H. Rept. 119-824

HIGH-CAPACITY GRID ACT

2026-09-14

Committees

Associated legislation

Text

Purpose and Summary

This legislation directs the Federal Energy Regulatory Commission, in consultation with the Department of Energy, to establish a best available transmission conductor class and require public utilities to utilize conductors from this class when seeking to construct or modify transmission lines.

Background and Need for Legislation

The nation's electric power grid is comprised of vast networks of high voltage transmission lines, generating resources, local distribution lines, and other critical infrastructure to ensure the delivery of adequate supplies of electricity to homes and businesses. This complex system is, to varying degrees, holistically planned with help from utilities, states, grid operators, and other balancing authorities to ensure reliable and affordable access to electricity that is a necessary aspect of modern life. As part of that complex system, there are hundreds of thousands of miles of high voltage transmission lines and millions of miles of local distribution lines to deliver electricity from where it is generated to where it is used. After decades of modest growth in electricity demand, the bulk power system of the United States is undergoing its most transformative period since WWII. Projections for expected load growth continue to change year after year. The Energy Policy Research Institute (EPRI) projects data centers alone will consume 9-17 percent of total U.S. electricity demand by 2030, which was revised 60 percent higher than estimates in 2024.\1\ Similarly, the Lawrence Berkley National Laboratory found that data center energy usage could range between 9.5-15.3 percent by 2030.\2\ These projections come at a time when the North American Electric Reliability Corporation (NERC) finds thermal generator retirements and growing prevalence of intermittent and non-dispatchable resources increase the complexity of planning and operating a reliable grid.\3\ --------------------------------------------------------------------------- \1\Electric Power Research Institute (EPRI), Powering Intelligence: Updated Scenarios of U.S. Data Center Electricity Usage and Power Strategies (February 2026) https://www.epri.com/research/products/ 000000003002034696. \2\Lawrence Berkeley National Laboratory (LBNL), United States Data Center Energy Usage Report: 2025 Update (June 2026) https:// eta.lbl.gov/publications/united-states-data-center- energy-2025. \3\North American Electric Reliability Corporation (NERC), Long- Term Reliability Assessment (January 2026) https://www.nerc.com/ globalassets/our-work/assessments/nerc_ltra_2025.pdf. --------------------------------------------------------------------------- As part of this exponential growth in electricity demand, over $100 billion of investment is in the pipeline for new transmission infrastructure.\4\ While the Committee is aware that large load users, such as data centers and manufacturers, will be responsible for significant costs associated with load growth, transmission upgrades that directly benefit ratepayers could be borne onto individual households. Furthermore, it is estimated that 30 percent of the transmission lines will need to be rebuilt over the next 10 years because of age and condition to prevent use beyond 70 years.\5\ It is imperative that the investments paid for by the ratepayer are funneled through the most cost-effective solution that can meet long- term growth projections. --------------------------------------------------------------------------- \4\Wood Mackenzie, Why US power transmission needs reinventing (August 2026) https://www.woodmac.com/news/opinion/why-us-power- transmission-needs-reinventing/. \5\IdahoNationalLaboratory, AdvancedConductorScanReport (September2024) https://inl.gov/content/uploads/2024/04/23-50856_R13_- AdvConductorsScanProjectReportCompressed.pdf. --------------------------------------------------------------------------- Aluminum conductor steel reinforced conductors have been the traditional choice for utilities and represent a majority of the transmission lines in service today. Like all conductors, there is a material limit to the temperature of the physical line before it melts or otherwise degrades. Advanced conductors, such as composite cores or advanced steel have significantly higher material limits that allow operators to pass through higher capacities of electricity. While advanced conductors may have a higher cost per mile than traditional alternatives, higher capacity transmission lines can cost- effectively transport more supplies of electricity. In addition to greenfield transmission, increasing the capacity on our current system can also cost-effectively meet demand growth in shorter time frames due to existing right of ways and permitting challenges that slow down greenfield construction projects, which sometimes can take up to 7-10 years to complete.\6\ It is estimated that upwards of 20 percent of our nation's bulk power system could be candidates for reconductoring.\7\ --------------------------------------------------------------------------- \6\Energy Innovation Policy and Technology Inc. & Grid Lab, Supporting Advanced Conductor Deployment: Barriers and Policy Solutions (April 2024) https://www.2035report.com/wp-content/uploads/2024/04/ Supporting-Advanced-Conductor-Deployment-Barriers-and-Policy- Solutions.pdf. \7\Id at 5. --------------------------------------------------------------------------- Recognizing the benefit advanced conductors have to the ratepayer during this time of exponential load growth, the Committee advanced H.R. 6633, the High-Capacity Grid Act to require utilities to deploy higher capacity transmission lines. Importantly, this legislation also recognizes the operational challenges and situational instances where traditional conductors provide similar levels of value. As a result, the legislation provides adequate flexibility for utilities to be exempted from the bill's requirements in the event an advanced conductor creates safety, reliability, or affordability challenges. The Federal Energy Regulatory Commission too has recognized the value of advanced transmission technologies to the reliable and affordable delivery of electricity. In successive planning orders, FERC required the consideration of technologies that can cost-effectively address transmission needs without constructing entirely new lines. As part of this process, FERC recognized the range of potential options that utilities may have in choosing the appropriate type of conductor.\8\ The Committee agrees with these findings, which is why H.R. 6633, the High-Capacity Grid Act ensures FERC develops a class of available options that have the requisite capacity requirements. This flexibility will ensure future innovation in conductor types are not limited to one choice and appropriately focuses on the attributes of advanced conductors, rather than the material. --------------------------------------------------------------------------- \8\Federal Energy Regulatory Commission (FERC), Docket No. RM22-14- 00; Order No. 2023-A (March 2024) https://www.ferc.gov/media/e1-rm22- 14-001. --------------------------------------------------------------------------- This legislation is an important step towards meeting future demand growth that protects reliability and affordability. However, the Committee also recognizes that our system requires significantly more generation to meet projected demands posed by data centers and domestic manufacturing. In addition, other alternative transmission technologies and innovative uses of high-performance computing power should also play a key role in meeting this demand.

Committee Action

On March 5, 2025, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Scaling for Growth: Meeting the Demand for Reliable, Affordable Electricity.'' The Subcommittee received testimony from: Todd Brickhouse, CEO and General Manager of Basin Electric Power Cooperative; Asim Z. Haque, Senior Vice President for Governmental and Member Services, PJM; Noel W. Black, Senior VP of Regulatory Affairs, Southern Company; and, Tyler H. Norris, James B. Duke Fellow, Duke University. On March 25, 2025, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Keeping the Lights On: Examining the State of Regional Grid Reliability.'' The Subcommittee received testimony from: Gordon van Welie, President & CEO, ISO New England (ISO-NE); Richard J. Dewey, President & CEO, New York Independent System Operator (NYISO); Manu Asthana, President & CEO, PJM Interconnection, LLC; Jennifer Curran, Senior Vice President for Planning and Operations, Midcontinent ISO (MISO); Lanny Nickell, CEO, Southwest Power Pool; Elliot Mainzer, President & CEO, California Independent System Operator (CAISO); and, Pablo Vegas, President & CEO, Electric Reliability Council of Texas, Inc., (ERCOT). On February 3, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Oversight of FERC: Advancing Affordable and Reliable Energy for All Americans.'' The Subcommittee received testimony from: The Honorable Laura V. Swett, Chairman, FERC; The Honorable David Rosner; Commissioner, FERC; The Honorable Lindsay S. See; Commissioner, FERC; The Honorable Judy W. Chang; Commissioner, FERC; and, The Honorable David A. LaCerte; Commissioner, FERC. On March 17, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Winter Storm Fern Lessons: Supplying Reliable Power to Meet Peak Demand.'' The Subcommittee received testimony from: Jim Robb, President and CEO, North American Electric Reliability Corporation; Jose Costa, President and CEO, Northeast Gas Association; Brett Mattison, President and CPO, Southwestern Electric Power Company; and, Michael Goggin, Executive Vice President, Grid Strategies. On April 29, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``AI and the Grid: Meeting Growing Power Demand While Protecting Ratepayers.'' The Subcommittee received testimony from: Nick Myers, Chairman, Arizona Corporation Commission; Tom Falcone, President, Large Public Power Council; Nelson Peeler, Senior VP of Grid Strategy, Planning and Integration, Duke Energy; and, Whitney Muse, President, Muse Energy. On May 13, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Wires, Rates, and States: Permitting Transmission for Affordable, Reliable Power.'' The Subcommittee received testimony from: Tony Clarke, Executive Director, National Association of Regulatory Utility Commissioners (NARUC); Mark Christie, former Chairman, FERC and Director, Center on Energy and Law, William & Mary Law School; Randy S. Howard, General Manager, Northern California Power Agency; Clay Rikard, Senior Vice President, System Planning, Southern Company; Rob Gramlich, President, Grid Strategies; and, Michael Skelly, CEO and Co-founder, GridUnited. On June 24, 2026, the Subcommittee on Energy met in open markup session and forwarded H.R. 6633, as amended, to the full Committee by a voice vote. On July 20, 2026, the full Committee on Energy and Commerce met in open markup session and ordered H.R. 6633, as amended, favorably reported to the House by a record vote of 49 yeas and 0 nays.

Committee Votes

Clause 3(b) of rule XIII requires the Committee to list the record votes on the motion to report legislation and amendments thereto. The following reflects the record votes taken during the Committee consideration: [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] Oversight Findings and Recommendations Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of rule XIII, the Committee held hearings and made findings that are reflected in this report. New Budget Authority, Entitlement Authority, and Tax Expenditures Pursuant to clause 3(c)(2) of rule XIII, the Committee finds that H.R. 6633 would result in no new or increased budget authority, entitlement authority, or tax expenditures or revenues.

Congressional Budget Office Estimate

Pursuant to clause 3(c)(3) of rule XIII, at the time this report was filed, the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974 was not available. Federal Mandates Statement The Committee adopts as its own the estimate of Federal mandates prepared by the Director of the Congressional Budget Office pursuant to section 423 of the Unfunded Mandates Reform Act. Statement of General Performance Goals and Objectives Pursuant to clause 3(c)(4) of rule XIII, the general performance goal or objective of this legislation is to require public utilities to utilize the best available transmission conductor when constructing or modifying transmission lines, while allowing for exceptions as provided. Duplication of Federal Programs Pursuant to clause 3(c)(5) of rule XIII, no provision of H.R. 6633 is known to be duplicative of another Federal program, including any program that was included in a report to Congress pursuant to section 21 of Public Law 111-139 or the most recent Catalog of Federal Domestic Assistance. Related Committee and Subcommittee Hearings Pursuant to clause 3(c)(6) of rule XIII, the following related hearing was used to develop or consider H.R. 6633: On March 5, 2025, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Scaling for Growth: Meeting the Demand for Reliable, Affordable Electricity.'' The Subcommittee received testimony from: Todd Brickhouse, CEO and General Manager of Basin Electric Power Cooperative; Asim Z. Haque, Senior Vice President for Governmental and Member Services, PJM; Noel W. Black, Senior VP of Regulatory Affairs, Southern Company; and, Tyler H. Norris, James B. Duke Fellow, Duke University. On March 25, 2025, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Keeping the Lights On: Examining the State of Regional Grid Reliability.'' The Subcommittee received testimony from: Gordon van Welie, President & CEO, ISO New England (ISO-NE); Richard J. Dewey, President & CEO, New York Independent System Operator (NYISO); Manu Asthana, President & CEO, PJM Interconnection, LLC; Jennifer Curran, Senior Vice President for Planning and Operations, Midcontinent ISO (MISO); Lanny Nickell, CEO, Southwest Power Pool; Elliot Mainzer, President & CEO, California Independent System Operator (CAISO); and, Pablo Vegas, President & CEO, Electric Reliability Council of Texas, Inc., (ERCOT). On February 3, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Oversight of FERC: Advancing Affordable and Reliable Energy for All Americans.'' The Subcommittee received testimony from: The Honorable Laura V. Swett, Chairman, FERC; The Honorable David Rosner; Commissioner, FERC; The Honorable Lindsay S. See; Commissioner, FERC; The Honorable Judy W. Chang; Commissioner, FERC; and, The Honorable David A. LaCerte; Commissioner, FERC. On March 17, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Winter Storm Fern Lessons: Supplying Reliable Power to Meet Peak Demand.'' The Subcommittee received testimony from: Jim Robb, President and CEO, North American Electric Reliability Corporation; Jose Costa, President and CEO, Northeast Gas Association; Brett Mattison, President and CPO, Southwestern Electric Power Company; and, Michael Goggin, Executive Vice President, Grid Strategies. On April 29, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``AI and the Grid: Meeting Growing Power Demand While Protecting Ratepayers.'' The Subcommittee received testimony from: Nick Myers, Chairman, Arizona Corporation Commission; Tom Falcone, President, Large Public Power Council; Nelson Peeler, Senior VP of Grid Strategy, Planning and Integration, Duke Energy; and, Whitney Muse, President, Muse Energy. On May 13, 2026, the Subcommittee on Energy held a hearing on H.R. 6633. The title of the hearing was ``Wires, Rates, and States: Permitting Transmission for Affordable, Reliable Power.'' The Subcommittee received testimony from: Tony Clarke, Executive Director, National Association of Regulatory Utility Commissioners (NARUC); Mark Christie, former Chairman, FERC and Director, Center on Energy and Law, William & Mary Law School; Randy S. Howard, General Manager, Northern California Power Agency; Clay Rikard, Senior Vice President, System Planning, Southern Company; Rob Gramlich, President, Grid Strategies; and, Michael Skelly, CEO and Co-founder, GridUnited. Committee Cost Estimate Pursuant to clause 3(d)(1) of rule XIII, the Committee adopts as its own the cost estimate prepared by the Director of the Congressional Budget Office pursuant to section 402 of the Congressional Budget Act of 1974. At the time this report was filed, the estimate was not available. Earmark, Limited Tax Benefits, and Limited Tariff Benefits Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the Committee finds that H.R. 6633 contains no earmarks, limited tax benefits, or limited tariff benefits. Advisory Committee Statement No advisory committees within the meaning of section 5(b) of the Federal Advisory Committee Act were created by this legislation. Applicability to Legislative Branch The Committee finds that the legislation does not relate to the terms and conditions of employment or access to public services or accommodations within the meaning of section 102(b)(3) of the Congressional Accountability Act. Section-by-Section Analysis of the Legislation Section 1. Short title This section provides the Act may be cited as the High- Capacity Grid Act. Section 2. Best-available transmission conductor class This section directs FERC, in consultation with the Department of Energy, to establish a class of best available transmission conductors that meet certain standards of performance. This section also requires public utilities to use conductors from this class unless seeking to meet specified exemptions to the legislation's requirements. Changes in Existing Law Made by the Bill, as Reported In compliance with clause 3(e) of rule XIII of the Rules of the House of Representatives, changes in existing law made by the bill, as reported, are shown as follows (new matter is printed in italics and existing law in which no change is proposed is shown in roman): FEDERAL POWER ACT * * * * * * * PART II--REGULATION OF ELECTRIC UTILITY COMPANIES ENGAGED IN INTERSTATE COMMERCE * * * * * * * SEC. 224. USE OF BEST-AVAILABLE TRANSMISSION CONDUCTORS. (a) Use of Best-available Transmission Conductors.--In exercising its authority under sections 205 and 206, the Commission shall require that public utilities use transmission conductors that are designated as part of the best-available transmission conductor class when carrying out covered projects. (b) Regulations.-- (1) In general.--Not later than 1 year after the date of enactment of this section, the Commission shall issue regulations to carry out this section. (2) Inclusions.--In issuing regulations under paragraph (1), the Commission shall-- (A) establish, in consultation with the Secretary of Energy, a methodology to designate, as part of the best-available transmission conductors class, transmission conductors that-- (i) provide the greatest feasible and commercially available energy-carrying capacity at a given voltage level; (ii) provide the highest feasible and commercially available electrical efficiency at that voltage level; and (iii) provide the greatest feasible and commercially available level of mechanical performance, taking into account relevant factors, including reliability, safety, and affordability; (B) using such methodology, designate transmission conductors as part of the best- available transmission conductor class; (C) establish filing requirements for public utilities to demonstrate compliance with the regulations, including (as applicable) such information and data the Commission determines necessary to demonstrate project-specific impacts described in subparagraph (D); and (D) provide that the requirement to use transmission conductors that are designated as part of the best-available transmission conductor class not apply-- (i) to carrying out any covered project for which a public utility, prior to the date of enactment of this section, has-- (I) filed for any State or Federal permit required to carry out the covered project; or (II) procured any transmission conductors; (ii) to the emergency replacement or repair of transmission facilities necessary to restore service following a natural disaster, act of terrorism, or other event designated as an emergency by a relevant Federal or State authority; (iii) if such use would negatively impact safety or violate a reliability standard; or (iv) if the public utility carrying out the covered project demonstrates such use would significantly increase the cost per kilowatt-hour of electricity without providing a material and commensurate increase to capacity, efficiency, or mechanical performance. (c) Periodic Review and Updates.--The Commission may, to reflect improvements in technology, periodically review and update-- (1) the methodology for designating transmission conductors as part of the best-available transmission conductor class; and (2) the designation of transmission conductors as part of the best-available transmission conductor class. (d) Definitions.--In this section: (1) Best-available transmission conductor class.--The term ``best-available transmission conductor class'' means a class of transmission conductors that are designated as part of the class pursuant to this section. (2) Commission.--The term ``Commission'' means the Federal Energy Regulatory Commission. (3) Covered project.--The term ``covered project'' means-- (A) the construction of a new transmission facility subject to the jurisdiction of the Commission under section 201(b) that includes a transmission conductor; or (B) any major (as determined by the Commission) modification, upgrade, replacement, or reconductoring of an existing transmission conductor subject to such jurisdiction. (4) Reliability standard.--The term ``reliability standard'' has the meaning given such term in section 215. * * * * * * * [all]