Public Law 81–519

To authorize the construction, operation, and maintenance of the Weber Basin reclamation project, Utah.

Approved August 29, 1949

Statutory text

AN ACT

To authorize the construction, operation, and maintenance of the Weber Basin reclamation project, Utah.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

That the Secretary of the Interior, through the Bureau of Reclamation, is hereby authorized to construct, operate, and maintain the Weber Basin project to consist of reservoirs, irrigation and drainage works, power plants, transmission lines, and similar works in and near Morgan, Davis, Summit, and Weber Counties, Utah, for the purposes of supplying irrigation water to lands, both new and presently irrigated; supplying municipal, industrial, and domestic water; controlling floods; and generating and selling electric energy to help meet the short supply of power in the area and as a means of making the whole project self-supporting and financially solvent; and for other beneficial purposes (including, but without limitation, the control and catchment of silt, improvement of the general quality of the water, the preservation and propagation of fish and wildlife, and the provision and improvement of recreational facilities), at an estimated cost of $69,500,000, all in substantial accord with the recommendations made in that certain report, dated July 15, 1949, of the regional director, region IV, Bureau of Reclamation, entitled “Weber Basin project, Utah”.

Sec. 2.

The Secretary is authorized to apportion equitably the costs of constructing, operating, and maintaining (including therein reasonable provision for replacement) the project works herein authorized between, on the one hand, their flood control, recreational, and fish and wildlife purposes and, on the other hand, their irrigation, power, municipal, and other water-supply purposes. The former allocations shall be nonreimbursable and nonreturnable. The latter allocations

Repayment period.

shall be reimbursable and returnable: Provided, That general repayment obligations undertaken pursuant to subsections (c)

53 Stat. 1194.

43 U. S. C. § 485h (c), (d).

Establishment of organization.

and (d) of section 9 of the Reclamation Act of 1939 may extend over a period not exceeding sixty years.

Sec. 3.

As a condition precedent to construction of any of the irrigation or drainage works herein authorized, there shall be established an organization in the State of Utah with powers satisfactory to the Secretary, including the power to tax property both real and personal within its boundaries and the power to enter into a contract or contracts with the United States for payment of reimbursable costs allocated to irrigation, municipal water supply, and other miscellaneous purposes.

Sec. 4.

This Act shall be a supplement to the Federal reclamation laws

43 U. S. C. § 372 et seq.

(Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto), the provisions whereof shall govern the construction, operation, and maintenance of the Weber Basin project except as otherwise herein provided.

Sec. 5.

There are hereby authorized to be appropriated, out of any moneys in the Treasury not otherwise appropriated, such sums as may be required to carry out the purposes of this Act.

Approved August 29, 1949.