Purpose and Summary
This legislation directs the Federal Energy Regulatory
Commission, in consultation with the Department of Energy, to
establish a best available transmission conductor class and
require public utilities to utilize conductors from this class
when seeking to construct or modify transmission lines.
Background and Need for Legislation
The nation's electric power grid is comprised of vast
networks of high voltage transmission lines, generating
resources, local distribution lines, and other critical
infrastructure to ensure the delivery of adequate supplies of
electricity to homes and businesses. This complex system is, to
varying degrees, holistically planned with help from utilities,
states, grid operators, and other balancing authorities to
ensure reliable and affordable access to electricity that is a
necessary aspect of modern life. As part of that complex
system, there are hundreds of thousands of miles of high
voltage transmission lines and millions of miles of local
distribution lines to deliver electricity from where it is
generated to where it is used.
After decades of modest growth in electricity demand, the
bulk power system of the United States is undergoing its most
transformative period since WWII. Projections for expected load
growth continue to change year after year. The Energy Policy
Research Institute (EPRI) projects data centers alone will
consume 9-17 percent of total U.S. electricity demand by 2030,
which was revised 60 percent higher than estimates in 2024.\1\
Similarly, the Lawrence Berkley National Laboratory found that
data center energy usage could range between 9.5-15.3 percent
by 2030.\2\ These projections come at a time when the North
American Electric Reliability Corporation (NERC) finds thermal
generator retirements and growing prevalence of intermittent
and non-dispatchable resources increase the complexity of
planning and operating a reliable grid.\3\
---------------------------------------------------------------------------
\1\Electric Power Research Institute (EPRI), Powering Intelligence:
Updated Scenarios of U.S. Data Center Electricity Usage and Power
Strategies (February 2026) https://www.epri.com/research/products/
000000003002034696.
\2\Lawrence Berkeley National Laboratory (LBNL), United States Data
Center Energy Usage Report: 2025 Update (June 2026) https://
eta.lbl.gov/publications/united-states-data-center-
energy-2025.
\3\North American Electric Reliability Corporation (NERC), Long-
Term Reliability Assessment (January 2026) https://www.nerc.com/
globalassets/our-work/assessments/nerc_ltra_2025.pdf.
---------------------------------------------------------------------------
As part of this exponential growth in electricity demand,
over $100 billion of investment is in the pipeline for new
transmission infrastructure.\4\ While the Committee is aware
that large load users, such as data centers and manufacturers,
will be responsible for significant costs associated with load
growth, transmission upgrades that directly benefit ratepayers
could be borne onto individual households. Furthermore, it is
estimated that 30 percent of the transmission lines will need
to be rebuilt over the next 10 years because of age and
condition to prevent use beyond 70 years.\5\ It is imperative
that the investments paid for by the ratepayer are funneled
through the most cost-effective solution that can meet long-
term growth projections.
---------------------------------------------------------------------------
\4\Wood Mackenzie, Why US power transmission needs reinventing
(August 2026) https://www.woodmac.com/news/opinion/why-us-power-
transmission-needs-reinventing/.
\5\IdahoNationalLaboratory, AdvancedConductorScanReport
(September2024) https://inl.gov/content/uploads/2024/04/23-50856_R13_-
AdvConductorsScanProjectReportCompressed.pdf.
---------------------------------------------------------------------------
Aluminum conductor steel reinforced conductors have been
the traditional choice for utilities and represent a majority
of the transmission lines in service today. Like all
conductors, there is a material limit to the temperature of the
physical line before it melts or otherwise degrades. Advanced
conductors, such as composite cores or advanced steel have
significantly higher material limits that allow operators to
pass through higher capacities of electricity. While advanced
conductors may have a higher cost per mile than traditional
alternatives, higher capacity transmission lines can cost-
effectively transport more supplies of electricity. In addition
to greenfield transmission, increasing the capacity on our
current system can also cost-effectively meet demand growth in
shorter time frames due to existing right of ways and
permitting challenges that slow down greenfield construction
projects, which sometimes can take up to 7-10 years to
complete.\6\ It is estimated that upwards of 20 percent of our
nation's bulk power system could be candidates for
reconductoring.\7\
---------------------------------------------------------------------------
\6\Energy Innovation Policy and Technology Inc. & Grid Lab,
Supporting Advanced Conductor Deployment: Barriers and Policy Solutions
(April 2024) https://www.2035report.com/wp-content/uploads/2024/04/
Supporting-Advanced-Conductor-Deployment-Barriers-and-Policy-
Solutions.pdf.
\7\Id at 5.
---------------------------------------------------------------------------
Recognizing the benefit advanced conductors have to the
ratepayer during this time of exponential load growth, the
Committee advanced H.R. 6633, the High-Capacity Grid Act to
require utilities to deploy higher capacity transmission lines.
Importantly, this legislation also recognizes the operational
challenges and situational instances where traditional
conductors provide similar levels of value. As a result, the
legislation provides adequate flexibility for utilities to be
exempted from the bill's requirements in the event an advanced
conductor creates safety, reliability, or affordability
challenges.
The Federal Energy Regulatory Commission too has recognized
the value of advanced transmission technologies to the reliable
and affordable delivery of electricity. In successive planning
orders, FERC required the consideration of technologies that
can cost-effectively address transmission needs without
constructing entirely new lines. As part of this process, FERC
recognized the range of potential options that utilities may
have in choosing the appropriate type of conductor.\8\ The
Committee agrees with these findings, which is why H.R. 6633,
the High-Capacity Grid Act ensures FERC develops a class of
available options that have the requisite capacity
requirements. This flexibility will ensure future innovation in
conductor types are not limited to one choice and appropriately
focuses on the attributes of advanced conductors, rather than
the material.
---------------------------------------------------------------------------
\8\Federal Energy Regulatory Commission (FERC), Docket No. RM22-14-
00; Order No. 2023-A (March 2024) https://www.ferc.gov/media/e1-rm22-
14-001.
---------------------------------------------------------------------------
This legislation is an important step towards meeting
future demand growth that protects reliability and
affordability. However, the Committee also recognizes that our
system requires significantly more generation to meet projected
demands posed by data centers and domestic manufacturing. In
addition, other alternative transmission technologies and
innovative uses of high-performance computing power should also
play a key role in meeting this demand.
Committee Action
On March 5, 2025, the Subcommittee on Energy held a hearing
on H.R. 6633. The title of the hearing was ``Scaling for
Growth: Meeting the Demand for Reliable, Affordable
Electricity.'' The Subcommittee received testimony from:
Todd Brickhouse, CEO and General Manager of
Basin Electric Power Cooperative;
Asim Z. Haque, Senior Vice President for
Governmental and Member Services, PJM;
Noel W. Black, Senior VP of Regulatory
Affairs, Southern Company; and,
Tyler H. Norris, James B. Duke Fellow, Duke
University.
On March 25, 2025, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``Keeping
the Lights On: Examining the State of Regional Grid
Reliability.'' The Subcommittee received testimony from:
Gordon van Welie, President & CEO, ISO New
England (ISO-NE);
Richard J. Dewey, President & CEO, New York
Independent System Operator (NYISO);
Manu Asthana, President & CEO, PJM
Interconnection, LLC;
Jennifer Curran, Senior Vice President for
Planning and Operations, Midcontinent ISO (MISO);
Lanny Nickell, CEO, Southwest Power Pool;
Elliot Mainzer, President & CEO, California
Independent System Operator (CAISO); and,
Pablo Vegas, President & CEO, Electric
Reliability Council of Texas, Inc., (ERCOT).
On February 3, 2026, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``Oversight
of FERC: Advancing Affordable and Reliable Energy for All
Americans.'' The Subcommittee received testimony from:
The Honorable Laura V. Swett, Chairman,
FERC;
The Honorable David Rosner; Commissioner,
FERC;
The Honorable Lindsay S. See; Commissioner,
FERC;
The Honorable Judy W. Chang; Commissioner,
FERC; and,
The Honorable David A. LaCerte;
Commissioner, FERC.
On March 17, 2026, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``Winter
Storm Fern Lessons: Supplying Reliable Power to Meet Peak
Demand.'' The Subcommittee received testimony from:
Jim Robb, President and CEO, North American
Electric Reliability Corporation;
Jose Costa, President and CEO, Northeast Gas
Association;
Brett Mattison, President and CPO,
Southwestern Electric Power Company; and,
Michael Goggin, Executive Vice President,
Grid Strategies.
On April 29, 2026, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``AI and the
Grid: Meeting Growing Power Demand While Protecting
Ratepayers.'' The Subcommittee received testimony from:
Nick Myers, Chairman, Arizona Corporation
Commission;
Tom Falcone, President, Large Public Power
Council;
Nelson Peeler, Senior VP of Grid Strategy,
Planning and Integration, Duke Energy; and,
Whitney Muse, President, Muse Energy.
On May 13, 2026, the Subcommittee on Energy held a hearing
on H.R. 6633. The title of the hearing was ``Wires, Rates, and
States: Permitting Transmission for Affordable, Reliable
Power.'' The Subcommittee received testimony from:
Tony Clarke, Executive Director, National
Association of Regulatory Utility Commissioners
(NARUC);
Mark Christie, former Chairman, FERC and
Director, Center on Energy and Law, William & Mary Law
School;
Randy S. Howard, General Manager, Northern
California Power Agency;
Clay Rikard, Senior Vice President, System
Planning, Southern Company;
Rob Gramlich, President, Grid Strategies;
and,
Michael Skelly, CEO and Co-founder,
GridUnited.
On June 24, 2026, the Subcommittee on Energy met in open
markup session and forwarded H.R. 6633, as amended, to the full
Committee by a voice vote. On July 20, 2026, the full Committee
on Energy and Commerce met in open markup session and ordered
H.R. 6633, as amended, favorably reported to the House by a
record vote of 49 yeas and 0 nays.
Committee Votes
Clause 3(b) of rule XIII requires the Committee to list the
record votes on the motion to report legislation and amendments
thereto. The following reflects the record votes taken during
the Committee consideration:
[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT]
Oversight Findings and Recommendations
Pursuant to clause 2(b)(1) of rule X and clause 3(c)(1) of
rule XIII, the Committee held hearings and made findings that
are reflected in this report.
New Budget Authority, Entitlement Authority, and Tax Expenditures
Pursuant to clause 3(c)(2) of rule XIII, the Committee
finds that H.R. 6633 would result in no new or increased budget
authority, entitlement authority, or tax expenditures or
revenues.
Congressional Budget Office Estimate
Pursuant to clause 3(c)(3) of rule XIII, at the time this
report was filed, the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974 was not available.
Federal Mandates Statement
The Committee adopts as its own the estimate of Federal
mandates prepared by the Director of the Congressional Budget
Office pursuant to section 423 of the Unfunded Mandates Reform
Act.
Statement of General Performance Goals and Objectives
Pursuant to clause 3(c)(4) of rule XIII, the general
performance goal or objective of this legislation is to require
public utilities to utilize the best available transmission
conductor when constructing or modifying transmission lines,
while allowing for exceptions as provided.
Duplication of Federal Programs
Pursuant to clause 3(c)(5) of rule XIII, no provision of
H.R. 6633 is known to be duplicative of another Federal
program, including any program that was included in a report to
Congress pursuant to section 21 of Public Law 111-139 or the
most recent Catalog of Federal Domestic Assistance.
Related Committee and Subcommittee Hearings
Pursuant to clause 3(c)(6) of rule XIII, the following
related hearing was used to develop or consider H.R. 6633:
On March 5, 2025, the Subcommittee on Energy held a hearing
on H.R. 6633. The title of the hearing was ``Scaling for
Growth: Meeting the Demand for Reliable, Affordable
Electricity.'' The Subcommittee received testimony from:
Todd Brickhouse, CEO and General Manager of
Basin Electric Power Cooperative;
Asim Z. Haque, Senior Vice President for
Governmental and Member Services, PJM;
Noel W. Black, Senior VP of Regulatory
Affairs, Southern Company; and,
Tyler H. Norris, James B. Duke Fellow, Duke
University.
On March 25, 2025, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``Keeping
the Lights On: Examining the State of Regional Grid
Reliability.'' The Subcommittee received testimony from:
Gordon van Welie, President & CEO, ISO New
England (ISO-NE);
Richard J. Dewey, President & CEO, New York
Independent System Operator (NYISO);
Manu Asthana, President & CEO, PJM
Interconnection, LLC;
Jennifer Curran, Senior Vice President for
Planning and Operations, Midcontinent ISO (MISO);
Lanny Nickell, CEO, Southwest Power Pool;
Elliot Mainzer, President & CEO, California
Independent System Operator (CAISO); and,
Pablo Vegas, President & CEO, Electric
Reliability Council of Texas, Inc., (ERCOT).
On February 3, 2026, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``Oversight
of FERC: Advancing Affordable and Reliable Energy for All
Americans.'' The Subcommittee received testimony from:
The Honorable Laura V. Swett, Chairman,
FERC;
The Honorable David Rosner; Commissioner,
FERC;
The Honorable Lindsay S. See; Commissioner,
FERC;
The Honorable Judy W. Chang; Commissioner,
FERC; and,
The Honorable David A. LaCerte;
Commissioner, FERC.
On March 17, 2026, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``Winter
Storm Fern Lessons: Supplying Reliable Power to Meet Peak
Demand.'' The Subcommittee received testimony from:
Jim Robb, President and CEO, North American
Electric Reliability Corporation;
Jose Costa, President and CEO, Northeast Gas
Association;
Brett Mattison, President and CPO,
Southwestern Electric Power Company; and,
Michael Goggin, Executive Vice President,
Grid Strategies.
On April 29, 2026, the Subcommittee on Energy held a
hearing on H.R. 6633. The title of the hearing was ``AI and the
Grid: Meeting Growing Power Demand While Protecting
Ratepayers.'' The Subcommittee received testimony from:
Nick Myers, Chairman, Arizona Corporation
Commission;
Tom Falcone, President, Large Public Power
Council;
Nelson Peeler, Senior VP of Grid Strategy,
Planning and Integration, Duke Energy; and,
Whitney Muse, President, Muse Energy.
On May 13, 2026, the Subcommittee on Energy held a hearing
on H.R. 6633. The title of the hearing was ``Wires, Rates, and
States: Permitting Transmission for Affordable, Reliable
Power.'' The Subcommittee received testimony from:
Tony Clarke, Executive Director, National
Association of Regulatory Utility Commissioners
(NARUC);
Mark Christie, former Chairman, FERC and
Director, Center on Energy and Law, William & Mary Law
School;
Randy S. Howard, General Manager, Northern
California Power Agency;
Clay Rikard, Senior Vice President, System
Planning, Southern Company;
Rob Gramlich, President, Grid Strategies;
and,
Michael Skelly, CEO and Co-founder,
GridUnited.
Committee Cost Estimate
Pursuant to clause 3(d)(1) of rule XIII, the Committee
adopts as its own the cost estimate prepared by the Director of
the Congressional Budget Office pursuant to section 402 of the
Congressional Budget Act of 1974. At the time this report was
filed, the estimate was not available.
Earmark, Limited Tax Benefits, and Limited Tariff Benefits
Pursuant to clause 9(e), 9(f), and 9(g) of rule XXI, the
Committee finds that H.R. 6633 contains no earmarks, limited
tax benefits, or limited tariff benefits.
Advisory Committee Statement
No advisory committees within the meaning of section 5(b)
of the Federal Advisory Committee Act were created by this
legislation.
Applicability to Legislative Branch
The Committee finds that the legislation does not relate to
the terms and conditions of employment or access to public
services or accommodations within the meaning of section
102(b)(3) of the Congressional Accountability Act.
Section-by-Section Analysis of the Legislation
Section 1. Short title
This section provides the Act may be cited as the High-
Capacity Grid Act.
Section 2. Best-available transmission conductor class
This section directs FERC, in consultation with the
Department of Energy, to establish a class of best available
transmission conductors that meet certain standards of
performance. This section also requires public utilities to use
conductors from this class unless seeking to meet specified
exemptions to the legislation's requirements.
Changes in Existing Law Made by the Bill, as Reported
In compliance with clause 3(e) of rule XIII of the Rules of
the House of Representatives, changes in existing law made by
the bill, as reported, are shown as follows (new matter is
printed in italics and existing law in which no change is
proposed is shown in roman):
FEDERAL POWER ACT
* * * * * * *
PART II--REGULATION OF ELECTRIC UTILITY COMPANIES ENGAGED IN INTERSTATE
COMMERCE
* * * * * * *
SEC. 224. USE OF BEST-AVAILABLE TRANSMISSION CONDUCTORS.
(a) Use of Best-available Transmission Conductors.--In
exercising its authority under sections 205 and 206, the
Commission shall require that public utilities use transmission
conductors that are designated as part of the best-available
transmission conductor class when carrying out covered
projects.
(b) Regulations.--
(1) In general.--Not later than 1 year after the date
of enactment of this section, the Commission shall
issue regulations to carry out this section.
(2) Inclusions.--In issuing regulations under
paragraph (1), the Commission shall--
(A) establish, in consultation with the
Secretary of Energy, a methodology to
designate, as part of the best-available
transmission conductors class, transmission
conductors that--
(i) provide the greatest feasible and
commercially available energy-carrying
capacity at a given voltage level;
(ii) provide the highest feasible and
commercially available electrical
efficiency at that voltage level; and
(iii) provide the greatest feasible
and commercially available level of
mechanical performance, taking into
account relevant factors, including
reliability, safety, and affordability;
(B) using such methodology, designate
transmission conductors as part of the best-
available transmission conductor class;
(C) establish filing requirements for public
utilities to demonstrate compliance with the
regulations, including (as applicable) such
information and data the Commission determines
necessary to demonstrate project-specific
impacts described in subparagraph (D); and
(D) provide that the requirement to use
transmission conductors that are designated as
part of the best-available transmission
conductor class not apply--
(i) to carrying out any covered
project for which a public utility,
prior to the date of enactment of this
section, has--
(I) filed for any State or
Federal permit required to
carry out the covered project;
or
(II) procured any
transmission conductors;
(ii) to the emergency replacement or
repair of transmission facilities
necessary to restore service following
a natural disaster, act of terrorism,
or other event designated as an
emergency by a relevant Federal or
State authority;
(iii) if such use would negatively
impact safety or violate a reliability
standard; or
(iv) if the public utility carrying
out the covered project demonstrates
such use would significantly increase
the cost per kilowatt-hour of
electricity without providing a
material and commensurate increase to
capacity, efficiency, or mechanical
performance.
(c) Periodic Review and Updates.--The Commission may, to
reflect improvements in technology, periodically review and
update--
(1) the methodology for designating transmission
conductors as part of the best-available transmission
conductor class; and
(2) the designation of transmission conductors as
part of the best-available transmission conductor
class.
(d) Definitions.--In this section:
(1) Best-available transmission conductor class.--The
term ``best-available transmission conductor class''
means a class of transmission conductors that are
designated as part of the class pursuant to this
section.
(2) Commission.--The term ``Commission'' means the
Federal Energy Regulatory Commission.
(3) Covered project.--The term ``covered project''
means--
(A) the construction of a new transmission
facility subject to the jurisdiction of the
Commission under section 201(b) that includes a
transmission conductor; or
(B) any major (as determined by the
Commission) modification, upgrade, replacement,
or reconductoring of an existing transmission
conductor subject to such jurisdiction.
(4) Reliability standard.--The term ``reliability
standard'' has the meaning given such term in section
215.
* * * * * * *
[all]