§ 515. Contracts for project; guaranty of cost

Statutory text

After approval of such general plans and specifications by the Secretary, and after notification of such approval, the bridge owner shall, in such manner and within such times as the Secretary may prescribe, take bids for the alteration of such bridge in accordance with such general plans and specifications. All bids, including any bid for all or part of the project submitted by the bridge owner, shall be submitted to the Secretary, together with a recommendation by the bridge owner as to the most competent bid or bids, and at the same time the bridge owner shall submit to the Secretary a written guaranty that the total cost of the project, including the cost of such work as is to be performed by the bridge owner and not included in the work to be performed by contract, shall not exceed the sum stated in said guaranty. The Secretary may direct the bridge owner to reject all bids and to take new bids, or may authorize the bridge owner to proceed with the project, by contract, or partly by contract and partly by the bridge owner, or wholly by the bridge owner. Upon such authorization and fixing of the proportionate shares of the cost as provided in section 516 of this title, the bridge owner shall, within a reasonable time to be prescribed by the Secretary, proceed with the work of alteration; and the cost thereof shall be borne by the United States and by the bridge owner, as provided in sections 516 and 517 of this title: Provided, That where funds have been appropriated for part only of a project, the bridge owner may take bids for part only of the work. In the event the bridge owner proceeds with the alteration through the taking of successive partial bids, the bridge owner shall, if required by the Secretary, submit a revised guaranty of cost after bids are accepted for successive parts of the work.

Legislative history

Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.

  1. Pub. L. 76–409 § 5 · 54 Stat. 497

    Enacted · 33 U.S.C. § 515

    June 21, 1940, ch. 409, § 5, 54 Stat. 498

    Source evidence

    Code source credit
    June 21, 1940, ch. 409, § 5, 54 Stat. 498

    Enacted provision · exact public law section
    Sec. 5. constracts for project; guaranty of cost After approval of such general plans and specifications by the Secretary, and within ninety days after notification of such approval, the bridge owner shall, in such manner as the Secretary may prescribe, take bids for the alteration of such bridge in accordance with such general plans and specifications. All bids, including Recommendation of owner. any bid for all or part of the project submitted by the bridge owner, shall be submitted to the Secretary, together with a recommendation by the bridge owner as to the most competent bid or bids, and at the same time the bridge owner shall submit to the Secretary a Written guaranty of cost. written guaranty that the total cost of the project, including the cost of such work as is to be performed by the bridge owner and not included in the work to be performed by contract, shall not exceed the sum stated in said guaranty. The Secretary may direct the Rejection, etc. bridge owner to reject all bids and to take new bids, or may authorize the bridge owner to proceed with the project, by contract, or partly by contract and partly by the bridge owner, or wholly by the bridge owner. Upon such authorization and fixing of the proportionate Commencement of work. shares of the cost as provided in section 6, the bridge owner shall, within a reasonable time to be prescribed by the Secretary, proceed with the work of alteration: and the cost thereof shal1 be borne by the United States and by the bridge owner, as hereinafter provided.

  2. Pub. L. 85–640 § 1(a) · 72 Stat. 595

    1. Struck · 33 U.S.C. § 515

      Pub. L. 85–640 struck out provisions which required bridge owner to take bids within 90 days after notification of approval of general plans and specifications

    2. Inserted · 33 U.S.C. § 515

      Pub. L. 85–640 inserted provisions permitting the taking of partial bids where funds have been appropriated for part of a project, and requiring the bridge owner, if requested, to submit a revised guaranty of cost

    Source evidence

    Code amendment note
    Pub. L. 85–640 struck out provisions which required bridge owner to take bids within 90 days after notification of approval of general plans and specifications, and inserted provisions permitting the taking of partial bids where funds have been appropriated for part of a project, and requiring the bridge owner, if requested, to submit a revised guaranty of cost.

1 of 3 references resolved to an enrolled provision · 2 partial

Editorial Notes

Amendments

1958—Pub. L. 85–640 struck out provisions which required bridge owner to take bids within 90 days after notification of approval of general plans and specifications, and inserted provisions permitting the taking of partial bids where funds have been appropriated for part of a project, and requiring the bridge owner, if requested, to submit a revised guaranty of cost.

Credits

1940–1958 · 2 acts
  1. 1940June 21, 1940, ch. 409, § 5, 54 Stat. 498
  2. 1958Pub. L. 85–640, § 1(a), (b), , 72 Stat. 595.
Show as published

(June 21, 1940, ch. 409, § 5, 54 Stat. 498; Pub. L. 85–640, § 1(a), (b), , 72 Stat. 595.)