Volume 45 · 571
Public Law 70–574
Granting the consent of Congress to Howard Seabury to construct, maintain, and operate a dam to retain tidal waters in an unnamed cove which is situated and extends from Cases Inlet into section 28, township 21 north, range 1 west, Willamette meridian, in Pierce County, State of Washington.
Approved May 16, 1928
Statutory text
An Act
Granting the consent of Congress to Howard Seabury to construct, maintain, and operate a dam to retain tidal waters in an unnamed cove which is situated and extends from Cases Inlet into section 28, township 21 north, range 1 west, Willamette meridian, in Pierce County, State of Washington.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
That the consent
Cases Inlet, Wash.
Howard Seabury may construct dam for retaining tidal waters in cove extending from.
of Congress is granted to Howard Seabury to construct, maintain, and operate, at a point suitable to the interests of navigation, a dam for the purpose of retaining tidal waters in an unnamed cove which is situated and extends from Cases Inlet into section 28, township 21 north, range 1 west, Willamette meridian, in Pierce County, State of Washington. Work shall not be commenced on such dam until the plans therefor, including plans for all accessory works,
Plans, etc., subject to approval of Secretary of War.
are submitted to and approved by the Secretary of War and the Chief of Engineers, who may impose such conditions and stipulations as they deem necessary to protect the interests of the United States, which may include the condition that Howard Seabury shall construct, maintain, and operate, in connection with such dam, and without expense to the United States, a lock, boom, sluice, or any other structure or structures which the Secretary of War and the Chief of Engineers at any time may deem necessary in the interests of navigation, in accordance with such plans as they may approve. This Act shall not be construed to authorize the use of such dam
Use restriction.
to develop water power or to generate hydroelectric energy.
Sec. 2.
The authority granted by this Act shall terminate if the
Time limit.
actual construction of the dam hereby authorized is not commenced within one year and completed within three years from the date of the passage of this Act.
Sec. 3.
The right to alter, amend, or repeal this Act is hereby
Amendment.
expressly reserved.
Approved, May 16, 1928.