Volume 56
Public Law 77–625
Authorizing the construction of certain public works in the basin of the Connecticut River for flood control.
Approved October 26, 1942
Statutory text
AN ACT
Authorizing the construction of certain public works in the basin of the Connecticut River for flood control.
Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,
That the project for
Connecticut River Basin.
Flood control.
flood control in the Connecticut River Basin adopted by the Act of June 28, 1938 (Public, Numbered 761, Seventy-fifth Congress), and the Act of August 18, 1941 (Public Law 228, Seventy-seventh
Congress), is hereby modified to include and authorize the construction of the Gulley Brook Conduit at Hartford, Connecticut, for flood control in accordance with the recommendations of the Chief of Engineers in House Document Numbered 804, Seventy-seventh Congress, second session, at an estimated cost of $420,000.
Approved, October 26, 1942.