Title 33 — Navigation and Navigable Waters

Chapter 36 — Water Resources Development

§ 2282c. Vertical integration and acceleration of studies

Statutory text

(a)

In general

To the extent practicable, a feasibility study initiated by the Secretary, after , under section 2282(a) of this title shall—

(1)

result in the completion of a final feasibility report not later than 4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to section 2282(b) of this title;

(2)

have a maximum total cost of $5,000,000; and

(3)

ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section.

(b)

Extension

If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall—

(1)

prepare an updated feasibility study schedule and cost estimate;

(2)

notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and

(3)

provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable.

(c)

Exception

(1)

In general

The Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsection (a).

(2)

Factors

In making a determination that a study is too complex to comply with the requirements of subsection (a), the Secretary shall consider—

(A)

the type, size, location, scope, and overall cost of the project;

(B)

whether the project will use any innovative design or construction techniques;

(C)

whether the project will require significant action by other Federal, State, or local agencies;

(D)

whether there is significant public dispute as to the nature or effects of the project; and

(E)

whether there is significant public dispute as to the economic or environmental costs or benefits of the project.

(3)

Notification

Each time the Secretary makes a determination under this subsection, the Secretary shall provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the results of that determination, including an identification of the specific 1 or more factors used in making the determination that the project is complex.

(d)

Reviews

Not later than 90 days after the date of the initiation of a study described in subsection (a) for a project, the Secretary shall—

(1)

take all steps necessary to initiate the process for completing federally mandated reviews that the Secretary is required to complete as part of the study, including the environmental review process under section 1005;

(2)

convene a meeting of all Federal, tribal, and State agencies identified under section 2348(e) of this title that may be required by law to conduct or issue a review, analysis, or opinion on or to make a determination concerning a permit or license for the study; and

(3)

take all steps necessary to provide information that will enable required reviews and analyses related to the project to be conducted by other agencies in a thorough and timely manner.

(e)

Interim report

Not later than 18 months after , the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes—

(1)

the status of the implementation of the planning process under this section, including the number of participating projects;

(2)

a review of project delivery schedules, including a description of any delays on those studies participating in the planning process under this section; and

(3)

any recommendations for additional authority necessary to support efforts to expedite the feasibility study process for water resource projects.

(f)

Final report

Not later than 4 years after , the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes—

(1)

the status of the implementation of this section, including a description of each feasibility study subject to the requirements of this section;

(2)

the amount of time taken to complete each feasibility study; and

(3)

any recommendations for additional authority necessary to support efforts to expedite the feasibility study process, including an analysis of whether the limitation established by subsection (a)(2) needs to be adjusted to address the impacts of inflation.

Legislative history

Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.

  1. Water Resources Reform and Development Act of 2014

    Pub. L. 113–121 title I § 1001 · 128 Stat. 1193

    Enacted · 33 U.S.C. § 2282c

    Pub. L. 113–121, title I, § 1001, June 10, 2014, 128 Stat. 1196

    Source evidence

    Code source credit
    Pub. L. 113–121, title I, § 1001, June 10, 2014, 128 Stat. 1196

    Enacted provision · exact public law section
    SEC. 1001. VERTICAL INTEGRATION AND ACCELERATION OF STUDIES. (a) In General.— To the extent practicable, a feasibility study initiated by the Secretary, after the date of enactment of this Act, under section 905(a) of the Water Resources Development Act of 1986 (33 U.S.C. 2282(a)) shall— (1) result in the completion of a final feasibility report not later than 3 years after the date of initiation; (2) have a maximum Federal cost of $3,000,000; and (3) ensure that personnel from the district, division, and headquarters levels of the Corps of Engineers concurrently conduct the review required under that section. (b) Extension.— If the Secretary determines that a feasibility study described in subsection (a) will not be conducted in accordance with subsection (a), the Secretary, not later than 30 days after the date of making the determination, shall— (1) prepare an updated feasibility study schedule and cost estimate; (2) notify the non-Federal feasibility cost-sharing partner that the feasibility study has been delayed; and (3) provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the reasons the requirements of subsection (a) are not attainable. (c) Termination of Authorization.— A feasibility study for which the Secretary has issued a determination under subsection (b) is not authorized after the last day of the 1-year period beginning on the date of the determination if the Secretary has not completed the study on or before such last day. (d) Exception.— (1) In general.— Notwithstanding the requirements of subsection (c), the Secretary may extend the timeline of a study by a period not to exceed 3 years, if the Secretary determines that the feasibility study is too complex to comply with the requirements of subsections (a) and (c). (2) Factors.— In making a determination that a study is too complex to comply with the requirements of subsections (a) and (c), the Secretary shall consider— (A) the type, size, location, scope, and overall cost of the project; (B) whether the project will use any innovative design or construction techniques; (C) whether the project will require significant action by other Federal, State, or local agencies; (D) whether there is significant public dispute as to the nature or effects of the project; and (E) whether there is significant public dispute as to the economic or environmental costs or benefits of the project. (3) Notification.— Each time the Secretary makes a determination under this subsection, the Secretary shall provide written notice to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives as to the results of that determination, including an identification of the specific 1 or more factors used in making the determination that the project is complex. (4) Limitation.— The Secretary shall not extend the timeline for a feasibility study for a period of more than 7 years, and any feasibility study that is not completed before that date shall no longer be authorized. (e) Reviews.— Not later than 90 days after the date of the initiation of a study described in subsection (a) for a project, the Secretary shall— (1) take all steps necessary to initiate the process for completing federally mandated reviews that the Secretary is required to complete as part of the study, including the environmental review process under section 1005; (2) convene a meeting of all Federal, tribal, and State agencies identified under section 2045(e) of the Water Resources Development Act of 2007 (33 U.S.C. 2348(e)) that may be required by law to conduct or issue a review, analysis, or opinion on or to make a determination concerning a permit or license for the study; and (3) take all steps necessary to provide information that will enable required reviews and analyses related to the project to be conducted by other agencies in a thorough and timely manner. (f) Interim Report.— Not later than 18 months after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes— (1) the status of the implementation of the planning process under this section, including the number of participating projects; (2) a review of project delivery schedules, including a description of any delays on those studies participating in the planning process under this section; and (3) any recommendations for additional authority necessary to support efforts to expedite the feasibility study process for water resource projects. (g) Final Report.— Not later than 4 years after the date of enactment of this Act, the Secretary shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives and make publicly available a report that describes— (1) the status of the implementation of this section, including a description of each feasibility study subject to the requirements of this section; (2) the amount of time taken to complete each feasibility study; and (3) any recommendations for additional authority necessary to support efforts to expedite the feasibility study process, including an analysis of whether the limitation established by subsection (a)(2) needs to be adjusted to address the impacts of inflation.

  2. Water Resources Development Act of 2018

    Pub. L. 115–270 title I § 1330(b) · 132 Stat. 3765

    Substituted · 33 U.S.C. § 2282c(d)(4)

    Pub. L. 115–270 substituted “10 years” for “7 years”

    Source evidence

    Code amendment note
    Subsec. (d)(4). Pub. L. 115–270 substituted “10 years” for “7 years”.

    Enacted provision · exact public law section
    (b) Study Extensions.— Section 1001(d)(4) of the Water Resources Reform and Development Act of 2014 (33 U.S.C. 2282c(d)(4)) is amended by striking “7 years” and inserting “10 years”.

  3. Water Resources Development Act of 2020

    Pub. L. 116–260 § 360(c)(2) · 134 Stat. 1182

    1. Redesignated · 33 U.S.C. § 2282c(c)

      Pub. L. 116–260, § 360(c)(2), redesignated subsec. (d) as (c)

    2. Struck · 33 U.S.C. § 2282c(c)

      Pub. L. 116–260, § 360(c)(2), struck out former subsec. (c). Prior to amendment, text of subsec. (c) read as follows: “A feasibility study for which the Secretary has issued a determination under subsection (b) is not authorized after the last day of the 1-year period beginning on the date of the determination if the Secretary has not completed the study on or before such last day.”

    Source evidence

    Code amendment note
    Subsec. (c). Pub. L. 116–260, § 360(c)(2), redesignated subsec. (d) as (c) and struck out former subsec. (c). Prior to amendment, text of subsec. (c) read as follows: “A feasibility study for which the Secretary has issued a determination under subsection (b) is not authorized after the last day of the 1-year period beginning on the date of the determination if the Secretary has not completed the study on or before such last day.”

    Enacted provision · exact public law section
    (2) by striking subsection (c) and redesignating subsections (d) through (g) as subsections (c) through (f), respectively.

  4. Water Resources Development Act of 2020

    Pub. L. 116–260 § 360(c)(2) · 134 Stat. 1182

    Redesignated · 33 U.S.C. § 2282c(d)

    Pub. L. 116–260, § 360(c)(2), redesignated subsec. (e) as (d). Former subsec. (d) redesignated (c)

    Source evidence

    Code amendment note
    Subsec. (d). Pub. L. 116–260, § 360(c)(2), redesignated subsec. (e) as (d). Former subsec. (d) redesignated (c).

    Enacted provision · exact public law section
    (2) by striking subsection (c) and redesignating subsections (d) through (g) as subsections (c) through (f), respectively.

  5. Water Resources Development Act of 2020

    Pub. L. 116–260 § 360(c)(1)(A) · 134 Stat. 1182

    1. Substituted · 33 U.S.C. § 2282c(d)(1)

      Pub. L. 116–260, § 360(c)(1)(A), (B), substituted “The Secretary” for “Notwithstanding the requirements of subsection (c), the Secretary”

    2. Substituted · 33 U.S.C. § 2282c(d)(1)

      Pub. L. 116–260, § 360(c)(1)(A), (B), substituted “subsection (a)” for “subsections (a) and (c)”

    Source evidence

    Code amendment note
    Subsec. (d)(1). Pub. L. 116–260, § 360(c)(1)(A), (B), substituted “The Secretary” for “Notwithstanding the requirements of subsection (c), the Secretary” and “subsection (a)” for “subsections (a) and (c)”.

    Enacted provision · exact public law section
    (A) in paragraph (1), by striking “Notwithstanding the requirements of subsection (c), the Secretary” and inserting “The Secretary”;

  6. Water Resources Development Act of 2020

    Pub. L. 116–260 § 360(c)(1)(B) · 134 Stat. 1182

    Substituted · 33 U.S.C. § 2282c(d)(2)

    Pub. L. 116–260, § 360(c)(1)(B), substituted “subsection (a)” for “subsections (a) and (c)” in introductory provisions

    Source evidence

    Code amendment note
    Subsec. (d)(2). Pub. L. 116–260, § 360(c)(1)(B), substituted “subsection (a)” for “subsections (a) and (c)” in introductory provisions.

    Enacted provision · exact public law section
    (B) by striking “subsections (a) and (c)” each place it appears and inserting “subsection (a)”; and

  7. Water Resources Development Act of 2020

    Pub. L. 116–260 § 360(c)(1)(C) · 134 Stat. 1182

    Struck · 33 U.S.C. § 2282c(d)(4)

    Pub. L. 116–260, § 360(c)(1)(C), struck out par. (4). Text read as follows: “The Secretary shall not extend the timeline for a feasibility study for a period of more than 10 years, and any feasibility study that is not completed before that date shall no longer be authorized.”

    Source evidence

    Code amendment note
    Subsec. (d)(4). Pub. L. 116–260, § 360(c)(1)(C), struck out par. (4). Text read as follows: “The Secretary shall not extend the timeline for a feasibility study for a period of more than 10 years, and any feasibility study that is not completed before that date shall no longer be authorized.”.

    Enacted provision · exact public law section
    (C) by striking paragraph (4); and

  8. Water Resources Development Act of 2020

    Pub. L. 116–260 § 360(c)(2) · 134 Stat. 1182

    Redesignated · 33 U.S.C. § 2282c(e)(g)

    Pub. L. 116–260, § 360(c)(2), redesignated subsecs. (f) and (g) as (e) and (f), respectively. Former subsec. (e) redesignated (d)

    Source evidence

    Code amendment note
    Subsecs. (e) to (g). Pub. L. 116–260, § 360(c)(2), redesignated subsecs. (f) and (g) as (e) and (f), respectively. Former subsec. (e) redesignated (d).

    Enacted provision · exact public law section
    (2) by striking subsection (c) and redesignating subsections (d) through (g) as subsections (c) through (f), respectively.

  9. Pub. L. 118–272 § 1103(a)(1) · 138 Stat. 3000

    Substituted · 33 U.S.C. § 2282c(a)(1)

    Pub. L. 118–272, § 1103(a)(1), substituted “4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to section 2282(b) of this title” for “3 years after the date of initiation”

    Unresolved: Pub. L. 118–272 was not found in the local Statutes at Large index.

    Source evidence

    Code amendment note
    Subsec. (a)(1). Pub. L. 118–272, § 1103(a)(1), substituted “4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to section 2282(b) of this title” for “3 years after the date of initiation”.

  10. Pub. L. 118–272 § 1103(a)(2) · 138 Stat. 3000

    1. Added · 33 U.S.C. § 2282c(a)(2)

      Pub. L. 118–272, § 1103(a)(2), added par. (2)

    2. Struck · 33 U.S.C. § 2282c(a)(2)

      Pub. L. 118–272, § 1103(a)(2), struck out former par. (2) which read as follows: “have a maximum Federal cost of $3,000,000; and”

    Unresolved: Pub. L. 118–272 was not found in the local Statutes at Large index.

    Source evidence

    Code amendment note
    Subsec. (a)(2). Pub. L. 118–272, § 1103(a)(2), added par. (2) and struck out former par. (2) which read as follows: “have a maximum Federal cost of $3,000,000; and”.

10 of 13 references resolved to an enrolled provision · 3 unresolved

Editorial Notes

References in Text

Section 1005, referred to in subsec. (d)(1), is section 1005 of Pub. L. 113–121, which enacted section 2349 of this title and amended generally section 2348 of this title.

Codification

Section was enacted as part of the Water Resources Reform and Development Act of 2014, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.

Amendments2018–2025 · 3 rounds

2025

Subsec. (a)(1). Pub. L. 118–272, § 1103(a)(1), substituted “4 years after the date on which the Secretary determines the Federal interest for purposes of the report pursuant to section 2282(b) of this title” for “3 years after the date of initiation”.

Subsec. (a)(2). Pub. L. 118–272, § 1103(a)(2), added par. (2) and struck out former par. (2) which read as follows: “have a maximum Federal cost of $3,000,000; and”.

2020

Subsec. (c). Pub. L. 116–260, § 360(c)(2), redesignated subsec. (d) as (c) and struck out former subsec. (c). Prior to amendment, text of subsec. (c) read as follows: “A feasibility study for which the Secretary has issued a determination under subsection (b) is not authorized after the last day of the 1-year period beginning on the date of the determination if the Secretary has not completed the study on or before such last day.”

Subsec. (d). Pub. L. 116–260, § 360(c)(2), redesignated subsec. (e) as (d). Former subsec. (d) redesignated (c).

Subsec. (d)(1). Pub. L. 116–260, § 360(c)(1)(A), (B), substituted “The Secretary” for “Notwithstanding the requirements of subsection (c), the Secretary” and “subsection (a)” for “subsections (a) and (c)”.

Subsec. (d)(2). Pub. L. 116–260, § 360(c)(1)(B), substituted “subsection (a)” for “subsections (a) and (c)” in introductory provisions.

Subsec. (d)(4). Pub. L. 116–260, § 360(c)(1)(C), struck out par. (4). Text read as follows: “The Secretary shall not extend the timeline for a feasibility study for a period of more than 10 years, and any feasibility study that is not completed before that date shall no longer be authorized.”.

Subsecs. (e) to (g). Pub. L. 116–260, § 360(c)(2), redesignated subsecs. (f) and (g) as (e) and (f), respectively. Former subsec. (e) redesignated (d).

2018

Subsec. (d)(4). Pub. L. 115–270 substituted “10 years” for “7 years”.

Statutory Notes and Related Subsidiaries

Savings Clause

Pub. L. 118–272, div. A, title I, § 1103(b), , 138 Stat. 3000, provided that: “Nothing in the amendments made by subsection (a) [amending this section] shall be construed to affect a feasibility study that was initiated prior to the date of the enactment of this Act [].”

“Secretary” Defined

Secretary means the Secretary of the Army, see section 2 of Pub. L. 113–121, set out as a note under section 2201 of this title.

Credits

2014–2025 · 4 acts
  1. 2014Pub. L. 113–121, title I, § 1001, , 128 Stat. 1196
  2. 2018Pub. L. 115–270, title I, § 1330(b), , 132 Stat. 3827
  3. 2020Pub. L. 116–260, div. AA, title III, § 360(c), , 134 Stat. 2733
  4. 2025Pub. L. 118–272, div. A, title I, § 1103(a), , 138 Stat. 3000.
Show as published

(Pub. L. 113–121, title I, § 1001, , 128 Stat. 1196; Pub. L. 115–270, title I, § 1330(b), , 132 Stat. 3827; Pub. L. 116–260, div. AA, title III, § 360(c), , 134 Stat. 2733; Pub. L. 118–272, div. A, title I, § 1103(a), , 138 Stat. 3000.)

Parsed from the official OLRC USLM XML in data/usc_all/usc33.xml · release point 119-108 · OLRC build 2026-04-17

USLM identifier /us/usc/t33/s2282c