Skip to content

Volume 63 · 853

Public Law 81–690

To authorize the American River Basin development, California, for irrigation and reclamation, and for other purposes.

Approved October 14, 1949

Statutory text

AN ACT

To authorize the American River Basin development, California, for irrigation and reclamation, and for other purposes.

Be it enacted by the Senate and House of Representatives of theUnited States of America in Congress assembled,

That the Central Valley project, California, authorized by section 2 of the Act of Congress of August 26, 1937 (50 Stat. 850), is hereby reauthorized to include the American River development as hereinafter described,which development is declared to be for the same purposes as described and set forth in the Act of Congress of August 26, 1937 (50 Stat. 850).

Sec. 2.

The American River development shall consist of: Folsom Dam and Reservoir having a storage capacity of approximately one million acre–feet, to be constructed by the Corps of Engineers at such point below the confluence of the North Fork and the South Fork of the American River near the city of Folsom, California, as the Secretary of the Army and the Chief of Engineers after consultation with the Bureau of Reclamation and other appropriate State, Federal, and local agencies may find most advisable; and the following features for the development and use of water, to be constructed, operated, and maintained by the Secretary of the Interior through the Commissioner of Reclamation: A hydroelectric power plant with a generating

Hydroelectric power plant.

capacity of approximately one hundred and twenty thousand kilowatts, and necessary hydroelectric after bay power plants and necessary electric transmission lines to the nearest practical interconnection with the Central Valley project transmission system; a storage dam with a capacity of approximately forty thousand acre-feet to be located on Sly Park Creek, a tributary of the North Fork of Consumnas River, with necessary appurtenant works, including a diversion dam on Camp Creek, tunnel, conduit, and canals for the delivery of water to lands in El Dorado County, and incidental works appurtenant thereto. The Secretary of the Interior, through the Bureau of

Investigations, surveys, etc.

Reclamation, is hereby further authorized and directed to conduct the necessary investigations, surveys, and studies for the purpose of developing plans for disposing of the water and electric power which would be made available by the project, including studies of such supplemental works and equipment as may be required to maintain a firm supply of electric energy, and render reports thereon which would set forth the works required for such disposition, together with findings as to their engineering and financial feasibility, including a study of the water resources and requirements of the entire American River watershed and the areas serviceable therefrom, and particularly of a diversion canal at the highest feasible level extending southerly from Folsom Reservoir as will permit the maximum beneficial use of the water for irrigation of the lands lying under said canal in El Dorado and Sacramento Counties; a diversion canal at the highest feasible level for the purpose of securing the maximum beneficial use of the water in Placer County extending northerly from such reservoir to a point on the Bear River in the vicinity of Sheridan, California, and a conduit or conduits with necessary pumping plants and supplemental works extending from the most feasible diversion point on the Central Valley project, California, to serve lands and municipalities in Contra Costa, Alameda, Santa Clara, San Joaquin, and San Benito Counties.

Nothing contained in this Act shall be construed by implication or

Recommendations of Secretary.

otherwise as an allocation of water and in the studies for the purposes of developing plans for disposal of water as herein authorized the Secretary of the Interior shall make recommendations for the use of water in accord with State water laws, including but not limited to such laws giving priority to the counties and areas of origin for present and future needs.

Said studies and the reports thereon shall be submitted to the proper

Reports, etc., to States.

58 Stat. 887.

33 U. S. C. §§ 701a–1, 701c, 701f, 701j notes, 708, 709; Supp. II, § 701c note; 16 U. S. C., §§ 460d, 825s; 43 U. S. C., §390.

State authorities under the procedure provided for in the Flood Control Act of 1944 (Public Law 534, Seventy-eighth Congress, second session).

Folsom Dam and Reservoir, upon completion of construction by the Corps of Engineers, to the extent where water from said reservoir is ready to be turned either into the power plant or conduits, shall be

Transfer to Bureau of Reclamation.

transferred to the Bureau of Reclamation for operation and maintenance under the supervision of the Secretary of the Interior together with the other features of the American River development herein authorized for construction by the Bureau of Reclamation, all in accordance with the Federal reclamation laws (Act of June 17, 1902,

43 U. S. C. § 372 et seq.; Supp. II, § 385a et seq.

32 Stat. 388, and Acts amendatory thereof or supplementary thereto). After the transfer as provided herein, the dam shall be operated for flood control in accordance with criteria established by the Secretary of the Army as provided for in section 7 of the Flood Control Act of

58 Stat. 890.

33 U. S. C. § 709.

Consultation with local interests.

1944 (Public Law 534, Seventy–eighth Congress, second session).

Sec. 3.

In locating and designing the works authorized for construction by section 2 of this Act the Secretary of the Army and the Chief of Engineers, the Secretary of the Interior and the Commissioner of Reclamation shall give due consideration to the report set forth in Bulletin Numbered 26 of the Division of Water Resources of the Department of Public Works of the State of California, and shall consult the local interests to be affected by the construction and operation of said works, through public hearings or in such other manner as in their discretion may be found best suited to a maximum expression of the views of such local interests.

Sec. 4.

The Secretary of the Interior is directed to cause the operation of said works to be coordinated and integrated with the operation of existing and future features of the Central Valley project in such manner as will effectuate the fullest and most economic utilization of the land and water resources of the Central Valley project of California for the widest possible public benefit.

Sec. 5.

There are hereby authorized to be appropriated, out of any money in the Treasury not otherwise appropriated, such sums as are necessary to carry out the purposes of this Act.

Approved October 14, 1949.

Parsed from the official Statutes at Large USLM XML in 63.xml