Background and Need for Legislation
WRDA 2026, as amended, builds on a long-standing commitment
to address the Nation's water resources needs, primarily
through the efforts of the Corps in partnership with state,
local, and Tribal governments and other non-Federal
stakeholders. To meet the diverse water resources
infrastructure needs of the Nation, WRDA 2026, as amended,
enhances the Corps' ability to expeditiously deliver critical
projects in concert with its project partners.
The Corps is the Federal Government's lead water resource
development and management agency.\2\ Its mission is to deliver
``vital public and military engineering services to secure our
nation, energize the economy, and reduce disaster risk.''\3\
Through 44 district offices, the Corps manages more than 13,000
miles of levees and 750 dams, generates over 70 billion
kilowatt hours of electricity through 356 generating units,
maintains 12,000 miles of inland and intracoastal waterways,
including 218 locks, and 1,067 coastal, Great Lakes, and inland
channels and harbors, has more than 9.3 million acre-feet of
water stored, and supports more than 301 million visits to
Corps lakes and river projects.\4\
---------------------------------------------------------------------------
\2\Anna E. Normand & Nicole T. Carter, Congr. Rsch Serv.. (IN11810)
U.S. Army Corps of Engineers Civil Works; Primer and Resources (June
24, 2026) available at https://www.crs.gov/Reports/IN11810.
\3\United States Army Corps of Engineers, About Us, (last accessed
on June 25, 2026), available at https://www.usace.army.mil/Missions/.
\4\U.S. Army Corps of Engineers, Value to the Nation: Fast Facts
(last accessed on June 25, 2026), available at https://
iwr.usace.army.mil/Missions/Value-to-the-Nation/Fast-Facts/.
---------------------------------------------------------------------------
Since the Nation's founding, Congress has passed water
resources infrastructure bills, starting in 1789 with a
lighthouse and beacons law and, most recently, the Water
Resources Development Act of 2024. Through Water Resources
Development Acts, ``Congress has established a general
framework and guidelines for implementing [U.S. Army Corps of
Engineers] water resources projects and activities.''\5\ WRDA
2026, as amended, builds on policies and reforms included in
prior laws. The need for WRDA 2026, as amended, arises from
several key factors:
---------------------------------------------------------------------------
\5\Nicole Carter & Anna E. Norman, Congr. Rsch Serv. (IF13112)
Water Resources Development Acts; Primer and Action in the 119th
Congress (updated Mar. 26, 2026) available at https://www.crs.gov/
Reports/IF13112.
---------------------------------------------------------------------------
1. Addressing Local Needs: Nationwide, communities
grapple with flooding, drought, natural disasters,
aging infrastructure, and other challenges. The Corps
is uniquely positioned to provide important and timely
relief to these communities. WRDA 2026, as amended,
authorizes new projects and studies to deliver water
infrastructure projects to communities and local
governments. Additionally, WRDA 2026, as amended,
modernizes Corps' policy and procedures to ensure these
projects are delivered more efficiently, and where
appropriate, more affordably to communities that may
face ability to pay concerns.
2. Economic Competitiveness: Efficient and sufficient
water transportation systems are vital for the Nation's
economic competitiveness.\6\ Continued investment in
ports, harbors, and inland waterways systems is
critical to ensure infrastructure longevity and safe
navigation. Enhancing river and coastal navigation
through infrastructure improvements ensures the smooth
movement of goods and supports economic growth.
Developing and maintaining ports that are prepared for
the largest ships support strong supply chains and
enhances global competitiveness.
---------------------------------------------------------------------------
\6\U.S. Army Corps of Engineers, Inland Marine Transportation
System, (last accessed Jul. 9, 2026), available at https://
www.usace.army.mil/Missions/Civil-Works/Navigation/IMTS/.
---------------------------------------------------------------------------
3. Collaboration with the Non-Federal Interest: To
maximize the benefits of Federal investments, water
resources development projects must be aligned with
local needs to ensure long-term support of the project.
WRDA 2026, as amended, amplifies the role of the non-
Federal interest throughout the full project lifecycle.
By encouraging increased collaboration with the non-
Federal interest, who is financially responsible for
costs associated with the planning, construction, and
maintenance of a project, as well as state and local
entities, WRDA 2026, as amended, ensures the Corps
leverages resources and expertise to deliver projects
that meet a community's unique needs efficiently.
Enactment of WRDA 2026, as amended, is crucial for
addressing these challenges and ensuring that the Nation's
water resources infrastructure can meet modern demands. This
legislation provides the necessary authority and direction to
the Corps to carry out its mission effectively and efficiently,
thereby safeguarding communities, enhancing economic
productivity, and protecting valuable environmental resources.
WRDA 2026, AS AMENDED, DELIVERS WATER RESOURCE PROJECTS
Using the established framework to carry out water resource
infrastructure projects by the Corps, WRDA 2026, as amended,
delivers infrastructure improvement and expansion projects.
This includes projects focused on navigation, flood and storm
damage control, ecosystem restoration, water supply, and other
related areas. The process involves several key steps:
1. Identifying Needs and Opportunities: The process
begins with the identification of water resources needs
and opportunities at the local, regional, and national
levels. This can be initiated by the non-Federal
interest, such as state and local governments, Tribal
entities, and other stakeholders, who recognize
specific challenges or opportunities in their areas.
2. Feasibility Studies: Once a need or opportunity is
identified, a request can be made by a member of
Congress to authorize a new feasibility study. Section
201 of WRDA 2026, as amended, authorizes the Secretary
to carry out 133 new feasibility studies, which can be
started after they receive appropriations.
3. Chief's Report: Following the completion of a
feasibility study, the Corps submits to Congress a
Report of the Chief of Engineers, more commonly
referred to as a Chief's Report, documenting the
findings and recommendations for a proposed water
resources project.\7\ This report provides the
necessary information for Congressional authorization
and funding of the project. In addition to Chief's
Reports, the Chief of Engineers prepares a Director's
Report when a water resources project is modified or
its expected construction cost exceeds the existing
project authorization.\8\ Section 401 of WRDA 2026, as
amended, authorizes 14 pending Chief's Reports or
Director's Reports that have been submitted to Congress
since the enactment of the Water Resources Development
Act of 2024, which can be started after they receive
appropriations.
---------------------------------------------------------------------------
\7\US. Army Corps of Engineers, Signed Chief's Reports, (last
accessed Jul. 15, 2026), available at https://planning.erdc.dren.mil/
toolbox/library.cfm?Option=Direct&Group=Main&
Item=Chief%20Report⋐=None&Sort=Default.
\8\U.S. Army Corps of Engineers, Signed Director's Reports, (last
accessed Jul. 15, 2026), available at https://planning.erdc.dren.mil/
toolbox/library.cfm?Option=Direct&Group=Main&
Item=Director%20Report⋐=None&Sort=Default.
---------------------------------------------------------------------------
DELIVERING ENVIRONMENTAL INFRASTRUCTURE PROJECTS THROUGH WRDA 2026, AS
AMENDED
In addition to the study and construction authority of
traditional water resources projects, the Corps has the
authority to provide design and construction assistance for
infrastructure in specified municipalities, counties, and
states through the Environmental Infrastructure program.
Projects within this program are for water distribution works,
stormwater management, surface water protection, and
environmental restoration, etc.\9\ Section 307 of WRDA 2026, as
amended, authorizes over 270 new environmental infrastructure
authorities or modifications to existing environmental
infrastructure authorities across the United States and
territories.
---------------------------------------------------------------------------
\9\Anna E. Normand, Cong. Rsch Serv. (R47162) Overview of U.S. Army
Corps of Engineers Environmental Infrastructure (EI) Assistance (June
27, 2025) available at https://www.crs.gov/Reports/R47162.
---------------------------------------------------------------------------
IMPROVING FLOOD AND COASTAL STORM RISK MANAGEMENT THROUGH WRDA 2026, AS
AMENDED
Through its flood and coastal storm risk management
missions, the Corps implements critical projects to ensure
protection of life, property, and natural resources across the
nation. WRDA 2026, as amended, strengthens the Corps' ability
to deliver these projects by clarifying the scope of the
mission, providing assistance to align flood risk management
projects with other Federal standards, and reiterating
Congressional support of nonstructural and natural and nature-
based alternatives to reduce risk when requested by the non-
Federal interest. This bill also enables greater collaboration
with state and local governments under technical assistance
authorities, such as Floodplain Management Services and
Planning Assistance to States. Key provisions include:
1. New Continuing Authorities Program to Improve
Flood Risk Management: Section 109(a) of WRDA 2026, as
amended, establishes a new authority under the
Continuing Authorities Program to carry out studies and
projects for the improvement of covered projects,
including flood risk management projects constructed by
the Corps. This new authority enables the Corps to
partner with non-Federal interests to modify existing
projects to improve flood risk management or meet
applicable Federal standards, including levee
accreditation standards. By doing so, this authority
addresses the misalignment between Corps' standards for
Civil Works projects and Federal Emergency Management
Agency's standards for levee accreditation.
2. Establishment of Levee Owners Board: Section 104
of WRDA 2026, as amended, establishes a Levee Owners
Board to develop recommendations to the Secretary and
Congress that are informed by on the ground, local
experiences. The Levee Owners Board will be comprised
of 11 members, representing various regions throughout
the country. This board will ensure non-Federal support
for budgetary decisions, feasibility report
recommendations, and implementation of the levee safety
program. Incorporation of levee owners' recommendations
will ensure the Corps' flood risk management mission is
implemented in a realistic, reasonable, and impactful
manner.
3. Comprehensive Use of the Flood Risk Management
Mission: The Water Resources Development Act of 2022
expanded the flood risk management mission to include a
broader scope of flood drivers, such as stormwater, but
this provision was not properly implemented by the
Corps. Under current guidance, the Corps only analyzes
riverine or tidal flooding, resulting in piecemeal
recommendations for local communities. Section 132 of
WRDA 2026, as amended, directly addresses this issue by
requiring the Corps to evaluate all types of flooding
in the study area requested by the non-Federal interest
and develop a comprehensive flood risk reduction
alternative. This section also ensures the Corps
considers both structural and nonstructural flood risk
management measures to deliver the most effective
solutions to local communities.
4. Continued Support for Natural and Nature-Based
Alternatives: The Water Resources Development Act of
2020 requires the Corps to include in each completed
feasibility study submitted for authorization a summary
of the natural and nature-based features evaluated for
each flood and storm damage risk reduction project, as
well as the projected long-term costs and benefits of
such features and whether such alternatives were
included in the final recommendation. Section 130 of
WRDA 2026, as amended, builds on this previous
requirement by creating a pilot program for an
alternative cost-justification analysis of natural and
nature-based features requested by the non-Federal
interest for a project.
IMPROVING NAVIGATION EFFICIENCY THROUGH WRDA 2026, AS AMENDED
Ports, harbors, and inland waterways are critical to
supporting economic and national security through
transportation of waterborne commerce and military goods. WRDA
2026, as amended, ensures appropriate investment in inland
waterways by requiring the Corps to conduct a system-wide
analysis to determine the most critical projects for
rehabilitation and maintenance. In addition, WRDA 2026, as
amended, continues the Committee's commitment to ensuring that
Federally authorized ports and commercial harbors are
maintained to their constructed dimensions to promote the
predicable and efficient movement of goods and services to
American taxpayers. This bill also ensures continued, safe
navigation by accelerating emergency inland navigation projects
and providing necessary flexibility in dredged material
planning. Key provisions include:
1. Inland Waterways Report: As the inland navigation
system ages, additional investments in rehabilitation,
repair, and replacement are necessary to ensure safe
and efficient commercial navigation. These projects
compete nationwide for limited operations and
maintenance funding, which increases the chance of
emergency closures or delayed maintenance dredging.
Section 206 of WRDA 2026, as amended, requires the
Corps to conduct a system-wide analysis of the
condition and reliability of inland and intracoastal
waterways infrastructure to identify those components
in critical need of maintenance or replacement. This
report will inform future infrastructure investments
and ensure transparency in how those decisions are
made.
2. Establishment of the Office of Inland Navigation
Construction Management: As the Corps begins additional
major rehabilitation or replacement projects for the
inland waterways, it is critical that these projects
proceed on schedule and within budget. Inland waterways
users often report construction delays and lack of
communication from the Corps regarding these projects.
Section 101 of WRDA 2026, as amended, directly
addresses these issues by establishing the Office of
Inland Navigation Construction Management, staffed by a
Program Manager, to centralize communications, increase
accountability, and provide regular updates to the
Inland Waterways Users Board and other non-Federal
interests.
3. Harbor Maintenance Trust Fund Allocations: Since
the Water Resources Reform and Development Act of 2014,
Congress has been uniquely focused on honoring the
Federal commitment to shippers and commercial ports to
fully maintain constructed widths and depts of
commercial harbors. Over the last few WRDAs, Congress
has directed the Corps to increase expenditures from
the Harbor Maintenance Trust Fund for the operation and
maintenance of Federally authorized coastal navigation
projects and to ensure an equitable allocation of
maintenance funds among the various categories of
commercial harbors, including donor and energy transfer
ports and emerging harbors. Section 113 of WRDA 2026,
as amended, builds on this effort by strengthening
requirements of the Corps to utilize all funds
collected through the Harbor Maintenance Trust Fund for
operations and maintenance, and to meet the specific
funding allocations proscribed in the Water Resources
Development Act of 2020.
4. Increasing Coordination on Maintenance Dredging:
Maintaining depths through maintenance dredging of
Federally authorized channels and harbors is critical
to ensuring navigation and maritime commerce. The
Committee has received several requests to strengthen
communication between the Corps, port operators, and
contract dredgers on maintenance dredging activities,
including project timelines and potential delays, to
reduce adverse impacts to trade and harbor operations.
Section 111 of WRDA 2026, as amended, directs the
Secretary to consult with non-Federal interests, state
and local governments, and other stakeholders,
including port operators, regarding the scope and
performance timelines when entering into contracts, or
making any changes to such contracts, for maintenance
dredging. This section also requires notification to
relevant stakeholders of any potential delays to a
dredging project.
5. Renewed Focus on Beneficial Use of Dredged
Material: WRDA 2026, as amended, builds off momentum
generated in the Water Resources Development Act of
2020, the Water Resources Development Act of 2022, and
the Water Resources Development Act of 2024 to continue
expanding the beneficial use of dredged material in
Civil Works projects. Section 112 of WRDA 2026, as
amended, requires the realignment of the Federal
standard for a water resources development project with
the policy changes and directives in these recent Water
Resources Development Acts. Section 205 requires the
Corps to draft a report describing the strategic plan,
and the status of implementation, to meet the goal
established in the Water Resources Development Act of
2020 of beneficially using 70 percent of dredged
material. These provisions reaffirm the Committee's
commitment to benefi
Hearings
For the purposes of rule XIII, clause 3(c)(6)(A) of the
119th Congress, the following hearings were used to develop or
consider H.R. 9497:
On Wednesday, May 7, 2025, the Subcommittee held a hearing
entitled, ``Cleaning Up the Past, Building the Future: The
Brownfields Program.'' The Subcommittee received testimony from
The Honorable Terry M. Wilbur, Clerk, Oswego County, New York,
on behalf of the National Association of Counties; Ms. Lisa
Shook, Assistant Chief, Division of Environmental Response and
Remediation, Ohio Environmental Protection Agency; Mr. Lance
Larson, Analyst in Environmental Policy, Resources, Science,
and Industry Division, Congressional Research Service; and Mr.
Michael R. Goldstein, Esq., Managing Partner, Goldstein
Environmental Law Firm, P.A. The hearing provided Members with
an opportunity to hear local and National perspectives on the
Environmental Protection Agency Brownfields Program.
On Wednesday, September 10, 2025, the Subcommittee held a
hearing entitled, ``Water Resources Development Acts
Implementation: Review and Oversight of Past Provisions.'' The
Subcommittee received testimony from The Honorable Adam. R.
Telle, Assistant Secretary, United States Army (Civil Works)'
Lt. Gen. William H. ``Butch'' Graham, Jr., Chief of Engineers
and Commanding General, United States Army Corps of Engineers.
The hearing provided Members with an opportunity to review
implementation of United States Army Corps of Engineers (Corps)
projects and policies that were included in previous Water
Resources Development Acts, including the Water Resources
Development Act of 2024.
On Wednesday, December 17, 2025, Subcommittee held a
hearing entitled, ``Water Resources Development Act of 2026:
Stakeholder Priorities.'' The Subcommittee received testimony
from water resources stakeholders to discuss priorities related
to primary mission areas of the United States Army Corps of
Engineers (Corps) for the Water Resources Development Act of
2026. Stakeholder witnesses included Julie Ufner, President and
Chief Executive Officer (CEO) of the National Waterways
Conference; Charles Camillo, Executive Vice President of the
Midwest Flood Control Association; Bryan Jones, President, Mid-
Atlantic Division of HNTB Corporation; and Noel Hacegaba, Chief
Operating Officer of the Port of Long Beach, California.
On Tuesday, February 24, 2026, the Subcommittee held a
hearing entitled, ``Proposals for a Water Resources Development
Act of 2026--Administration Priorities.'' The Subcommittee
received testimony from the Assistant Secretary of the Army
(Civil Works) and the Chief of Engineers about the status of
the 2026 Report to Congress on Future Water Resources
Development, upcoming and prior Chief's Reports, and receive
testimony and proposals for WRDA 2026 from the Administration.
At the hearing, Members received testimony from the Honorable
Adam R. Telle, Assistant Secretary of the Army (Civil Works)
and Lieutenant General William H. ``Butch'' Graham, Chief of
Engineers and Commanding General, United States Army Corps of
Engineers.
Legislative History and Consideration
H.R. 9497, the ``Water Resources Development Act of 2026'',
was introduced in the United States House of Representatives on
June 29, 2026, by Mr. Graves of Missouri, Mr. Larsen of
Washington, Mr. Collins of Georgia, and Ms. Wilson of Florida,
and referred to the Committee on Transportation and
Infrastructure. Within the Committee on Transportation and
Infrastructure, H.R. 9497 was referred to the Subcommittee on
Water Resources and Environment.
The Subcommittee on Water Resources and Environment was
discharged from further consideration of H.R. 9497 on July 14,
2026.
The Committee considered H.R. 9497 on July 14, 2026, and
ordered the measure to be reported to the House with a
favorable recommendation, with amendment, by recorded vote of
66 yeas to 0 nays.
The following amendments were offered:
An Amendment in the Nature of a Substitute to H.R. 9497,
offered by Chairman Graves; was AGREED TO, as amended, by voice
vote.
A Manager's Amendment to the Amendment in the Nature of a
Substitute to H.R. 9497, offered by Chairman Graves: Page 10,
beginning on line 12, strike ``modify the operation of projects
under other authorities to''. Page 11, after line 23, insert
the following: (ix) Consult and coordinate with the applicable
Federal Power Marketing Administration on the potential effect
to hydropower generation. Page 56, line 23, strike ``or''. Page
56, after line 23, insert the following (and redesignate the
subsequent subparagraph accordingly): ``(F) groundwater aquifer
recharge; or'' Strike section 113. Page 70, after line 25,
insert the following: (c) APPLICABILITY.--The amendments made
by subsection (b)(1) shall apply with respect to funds made
available after the date of enactment of this Act. Page 72,
beginning on line 11, strike ``the Secretary'' and insert ``and
in cases in which capacity is inadequate to accommodate the
maintenance dredging needs of the harbor, the Secretary''. Page
76, after line 2, insert the following: ``(ll) Pensacola Bay
System Watershed, Florida.''. Page 87, line 7, strike ``and
inserting'' and all that follows through the closing quotation
mark and insert ``and inserting a semicolon''. Page 87, line
26, strike ``success'' and all that follows through the end of
the line and insert ``success; and''. Page 87, after line 26,
insert the following: ``(F) the restoration and rehabilitation
of habitat for fish in the Choctawhatchee Bay and off the coast
in the vicinity of Okaloosa County, Florida.''. Page 95, line
13, strike ``Not later than'' and insert the following: (a) IN
GENERAL.--Not later than Page 95, after line 21, insert the
following: (3) The counties of Arkansas, Clay, Greene,
Independence, Jackson, Lawrence, Lonoke, Randolph, and
Woodruff, Arkansas, shall be transferred to the Memphis
District. (4) Desha County, Arkansas, and Lincoln County,
Arkansas, shall be transferred to the Vicksburg District. Page
95, after line 21, insert the following: (b) REQUIREMENT WITH
RESPECT TO REALIGNMENT ACTION.--(1) IN GENERAL.--Except as
provided in subsection (a), the Secretary may not carry out any
action to modify a geographic boundary of the Corps of
Engineers unless the Secretary submits to the Committee on
Transportation and Infrastructure of the House of
Representatives and the Committee on Environment and Public
Works of the Senate a notification not later than 30 days in
advance of such modification. (2) CONSULTATION AND PUBLIC
COMMENT.--In developing the notification required under
paragraph (1), the Secretary shall, to the extent practicable,
consult with and accept comments from affected stakeholders in
the geographic boundary affected by the proposed modification
to the geographic boundary of the Corps of Engineers,
including--(A) State, Tribal, or local governments; (B) non-
Federal interests; (C) the workforce of the Corps of Engineers
(including any organizations representing such workforce); and
(D) other entities, as determined appropriate by the Secretary.
(3) CONTENTS.--In the notification required under paragraph
(1), the Secretary shall include--(A) a justification for a
modification to the geographic boundary of the Corps of
Engineers; (B) a description of the effects of such
modification on--(i) the ability of the Corps of Engineers to
execute its mission; (ii) the finances of the Corps of
Engineers; (iii) the workforce of the Corps of Engineers; and
(iv) stakeholders (including State agencies, conservation
districts, and the public); and (C) a summary of any comments
received under paragraph (2) and the Secretary's response to
such comments. Page 96, strike lines 15 through 18 and insert
the following: (a) COMMUNICATION.--The Corps of Engineers,
including each district of the Corps of Engineers, shall have
open communications with each office of a Member of Congress.
Page 96, beginning on line 19, strike ``the Chairman or Ranking
Member of the Committee on Transportation and Infrastructure of
the House of Representatives or the Committee on Environment
and Public Works of the Senate'' and insert ``any Member of
Congress''. Page 97, after line 9, insert the following: (d)
MEMBER OF CONGRESS DEFINED.--In this section, the term ``Member
of Congress'' includes a Delegate or Resident Commissioner to
Congress. Page 111, after line 10, insert the following: ``(__)
The feasibility study for the project for flood risk
management, including riverbank stabilization and bluff
stabilization, Columbus and Hickman, Kentucky, authorized by
section 8201(a)(28) of the Water Resources Development Act of
2022 (136 Stat. 3746) (as modified by this Act).''. Page 112,
after line 15, insert the following: ``(11) The feasibility
study for the project for flood risk management, including
riverbank stabilization and bluff stabilization, Columbus and
Hickman, Kentucky, authorized by section 8201(a)(28) of the
Water Resources Development Act of 2022 (136 Stat. 3746) (as
modified by this Act).''. At the end of title I, insert the
following: SEC. 145. VESSEL REMOVAL BY CORPS OF ENGINEERS.
Section 19(b)(4) of the Act of March 3, 1899 (33 U.S.C. 414(b))
is amended--(1) in subparagraph (A)(i), by inserting ``under
section 4711 of title 46, United States Code,'' after
``Commandant of the Coast Guard''; and (2) in subparagraph
(B)(iii)(I), by inserting ``under section 4711 of title 46,
United States Code,'' after ``Commandant of the Coast Guard''.
Page 130, after line 18, insert the following: (l) INTRACOASTAL
WATERWAY, FLORIDA.--Modification to the project for navigation,
Intracoastal Waterway from Jacksonville, Florida, to Miami,
Florida, authorized by section 2 of the Act of March 2, 1945
(chapter 19, 59 Stat. 16), to include the navigation channel at
Jupiter Inlet, Florida. Page 133, after line 5, insert the
following: (__) PORT OF IBERIA, LOUISIANA.--Modifications to
the project for navigation, Port of Iberia, Louisiana,
authorized by section 1001(25) of the Water Resources
Development Act of 2007 (121 Stat. 1053; 128 Stat. 1351), to
improve navigation in the Federal navigation channel of the
Freshwater Bayou by deepening the channel south of the
Freshwater City Lock up to 32 feet, including the Freshwater
Bayou lock bypass channel as part of the Federal project, and
deepening and widening the bypass channel. Page 144, strike
lines 11 through 14. Page 144, after line 24, insert the
following: (__) Project for storm damage reduction and
shoreline protection, including the engineering documentation
report, Brigantine Inlet to Great Egg Harbor Inlet, Absecon
Island, New Jersey, authorized by section 101(b)(13) of the
Water Resources Development Act of 1996 (110 Stat. 3668). Page
145, line 10, insert ``the'' before ``project''. Page 149,
after line 19, insert the following: (10) Project for coastal
storm risk management, Nassau County Back Bays, New York,
authorized pursuant to the Act of June 15, 1955 (chapter 140,
69 Stat. 132). Page 151, after line 11, insert the following:
(g) NEW YORK AND NEW JERSEY HARBOR AND TRIBUTARIES.--(1)
SCHEDULE.--Not later than 90 days after the date of enactment
of this Act, the Secretary, in consultation with the non-
Federal interests for the project described in subsection
(b)(9), shall provide to such non-Federal interests and
congressional delegations a schedule for completion of the
final report of the Chief of Engineers and other project
decision documents including--(A) the remaining study, review,
decision milestones, and budget; (B) any separable elements,
actionable elements, phases, reaches, or features expected to
be advanced and the anticipated timeline for any such
advancements for the duration of the project until completion;
(C) the status of responses to public comments received on the
2022 Draft Integrated Feasibility Report and Tier 1
Environmental Impact Statement and Tentatively Selected Plan;
and (D) any impediments to completion of the final report of
the Chief of Engineers and any other decision document. (2)
BRIEFINGS.--Until completion of the final report of the Chief
of Engineers and other decision documents described in
paragraph (1), the Secretary shall brief the non-Federal
interests and congressional delegations not less frequently
than once per quarter on the status of the project, including
progress toward the milestones identified under paragraph (1).
(3) CONGRESSIONAL REPORTS.--Not later than 6 months after the
date of enactment of this Act, and annually thereafter for a
period of 5 years, the Secretary shall submit to Congress a
report detailing the progress on the schedule for completion
required under this subsection. Page 151, after line 20, insert
the following: (b) COLUMBUS AND HICKMAN, KENTUCKY.--The
feasibility study for the project for flood risk management,
including riverbank stabilization, Columbus, Kentucky,
authorized by section 8201(a)(28) of the Water Resources
Development Act of 2022 (136 Stat. 3746), is modified to
authorize the Secretary to include in the study bluff
stabilization as an authorized purpose and to include in the
study area the City of Hickman, Kentucky. (c) MAURICE RIVER,
NEW JERSEY.--The feasibility study for the project for
navigation and for beneficial use of dredged materials for
hurricane and storm damage risk reduction and ecosystem
restoration, Maurice River, New Jersey, authorized by section
8201(a)(53) of the Water Resources Development Act of 2022 (136
Stat. 3747), is modified to authorize the Secretary to include
streambank erosion and shoreline protection and to include in
the study area the East Point Lighthouse. Page 152, line 12,
strike ``subsections (a) and (b)'' and insert ``subsections (a)
through (d)''. Page 152, beginning on line 14, strike
``subsection (a) or (b)'' and insert ``subsection (a), (b),
(c), or (d)''. Page 174, after line 19, insert the following:
(c) REPORT ON LOWER PEARL RIVER RESTORATION PROJECT.--(1) IN
GENERAL.--The Engineer Inspector General of the Corps of
Engineers shall submit to the Committee on Transportation and
Infrastructure of the House of Representatives a report on the
failure and degradation of the weir constructed at Wilson's
Slough, near Walkiah Bluff, Mississippi, as part of the project
for flood damage reduction, Pearl River Basin, including
Shoccoe, Mississippi, authorized by section 401(e)(3) of the
Water Resources Development Act of 1986 (100 Stat. 4132; 121
Stat. 1134). (2) CONTENTS.--The report submitted under
paragraph (1) shall include--(A) an assessment of the design,
construction, operation, and maintenance of the weir; (B) a
determination, to the extent practicable, of whether the
failure or degradation of the weir was primarily attributable
to structural deficiencies, inadequate operations or
maintenance, natural events, or a combination thereof; and (C)
any recommendations for administrative or legislative actions
necessary to restore functionality of the Lower Pearl River
Restoration project or prevent similar failures in future
environmental restoration projects. After section 206, insert
the following: SEC. 207. COASTAL STORM RISK MANAGEMENT TRUST
FUND STUDY. The Secretary shall conduct a study on the creation
of a Coastal Storm Risk Management Trust Fund, including
identification of potential sources of funding for such a trust
fund. SEC. 208. ASSESSMENT OF EMERGING HARBOR MAINTENANCE
BACKLOG. (a) ASSESSMENT.--Not later than 1 year after the date
of enactment of this Act, the Secretary shall conduct an
assessment of Federally authorized emerging harbors that have
experienced deferred maintenance, inadequate operations and
maintenance funding, or recurring navigation deficiencies. (b)
CONTENTS.--In conducting the assessment under subsection (a),
the Secretary shall identify, for each emerging harbor--(1) the
authorized dimensions and current condition of the harbor and
associated Federal navigation features; (2) the extent of
deferred maintenance and dredging needs; (3) the economic,
public safety, emergency response, commercial fishing, Tribal,
and recreational impacts associated with deferred maintenance;
(4) whether the harbor has been unable to receive regular
maintenance because of current benefit-cost methodologies or
other Federal policies; (5) whether the harbor has not received
Federal operations and maintenance funding for a period of not
less than 10 years and the impacts of such lack of maintenance
on navigation, safety, and local economic activity; (6)
recommendations for addressing identified maintenance backlogs;
and (7) a determination of--(A) the interest of State, local,
and Tribal governments, and port authorities, in assuming
responsibility for the operation and maintenance of the
emerging harbor; and (B) any legal, financial, or operational
barriers to such assumption of responsibility. (c)
CONSULTATION.--In conducting the assessment under this section,
the Secretary shall consult with State, local, Tribal, and port
authorities regarding--(1) the potential deauthorization of
Federally authorized emerging harbors; (2) the interest of non-
Federal public entities in assuming responsibility for the
operation and maintenance of such harbors; and (3) the
authorities, funding mechanisms, and technical assistance that
may be necessary to facilitate such transfers. (d) REPORT TO
CONGRESS.--(1) IN GENERAL.--Not later than 1 year after the
date of enactment of this Act, the Secretary shall submit to
the Committee on Transportation and Infrastructure of the House
of Representatives and the Committee on Environment and Public
Works of the Senate a report containing the results of the
assessment conducted under this section and recommendations for
administrative or legislative actions to address any identified
backlogs, including any recommendationsregarding the transfer
of operation and maintenance responsibilities to interested non-Federal
entities. (2) PRIORITY LIST.--The Secretary shall include in the report
under paragraph (1) a prioritized list of emerging harbor maintenance
projects based on economic importance, public safety, commercial
fishing activity, Tribal reliance, emergency access needs, and the
extent of deferred maintenance. (e) EMERGING HARBOR DEFINED.--In this
section, the term ``emerging harbor'' has the meaning given the term in
section 210(f)(2) of the Water Resources Development Act of 1986 (33
U.S.C. 2238(f)(2)). Page 176, beginning on line 5, strike ``subsection
(a)'' and insert ``paragraph (1)''. Page 176, beginning on line 18,
strike ``described in paragraph (2)'' and insert ``and tests described
in subparagraph (B)''. Page 177, beginning on line 2, strike
``subsection (a)'' and insert ``paragraph (1)''. Page 177, strike line
5 and insert the following: (B) Indian Tribes; and Page 177, line 6,
strike ``(B)'' and insert ``(C)''. Page 177, after line 7, insert the
following: (____) GUIDANCE.--Not later than 1 year after the completion
of the activities and testing described in paragraph (1), the Secretary
shall publish guidance for the utilization of natural infrastructure in
dryland streams technologies in civil works projects. Page 177, line
16,
Committee Votes
Clause 3(b) of rule XIII of the Rules of the House of
Representatives requires each committee report to include the
total number of votes cast for and against on each record vote
on a motion to report and on any amendment offered to the
measure or matter, and the names of those members voting for
and against.
Vote: 130.
Measure: H.R. 9497.
On: Final passage: H.R. 9497, as amended.
Yea 66; Nay 0.
Present 0; Not Voting 1.
----------------------------------------------------------------------------------------------------------------
Member Vote Member Vote
----------------------------------------------------------------------------------------------------------------
Mr. Graves of MO................................ Y Mr. Larsen of WA.................. Y
Mr. Crawford.................................... Y Ms. Norton........................ Y
Mr. Webster of FL............................... Y Mr. Nadler........................ Y
Mr. Massie...................................... Y Mr. Garamendi..................... Y
Mr. Perry....................................... Y Mr. Johnson of GA................. Y
Mr. Babin....................................... Y Mr. Carson........................ Y
Mr. Rouzer...................................... Y Ms. Titus......................... Y
Mr. Bost........................................ ............ Mr. Huffman....................... Y
Mr. Westerman................................... Y Ms. Brownley...................... Y
Mr. Mast........................................ Y Ms. Wilson of FL.................. Y
Mr. Stauber..................................... Y Mr. DeSaulnier.................... Y
Mr. Burchett.................................... Y Mr. Carbajal...................... Y
Mr. Johnson of SD............................... Y Mr. Stanton....................... Y
Mr. Van Drew.................................... Y Ms. Davids of KS.................. Y
Mr. Nehls....................................... Y Mr. Garcia of IL.................. Y
Mr. Mann........................................ Y Mr. Pappas........................ Y
Mr. Owens....................................... Y Mr. Moulton....................... Y
Mr. Burlison.................................... Y Ms. Strickland.................... Y
Mr. Collins..................................... Y Mr. Ryan.......................... Y
Mr. Ezell....................................... Y Ms. Hoyle of OR................... Y
Mr. Kiley....................................... Y Mrs. Sykes........................ Y
Mr. Fong........................................ Y Ms. Scholten...................... Y
Mr. Wied........................................ Y Mrs. Foushee...................... Y
Mr. Barrett..................................... Y Mr. Deluzio....................... Y
Mr. Begich...................................... Y Mr. Garcia of CA.................. Y
Mr. Bresnahan................................... Y Ms. Pou........................... Y
Mr. Hurd........................................ Y Ms. McDonald Rivet................ Y
Mr. McDowell.................................... Y Ms. Friedman...................... Y
Mr. Taylor...................................... Y Ms. Gillen........................ Y
Mr. Knott....................................... Y Mr. Figures....................... Y
Ms. King-Hinds.................................. Y Mr. Frost......................... Y
Mr. Kennedy..................................... Y
Mr. Onder....................................... Y
Mr. Patronis.................................... Y
Mr. Fuller...................................... Y
Mr. Gallagher................................... Y
----------------------------------------------------------------------------------------------------------------
Vote: 129.
Measure: H.R. 9497.
On: No. 327, offered by Mr. Perry.
Yea 30; Nay 35.
Present 0; Not Voting 2.
----------------------------------------------------------------------------------------------------------------
Member Vote Member Vote
----------------------------------------------------------------------------------------------------------------
Mr. Graves of MO................................ N Mr. Larsen of WA.................. N
Mr. Crawford.................................... Y Ms. Norton........................ N
Mr. Webster of FL............................... Y Mr. Nadler........................ N
Mr. Massie...................................... Y Mr. Garamendi..................... N
Mr. Perry....................................... Y Mr. Johnson of GA................. N
Mr. Babin....................................... Y Mr. Carson........................ N
Mr. Rouzer...................................... Y Ms. Titus......................... N
Mr. Bost........................................ ............ Mr. Huffman....................... N
Mr. Westerman................................... Y Ms. Brownley...................... N
Mr. Mast........................................ Y Ms. Wilson of FL.................. N
Mr. Stauber..................................... Y Mr. DeSaulnier.................... N
Mr. Burchett.................................... Y Mr. Carbajal...................... N
Mr. Johnson of SD............................... Y Mr. Stanton....................... N
Mr. Van Drew.................................... Y Ms. Davids of KS.................. N
Mr. Nehls....................................... Y Mr. Garcia of IL.................. N
Mr. Mann........................................ Y Mr. Pappas........................ N
Mr. Owens....................................... Y Mr. Moulton....................... N
Mr. Burlison.................................... Y Ms. Strickland.................... N
Mr. Collins..................................... Y Mr. Ryan.......................... N
Mr. Ezell....................................... Y Ms. Hoyle of OR................... N
Mr. Kiley....................................... N Mrs. Sykes........................ N
Mr. Fong........................................ Y Ms. Scholten...................... N
Mr. Wied........................................ Y Mrs. Foushee...................... N
Mr. Barrett..................................... ............ Mr. Deluzio....................... N
Mr. Begich...................................... Y Mr. Garcia of CA.................. N
Mr. Bresnahan................................... Y Ms. Pou........................... N
Mr. Hurd........................................ Y Ms. McDonald Rivet................ N
Mr. McDowell.................................... Y Ms. Friedman...................... N
Mr. Taylor...................................... Y Ms. Gillen........................ N
Mr. Knott....................................... Y Mr. Figures....................... N
Ms. King-Hinds.................................. N Mr. Frost......................... N
Mr. Kennedy..................................... Y
Mr. Onder....................................... Y
Mr. Patronis.................................... Y
Mr. Fuller...................................... Y
Mr. Gallagher................................... N
----------------------------------------------------------------------------------------------------------------
Committee Oversight Findings and Recommendations
With respect to the requirements of clause 3(c)(1) of rule
XIII of the Rules of the House of Representatives, the
Committee's oversight findings and recommendations are
reflected in this report.
New Budget Authority and Tax Expenditures
With respect to the requirements of clause 3(c)(2) of rule
XIII of the Rules of the House of Representatives and section
308(a) of the Congressional Budget Act of 1974 and with respect
to requirements of clause (3)(c)(3) of rule XIII of the Rules
of the House of Representatives and section 402 of the
Congressional Budget Act of 1974, the Committee has requested
but not received a cost estimate for this bill from the
Director of Congressional Budget Office. The Committee has
requested but not received from the Director of the
Congressional Budget Office a statement as to whether this bill
contains any new budget authority, spending authority, credit
authority, or an increase or decrease in revenues or tax
expenditures. The Chairman of the Committee shall cause such
estimate and statement to be printed in the Congressional
Record upon its receipt by the Committee.
Congressional Budget Office Cost Estimate
With respect to the requirement of clause 3(c)(3) of rule
XIII of the Rules of the House of Representatives, a cost
estimate provided by the Congressional Budget Office pursuant
to section 402 of the Congressional Budget Act of 1974 was not
made available to the Committee in time for the filing of this
report. The Chairman of the Committee shall cause such estimate
to be printed in the Congressional Record upon its receipt by
the Committee.
Performance Goals and Objectives
With respect to the requirement of clause 3(c)(4) of rule
XIII of the Rules of the House of Representatives, the
performance goal and objective of this legislation is to carry
out water resources development activities for the Nation,
usually through cost-shared partnerships with non-Federal
interests.
Duplication of Federal Programs
Pursuant to clause 3(c)(5) of rule XIII of the Rules of the
House of Representatives, the Committee finds that no provision
of H.R. 9496 establishes or reauthorizes a program of the
Federal government known to be duplicative of another Federal
program, a program that was included in any report from the
Government Accountability Office to Congress pursuant to
section 21 of Public Law 111-139, or a program related to a
program identified in the most recent Catalog of Federal
Domestic Assistance.
Congressional Earmarks, Limited Tax Benefits, and Limited
Tariff Benefits
In compliance with clause 9 of rule XXI of the Rules of the
House of Representatives, this bill, as reported, contains no
congressional earmarks, limited tax benefits, or limited tariff
benefits as defined in clause 9(e), 9(f), or 9(g) of the rule
XXI.
Federal Mandates Statement
An estimate of Federal mandates prepared by the Director of
the Congressional Budget Office pursuant to section 423 of the
Unfunded Mandates Reform Act was not made available to the
Committee in time for the filing of this report. The Chairman
of the Committee shall cause such estimate to be printed in the
Congressional Record upon its receipt by the Committee.
Preemption Clarification
Section 423 of the Congressional Budget Act of 1974
requires the report of any Committee on a bill or joint
resolution to include a statement on the extent to which the
bill or joint resolution is intended to preempt state, local,
or tribal law. The Committee finds that H.R. 9497 does not
preempt any state, local, or Tribal law.
Advisory Committee Statement
No advisory committees within the definition of Section
5(b) of the appendix to Title 5, United States Code, are
created by this legislation.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act (Public Law
104-1).
Section-by-Section Analysis of the Legislation
Section 1. Short title; table of contents
This section of the bill provides the title of the bill as
the ``Water Resources Development Act of 2026.'' This section
also provides the table of contents for the bill.
Section 2. Secretary defined
This section provides that in this division, the term
``Secretary'' means the Secretary of the Army.
TITLE I--GENERAL PROVISIONS
Section 101. Program Offices within the Directorate of Civil Works
This section directs the Secretary to establish the
following offices in the Directorate of Civil Works: Office of
Inland Navigation Construction; Office of Water Supply, Water
Conservation, and Drought Resiliency; Office on Technical
Assistance and Community Outreach; and Office on Alternative
Delivery Methods.
Section 102. Contracting efficiency
This section includes a Sense of Congress that the Corps
should maximize efficiency through use of multiyear or
continuing contracts. This section also requires the
Comptroller of the United States to study the benefits of the
Corps using multiyear or continuing contracts for construction
of authorized water resource development projects.
Section 103. Removal or Remediation of contaminated sediment
This section authorizes the Secretary to develop a joint
plan, in coordination with the non-Federal interest, for the
covered project and approved by the Environmental Protection
Agency (EPA), to carry out covered projects with contaminated
sediment concerns. In utilizing this authority, the Secretary
is directed to coordinate with state and local governments as
early as possible to incorporate any state or local
requirements related to contaminated sediments to minimize
project delays while also limiting impacts on water quality and
public health.
Section 104. Levee Owners Board
This section establishes a Levee Owners Board to develop
recommendations regarding levee system reliability, flood risk
management projects submitted to Congress, and the Corps' levee
safety program.
Section 105. Categorical permissions
This section directs the Secretary to promulgate a
rulemaking to establish ``categorical permissions'' for
activities in the Corps' Section 408 program to modify a
project constructed by the Corps.
Section 106. Contributions by Non-Federal Interests
This section authorizes the Corps to accept non-Federal
funds for a project that has exceeded or is expected to exceed
its authorized maximum cost threshold, pursuant to a written
agreement.
Section 107. Electronic submission and tracking of permit
applications
This section requires the Secretary to use an electronic
system for project permit application preparation, submission,
and tracking.
Section 108. Project study schedule and cost estimate
This section provides a non-Federal interest greater
control over feasibility study schedules and costs and requires
notifications to Congress when a study is extended beyond four
years or $5 million in Federal costs, or when a study is
terminated.
Section 109. Continuing authority programs
This section establishes two new continuing authority
programs (CAPs), one for drought resiliency and another for
improving completed flood risk management projects. This
section also modifies authorizations for the Corps' existing
CAPs.
Section 110. Dredged material management plans
This section requires dredged material management plans to
identify dredged material placement capacity for a minimum of
10 years.
Section 111. Dredging coordination
This section directs the Secretary to consult with non-
Federal interests, state and local governments, and other
stakeholders on scope and timelines when entering into
contracts, or making any changes to contracts, for maintenance
dredging.
Section 112. Federal standard for dredged material disposal or
placement
This section directs the Secretary to update regulations
related to the Federal standard for dredged material
management, to align with requirements in prior Water Resources
Development Acts.
Section 113. Allocations from the Harbor Maintenance Trust Fund
This section clarifies Harbor Maintenance Trust Fund (Trust
Fund) allocation requirements from the Water Resources
Development Act of 2020. Additionally, this section requires an
annual report from the Corps on allocations from the Trust Fund
for each category of projects and variations between required
and actual allocations.
Section 114. Soo locks operator wage rates
This section establishes a normalized wage rate for Corps
employees at the Soo Locks in Sault Sainte Marie, Michigan.
Section 115. Beneficial use of dredged material from harbors in the
State of Ohio
This section directs the Secretary to expedite execution of
agreements with non-Federal sponsors for the design,
construction, or operation of a facility providing for
beneficial use of dredged material from a Federally authorized
harbor in the State of Ohio.
Section 116. Minimum real estate interest
This section directs the Secretary to revise or update the
Corps' policy and guidance documents related to identifying and
approving the appropriate minimum real estate interest to
support a water resources development project.
Section 117. Real estate appraisal validity
This section directs the Secretary to review and update all
policies and guidance applicable to the real estate appraisal
process for civil works projects to identify efficiencies and
align durations associated with appraisal and certified cost
estimate validity.
Section 118. Watershed and river basin assessments
This section includes additional locations for watershed-
based studies under section 729 of the Water Resources
Development Act of 1986.
Section 119. Prohibition on diversion of water from Missouri River
This section prohibits the diversion of water from the
Missouri River or any of its tributaries to a state outside of
the watershed, unless such diversion is approved by the
Governor of each of the Missouri River states.
Section 120. Law enforcement at Water Resources Development projects
This section increases the authorized amount for the
Secretary to contract with state or local governments for
providing law enforcement services at Corps' facilities, as
authorized under section 120 of the Water Resourc