Title 42 — The Public Health and Welfare
Part E · Chapter 149 — National Energy Policy and Programs
§ 16275. Department of Energy civilian nuclear infrastructure and facilities
Statutory text
In general
The Secretary shall operate and maintain infrastructure and facilities to support the nuclear energy research, development, demonstration, and commercial application programs, including radiological facilities management, isotope production, and facilities management.
Duties
In carrying out this section, the Secretary shall—
develop an inventory of nuclear science and engineering facilities, equipment, expertise, and other assets at all of the National Laboratories;
develop a prioritized list of nuclear science and engineering plant and equipment improvements needed at each of the National Laboratories;
consider the available facilities and expertise at all National Laboratories and emphasize investments which complement rather than duplicate capabilities; and
develop a timeline and a proposed budget for the completion of deferred maintenance on plant and equipment, with the goal of ensuring that Department programs under this part will be generally recognized to be among the best in the world.
Versatile neutron source
Authorization
In general
Not later than , the Secretary shall provide for a versatile reactor-based fast neutron source, which shall operate as a national user facility.
Consultations required
In carrying out subparagraph (A), the Secretary shall consult with the private sector, institutions of higher education, the National Laboratories, and relevant Federal agencies to ensure that the user facility described in subparagraph (A) will meet the research needs of the largest practicable majority of prospective users.
Establishment
As soon as practicable after determining the mission need under paragraph (1)(A), the Secretary shall submit to the appropriate committees of Congress a detailed plan for the establishment of the user facility.
Facility requirements
Capabilities
The Secretary shall ensure that the user facility will provide, at a minimum, the following capabilities:
Fast neutron spectrum irradiation capability.
Capacity for upgrades to accommodate new or expanded research needs.
Considerations
In carrying out the plan submitted under paragraph (2), the Secretary shall consider the following:
Capabilities that support experimental high-temperature testing.
Providing a source of fast neutrons at a neutron flux, higher than that at which current research facilities operate, sufficient to enable research for an optimal base of prospective users.
Maximizing irradiation flexibility and irradiation volume to accommodate as many concurrent users as possible.
Capabilities for irradiation with neutrons of a lower energy spectrum.
Multiple loops for fuels and materials testing in different coolants.
Additional pre-irradiation and post-irradiation examination capabilities.
Lifetime operating costs and lifecycle costs.
Deadline for establishment
The Secretary shall, to the maximum extent practicable, complete construction of, and approve the start of operations for, the user facility by not later than .
Reporting
The Secretary shall include in the annual budget request of the Department an explanation for any delay in the progress of the Department in completing the user facility by the deadline described in paragraph (4).
Coordination
The Secretary shall leverage the best practices for management, construction, and operation of national user facilities from the Office of Science.
Authorization of appropriations
There are authorized to be appropriated to the Secretary to carry out to completion the construction of the facility under this section—
$295,000,000 for fiscal year 2021;
$348,000,000 for fiscal year 2022;
$525,000,000 for fiscal year 2023;
$534,000,000 for fiscal year 2024; and
$584,000,000 for fiscal year 2025.
Gateway for Accelerated Innovation in Nuclear
In general
In carrying out the programs under this part, the Secretary is authorized to establish a new initiative to be known as the Gateway for Accelerated Innovation in Nuclear (GAIN). The initiative shall, to the maximum extent practicable and consistent with national security, provide the nuclear energy industry with access to cutting edge research and development along with the technical, regulatory, and financial support necessary to move innovative nuclear energy technologies toward commercialization in an accelerated and cost-effective fashion. The Secretary shall make available, as a minimum—
experimental capabilities and testing facilities;
computational capabilities, modeling, and simulation tools;
access to existing datasets and data validation tools; and
technical assistance with guidance or processes as needed.
Selection
In general
The Secretary shall select industry partners for awards on a competitive merit-reviewed basis.
Considerations
In selecting industry partners under subparagraph (A), the Secretary shall consider—
the information disclosed by the Department as described in paragraph (1); and
any existing facilities the Department will provide for public private partnership activities.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Energy Research, Development, Demonstration, and Commercial Application Act of 2005
Pub. L. 109–58 title IX § 955 · 119 Stat. 594
Enacted · 42 U.S.C. § 16275
Pub. L. 109–58, title IX, § 955, Aug. 8, 2005, 119 Stat. 887
Source evidence
Code source credit
Pub. L. 109–58, title IX, § 955, Aug. 8, 2005, 119 Stat. 887Enacted provision · exact public law section
SEC. 955. DEPARTMENT OF ENERGY CIVILIAN NUCLEAR INFRASTRUCTURE AND FACILITIES. (a) In General.— The Secretary shall operate and maintain infrastructure and facilities to support the nuclear energy research, development, demonstration, and commercial application programs, including radiological facilities management, isotope production, and facilities management. (b) Duties.— In carrying out this section, the Secretary shall— (1) develop an inventory of nuclear science and engineering facilities, equipment, expertise, and other assets at all of the National Laboratories; (2) develop a prioritized list of nuclear science and engineering plant and equipment improvements needed at each of the National Laboratories; (3) consider the available facilities and expertise at all National Laboratories and emphasize investments which complement rather than duplicate capabilities; and (4) develop a timeline and a proposed budget for the completion of deferred maintenance on plant and equipment, with the goal of ensuring that Department programs under this subtitle will be generally recognized to be among the best in the world. (c) Plan.— The Secretary shall develop a comprehensive plan for the facilities at the Idaho National Laboratory, especially taking into account the resources available at other National Laboratories. In developing the plan, the Secretary shall— (1) evaluate the facilities planning processes utilized by other physical science and engineering research and development institutions, both in the United States and abroad, that are generally recognized as being among the best in the world, and consider how those processes might be adapted toward developing such facilities plan; (2) avoid duplicating, moving, or transferring nuclear science and engineering facilities, equipment, expertise, and other assets that currently exist at other National Laboratories; (3) consider the establishment of a national transuranic analytic chemistry laboratory as a user facility at the Idaho National Laboratory; (4) include a plan to develop, if feasible, the Advanced Test Reactor and Test Reactor Area into a user facility that is more readily accessible to academic and industrial researchers; (5) consider the establishment of a fast neutron source as a user facility; (6) consider the establishment of new hot cells and the configuration of hot cells most likely to advance research, development, demonstration, and commercial application in nuclear science and engineering, especially in the context of the condition and availability of these facilities elsewhere in the National Laboratories; and (7) include a timeline and a proposed budget for the completion of deferred maintenance on plant and equipment. (d) Transmittal to Congress.— Not Deadline. later than 1 year after the date of enactment of this Act, the Secretary shall transmit the plan under subsection (c) to Congress.Nuclear Energy Innovation Capabilities Act of 2017
Pub. L. 115–248 § 2(e) · 132 Stat. 3154
Added · 42 U.S.C. § 16275(c); 42 U.S.C. § 16275(d)
Pub. L. 115–248 added subsec. (c)
Struck · 42 U.S.C. § 16275(c); 42 U.S.C. § 16275(d)
Pub. L. 115–248 struck out former subsecs. (c) and (d) which required development of a comprehensive plan for the facilities at the Idaho National Laboratory and transmittal of the plan to Congress
Source evidence
Code amendment note
Subsecs. (c), (d). Pub. L. 115–248 added subsec. (c) and struck out former subsecs. (c) and (d) which required development of a comprehensive plan for the facilities at the Idaho National Laboratory and transmittal of the plan to Congress.Enacted provision · exact public law section
(e) Department of Energy Civilian Nuclear Infrastructure and Facilities.— Section 955 of the Energy Policy Act of 2005 (42 U.S.C. 16275) is amended— (1) by striking subsections (c) and (d); and (2) by adding at the end the following: “(c) Versatile Neutron Source.— “(1) Mission need.— “(A) In general.— Not later than December 31, 2017, the Secretary shall determine the mission need for a versatile reactor-based fast neutron source, which shall operate as a national user facility. “(B) Consultations required.— In carrying out subparagraph (A), the Secretary shall consult with the private sector, institutions of higher education, the National Laboratories, and relevant Federal agencies to ensure that the user facility described in subparagraph (A) will meet the research needs of the largest practicable majority of prospective users. “(2) Establishment.— As soon as practicable after determining the mission need under paragraph (1)(A), the Secretary shall submit to the appropriate committees of Congress a detailed plan for the establishment of the user facility. “(3) Facility requirements.— “(A) Capabilities.— The Secretary shall ensure that the user facility will provide, at a minimum, the following capabilities: “(i) Fast neutron spectrum irradiation capability. “(ii) Capacity for upgrades to accommodate new or expanded research needs. “(B) Considerations.— In carrying out the plan submitted under paragraph (2), the Secretary shall consider the following: “(i) Capabilities that support experimental high-temperature testing. “(ii) Providing a source of fast neutrons at a neutron flux, higher than that at which current research facilities operate, sufficient to enable research for an optimal base of prospective users. “(iii) Maximizing irradiation flexibility and irradiation volume to accommodate as many concurrent users as possible. “(iv) Capabilities for irradiation with neutrons of a lower energy spectrum. “(v) Multiple loops for fuels and materials testing in different coolants. “(vi) Additional pre-irradiation and post-irradiation examination capabilities. “(vii) Lifetime operating costs and lifecycle costs. “(4) Deadline for establishment.— The Secretary shall, to the maximum extent practicable, complete construction of, and approve the start of operations for, the user facility by not later than December 31, 2025. “(5) Reporting.— The Secretary shall include in the annual budget request of the Department an explanation for any delay in the progress of the Department in completing the user facility by the deadline described in paragraph (4). “(6) Coordination.— The Secretary shall leverage the best practices for management, construction, and operation of national user facilities from the Office of Science.” .Energy Act of 2020
Pub. L. 116–260 § 2003(f)(1)(A) · 134 Stat. 1182
Substituted · 42 U.S.C. § 16275(c)(1)
Pub. L. 116–260, § 2003(f)(1)(A), substituted “Authorization” for “Mission need” in heading
Source evidence
Code amendment note
Subsec. (c)(1). Pub. L. 116–260, § 2003(f)(1)(A), substituted “Authorization” for “Mission need” in heading.Enacted provision · exact public law section
(A) in the paragraph heading, by striking “Mission need” and inserting “Authorization”; andEnergy Act of 2020
Pub. L. 116–260 § 2003(f)(1)(B) · 134 Stat. 1182
Substituted · 42 U.S.C. § 16275(c)(1)(A)
Pub. L. 116–260, § 2003(f)(1)(B), substituted “provide” for “determine the mission need”
Source evidence
Code amendment note
Subsec. (c)(1)(A). Pub. L. 116–260, § 2003(f)(1)(B), substituted “provide” for “determine the mission need”.Enacted provision · exact public law section
(B) in subparagraph (A), by striking “determine the mission need” and inserting “provide”;Energy Act of 2020
Pub. L. 116–260 § 2003(f)(3) · 134 Stat. 1182
Substituted · 42 U.S.C. § 16275(c)(4)
Pub. L. 116–260, § 2003(f)(3), substituted “2026” for “2025”
Source evidence
Code amendment note
Subsec. (c)(4). Pub. L. 116–260, § 2003(f)(3), substituted “2026” for “2025”.Enacted provision · exact public law section
(3) in subsection (c) paragraph (4), by striking “2025” and inserting “2026”; andEnergy Act of 2020
Pub. L. 116–260 § 2003(f)(2) · 134 Stat. 1182
Added · 42 U.S.C. § 16275(c)(7)
Pub. L. 116–260, § 2003(f)(2), added par. (7)
Source evidence
Code amendment note
Subsec. (c)(7). Pub. L. 116–260, § 2003(f)(2), added par. (7).Enacted provision · exact public law section
(2) by adding at the end of subsection (c) the following: “(7) Authorization of appropriations.— There are authorized to be appropriated to the Secretary to carry out to completion the construction of the facility under this section— “(A) $295,000,000 for fiscal year 2021; “(B) $348,000,000 for fiscal year 2022; “(C) $525,000,000 for fiscal year 2023; “(D) $534,000,000 for fiscal year 2024; and “(E) $584,000,000 for fiscal year 2025.” .Energy Act of 2020
Pub. L. 116–260 § 2003(f)(4) · 134 Stat. 1182
Added · 42 U.S.C. § 16275(d)
Pub. L. 116–260, § 2003(f)(4), added subsec. (d)
Source evidence
Code amendment note
Subsec. (d). Pub. L. 116–260, § 2003(f)(4), added subsec. (d).Enacted provision · exact public law section
(4) by adding at the end the following: “(d) Gateway for Accelerated Innovation in Nuclear.— “(1) In general.— In carrying out the programs under this subtitle, the Secretary is authorized to establish a new initiative to be known as the Gateway for Accelerated Innovation in Nuclear (GAIN). The initiative shall, to the maximum extent practicable and consistent with national security, provide the nuclear energy industry with access to cutting edge research and development along with the technical, regulatory, and financial support necessary to move innovative nuclear energy technologies toward commercialization in an accelerated and cost-effective fashion. The Secretary shall make available, as a minimum— “(A) experimental capabilities and testing facilities; “(B) computational capabilities, modeling, and simulation tools; “(C) access to existing datasets and data validation tools; and “(D) technical assistance with guidance or processes as needed. “(2) Selection.— “(A) In general.— The Secretary shall select industry partners for awards on a competitive merit-reviewed basis. “(B) Considerations.— In selecting industry partners under subparagraph (A), the Secretary shall consider— “(i) the information disclosed by the Department as described in paragraph (1); and “(ii) any existing facilities the Department will provide for public private partnership activities.” .
8 of 8 references resolved to an enrolled provision
Editorial Notes
Amendments2018–2020 · 2 rounds
2020
Subsec. (c)(1). Pub. L. 116–260, § 2003(f)(1)(A), substituted “Authorization” for “Mission need” in heading.
Subsec. (c)(1)(A). Pub. L. 116–260, § 2003(f)(1)(B), substituted “provide” for “determine the mission need”.
Subsec. (c)(4). Pub. L. 116–260, § 2003(f)(3), substituted “2026” for “2025”.
Subsec. (c)(7). Pub. L. 116–260, § 2003(f)(2), added par. (7).
Subsec. (d). Pub. L. 116–260, § 2003(f)(4), added subsec. (d).
2018
Subsecs. (c), (d). Pub. L. 115–248 added subsec. (c) and struck out former subsecs. (c) and (d) which required development of a comprehensive plan for the facilities at the Idaho National Laboratory and transmittal of the plan to Congress.
Credits
2005–2020 · 3 acts
- 2005Pub. L. 109–58, title IX, § 955, , 119 Stat. 887
- 2018Pub. L. 115–248, § 2(e), , 132 Stat. 3156
- 2020Pub. L. 116–260, div. Z, title II, § 2003(f), , 134 Stat. 2466.
Show as published
(Pub. L. 109–58, title IX, § 955, , 119 Stat. 887; Pub. L. 115–248, § 2(e), , 132 Stat. 3156; Pub. L. 116–260, div. Z, title II, § 2003(f), , 134 Stat. 2466.)