Title 16 — Conservation
Chapter 12 — Federal Regulation and Development of Power
§ 824j. Wheeling authority
Statutory text
Transmission service by any electric utility; notice, hearing and findings by Commission
Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant. Upon receipt of such application, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.
Reliability of electric service
No order may be issued under this section or section 824i of this title if, after giving consideration to consistently applied regional or national reliability standards, guidelines, or criteria, the Commission finds that such order would unreasonably impair the continued reliability of electric systems affected by the order.
Replacement of electric energy
No order may be issued under subsection (a) or (b) which requires the transmitting utility subject to the order to transmit, during any period, an amount of electric energy which replaces any amount of electric energy—
required to be provided to such applicant pursuant to a contract during such period, or
currently provided to the applicant by the utility subject to the order pursuant to a rate schedule on file during such period with the Commission: Provided, That nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination or modification of an existing rate schedule: Provided, That such order shall not become effective until termination of such rate schedule or the modification becomes effective.
Termination or modification of order; notice, hearing and findings of Commission; contents of order; inclusion in order of terms and conditions agreed upon by parties
Any transmitting utility ordered under subsection (a) or (b) to provide transmission services may apply to the Commission for an order permitting such transmitting utility to cease providing all, or any portion of, such services. After public notice, notice to each affected State regulatory authority, each affected Federal power marketing agency, each affected transmitting utility, and each affected electric utility, and after an opportunity for an evidentiary hearing, the Commission shall issue an order terminating or modifying the order issued under subsection (a) or (b), if the transmitting utility providing such transmission services has demonstrated, and the Commission has found, that—
due to changed circumstances, the requirements applicable, under this section and section 824k of this title, to the issuance of an order under subsection (a) or (b) are no longer met, or 1
any transmission capacity of the utility providing transmission services under such order which was, at the time such order was issued, in excess of the capacity necessary to serve its own customers is no longer in excess of the capacity necessary for such purposes, or
the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has failed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.
No order shall be issued under this subsection pursuant to a finding under subparagraph (A) unless the Commission finds that such order is in the public interest.
Any order issued under this subsection terminating or modifying an order issued under subsection (a) or (b) shall—
provide for any appropriate compensation, and
provide the affected electric utilities adequate opportunity and time to—
make suitable alternative arrangements for any transmission services terminated or modified, and
insure that the interests of ratepayers of such utilities are adequately protected.
No order may be issued under this subsection terminating or modifying any order issued under subsection (a) or (b) if the order under subsection (a) or (b) includes terms and conditions agreed upon by the parties which—
fix a period during which transmission services are to be provided under the order under subsection (a) or (b), or
otherwise provide procedures or methods for terminating or modifying such order (including, if appropriate, the return of the transmission capacity when necessary to take into account an increase, after the issuance of such order, in the needs of the transmitting utility subject to such order for transmission capacity).
“Facilities” defined
As used in this section, the term “facilities” means only facilities used for the generation or transmission of electric energy.
Footnotes
- 1 So in original. The word “or” probably should not appear.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Public Utility Regulatory Policies Act of 1978
Pub. L. 95–617 title II § 203 · 92 Stat. 3117
Enacted · 16 U.S.C. § 824j
June 10, 1920, ch. 285, pt. II, § 211, as added Pub. L. 95–617, title II, § 203, Nov. 9, 1978, 92 Stat. 3136
Source evidence
Code source credit
June 10, 1920, ch. 285, pt. II, § 211, as added Pub. L. 95–617, title II, § 203, Nov. 9, 1978, 92 Stat. 3136Enacted provision · exact public law section
SEC. 203. WHEELING. Part II of the Federal Power Act, as amended by section 202 of this Act, is further amended by adding the following new section at the end thereof: “Sec. 211. “certain wheeling authority (a) Any electric utility or Federal power marketing 16 USC 824j. agency may apply to the Commission for an order under this subsection requiring any other electric utility to provide transmission services to the applicant (including any enlargement of transmission capacity necessary to provide such services). Upon receipt of such application, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such order if it finds that such order— “(1) is in the public interest, “(2) would— “(A) conserve a significant amount of energy, “(B) significantly promote the efficient use of facilities and resources, or “(C) improve the reliability of any electric utility system to which the order applies, and “(3) meets the requirements of section 212. Post, p. 3138. “(b) Any electric utility, or Federal power marketing agency, which purchases electric energy for resale from any other electric utility may apply to the Commission for an order under this subsection requiring such other electric utility to provide transmission services to the applicant (including any increase in transmission capacity necessary to provide such services). Upon receipt of an application under this subsection, after public notice and notice to each affected State regulatory authority, each affected electric utility, and each affected Federal power marketing agency, and after affording an opportunity for an evidentiary hearing, the Commission may issue such an order if the Commission determines that— “(1) such other electric utility has given actual or constructive notice that it is unwilling or unable to provide electric service to the applicant and has been requested by the applicant to provide the transmission services requested in the application under this subsection, and “(2) such order meets the requirements of section 212. “(c) (1) No order may be issued under subsection (a) unless the Commission determines that such order would reasonably preserve existing competitive relationships. “(2) No order may be issued under subsection (a) or (b) which requires the electric utility subject to the order to transmit, during any period, an amount of electric energy which replaces any amount of electric energy— “(A) required to be provided to such applicant pursuant to a contract during such period, or “(B) currently provided to the applicant by the utility subject to the order pursuant to a rate schedule on file during such period with the Commission. “(3) No order may be issued under the authority of subsection (a) or (b) which is inconsistent with any State law which governs the retail marketing areas of electric utilities. “(4) No order may be issued under subsection (a) or (b) which provides for the transmission of electric energy directly to an ultimate consumer. “(d) (1) Any electric utility ordered under subsection (a) or (b) to provide transmission services may apply to the Commission for an order permitting such electric utility to cease providing all, or any portion of, such services. After public notice, notice to each affected State regulatory authority, each affected Federal power marketing agency, and each affected electric utility, and after an opportunity for an evidentiary hearing, the Commission shall issue an order terminating or modifying the order issued under subsection (a) or (b), if the electric utility providing such transmission services has demonstrated, and the Commission has found, that— “(A) due to changed circumstances, the requirements applicable, Infra. under this section and section 212. to the issuance of an order under subsection (a) or (b) are no longer met, or “(B) any transmission capacity of the utility providing transmission services under such order which was, at the time such order was issued, in excess of the capacity necessary to serve its own customers is no longer in excess of the capacity necessary for such purposes. No order shall be issued under this subsection pursuant to a finding under subparagraph (A) unless the Commission finds that such order is in the public interest. “(2) Any order issued under this subsection terminating or modifying an order issued under subsection (a) or (b) shall— “(A) provide for any appropriate compensation, and “(B) provide the affected electric utilities adequate opportunity and time to— “(i) make suitable alternative arrangements for any transmission services terminated or modified, and “(ii) insure that the interests of ratepayers of such utilities are adequately protected. “(3) No order may be issued under this subsection terminating or modifying any order issued under subsection (a) or (b) if the order under subsection (a) or (b) includes terms and conditions agreed upon by the parties which—, “(A) fix a period during which transmission services are to be provided under the order under subsection (a) or (b), or “(B) otherwise provide procedures or methods for terminating or modifying such order (including, if appropriate, the return of the transmission capacity when necessary to take into account an increase, after the issuance of such order, in the needs of the electric utility subject to such order for transmission capacity). “(e) As used in this section, the term ‘facilities’ means only facilities used for the generation or transmission of electric energy.”.Energy Security Act
Pub. L. 96–294 title VI § 643(a)(3) · 94 Stat. 611
Added · 16 U.S.C. § 824j(a)
Pub. L. 96–294 added applicability to geothermal power producers
Source evidence
Code amendment note
Subsec. (a). Pub. L. 96–294 added applicability to geothermal power producers.Enacted provision · exact public law section
(3) by striking out “Any electric utility” at the beginning of section 211(a) and inserting in lieu thereof “;Any electric utility, geothermal power producer (including a producer which is not an electric utility),”.Electric Consumers Protection Act of 1986
Pub. L. 99–495 § 15 · 100 Stat. 1243
Inserted · 16 U.S.C. § 824j(c)(2)(B)
Pub. L. 99–495 inserted provisions that nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination or modification of an existing rate schedule, provided that such order shall not become effective until termination of such rate schedule or the modification becomes effective
Source evidence
Code amendment note
Subsec. (c)(2)(B). Pub. L. 99–495 inserted provisions that nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination or modification of an existing rate schedule, provided that such order shall not become effective until termination of such rate schedule or the modification becomes effective.Enacted provision · exact public law section
SEC. 15. APPLICATIONS FOR CERTAIN ORDERS UNDER FEDERAL POWER ACT. Section 211(c)(2)(B) of the Federal Power Act is amended by adding 16 USC 824j. the following before the period: “: Provided, That nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination of modification of an existing rate schedule: Provided, That such order shall not become effective until termination of such rate schedule or the modification becomes effective”.Effective date note
Amendment by Pub. L. 99–495 effective with respect to each license, permit, or exemption issued under this chapter after Oct. 16, 1986, see section 18 of Pub. L. 99–495, set out as a note under section 797 of this title.Energy Policy Act of 1992
Pub. L. 102–486 § 721(1) · 106 Stat. 2776
Amended · 16 U.S.C. § 824j(a)
Pub. L. 102–486, § 721(1), amended first sentence generally. Prior to amendment, first sentence read as follows: “Any electric utility, geothermal power producer (including a producer which is not an electric utility), or Federal power marketing agency may apply to the Commission for an order under this subsection requiring any other electric utility to provide transmission services to the applicant (including any enlargement of transmission capacity necessary to provide such services).”
Source evidence
Code amendment note
Subsec. (a). Pub. L. 102–486, § 721(1), amended first sentence generally. Prior to amendment, first sentence read as follows: “Any electric utility, geothermal power producer (including a producer which is not an electric utility), or Federal power marketing agency may apply to the Commission for an order under this subsection requiring any other electric utility to provide transmission services to the applicant (including any enlargement of transmission capacity necessary to provide such services).”Enacted provision · exact public law section
(1) The first sentence of subsection (a) is amended to read as follows: “Any electric utility, Federal power marketing agency, or any other person generating electric energy for sale for resale, may apply to the Commission for an order under this subsection requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) to the applicant.”.Energy Policy Act of 1992
Pub. L. 102–486 § 721(2) · 106 Stat. 2776
Substituted · 16 U.S.C. § 824j(a)
Pub. L. 102–486, § 721(2), in second sentence, substituted “the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.” for “the Commission may issue such order if it finds that such order—
Target inherited from the preceding amendment note.
Source evidence
Code amendment note
Pub. L. 102–486, § 721(2), in second sentence, substituted “the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.” for “the Commission may issue such order if it finds that such order—“(1) is in the public interest, “(2) would— “(A) conserve a significant amount of energy, “(B) significantly promote the efficient use of facilities and resources, or “(C) improve the reliability of any electric utility system to which the order applies, and “(3) meets the requirements of section 824k of this title.”
Enacted provision · exact public law section
(2) In the second sentence of subsection (a), strike “the Commission may” and all that follows and insert “the Commission may issue such order if it finds that such order meets the requirements of section 212, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.”Energy Policy Act of 1992
Pub. L. 102–486 § 721(3) · 106 Stat. 2776
Amended · 16 U.S.C. § 824j(b)
Pub. L. 102–486, § 721(3), amended subsec. (b) generally
Substituted · 16 U.S.C. § 824j(b)
Pub. L. 102–486, § 721(3), substituting provisions relating to reliability of electric service for provisions which related to transmission service by sellers of electric energy for resale and notice, hearing, and determinations by Commission
Source evidence
Code amendment note
Subsec. (b). Pub. L. 102–486, § 721(3), amended subsec. (b) generally, substituting provisions relating to reliability of electric service for provisions which related to transmission service by sellers of electric energy for resale and notice, hearing, and determinations by Commission.Enacted provision · exact public law section
(3) Amend subsection (b) to read as follows: “(b) Reliability of Electric Service.— No order may be issued under this section or section 210 if, after giving consideration to consistently applied regional or national reliability standards, guidelines, or criteria, the Commission finds that such order would unreasonably impair the continued reliability of electric systems affected by the order”.Energy Policy Act of 1992
Pub. L. 102–486 § 721(4) · 106 Stat. 2776
Struck · 16 U.S.C. § 824j(c)
Pub. L. 102–486, § 721(4), struck out pars. (1), (3), and (4)
Substituted · 16 U.S.C. § 824j(c)
Pub. L. 102–486, § 721(4), substituted “which requires the transmitting” for “which requires the electric” in introductory provisions of par. (2). Prior to amendment, pars. (1), (3), and (4) read as follows:
Source evidence
Code amendment note
Subsec. (c). Pub. L. 102–486, § 721(4), struck out pars. (1), (3), and (4), and substituted “which requires the transmitting” for “which requires the electric” in introductory provisions of par. (2). Prior to amendment, pars. (1), (3), and (4) read as follows:“(1) No order may be issued under subsection (a) of this section unless the Commission determines that such order would reasonably preserve existing competitive relationships. “(3) No order may be issued under the authority of subsection (a) or (b) of this section which is inconsistent with any State law which governs the retail marketing areas of electric utilities. “(4) No order may be issued under subsection (a) or (b) of this section which provides for the transmission of electric energy directly to an ultimate consumer.”
Enacted provision · exact public law section
(4) In subsection (c)— (A) Strike out paragraph (1). (B) In paragraph (2) strike “which requires the electric” and insert “which requires the transmitting”. (C) Strike out paragraphs (3) and (4).Energy Policy Act of 1992
Pub. L. 102–486 § 721(5) · 106 Stat. 2776
Substituted · 16 U.S.C. § 824j(d)
Pub. L. 102–486, § 721(5), in first sentence substituted “transmitting” for “electric” before “utility” in two places, in second sentence inserted “each affected transmitting utility,” before “and each affected electric utility”, in par. (1) substituted “, or” for period at end of subpar. (B)
Substituted · 16 U.S.C. § 824j(d)
Pub. L. 102–486, § 721(5), in first sentence added subpar. (C), and in par. (3)(B) substituted “transmitting” for “electric” before “utility”
Source evidence
Code amendment note
Subsec. (d). Pub. L. 102–486, § 721(5), in first sentence substituted “transmitting” for “electric” before “utility” in two places, in second sentence inserted “each affected transmitting utility,” before “and each affected electric utility”, in par. (1) substituted “, or” for period at end of subpar. (B) and added subpar. (C), and in par. (3)(B) substituted “transmitting” for “electric” before “utility”.Enacted provision · exact public law section
(5) In subsection (a)— (A) In the first sentence of paragraph (1), strike “electric” and insert “transmitting” in each place it appears. (B) In the second sentence of paragraph (1) before “and each affected electric utility,” insert “each affected transmitting utility,”. (C) In paragraph (3), strike “electric” and insert “transmitting”. (D) Strike the period in subparagraph (B) of paragraph (1) and insert or” and after subparagraph (B) insert the following new subparagraph: “(C) the ordered transmission services require enlargement of transmission capacity and the transmitting utility subject to the order has railed, after making a good faith effort, to obtain the necessary approvals or property rights under applicable Federal, State, and local laws.”.Electricity Modernization Act of 2005
Pub. L. 109–58 § 1295(c)(1) · 119 Stat. 594
Struck · 16 U.S.C. § 824j(c)
Pub. L. 109–58, § 1295(c)(1), struck out par. (2) designation before introductory provisions
Redesignated · 16 U.S.C. § 824j(c)
Pub. L. 109–58, § 1295(c)(1), redesignated former subpars. (A) and (B) as pars. (1) and (2), respectively, and in par. (2) substituted “termination or modification” for “termination of modification”
Source evidence
Code amendment note
Subsec. (c). Pub. L. 109–58, § 1295(c)(1), struck out par. (2) designation before introductory provisions, redesignated former subpars. (A) and (B) as pars. (1) and (2), respectively, and in par. (2) substituted “termination or modification” for “termination of modification”.Enacted provision · exact public law section
(1) in subsection (c)— (A) by striking “(2)”; (B) by striking “(A)” and inserting “(1)” (C) by striking “(B)” and inserting “(2)”; and (D) by striking “termination of modification” and inserting “termination or modification”; andElectricity Modernization Act of 2005
Pub. L. 109–58 § 1295(c)(2) · 119 Stat. 594
Substituted · 16 U.S.C. § 824j(d)(1)
Pub. L. 109–58, § 1295(c)(2), substituted “if the transmitting utility providing” for “if the electric utility providing” in introductory provisions
Source evidence
Code amendment note
Subsec. (d)(1). Pub. L. 109–58, § 1295(c)(2), substituted “if the transmitting utility providing” for “if the electric utility providing” in introductory provisions.Enacted provision · exact public law section
(2) in the second sentence of subsection (d)(1), by striking “electric utility” the second place it appears and inserting “transmitting utility”.
14 of 14 references resolved to an enrolled provision
Editorial Notes
Amendments1980–2005 · 4 rounds
2005
Subsec. (c). Pub. L. 109–58, § 1295(c)(1), struck out par. (2) designation before introductory provisions, redesignated former subpars. (A) and (B) as pars. (1) and (2), respectively, and in par. (2) substituted “termination or modification” for “termination of modification”.
Subsec. (d)(1). Pub. L. 109–58, § 1295(c)(2), substituted “if the transmitting utility providing” for “if the electric utility providing” in introductory provisions.
1992
Subsec. (a). Pub. L. 102–486, § 721(1), amended first sentence generally. Prior to amendment, first sentence read as follows: “Any electric utility, geothermal power producer (including a producer which is not an electric utility), or Federal power marketing agency may apply to the Commission for an order under this subsection requiring any other electric utility to provide transmission services to the applicant (including any enlargement of transmission capacity necessary to provide such services).”
Pub. L. 102–486, § 721(2), in second sentence, substituted “the Commission may issue such order if it finds that such order meets the requirements of section 824k of this title, and would otherwise be in the public interest. No order may be issued under this subsection unless the applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order.” for “the Commission may issue such order if it finds that such order—
“(1) is in the public interest,
“(2) would—
“(A) conserve a significant amount of energy,
“(B) significantly promote the efficient use of facilities and resources, or
“(C) improve the reliability of any electric utility system to which the order applies, and
“(3) meets the requirements of section 824k of this title.”
Subsec. (b). Pub. L. 102–486, § 721(3), amended subsec. (b) generally, substituting provisions relating to reliability of electric service for provisions which related to transmission service by sellers of electric energy for resale and notice, hearing, and determinations by Commission.
Subsec. (c). Pub. L. 102–486, § 721(4), struck out pars. (1), (3), and (4), and substituted “which requires the transmitting” for “which requires the electric” in introductory provisions of par. (2). Prior to amendment, pars. (1), (3), and (4) read as follows:
“(1) No order may be issued under subsection (a) of this section unless the Commission determines that such order would reasonably preserve existing competitive relationships.
“(3) No order may be issued under the authority of subsection (a) or (b) of this section which is inconsistent with any State law which governs the retail marketing areas of electric utilities.
“(4) No order may be issued under subsection (a) or (b) of this section which provides for the transmission of electric energy directly to an ultimate consumer.”
Subsec. (d). Pub. L. 102–486, § 721(5), in first sentence substituted “transmitting” for “electric” before “utility” in two places, in second sentence inserted “each affected transmitting utility,” before “and each affected electric utility”, in par. (1) substituted “, or” for period at end of subpar. (B) and added subpar. (C), and in par. (3)(B) substituted “transmitting” for “electric” before “utility”.
1986
Subsec. (c)(2)(B). Pub. L. 99–495 inserted provisions that nothing in this subparagraph shall prevent an application for an order hereunder to be filed prior to termination or modification of an existing rate schedule, provided that such order shall not become effective until termination of such rate schedule or the modification becomes effective.
1980
Subsec. (a). Pub. L. 96–294 added applicability to geothermal power producers.
Statutory Notes and Related Subsidiaries
Effective Date of 1986 Amendment
Amendment by Pub. L. 99–495 effective with respect to each license, permit, or exemption issued under this chapter after , see section 18 of Pub. L. 99–495, set out as a note under section 797 of this title.
State Authorities; Construction
Nothing in amendment by Pub. L. 102–486 to be construed as affecting or intending to affect, or in any way to interfere with, authority of any State or local government relating to environmental protection or siting of facilities, see section 731 of Pub. L. 102–486, set out as a note under section 796 of this title.
Credits
1920–2005 · 5 acts
- 1920June 10, 1920, ch. 285, pt. II, § 211, as added Pub. L. 95–617, title II, § 203, , 92 Stat. 3136
- 1980amended Pub. L. 96–294, title VI, § 643(a)(3), , 94 Stat. 770
- 1986Pub. L. 99–495, § 15, , 100 Stat. 1257
- 1992Pub. L. 102–486, title VII, § 721, , 106 Stat. 2915
- 2005Pub. L. 109–58, title XII, § 1295(c), , 119 Stat. 985.
Show as published
(June 10, 1920, ch. 285, pt. II, § 211, as added Pub. L. 95–617, title II, § 203, , 92 Stat. 3136; amended Pub. L. 96–294, title VI, § 643(a)(3), , 94 Stat. 770; Pub. L. 99–495, § 15, , 100 Stat. 1257; Pub. L. 102–486, title VII, § 721, , 106 Stat. 2915; Pub. L. 109–58, title XII, § 1295(c), , 119 Stat. 985.)