Skip to content

Volume 88 · 116

Public Law 93–276

To authorize appropriations to the Atomic Energy Commission in accordance with section 261 of the Atomic Energy Act of 1954, as amended, and for other purposes.

Approved May 10, 1974

Statutory text

An Act

To authorize appropriations to the Atomic Energy Commission in accordance with section 261 of the Atomic Energy Act of 1954, as amended, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

Sec. 101.

There is hereby authorized to be appropriated to the Atomic Energy Commission in accordance with the provisions of section 261 of the Atomic Energy Act of 1954, as amended:

42 USC 2017.

(a)

For “Operating expenses”, $2,551,533,000 not to exceed $132,200,000 in operating costs for the high-energy physics program category.

(b)

For “Plant and capital equipment”, including construction, acquisition, or modification of facilities, including land acquisition; and acquisition and fabrication of capital equipment not related to construction, a sum of dollars equal to the total of the following:

(1)

Nuclear Materials.—

Project 75–1–a, additional facilities, high-level waste handling and storage. Savannah River, South Carolina, $30,000,000.

Project 75–1–b, replacement ventilation air filter, H chemical separations area. Savannah River, South Carolina, $6,000,000.

Project 75–1–c, new waste calcining facility, Idaho Chemical Processing Plant, National Reactor Testing Station, Idaho, $20,000,000.

Project 75–1–d, Waste management effluent control, Richland, Washington, $3,500,000.

Project 75–1–e, retooling of component preparation laboratories, multiple sites, $4,500,000.

Project 75–1–f, atmospheric pollution control facilities, stoker fired boilers. Savannah River, South Carolina, $7,500,000.

(2)

Nuclear Materials.—

Project 75–2–a, additional cooling tower capacity, gaseous diffusion plant, Portsmouth, Ohio, $2,200,000.

(3)

Weapons.—

Project 75–3–a, weapons production, development, and test installations, $10,000,000.

Project 75–3–b, high energy laser facility, Los Alamos Scientific Laboratory, New Mexico, $22,600,000.

Project 75–3–c, TRIDENT production facilities, various locations, $22,200,000.

Project 75–3–d, consolidation of final assembly plants, Pantex, Amarillo, Texas, $4,500,000.

Project 75–3–e, addition to building 350 for safeguards analytical laboratory, Argonne National Laboratory, Illinois, $3,500,000.

(4)

Weapons.—

Project 75–4–a, technical support relocation, Los Alamos Scientific Laboratory, New Mexico, $2,800,000.

(5)

Civilian Reactor Research and Development.—

Project 75–5–a, transient test facility, Santa Susana, California, $4,000,000.

Project 75–5–b, advanced test reactor control system upgrading, National Reactor Testing Station, Idaho, $2,400,000.

Project 75–5–c, test reactor area water recycle and pollution control facilities. National Reactor Testing Station, Idaho, $1,000,000.

Project 75–5–d, modifications to reactors, $4,000,000.

Project 75–5–e, high temperature gas reactor fuel reprocessing facility. National Reactor Testing Station, Idaho, $10,100,000.

Project 75–5–f, high temperature gas reactor fuel refabrication pilot plant, Oak Ridge National Laboratory, Tennessee, $3,000,000.

Project 75–5–g, molten salt breeder reactor (preliminary planning preparatory to possible future demonstration project), $1,500,000.

(6)

Physical Research.—

Project 75–6–a, accelerator and reactor improvements and modifications, $3,000,000.

Project 75–6–b, heavy ion research facilities, various locations, $19,200,000.

Project 75–6–c, positron-electron joint project, Lawrence Berkeley Laboratory and Stanford Linear Accelerator Center, $900,000.

(7)

Biomedical and Environmental Research and Safety.—

Project 75–7–a, upgrading of laboratory facilities. Oak Ridge National Laboratory, Tennessee, $2,100,000.

Project 75–7–b, environmental research laboratory. Savannah River, South Carolina, $2,000,000.

Project 75–7–c, intermediate-level waste management facilities, Oak Ridge National Laboratory, Tennessee, $9,500,000.

Project 75–7–d, modifications and additions to biomedical and environmental research facilities, $2,850,000.

(8)

Biomedical and Environmental Research and Safety.—

Project 75–8–a, environmental sciences laboratory. Oak Ridge National Laboratory, Tennessee, $8,800,000.

(9)

General Plant Projects.—

$55,650,000.

(10)

Construction Planning and Design.—

$2,000,000.

(11)

Capital Equipment.—

Acquisition and fabrication of capital equipment not related to construction, $208,850,000.

(12)

Reactor Safety Research.—

Project 75–12–a, reactor safety facilities modifications, $1,000,000.

(13)

Applied Energy Technology.—

Project 75–13–a, hydrothermal pilot plant, $1,000,000.

Sec. 102. Limitations.—

(a)

The Commission is authorized to start any project set forth in subsection 101(b) (1), (3), (5), (6), (7), (12), and (13) only if the currently estimated cost of that project does not exceed by more than 25 per centum the estimated cost set forth for that project.

(b)

The Commission is authorized to start any project set forth in subsection 101(b) (2), (4), (8), and (10) only if the currently estimated cost of that project does not exceed by more than 10 per centum the estimated cost set forth for that project.

(c)

The Commission is authorized to start any project under subsection 101(b) (9) only if it is in accordance with the following:

(1)

The maximum currently estimated cost of any project shall be $500,000 and the maximum currently estimated cost of any building included in such project shall be $100,000: Provided, That the building cost limitation may be exceeded if the Commission determines that it is necessary in the interest of efficiency and economy.

(2)

The total cost of all projects undertaken under subsection 101(b) (9) shall not exceed the estimated cost set forth in that subsection by more than 10 per centum.

(d)

The total cost of any project undertaken under subsection 101(b) (1), (3), (5), (6), (7), (12), and (13) shall not exceed the estimated cost set forth for that project by more than 25 per centum, unless and until additional appropriations are authorized under section 261 of the Atomic Energy Act of 1954, as amended, provided

42 USC 2017.

that this subsection will not apply to any project with an estimated cost less than $5,000,000.

(e)

The total cost of any project undertaken under subsection 101(b) (2), (4), (8), (9), and (10) shall not exceed the estimated cost set forth for that project by more than 10 per centum, unless and until additional appropriations are authorized under section 261 of the Atomic Energy Act of 1954, as amended, provided that this subsection

42 USC 2017.

will not apply to any project with an estimated cost less than $5,000,000.

Sec. 103.

The Commission is authorized to perform construction

Construction design services.

design services for any Commission construction project whenever (1) such construction project has been included in a proposed authorization bill transmitted to the Congress by the Commission, and (2) the Commission determines that the project is of such urgency that construction of the project should be initiated promptly upon enactment of legislation appropriating funds for its construction.

Sec. 104.

Any moneys received by the Commission (except sums received from the disposal of property under the Atomic Energy Community Act of 1955, as amended (42 U.S.C. 2301)), may be retained by the Commission and credited to its “Operating expenses” appropriation notwithstanding the provisions of section 3617 of the Revised Statutes (31 U.S.C. 484).

Sec. 105.

Transfers of sums from the “Operating expenses” appropriation

Transfer of sums.

may be made to other agencies of the Government for the performance of the work for which the appropriation is made, and in such cases the sums so transferred may be merged with the appropriation to which transferred.

Sec. 106.

When so specified in an appropriation Act, transfers of

Transfer of amounts.

amounts between “Operating expenses” and “Plant and capital equipment” may be made as provided in such appropriation Act.

Sec. 107. Amendment of Prior Year Acts.—

(a)

Section 101 of Public Law 89–428, as amended, is further amended by striking from

80 Stat. 162; 81 Stat. 126.

subsection (b) (3) project 67–3–a, fast flux test facility, the figure “$87,500,000”, and substituting therefor the figure “$420,000,000”.

(b)

Section 101 of Public Law 91–273, as amended, is further

87 Stat. 145.

amended by striking from subsection (b) (1), project 71–1–f, process equipment modifications, gaseous diffusion plants, the figure “$172,100,000” and substituting therefor the figure “$295,100,000”.

(c)

Section 106 of Public Law 91–273, as amended, is further

84 Stat. 300; 87 Stat. 145.

amended by striking from subsection (a) the figure “$2,000,000” and substituting therefor the figure “$3,000,000,” and by adding thereto the following new subsection (c):

“(c) The Commission is hereby authorized to agree, by modification to the definitive cooperative arrangement reflecting such changes therein as it deems appropriate for such purpose, to the following: (1) to execute and deliver to the other parties to the AEC definitive contract, the special undertakings of indemnification specified in said contract, which undertakings shall be subject to availability of appropriations to the Atomic Energy Commission (or any other Federal agency to which the Commission’s pertinent functions might be transferred at some future time) and to the provisions of section 3679 of the Revised Statutes, as amended; and (2) to acquire ownership and

31 USC 665.

custody of the property constituting the Liquid Metal Fast Breeder Reactor powerplant or parts thereof, and to use, decommission, and dispose of said property, as provided for in the AEC definitive contract.”

(d)

Section 101 of Public Law 92–314, as amended, is amended by

86 Stat. 222.

striking from subsection (b)(4) , project 73–4–b, land acquisition, Rocky Flats, Colorado, the figure “$8,000,000” and substituting therefor the figure “$11,400,000”.

(e)

Section 101 of Public Law 93–60 is amended by (1) striking

87 Stat. 143.

from subsection (b)(1), project 74–1–a, additional facilities, high level waste storage, Savannah River, South Carolina, the figure “$14,000,000” and substituting therefor the figure “$17,500,000”, (2) striking from subsection (b)(1), project 74–1–g, cascade uprating program, gaseous diffusion plants, the words “(partial AE and limited component procurement only)” and further striking the figure “$6,000,000” and substituting therefor the figure “$183,100,000”, and (3) striking from subsection (b)(2), project 74–2–d, national security and resources study center, the words “(AE only), site undesignated” and substituting therefor the words “Los Alamos Scientific Laboratory, New Mexico” and further striking the figure “$350,000” and substituting therefor the figure “$4,600,000”.

Sec. 108. Rescission.—

(a)

Public Law 91–44, as amended, is further

83 Stat. 46; 86 Stat. 225.

amended by rescinding therefrom authorization for a project, except for funds heretofore obligated, as follows:

Project 70–1–b, bedrock waste storage (AE and site selection drilling only). Savannah River, South Carolina, $4,300,000.

(b)

Public Law 92–84, as amended, is further amended by rescinding

85 Stat. 304.

therefrom authorization for a project, except for funds heretofore obligated, as follows:

Project 72–3–b, national radioactive waste repository, site undetermined, $3,500,000.

(c)

Public Law 92–314, as amended, is further amended by rescinding

86 Stat. 224.

therefrom authorization for a project, except for funds heretofore obligated, as follows:

Project 73–6–c, accelerator improvements, Cambridge Electron Accelerator, Massachusetts, $75,000.

TITLE II

Sec. 201.

Section 157b. (3) of the Atomic Energy Act of 1954, as amended, is amended by striking out “upon the recommendation of”

42 USC 2187.

and inserting in lieu thereof “after consultation with”.

Approved May 10, 1974.

Parsed from the official Statutes at Large USLM XML in 88.xml