Title 33 — Navigation and Navigable Waters
Chapter 36 — Water Resources Development
§ 2346. Project administration
Statutory text
Project tracking
The Secretary shall assign a unique tracking number to each water resources project under the jurisdiction of the Secretary to be used by each Federal agency throughout the life of the project.
Report repository
In general
The Secretary shall provide to the Library of Congress a copy of each final feasibility study, final environmental impact statement, final reevaluation report, final post-authorization change report, record of decision, and report to Congress prepared by the Corps of Engineers.
Availability to public
Each document described in paragraph (1) shall be made available to the public, and an electronic copy of each document shall be made permanently available to the public through the Internet.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Water Resources Development Act of 2007
Pub. L. 110–114 title II § 2041 · 121 Stat. 1041
Enacted · 33 U.S.C. § 2346
Pub. L. 110–114, title II, § 2041, Nov. 8, 2007, 121 Stat. 1100
Source evidence
Code source credit
Pub. L. 110–114, title II, § 2041, Nov. 8, 2007, 121 Stat. 1100Enacted provision · exact public law section
SEC. 2041. PROJECT ADMINISTRATION. (a) Project Tracking.— The Secretary shall assign a unique tracking number to each water resources project under the jurisdiction of the Secretary to be used by each Federal agency throughout the life of the project. (b) Report Repository.— (1) In general.— The Secretary shall provide to the Library of Congress a copy of each final feasibility study, final environmental impact statement, final reevaluation report, record of decision, and report to Congress prepared by the Corps of Engineers. (2) Availability to public.— Each Public information. Internet. document described in paragraph (1) shall be made available to the public, and an electronic copy of each document shall be made permanently available to the public through the Internet.Water Resources Development Act of 2016
Pub. L. 114–322 title I § 1136(b) · 130 Stat. 1628
Inserted · 33 U.S.C. § 2346(b)(1)
Pub. L. 114–322 inserted “final post-authorization change report,” after “final reevaluation report,”
Source evidence
Code amendment note
Subsec. (b)(1). Pub. L. 114–322 inserted “final post-authorization change report,” after “final reevaluation report,”.Enacted provision · exact public law section
(b) Project Administration.— Section 2041(b)(1) of the Water Resources Development Act of 2007 (33 U.S.C. 2346(b)(1)) is amended by inserting “final post-authorization change report,” after “final reevaluation report,”.
2 of 2 references resolved to an enrolled provision
Editorial Notes
Codification
Section was enacted as part of the Water Resources Development Act of 2007, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.
Amendments
2016—Subsec. (b)(1). Pub. L. 114–322 inserted “final post-authorization change report,” after “final reevaluation report,”.
Statutory Notes and Related Subsidiaries
“Secretary” Defined
Secretary means the Secretary of the Army, see section 2 of Pub. L. 110–114, set out as a note under section 2201 of this title.
Credits
2007–2016 · 2 acts
- 2007Pub. L. 110–114, title II, § 2041, , 121 Stat. 1100
- 2016Pub. L. 114–322, title I, § 1136(b), , 130 Stat. 1657.
Show as published
(Pub. L. 110–114, title II, § 2041, , 121 Stat. 1100; Pub. L. 114–322, title I, § 1136(b), , 130 Stat. 1657.)