Title 16 — Conservation
Chapter 12G — Pacific Northwest Federal Transmission System
§ 838d. Transmission of non-Federal power
Statutory text
The Administrator shall make available to all utilities on a fair and nondiscriminatory basis, any capacity in the Federal transmission system which he determines to be in excess of the capacity required to transmit electric power generated or acquired by the United States.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Federal Columbia River Transmission System Act
Pub. L. 93–454 § 6 · 88 Stat. 1376
Enacted · 16 U.S.C. § 838d
(Pub. L. 93–454, § 6, Oct. 18, 1974, 88 Stat. 1377.)
Source evidence
Code source credit
(Pub. L. 93–454, § 6, Oct. 18, 1974, 88 Stat. 1377.)Enacted provision · exact public law section
Sec. 6. The Administrator shall make available to all utilities on a 16 USC 838d. fair and nondiscriminatory basis, any capacity in the Federal transmission system which he determines to be in excess of the capacity required to transmit electric power generated or acquired by the United States.
1 of 1 references resolved to an enrolled provision
Statutory Notes and Related Subsidiaries
Transfer of Functions
Functions of Secretary of the Interior with respect to Bonneville Power Administration transferred to Secretary of Energy by section 7152(a)(1)(D), (2) of Title 42, The Public Health and Welfare, with Bonneville Power Administration to be preserved as a distinct organizational entity within Department of Energy and headed by an Administrator.