Title 16 — Conservation
Chapter 47 — Small Hydroelectric Power Projects
§ 2708. Definitions
Statutory text
For purposes of this chapter, the term—
“small hydroelectric power project” means any hydroelectric power project which is located at the site of any existing dam, which uses the water power potential of such dam, and which has not more than 30,000 kilowatts of installed capacity;
“electric cooperative” means any cooperative association eligible to receive loans under section 904 of title 7;
“industrial development agency” means any agency which is permitted to issue obligations the interest on which is excludable from gross income under section 103 of title 26;
“project costs” means the cost of acquisiiton 1 or construction of all facilities and services and the cost of acquisition of all land and interests in land used in the design and construction and operation of a small hydroelectric power project;
“nonprofit organization” means any organization described in section 501(c)(3) or 501(c)(4) of title 26 and exempt from tax under section 501(a) of title 26 (but only with respect to a trade or business carried on by such organization which is not an unrelated trade or business, determined by applying section 513(a) of title 26 to such organization);
“existing dam” means any dam, the construction of which was completed or on 2 before , and which does not require any construction or enlargement of impoundment structures (other than repairs or reconstruction) in connection with the installation of any small hydroelectric power project;
“municipality” has the meaning provided in section 796 of this title; and
“person” has the meaning provided in section 796 of this title.
The requirement in subsection (a)(1) that a project be located at the site of an existing dam in order to qualify as a small hydroelectric power project, and the other provisions of this chapter which require that a project be at or in connection with an existing dam (or utilize the potential of such dam) in order to be assisted under or included within such provisions, shall not be construed to exclude—
from the definition contained in such subsection (a)(1), or
from any other provision of this chapter,
any project which utilizes or proposes to utilize natural water features for the generation of electricity, without the need for any dam or impoundment, in a manner which (as determined by the Commission) will achieve the purposes of this chapter and will do so without any adverse effect upon such natural water features.
Footnotes
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Public Utility Regulatory Policies Act of 1978
Pub. L. 95–617 title IV § 408 · 92 Stat. 3117
Enacted · 16 U.S.C. § 2708
Pub. L. 95–617, title IV, § 408, Nov. 9, 1978, 92 Stat. 3156
Source evidence
Code source credit
Pub. L. 95–617, title IV, § 408, Nov. 9, 1978, 92 Stat. 3156Enacted provision · exact public law section
SEC. 408. DEFINITIONS. For purposes of this title, the term— (1) “small hydroelectric power project” means any hydroelectric power project which is located at the site of any existing dam, which uses the water power potential of such dam, and which has not more than 15,000 kilowatts of installed capacity; (2) “electric cooperative” means any cooperative association eligible to receive loans under section 4 of the Rural Electrification Act of 1936 (7 U.S.C. 904); (3) “industrial development agency” means any agency which is permitted to issue obligations the interest on which is excludable from gross income under section 103 of the Internal Revenue 26 USC 103. Code of 1954; (4) “project costs” means the cost of acquisiiton or construction of all facilities and services and the cost of acquisition of all land and interests in land used in the design and construction and operation of a small hydroelectric power project; (5) “nonprofit organization” means any organization described in section 501(c) (3) or 501(c) (4) of the Internal Revenue Code of 1954 and exempt from tax under section 501(a) of such Code 26 USC 501. (but only with respect to a trade or business carried on by such organization which is not an unrelated trade or business, determined by applying section 513(a) to such organization); 26 USC 513. (6) “existing dam” means any dam, the construction of which was completed or on before April 20, 1977, and which does not require any construction or enlargement of impoundment structures (other than repairs or reconstruction) in connection with the installation of any small hydroelectric power project; (7) “municipality” has the meaning provided in section 3 of the Federal Power Act; and 16 USC 796. (8) “person” has the meaning provided in section 3 of the Federal Power Act.Energy Security Act
Pub. L. 96–294 § 408(a) · 94 Stat. 611
Substituted · 16 U.S.C. § 2708(a)
Pub. L. 96–294, § 408(a), (c)(1), designated existing provisions as subsec. (a) and, as so designated, in par. (1) substituted “30,000” for “15,000”
Source evidence
Code amendment note
Subsec. (a). Pub. L. 96–294, § 408(a), (c)(1), designated existing provisions as subsec. (a) and, as so designated, in par. (1) substituted “30,000” for “15,000”.Enacted provision · exact public law section
(a) Section 408(1) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2708(1)) is amended by striking out “15,000 kilowatts” and inserting in lieu thereof “30,000 kilowatts”.Energy Security Act
Pub. L. 96–294 § 408(c)(2) · 94 Stat. 611
Added · 16 U.S.C. § 2708(b)
Pub. L. 96–294, § 408(c)(2), added subsec. (b)
Source evidence
Code amendment note
Subsec. (b). Pub. L. 96–294, § 408(c)(2), added subsec. (b).Enacted provision · exact public law section
(2) by adding at the end thereof the following new subsection: “(b) The requirement in subsection (a)(1) that a project be located at the site of an existing dam in order to qualify as a small hydroelectric power project, and the other provisions of this title which require that a project be at or in connection with an existing dam (or utilize the potential of such dam) in order to be assisted under or included within such provisions, shall not be construed to exclude— “(1) from the definition contained in such subsection (a)(1), or “(2) from any other provision of this title, any project which utilizes or proposes to utilize natural water features for the generation of electricity, without the need for any dam or impoundment, in a manner which (as determined by the Commission) will achieve the purposes of this title and will do so without any adverse effect upon such natural water features.”.Tax Reform Act of 1986
Pub. L. 99–514 § 2 · 100 Stat. 2085
Substituted · 16 U.S.C. § 2708(a)(3); 16 U.S.C. § 2708(a)(5)
Pub. L. 99–514 substituted “Internal Revenue Code of 1986” for “Internal Revenue Code of 1954”, which for purposes of codification was translated as “title 26” thus requiring no change in text
Source evidence
Code amendment note
Subsec. (a)(3), (5). Pub. L. 99–514 substituted “Internal Revenue Code of 1986” for “Internal Revenue Code of 1954”, which for purposes of codification was translated as “title 26” thus requiring no change in text.Enacted provision · exact public law section
SEC. 2. INTERNAL REVENUE CODE OF 1986. (a) Redesignation of 1954 Code.— The Internal Revenue Title enacted August 16, 1954, as heretofore, hereby, or hereafter amended, may be cited as the “Internal Revenue Code of 1986”. (b) References in Laws, Etc.— Except when inappropriate, any reference in any law, Executive order, or other document— (1) to the Internal Revenue Code of 1954 shall include a reference to the Internal Revenue Code of 1986, and (2) to the Internal Revenue Code of 1986 shall include a reference to the provisions of law formerly known as the Internal Revenue Code of 1954.Energy Policy Act of 2005
Pub. L. 109–58 title II § 246 · 119 Stat. 594
Substituted · 16 U.S.C. § 2708(a)(6)
Pub. L. 109–58 substituted “July 22, 2005” for “April 20, 1977”
Source evidence
Code amendment note
Subsec. (a)(6). Pub. L. 109–58 substituted “July 22, 2005” for “April 20, 1977”.Enacted provision · exact public law section
SEC. 246. SMALL HYDROELECTRIC POWER PROJECTS. Section 408(a)(6) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2708(a)(6)) is amended by striking “April 20, 1977” and inserting “July 22, 2005”.
5 of 5 references resolved to an enrolled provision
Editorial Notes
References in Text
The Commission, referred to in subsec. (b), means the Federal Energy Regulatory Commission, see section 2602(3) of this title.
Amendments1980–2005 · 3 rounds
2005
Subsec. (a)(6). Pub. L. 109–58 substituted “” for “”.
1986
Subsec. (a)(3), (5). Pub. L. 99–514 substituted “Internal Revenue Code of 1986” for “Internal Revenue Code of 1954”, which for purposes of codification was translated as “title 26” thus requiring no change in text.
1980
Subsec. (a). Pub. L. 96–294, § 408(a), (c)(1), designated existing provisions as subsec. (a) and, as so designated, in par. (1) substituted “30,000” for “15,000”.
Subsec. (b). Pub. L. 96–294, § 408(c)(2), added subsec. (b).
Credits
1978–2005 · 4 acts
- 1978Pub. L. 95–617, title IV, § 408, , 92 Stat. 3156
- 1980Pub. L. 96–294, title IV, § 408(a), (c), , 94 Stat. 718
- 1986Pub. L. 99–514, § 2, , 100 Stat. 2095
- 2005Pub. L. 109–58, title II, § 246, , 119 Stat. 679.
Show as published
(Pub. L. 95–617, title IV, § 408, , 92 Stat. 3156; Pub. L. 96–294, title IV, § 408(a), (c), , 94 Stat. 718; Pub. L. 99–514, § 2, , 100 Stat. 2095; Pub. L. 109–58, title II, § 246, , 119 Stat. 679.)