Title 42 — The Public Health and Welfare
Part A · Chapter 108 — Nuclear Waste Policy
§ 10142. Disposal of spent nuclear fuel
Statutory text
Notwithstanding any other provision of this part, any repository constructed on a site approved under this part shall be designed and constructed to permit the retrieval of any spent nuclear fuel placed in such repository, during an appropriate period of operation of the facility, for any reason pertaining to the public health and safety, or the environment, or for the purpose of permitting the recovery of the economically valuable contents of such spent fuel. The Secretary shall specify the appropriate period of retrievability with respect to any repository at the time of design of such repository, and such aspect of such repository shall be subject to approval or disapproval by the Commission as part of the construction authorization process under subsections (b) through (d) of section 10134 of this title.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Nuclear Waste Policy Act of 1982
Pub. L. 97–425 title I § 122 · 96 Stat. 2201
Enacted · 42 U.S.C. § 10142
(Pub. L. 97–425, title I, § 122, Jan. 7, 1983, 96 Stat. 2228.)
Source evidence
Code source credit
(Pub. L. 97–425, title I, § 122, Jan. 7, 1983, 96 Stat. 2228.)Enacted provision · exact public law section
Sec. 122. disposal of spent nuclear fuel Notwithstanding any other provision of this subtitle, any repository constructed on a site approved under this subtitle shall be designed and constructed to permit the retrieval of any spent nuclear fuel placed in such repository, during an appropriate period of operation of the facility, for any reason pertaining to the public health and safety, or the environment, or for the purpose of permitting the recovery of the economically valuable contents of such spent fuel. The Secretary shall specify the appropriate period of retrievability with respect to any repository at the time of design of such repository, and such aspect of such repository shall be subject to approval or disapproval by the Commission as part of the construction authorization process under subsections (b) through (d) of section 114.
1 of 1 references resolved to an enrolled provision