to section 21 of Public Law 111-139
or identified in the most recent Catalog of Federal Domestic
Assistance published pursuant to the Federal Program
Information Act (Public Law 95-220, as amended by Public Law
98-169) as relating to other programs.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Preemption of State, Local or Tribal Law
Any preemptive effect of this bill over state, local, or
tribal law is intended to be consistent with the bill's
purposes and text and the Supremacy Clause of Article VI of the
U.S. Constitution.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (existing law
proposed to be omitted is enclosed in black brackets, new
matter is printed in italics, and existing law in which no
change is proposed is shown in roman):
RECLAMATION PROJECT ACT OF 1939
* * * * * * *
Sec. 9. (a) No expenditures for the construction of any new
project, new division of a project, or new supplemental works
on a project shall be made, nor shall estimates be submitted
therefor, by the Secretary until after he has made an
investigation thereof and has submitted to the President and to
the Congress his report and findings on--
(1) the engineering feasibility of the proposed construction;
(2) the estimated cost of the proposed construction;
(3) the part of the estimated cost which can properly be
allocated to irrigation and probably be repaid by the water
users;
(4) the part of the estimated cost which can properly be
allocated to power and probably be returned to the United
States in net power revenues;
(5) the part of the estimated cost which can properly be
allocated to municipal water supply or other miscellaneous
purposes and probably be returned to the United States.
If the proposed construction is found by the Secretary to have
engineering feasibility and if the repayable and returnable
allocations to irrigation, power, and municipal water supply or
other miscellaneous purposes found by the Secretary to be
proper, together with any allocation to flood control or
navigation made under subsection (b) of this section, equal the
total estimated cost of construction as determined by the
Secretary, then the new project, new division of a project, or
supplemental works on a project, covered by his findings, shall
be deemed authorized and may be undertaken by the Secretary. If
all such allocations do not equal said total estimated cost,
then said new project, new division, or new supplemental works
may be undertaken by the Secretary only after provision
therefor has been made by Act of Congress enacted after the
Secretary has submitted to the President and the Congress the
report and findings involved.
(b) In connection with any new project, new division of a
project, or supplemental works on a project there may be
allocated to flood control or navigation the part of said total
estimated cost which the Secretary may find to be proper. Items
for any such allocations made in connection with projects which
may be undertaken pursuant to subsection (a) of this section
shall be included in the estimates of appropriations submitted
by the Secretary for said projects, and funds for such portions
of the projects shall not become available except as directly
appropriated or allotted to the Department of the Interior. In
connection with the making of such an allocation, the Secretary
shall consult with the Chief of Engineers and the Secretary of
the Army, and may perform any of the necessary investigations
or studies under a cooperative agreement with the Secretary of
the Army. In the event of such an allocation the Secretary of
the Interior shall operate the project for purposes of flood
control or navigation, to the extent justified by said
allocation therefor.
(c) Furnishing Water to Municipalities; Sale of Electric
Power; Lease of Power Privileges._
(1) The Secretary is authorized to enter into
contracts to furnish water for municipal water supply
or miscellaneous purposes: Provided, That any such
contract either (A) shall require repayment to the
United States, over a period of not to exceed forty
years from the year in which water is first delivered
for the use of the contracting party, with interest not
exceeding the rate of 3\1/2\ per centum per annum if
the Secretary determines an interest charge to be
proper, of an appropriate share as determined by the
Secretary of that part of the construction costs
allocated by him to municipal water supply or other
miscellaneous purposes; or (B) shall be for such
periods, not to exceed forty years, and at such rates
as in the Secretary's judgment will produce revenues at
least sufficient to cover an appropriate share of the
annual operation and maintenance cost and an
appropriate share of such fixed charges as the
Secretary deems proper, and shall require the payment
of said rates each year in advance of delivery of water
for said year. Any sale of electric power or lease of
power privileges, made by the Secretary in connection
with the operation of any project or division of a
project, shall be for such periods, not to exceed forty
years, and at such rates as in his judgment will
produce power revenues at least sufficient to cover an
appropriate share of the annual operation and
maintenance cost, interest on an appropriate share of
the construction investment at not less than 3 per
centum per annum, and such other fixed charges as the
Secretary deems proper: Provided further, That in said
sales or leases preference shall be given to
municipalities and other public corporations or
agencies; and also to cooperatives and other nonprofit
organizations financed in whole or in part by loans
made pursuant to the Rural Electrification Act of 1936
and any amendments thereof. Nothing in this subsection
shall be applicable to provisions in existing
contracts, made pursuant to law, for the use of power
and miscellaneous revenues of a project for the benefit
of users of water from such project. The provisions of
this subsection respecting the sales of electric power
and leases of power privileges shall be an
authorization in addition to and alternative to any
authority in existing laws related to particular
projectsand reserve to the Secretary the exclusive
authority to develop [small conduit hydropower using
Bureau of Reclamation facilities and pumped storage
hydropower exclusively using Bureau of Reclamation
reservoirs] hydropower using all Bureau of Reclamation
facilities. No contract relating to municipal water
supply or miscellaneous purposes or to electric power
or power privileges shall be made unless, in the
judgment of the Secretary, it will not impair the
efficiency of the project for irrigation purposes.
(2)(A) When carrying out this subsection, the
Secretary shall first offer the lease of power
privilege to an irrigation district or water
users association operating the [applicable
transferred conduit] applicable transferred
works facility, or to the irrigation district
or water users association receiving water from
the [applicable reserved conduit] applicable
reserved works facility. The Secretary shall
determine a reasonable time frame for the
irrigation district or water users association
to accept or reject a lease of [power privilege
offer for a small conduit] power privilege
offer for the hydropower project.
(B) If the irrigation district or
water users association elects not
accept a lease of power privilege offer
under subparagraph (A), the Secretary
shall offer the lease of power
privilege to other parties in
accordance with this subsection.
(3) The Bureau of Reclamation shall apply its
categorical exclusion process under the
National Environmental Policy Act of 1969 (42
U.S.C. 4321 et seq.) to [small conduit]
applicable hydropower development under this
subsection, excluding siting of associated
transmission facilities on Federal lands.
(4) The Power Resources Office of the Bureau
of Reclamation shall be the lead office of
[small conduit hydropower] policy and
procedure-setting activities conducted under
this subsection.
(5) Nothing in this subsection shall obligate
the Western Area Power Administration, the
Bonneville Power Administration, or the
Southwestern Power Administration to purchase
or market any of the power produced by the
facilities covered under this subsection and
none of the costs associated with production or
delivery of such power shall be assigned to
project purposes for inclusion in project
rates.
(6) Nothing in this subsection shall alter or
impede the delivery and management of water by
Bureau of Reclamation facilities, or the
management of Bureau of Reclamation facilities
specially authorized for hydropower generation,
as water used for [conduit] hydropower
generation [shall be deemed incidental to]
shall be deemed secondary to use of water for
the original project purposes. Lease of power
privilege shall be made only when, in the
judgment of the Secretary, the exercise of the
lease will not be incompatible with the
purposes of the project or division involved,
nor shall it create any unmitigated financial
or physical impacts to the project or division
involved. The Secretary shall notify and
consult with the irrigation district or water
users association operating the [transferred
conduit] transferred works facility before
offering the lease of power privilege and shall
prescribe terms and conditions that will
adequately protect the planning, design,
construction, operation, maintenance, and other
interests of the United States and the project
or division involved.
(7) Nothing in this subsection shall alter or
affect any existing agreements for the
development of [conduit] hydropower projects or
disposition of revenues.
(8) Nothing in this subsection shall alter or
affect any existing preliminary permit,
license, or exemption (referred to in this
section as an ``authorization'') issued by the
Federal Energy Regulatory Commission under Part
I of the Federal Power Act (16 U.S.C. 792 et
seq.) or any project for which an application
was filed with the Federal Energy Regulatory
Commission before [August 9, 2013,] the date of
the enactment of the Rural Jobs and Hydropower
Expansion Act and is still pending. Any
authorization issued by the Federal Energy
Regulatory Commission with respect to a project
shall remain in place until such authorization
becomes inactive. As allowed by the Federal
Energy Regulatory Commission, an authorization
may be renewed and remain active. Once the
authorization becomes inactive, project site
jurisdiction shall shift to the Bureau of
Reclamation exclusively.
(9) Nothing in this section shall expand or
otherwise amend the Bureau of Reclamation lease
of power privilege authorities outside the
project boundary.
[(9)] (10) In this subsection:
[(A) Conduit.--The term ``conduit''
means any Bureau of Reclamation tunnel,
canal, pipeline, aqueduct, flume,
ditch, or similar manmade water
conveyance that is operated for the
distribution of water for agricultural,
municipal, or industrial consumption
and not primarily for the generation of
electricity.]
[(B)] (A) Irrigation district.--The
term ``irrigation district'' means any
irrigation, water conservation or
conservancy, multicounty water
conservation or conservancy district,
or any separate public entity composed
of two or more such districts and
jointly exercising powers of its member
districts.
[(C) Reserved conduit.--The term
``reserved conduit'' means any conduit
that is included in project works the
care, operation, and maintenance of
which has been reserved by the
Secretary, through the Commissioner of
the Bureau of Reclamation.
[(D) Transferred conduit.--The term
``transferred conduit'' means any
conduit that is included in project
works the care, operation, and
maintenance of which has been
transferred to a legally organized
water users association or irrigation
district.
[(E) Small conduit hydropower.--The
term ``small conduit hydropower'' means
a facility capable of producing 5
megawatts or less of electric
capacity.]
(B) Reserved works facility.--The
term ``reserved works facility'' means
those facilities owned by the Bureau of
Reclamation where the Bureau of
Reclamation has retained responsibility
for carrying out operation and
maintenance activities.
(C) Transferred works facility.--The
term ``transferred works facility''
means a project facility where the
operations and maintenance of that
facility is carried out by a non-
Federal entity under the provisions of
a formal operations and maintenance
transfer contract.
(d) No water may be delivered for irrigation of lands in
connection with any new project, new division of a project, or
supplemental works on a project until an organization,
satisfactory in form and powers to the Secretary, has entered
into a repayment contract with the United States, in a form
satisfactory to the Secretary, providing among other things--
(1) That the Secretary may fix a development period
for each irrigation block, if any, of not to exceed ten
years from and including the first calendar year in
which water is delivered for the lands in said block;
and that during the development period w
Dissenting Views
H.R. 7487, the Rural Jobs and Hydropower Expansion Act,
would amend the Reclamation Project Act of 1939, authorizing
all non-federal hydropower development projects associated with
Bureau of Reclamation (Reclamation) facilities to utilize the
Department of the Interior's Lease of Power Privilege (LOPP)
permitting process in lieu of the permitting and licensing
process used by the Federal Energy Regulatory Commission
(FERC).
Congress tasked FERC with overseeing most non-federal
hydropower development in the United States and designed the
Federal Power Act (FPA) licensing process to balance energy
production with other important public interests, including the
protection of Tribal reservations, federal public lands, and
fish and wildlife resources. The Interior Department's
hydropower permitting process does not provide clear
equivalents to the FPA in statute. Under current law, the
development of hydropower by non-federal entities on
Reclamation projects is permitted by both Reclamation and FERC.
Jurisdiction is defined under Memorandums of Understanding,
with Reclamation maintaining exclusive jurisdiction over
Reclamation facilities authorized by Congress for federal
hydropower purposes, while FERC is responsible for permitting
at Reclamation facilities not originally authorized for federal
hydropower development.
H.R. 7487 would significantly expand the use of the
Interior Department's statutorily less protective permitting
process for non-federal hydropower development at Reclamation
water facilities, including many projects that would otherwise
be licensed by FERC under the FPA. Specifically, FPA section
4(e) requires FERC, before licensing or relicensing a
hydropower project affecting a federal reservation--including
Tribal trust lands and many federal public lands--to determine
that a project will not interfere or be inconsistent with the
purposes for which a federal reservation was created. FERC is
also required to include hydropower license conditions
prescribed by the federal agency with jurisdiction over that
reservation to ensure its adequate protection and use. FPA
section 18 also gives the U.S. Fish and Wildlife Service and
the National Marine Fisheries Service authority to prescribe
mandatory fishway conditions for projects that would affect
fish passage. FPA section 10(j) also requires FERC to include
license conditions to protect, mitigate damage to, and enhance
fish and wildlife affected by a licensed hydropower project,
based on recommendations from federal and state fish and
wildlife agencies, unless FERC determines those recommendations
are inconsistent with the FPA or other law. Together, these
provisions give Tribes, federal land managers, and resource
agencies enforceable tools to protect Tribal rights and
resources, federal reservations, fish passage, recreation and
other environmental resources during the hydropower licensing
process.
While Reclamation regulations may incorporate similar
protections into the permitting process, the Reclamation
Project Act of 1939 does not provide the same protection as the
FPA. H.R. 7487 would remove many non-federal hydropower
projects from the enforceable statutory protections of the FPA
and place them under the Interior Department's less protective
permitting process without requiring similar safeguards.
Congress can support hydropower development and improve the
licensing process without weakening major existing safeguards
for Tribes, public lands, and our native fish and wildlife. In
an effort to work with the Majority, the Minority offered an
amendment that would preserve existing FPA safeguards for non-
federal hydropower development projects affecting Tribes,
treaty rights, fish and wildlife and other public resources,
while still allowing the bill to consolidate licensing at the
Interior Department. Unfortunately, our amendment was not
adopted. For these reasons, I oppose this legislation.
Jared Huffman,
Ranking Member.