Title 42 — The Public Health and Welfare
Part G · Chapter 149 — National Energy Policy and Programs
§ 16312. Fusion energy sciences program
Statutory text
Declaration of policy
It shall be the policy of the United States to conduct research, development, demonstration, and commercial applications to provide for the scientific, engineering, and commercial infrastructure necessary to ensure that the United States is competitive with other countries in providing fusion energy for its own needs and the needs of other countries, including by demonstrating electric power or hydrogen production for the United States energy grid using fusion energy at the earliest date.
Planning
In general
Not later than 180 days after , the Secretary shall submit to Congress a plan (with proposed cost estimates, budgets, and lists of potential international partners) for the implementation of the policy described in subsection (a) in a manner that ensures that—
existing fusion research facilities are more fully used;
fusion science, technology, theory, advanced computation, modeling, and simulation are strengthened;
new magnetic and inertial fusion research and development facilities are selected based on scientific innovation and cost effectiveness, and the potential of the facilities to advance the goal of practical fusion energy at the earliest date practicable;
facilities that are selected are funded at a cost-effective rate;
communication of scientific results and methods between the fusion energy science community and the broader scientific and technology communities is improved;
inertial confinement fusion facilities are used to the extent practicable for the purpose of inertial fusion energy research and development;
attractive alternative inertial and magnetic fusion energy approaches are more fully explored; and
to the extent practicable, the recommendations of the Fusion Energy Sciences Advisory Committee in the report on workforce planning, dated March 2004, are carried out, including periodic reassessment of program needs.
Costs and schedules
The plan shall also address the status of and, to the extent practicable, costs and schedules for—
the design and implementation of international or national facilities for the testing of fusion materials; and
the design and implementation of international or national facilities for the testing and development of key fusion technologies.
United States participation in ITER
In general
There is authorized United States participation in the construction and operations of the ITER project, as agreed to under the “Agreement on the Establishment of the ITER International Fusion Energy Organization for the Joint Implementation of the ITER Project”. The Director shall coordinate and carry out the responsibilities of the United States with respect to this Agreement.
Report
Not later than 1 year after the date of enactment of this section, the Secretary shall submit to Congress a report providing an assessment of the most recent schedule for ITER that has been approved by the ITER Council.
Authorization of appropriations
Out of funds authorized to be appropriated under section 18645(o) of this title, there shall be made available to the Secretary to carry out the construction of ITER—
$374,000,000 for fiscal year 2021;
$379,700,000 for fiscal year 2023;
$419,250,000 for fiscal year 2024;
$415,000,000 for fiscal year 2025;
$370,500,000 for fiscal year 2026; and
$411,078,000 for fiscal year 2027.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Energy Research, Development, Demonstration, and Commercial Application Act of 2005
Pub. L. 109–58 title IX § 972 · 119 Stat. 594
Enacted · 42 U.S.C. § 16312
Pub. L. 109–58, title IX, § 972, Aug. 8, 2005, 119 Stat. 899
Source evidence
Code source credit
Pub. L. 109–58, title IX, § 972, Aug. 8, 2005, 119 Stat. 899Enacted provision · exact public law section
SEC. 972. FUSION ENERGY SCIENCES PROGRAM. (a) Declaration of Policy.— It shall be the policy of the United States to conduct research, development, demonstration, and commercial applications to provide for the scientific, engineering, and commercial infrastructure necessary to ensure that the United States is competitive with other countries in providing fusion energy for its own needs and the needs of other countries, including by demonstrating electric power or hydrogen production for the United States energy grid using fusion energy at the earliest date. (b) Planning.— (1) In general.— Not later than 180 days after the date of enactment of this Act, the Secretary shall submit to Congress a plan (with proposed cost estimates, budgets, and lists of potential international partners) for the implementation of the policy described in subsection (a) in a manner that ensures that— (A) existing fusion research facilities are more fully used; (B) fusion science, technology, theory, advanced computation, modeling, and simulation are strengthened; (C) new magnetic and inertial fusion research and development facilities are selected based on scientific innovation and cost effectiveness, and the potential of the facilities to advance the goal of practical fusion energy at the earliest date practicable; (D) facilities that are selected are funded at a cost-effective rate; (E) communication of scientific results and methods between the fusion energy science community and the broader scientific and technology communities is improved; (F) inertial confinement fusion facilities are used to the extent practicable for the purpose of inertial fusion energy research and development; (G) attractive alternative inertial and magnetic fusion energy approaches are more fully explored; and (H) to the extent practicable, the recommendations of the Fusion Energy Sciences Advisory Committee in the report on workforce planning, dated March 2004, are carried out, including periodic reassessment of program needs. (2) Costs and schedules.— The plan shall also address the status of and, to the extent practicable, costs and schedules for— (A) the design and implementation of international or national facilities for the testing of fusion materials; and (B) the design and implementation of international or national facilities for the testing and development of key fusion technologies. (c) United States Participation in ITER.— (1) Definitions.— In this subsection: (A) Construction.— (i) In general.— The term “construction” means— (I) the physical construction of the ITER facility; and (II) the physical construction, purchase, or manufacture of equipment or components that are specifically designed for the ITER facility. (ii) Exclusions.— The term “construction” does not include the design of the facility, equipment, or components. (B) ITER.— The term “ITER” means the international burning plasma fusion research project in which the President announced United States participation on January 30, 2003, or any similar international project. (2) Participation.— The United States may participate in the ITER only in accordance with this subsection. (3) Agreement.— (A) In general.— The Secretary may negotiate an agreement for United States participation in the ITER. (B) Contents.— Any agreement for United States participation in the ITER shall, at a minimum— (i) clearly define the United States financial contribution to construction and operating costs, as well as any other costs associated with a project; (ii) ensure that the share of high-technology components of the ITER manufactured in the United States is at least proportionate to the United States financial contribution to the ITER; (iii) ensure that the United States will not be financially responsible for cost overruns in components manufactured in other ITER participating countries; (iv) guarantee the United States full access to all data generated by the ITER; (v) enable United States researchers to propose and carry out an equitable share of the experiments at the ITER; (vi) provide the United States with a role in all collective decisionmaking related to the ITER; and (vii) describe the process for discontinuing or decommissioning the ITER and any United States role in that process. (4) Plan.— (A) Development.— The Secretary, in consultation with the Fusion Energy Sciences Advisory Committee, shall develop a plan for the participation of United States scientists in the ITER that shall include— (i) the United States research agenda for the ITER; (ii) methods to evaluate whether the ITER is promoting progress toward making fusion a reliable and affordable source of power; and (iii) a description of how work at the ITER will relate to other elements of the United States fusion program. (B) Review.— The Secretary shall request a review of the plan by the National Academy of Sciences. (5) Limitation.— Reports. Deadlines. No Federal funds shall be expended for the construction of the ITER until the Secretary has submitted to Congress— (A) the agreement negotiated in accordance with paragraph (3) and 120 days have elapsed since that submission; (B) a report describing the management structure of the ITER and providing a fixed dollar estimate of the cost of United States participation in the construction of the ITER, and 120 days have elapsed since that submission; (C) a report describing how United States participation in the ITER will be funded without reducing funding for other programs in the Office of Science (including other fusion programs), and 60 days have elapsed since that submission; and (D) the plan required by paragraph (4) (but not the National Academy of Sciences review of that plan), and 60 days have elapsed since that submission. (6) Alternative to iter.— (A) In general.— If at any time during the negotiations on the ITER, the Secretary determines that construction and operation of the ITER is unlikely or infeasible, the Secretary shall submit to Congress, along with the budget request of the President submitted to Congress for the following fiscal year, a plan for implementing a domestic burning plasma experiment such as the Fusion Ignition Research Experiment, including costs and schedules for the plan. (B) Administration.— The Secretary shall— (i) refine the plan in full consultation with the Fusion Energy Sciences Advisory Committee; and (ii) transmit the plan to the National Academy of Sciences for review.Energy Act of 2020
Pub. L. 116–260 div. Z title II § 2008(b) · 134 Stat. 1182
Amended · 42 U.S.C. § 16312(c)
Pub. L. 116–260 amended subsec. (c) generally. Prior to amendment, subsec. (c) related to United States participation in ITER
Source evidence
Code amendment note
Subsec. (c). Pub. L. 116–260 amended subsec. (c) generally. Prior to amendment, subsec. (c) related to United States participation in ITER.Enacted provision · exact public law section
(b) ITER.— Section 972(c) of the Energy Policy Act of 2005 (42 U.S.C. 16312) is amended to read as follows: “(c) United States Participation in ITER.— “(1) In general.— There is authorized United States participation in the construction and operations of the ITER project, as agreed to under the April 25, 2007 ‘Agreement on the Establishment of the ITER International Fusion Energy Organization for the Joint Implementation of the ITER Project’. The Director Coordination. shall coordinate and carry out the responsibilities of the United States with respect to this Agreement. “(2) Report.— Not later than 1 year after the date of enactment of this section, the Secretary shall submit to Congress a report providing an assessment of the most recent schedule for ITER that has been approved by the ITER Council. “(3) Authorization of appropriations.— Out of funds authorized to be appropriated under section 307(o) of the Department of Energy Research and Innovation Act (42 U.S.C. 18645), there shall be made available to the Secretary to carry out the construction of ITER— “(A) $374,000,000 for fiscal year 2021; and “(B) $281,000,000 for each of fiscal years 2022 through 2025.” .Research and Development, Competition, and Innovation Act
Pub. L. 117–167 div. B title I § 10105(b) · 136 Stat. 1366
Added · 42 U.S.C. § 16312(c)(3)(B)(F)
Pub. L. 117–167 added subpars. (B) to (F)
Struck · 42 U.S.C. § 16312(c)(3)(B)(F)
Pub. L. 117–167 struck out former subpar. (B) which read as follows: “$281,000,000 for each of fiscal years 2022 through 2025.”
Source evidence
Code amendment note
Subsec. (c)(3)(B) to (F). Pub. L. 117–167 added subpars. (B) to (F) and struck out former subpar. (B) which read as follows: “$281,000,000 for each of fiscal years 2022 through 2025.”Enacted provision · exact public law section
(b) ITER Construction.— Section 972(c)(3) of the Energy Policy Act of 2005 (42 U.S.C. 16312(c)(3)) is amended— (1) in subparagraph (A), by striking “and” at the end; and (2) by striking subparagraph (B) and inserting the following: “(B) $379,700,000 for fiscal year 2023; “(C) $419,250,000 for fiscal year 2024; “(D) $415,000,000 for fiscal year 2025; “(E) $370,500,000 for fiscal year 2026; and “(F) $411,078,000 for fiscal year 2027.” .
4 of 4 references resolved to an enrolled provision
Editorial Notes
References in Text
The date of enactment of this section, referred to in subsec. (c)(2), probably means the date of enactment of Pub. L. 116–260, which enacted subsec. (c) of this section and was approved .
Amendments2020–2022 · 2 rounds
2022
Subsec. (c)(3)(B) to (F). Pub. L. 117–167 added subpars. (B) to (F) and struck out former subpar. (B) which read as follows: “$281,000,000 for each of fiscal years 2022 through 2025.”
2020
Subsec. (c). Pub. L. 116–260 amended subsec. (c) generally. Prior to amendment, subsec. (c) related to United States participation in ITER.