Public Law 80–330

Granting the consent of Congress to Carolina Power and Light Company to construct, maintain, and operate a dam in the Lumber River.

Approved May 21, 1948

Statutory text

AN ACT

Granting the consent of Congress to Carolina Power and Light Company to construct, maintain, and operate a dam in the Lumber River.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

That the consent of Congress is hereby granted to Carolina Power and Light Company, its

Lumber River.

Construction, etc., of dam.

successors or assigns, to construct, maintain, and operate a dam in, and modify the channel of, the Lumber River, at a point suitable to the interests of navigation, approximately three and one–half miles south of Lumberton, North Carolina, and approximately one and one–half miles below the United States Highway Numbered 74 bridge in Robeson County, North Carolina: Provided, That the work shall not

Approval of plans.

be commenced until the plans therefor have been submitted to and approved by the Chief of Engineers, United States Army, and by the Secretary of the Army, and a permit for the construction be issued by them: Provided further, That this Act shall not be construed to

Restriction.

authorize the use of such dam to develop water power or generate hydroelectric energy.

Sec. 2.

That the authority

Time limitation.

granted by this Act shall cease and be null and void, unless actual construction of the dam hereby authorized is commenced within two years and completed within five years from

Removal of interference.

the date of approval of this Act: Provided, That from and after thirty days’ notice from the Federal Power Commission, or other authorized agency of the United States, to said Carolina Power and Light Company, its successors or assigns, that desirable water-power developments will be interfered with by the existence of said dam, the said company, or its successors or assigns, shall alter the dam, without expense to the United States, so as to remove said interference and, upon failure to do so within a reasonable time, the authority hereby granted to construct, maintain, and operate said dam shall terminate and be at an end; and any grantee or licensee of the United States, proposing to develop a power project at or near said dam, shall have authority to remove, submerge, or utilize said dam, under such conditions as said Commission or other agency may determine, but such conditions shall not include compensation for the removal,

Nonliability of U. S. for damage claims.

submergence, or utilization of said dam: And provided further, That the Carolina Power and Light Company, its successors or assigns, shall hold and save the United States free from all claims for damage which may be sustained by the dam herein authorized, or damage sustained by the appurtenances of the said dam by reason of operations by the United States for flood control, the preservation or improvement of navigation, or for other purposes.

Sec. 3.

The right to alter,

Rights reserved.

amend, or repeal this Act is hereby expressly reserved.

Approved May 21, 1948.