Title 49 — Transportation
Part B · Chapter 471 — Airport Development
§ 47106. Project grant application approval conditioned on satisfaction of project requirements
Statutory text
Project Grant Application Approval.—
The Secretary of Transportation may approve an application under this subchapter for a project grant only if the Secretary is satisfied that—
the project is consistent with plans (existing at the time the project is approved) of public agencies authorized by the State in which the airport is located to plan for the development of the area surrounding the airport;
the project will contribute to carrying out this subchapter;
enough money is available to pay the project costs that will not be paid by the United States Government under this subchapter;
the project will be completed without unreasonable delay;
the sponsor has authority to carry out the project as proposed;
if the project is for an airport that has an airport master plan that includes the project, the master plan addresses issues relating to solid waste recycling at the airport, including—
the feasibility of solid waste recycling at the airport;
minimizing the generation of solid waste at the airport;
operation and maintenance requirements;
the review of waste management contracts; and
the potential for cost savings or the generation of revenue; and
if the project is at an airport that is listed as having an unclassified status under the most recent national plan of integrated airport systems (as described in section 47103), the project will be funded with an amount appropriated under section 47114(d)(2)(B) and is—
for maintenance of the pavement of the primary runway;
for obstruction removal for the primary runway;
for the rehabilitation of the primary runway; or
for a project that the Secretary considers necessary for the safe operation of the airport.
Airport Development Project Grant Application Approval.—
The Secretary may approve an application under this subchapter for an airport development project grant for an airport only if the Secretary is satisfied that—
the sponsor, a public agency, or the Government holds good title to the areas of the airport used or intended to be used for the landing, taking off, or surface maneuvering of aircraft, or that good title will be acquired;
the interests of the community in or near which the project may be located have been given fair consideration; and
the application provides touchdown zone and centerline runway lighting, high intensity runway lighting, or land necessary for installing approach light systems that the Secretary, considering the category of the airport and the kind and volume of traffic using it, decides is necessary for safe and efficient use of the airport by aircraft.
Environmental Requirements.—
The Secretary may approve an application under this subchapter for an airport development project involving the location of an airport or runway or a major runway extension—
only if the sponsor certifies to the Secretary that—
an opportunity for a public hearing was given to consider the economic, social, and environmental effects of the location and the location’s consistency with the objectives of any planning that the community has carried out;
the airport management board has voting representation from the communities in which the project is located or has advised the communities that they have the right to petition the Secretary about a proposed project; and
with respect to an airport development project involving the location of an airport, runway, or major runway extension at a medium or large hub airport, the airport sponsor has made available to and has provided upon request to the metropolitan planning organization in the area in which the airport is located, if any, a copy of the proposed amendment to the airport layout plan to depict the project and a copy of any airport master plan in which the project is described or depicted; and
if the application is found to have a significant adverse effect on natural resources, including fish and wildlife, natural, scenic, and recreation assets, water and air quality, or another factor affecting the environment, only after finding that no possible and prudent alternative to the project exists and that every reasonable step has been taken to minimize the adverse effect.
The Secretary may approve an application under this subchapter for an airport development project that does not involve the location of an airport or runway, or a major runway extension, at an existing airport without requiring an environmental impact statement related to noise for the project if—
completing the project would allow operations at the airport involving aircraft complying with the noise standards prescribed for “stage 3” aircraft in section 36.1 of title 14, Code of Federal Regulations, to replace existing operations involving aircraft that do not comply with those standards; and
the project meets the other requirements under this subchapter.
At the Secretary’s request, the sponsor shall give the Secretary a copy of the transcript of any hearing held under paragraph (1)(A) of this subsection.
The Secretary may make a finding under paragraph (1)(B) of this subsection only after completely reviewing the matter. The review and finding must be a matter of public record.
Withholding Approval.—
The Secretary may withhold approval of an application under this subchapter for amounts apportioned under section 47114(c) and (e) of this title for violating an assurance or requirement of this subchapter only if—
the Secretary provides the sponsor an opportunity for a hearing; and
not later than 180 days after the later of the date of the application or the date the Secretary discovers the noncompliance, the Secretary finds that a violation has occurred.
The 180-day period may be extended by—
agreement between the Secretary and the sponsor; or
the hearing officer if the officer decides an extension is necessary because the sponsor did not follow the schedule the officer established.
A person adversely affected by an order of the Secretary withholding approval may obtain review of the order by filing a petition in the United States Court of Appeals for the District of Columbia Circuit or in the court of appeals of the United States for the circuit in which the project is located. The action must be brought not later than 60 days after the order is served on the petitioner.
Reports Relating to Construction of Certain New Hub Airports.—
At least 90 days prior to the approval under this subchapter of a project grant application for construction of a new hub airport that is expected to have 0.25 percent or more of the total annual enplanements in the United States, the Secretary shall submit to Congress a report analyzing the anticipated impact of such proposed new airport on—
the fees charged to air carriers (including landing fees), and other costs that will be incurred by air carriers, for using the proposed airport;
air transportation that will be provided in the geographic region of the proposed airport; and
the availability and cost of providing air transportation to rural areas in such geographic region.
Competition Plans.—
Prohibition.—
Beginning in fiscal year 2001, no passenger facility charge may be approved for a covered airport under section 40117 and no grant may be made under this subchapter for a covered airport unless the airport has submitted to the Secretary a written competition plan in accordance with this subsection.
Contents.—
A competition plan under this subsection shall include information on the availability of airport gates and related facilities, leasing and sub-leasing arrangements, gate-use requirements, gate-assignment policy, financial constraints, airport controls over air- and ground-side capacity, and whether the airport intends to build or acquire gates that would be used as common facilities.
Special rule for fiscal year 2002.—
This subsection does not apply to any passenger facility fee approved, or grant made, in fiscal year 2002 if the fee or grant is to be used to improve security at a covered airport.
Covered airport defined.—
In this subsection, the term “covered airport” means a commercial service airport—
that has more than .25 percent of the total number of passenger boardings each year at all such airports; and
at which one or two air carriers control more than 50 percent of the passenger boardings.
Consultation With Secretary of Homeland Security.—
The Secretary shall consult with the Secretary of Homeland Security before approving an application under this subchapter for an airport development project grant for activities described in section 47102(3)(B)(ii) only as they relate to security equipment or section 47102(3)(B)(x) only as they relate to installation of bulk explosive detection system.
Evaluation of Airport Master Plans.—
When evaluating the master plan of an airport for purposes of this subchapter, the Secretary shall take into account—
the role the airport plays with respect to medical emergencies and evacuations; and
the role the airport plays in emergency or disaster preparedness in the community served by the airport.
Legislative history
Reconstructed from this section’s Code source credit and amendment notes, resolved against the local Statutes at Large. Editorial notes are evidence, not the law that made the change.
Pub. L. 103–272 § 1(e) · 108 Stat. 745
Enacted · 49 U.S.C. § 47106
Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat. 1254
Source evidence
Code source credit
Pub. L. 103–272, § 1(e), July 5, 1994, 108 Stat. 1254Enacted provision · exact public law section
Section 1. subtitles ii, ii, and v-x of title 49, united states code (a) Certain general and permanent laws of the 49 USC prec. 101 note. United States, related to transportation, are revised, codified, and enacted by subsections (c)–(e) of this section without substantive change as subtitles II, III, and V–X of title 49, United States Code, “Transportation”. Those laws may be cited as “49 U.S.C. ________”. (b) Title 49, United States Code, is amended by striking the table of subtitles at the beginning of the title and substituting the following new table of subtitles: “Subtitle “I. DEPARTMENT OF TRANSPORTATION “II. OTHER GOVERNMENT AGENCIES “III. GENERAL AND INTERMODAL PROGRAMS “IV. INTERSTATE COMMERCE “V. RAIL PROGRAMS “VI. MOTOR VEHICLE AND DRIVER PROGRAMS “VII. AVIATION PROGRAMS “VIII. PIPELINES “IX. COMMERCIAL SPACE TRANSPORTATION “X. MISCELLANEOUS (c) Title 49, United States Code, is amended by striking subtitle II, except that chapter 31 (comprising sections 3101–3104) of subtitle II is redesignated and restated as chapter 315 (comprising sections 31501–31504) of subtitle VI of title 49, as enacted by subsection (e) of this section. (d) Title 49, United States Code, is amended by adding the following immediately after subtitle I:Pub. L. 103–305 title I · 108 Stat. 1569
Added · 49 U.S.C. § 47106(d); 49 U.S.C. § 47106(e)
Pub. L. 103–305 added subsec. (e)
Redesignated · 49 U.S.C. § 47106(d); 49 U.S.C. § 47106(e)
Pub. L. 103–305 redesignated former subsec. (e) as (d)
Struck · 49 U.S.C. § 47106(d); 49 U.S.C. § 47106(e)
Pub. L. 103–305 struck out former subsec. (d) which read as follows:
Source evidence
Code amendment note
Subsecs. (d), (e). Pub. L. 103–305 added subsec. (e), redesignated former subsec. (e) as (d), and struck out former subsec. (d) which read as follows:“(d) General Aviation Airport Project Grant Application Approval.—(1) In this subsection, ‘general aviation airport’ means a public airport that is not an air carrier airport. “(2) The Secretary may approve an application under this subchapter for an airport development project included in a project grant application involving the construction or extension of a runway at a general aviation airport located on both sides of a boundary line separating 2 counties within a State only if, before the application is submitted to the Secretary, the project is approved by the governing body of each village incorporated under the laws of the State and located entirely within 5 miles of the nearest boundary of the airport.”
Enacted provision · exact public law
TITLE I— AIRPORT AND AIRWAY IMPROVEMENT SEC. 101. AIRPORT IMPROVEMENT PROGRAM. (a) Authorization of Appropriations.— Section 48103 is amended— (1) by striking “Not more” and all that follows through “1993,” and inserting “The total amounts which shall be avail-able after September 30, 1981, to the Secretary of Transportation”; and (2) by inserting before the period at the end “shall be $17,583,500,000 for fiscal years ending before October 1, 1994, $19,744,500,000 for fiscal years ending before October 1, 1995, and $21,958,500,000 for fiscal years ending before October 1, 1996”. (b) Obligational Authority.— Section 47104(c) is amended by striking “After” and all that follows through “Secretary” and inserting “After September 30, 1996, the Secretary”. SEC. 102. AIRWAY IMPROVEMENT PROGRAM. (a) Airway Facilities and Equipment.— Section 48101(a) is amended— (1) in paragraph (1) by striking “for” and inserting “For”; (2) in paragraph (2)— (A) by striking “for” and inserting “For”; and (B) by striking “$11,100,000,000” and inserting “$10,724,000,000”; (3) in paragraph (3)— (A) by striking “for” and inserting “For”; and (B) by striking “$14,000,000,000” and inserting “$13,394,000,000”; and (4) by adding at the end the following: “(4) For the fiscal years ending September 30, 1991–1996, $16,129,000,000.”. (b) Certain Direct Costs and Joint Air Navigation Services.— Section 48104 is amended— (1) in the heading for subsection (b) by inserting “FOR FISCAL YEARS 1993” after “LIMITATION”; (2) in subsection (b) by striking “each” and all that follows through “1995,” and inserting “fiscal year 1993”; and (3) by adding at the end the following: “(c) Limitation for Fiscal Years 1994–1996.— The amount appropriated from the Trust Fund for the purposes of paragraphs (1) and (2) of subsection (a) for each of fiscal years 1994, 1995, and 1996 may not exceed the lesser of— “(1) 50 percent of the amount of funds made available under sections 48101-48103 of this title for such fiscal year; or “(2) (A) 70 percent of the amount of funds made available under sections 106(k) and 48101–48103 of this title for such fiscal year; less “(B) the amount of funds made available under sections 48101–48103 of this title for such fiscal year.”. (c) Limitation on Obligating or Expending Funds.— Section 48108(c) is amended by striking “1995” and inserting “1996”. SEC. 103. OPERATIONS OF FAA. Section 106(k) is amended by striking “, $5,100,000,000” and all that follows through “1995” and inserting “, $4,576,000,000 for fiscal year 1994, $4,674,000,000 for fiscal year 1995, and $4,810,000,000 for fiscal year 1996”. SEC. 104. INNOVATIVE TECHNOLOGY POLICY. Section 47101(a) is amended— (1) by striking “and” at the end of paragraph (9)(C); (2) by striking the period at the end of paragraph (10) and inserting a semicolon; and (3) by adding at the end the following: “(11) that the airport improvement program should be administered to encourage projects that employ innovative technology, concepts, and approaches that will promote safety, capacity, and efficiency improvements in the construction of airports and in the air transportation system (including the development and use of innovative concrete and other materials in the construction of airport facilities to minimize initial laydown costs, minimize time out of service, and maximize lifecycle durability) and to encourage and solicit innovative technology proposals and activities in the expenditure of funding pursuant to this subchapter;”. SEC. 105. INCLUSION OF EXPLOSIVE DETECTION DEVICES AND UNIVERSAL ACCESS SYSTEMS. Section 47102(3)(B)(ii) is amended by inserting after “or security equipment” the following: “, including explosive detection devices and universal access systems,”. SEC. 106. SUBMISSION AND APPROVAL OF PROJECT GRANT APPLICATIONS. Section 47105(a)(1)(B) is amended— (1) by striking “at least 2” each place it appears and inserting “1 or more”; and (2) by striking “similar”. SEC. 107. PREVENTIVE MAINTENANCE. (a) Condition of Assistance.— Section 47105 is amended— (1) by redesignating subsection (e) as subsection (f); and (2) by inserting after subsection (d) the following new subsection: “(e) Preventive Maintenance.— After January 1, 1995, the Secretary may approve an application under this subchapter for the replacement or reconstruction of pavement at an airport only if the sponsor has provided such assurances or certifications as the Secretary may determine appropriate that such airport has implemented an effective airport pavement maintenance-management program. The Secretary may require such reports on pavement condition and pavement management programs as the Secretary determines may be useful.”. (b) Study.— (1) In general.— The Secretary shall study the products used for airport pavement maintenance and rehabilitation. Such study shall consider, at a minimum, the cost and benefits of the following: (A) A requirement that the manufacturer or installer of such products provide minimum warranties. (B) Establishment of enhanced minimum specifications or performance standards for such products. (C) The use of insurance or other means to improve the performance and value of such products. (2) Solicitation of Views.— In conducting the study under this subsection, the Secretary shall solicit and consider the views of airport operators, manufacturers of airport pavement maintenance and rehabilitation products, installers of such products, appropriate Federal agencies, and other relevant persons. (3) Report.— Not later than June 1, 1995, the Secretary shall report to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Public Works and Transportation of the House of Representatives on the results of the study conducted under this subsection. SEC. 108. REPEAL OF GENERAL AVIATION AIRPORT PROJECT GRANT APPLICATION APPROVAL. Section 47106 is amended— (1) by striking subsection (d); and (2) by redesignating subsection (e) as subsection (d). SEC. 109. REPORTS ON IMPACTS OF NEW AIRPORT PROJECTS. Section 47106 is amended by adding at the end the following: “(e) Reports Relating to Construction of Certain New Hub Airports.— At least 90 days prior to the approval under this subchapter of a project grant application for construction of a new hub airport that is expected to have 0.25 percent or more of the total annual enplanements in the United States, the Secretary shall submit to Congress a report analyzing the anticipated impact of such proposed new airport on— “(1) the fees charged to air carriers (including landing fees), and other costs that will be incurred by air carriers, for using the proposed airport; “(2) air transportation that will be provided in the geographic region of the proposed airport; and “(3) the availability and cost of providing air transportation to rural areas in such geographic region.”. SEC. 110. AIRPORT FEES POLICY. Section 47101(a) is further amended by adding at the end the following: “(12) that airport fees, rates, and charges must be reasonable and may only be used for purposes not prohibited by this Act; and “(13) that airports should be as self-sustaining as possible under the circumstances existing at each particular airport and in establishing new fees, rates, and charges, and generating revenues from all sources, airport owners and operators should not seek to create revenue surpluses that exceed the amounts to be used for airport system purposes and for other purposes for which airport revenues may be spent under section 47107(b)(1) of this title, including reasonable reserves and other funds to facilitate financing and cover contingencies.”. SEC. 111. AIRPORT FINANCIAL REPORTS. (a) In General.— Section 47107(a) is amended— (1) by inserting before the semicolon at the end of paragraph (15) “and make such reports available to the public”; (2) by striking “and” at the end of paragraph (17); (3) by striking the period at the end of paragraph (18) and inserting “; and”; and (4) by adding at the end the following: “(19) the airport; owner or operator will submit to the Public information. Secretary and make available to the public an annual report listing in detail— “(A) all amounts paid by the airport to any other unit of government and the purposes for which each such payment was made; and “(B) all services and property provided to other units of government and the amount of compensation received for provision of each such service and property.”. (b) Format for Reporting.— Within 180 days after the date of the enactment of this Act, the Secretary shall prescribe a uniform simplified format for reporting that is applicable to airports. Such format shall be designed to enable the public to understand readily how funds are collected and spent at airports, and to provide sufficient information relating to total revenues, operating expenditures, capital expenditures, debt service payments, contributions to restricted funds, accounts, or reserves required by financing agreements or covenants or airport lease or use agreements or covenants. Such format shall require each commercial service airport to report the amount of any revenue surplus, the amount of concession-generated revenue, and other information as required by the Secretary. (c) Annual Summaries.— Section 47107 is amended by adding at the end the following: “(k) Annual Summaries of Financial Reports.— The Secretary shall provide to the Committee on Commerce, Science, and Transportation of the Senate and the Committee on Public Works and Transportation of the House of Representatives an annual summary of the reports submitted to the Secretary under subsection (a)(19) of this section and under section 111(b) of the Federal Aviation Administration Authorization Act of 1994.”. SEC. 112. ADDITIONAL ENFORCEMENT AGAINST ILLEGAL DIVERSION OF AIRPORT REVENUE. (a) New Policies and Procedures.— Section 47107 is further amended by adding at the end the following: “(1) Policies and Procedures to Ensure Enforcement Against Illegal Diversion of Airport Revenue.— “(1) In general.— Not later than 90 days after the date of he enactment of this subsection, the Secretary of Transportation shall establish policies and procedures that will assure the prompt and effective enforcement of subsections (a)(13) and (b) of this section and grant assurances made under such subsections. Such policies and procedures shall recognize the exemption provision in subsection (b)(2) of this section and shall respond to the information contained in the reports of the Inspector General of the Department of Transportation on airport revenue diversion and such other relevant information as the Secretary may by law consider. “(2) Revenue diversion.— Policies and procedures to be established pursuant to paragraph (1) of this subsection shall prohibit, at a minimum, the diversion of airport revenues (except as authorized under subsection (b) of this section) through— “(A) direct payments or indirect payments, other than payments reflecting the value of services and facilities provided to the airport; “(B) use of airport revenues for general economic development, marketing, and promotional activities unrelated to airports or airport systems; “(C) payments in lieu of taxes or other assessments that exceed the value of services provided; or “(D) payments to compensate nonsponsoring governmental bodies for lost tax revenues exceeding stated tax rates. “(3) Efforts to be self-sustaining.— With respect to subsection (a)(13) of this section, policies and procedures to be established pursuant to paragraph (1) of this subsection shall take into account, at a minimum, whether owners and operators of airports, when entering into new or revised agreements or otherwise establishing rates, charges, and fees, have undertaken reasonable efforts to make their particular airports as self-sustaining as possible under the circumstances existing at such airports. “(4) Administrative safeguards.— Policies and procedures to be established pursuant to paragraph (1) shall mandate internal controls, auditing requirements, and increased levels of Department of Transportation personnel sufficient to respond fully and promptly to complaints received regarding possible violations of subsections (a)(13) and (b) of this section and grant assurances made under such subsections and to alert the Secretary to such possible violations.”. (b) Withholding of Approval of Applications for Grants or Passenger Facility Charges; Judicial Enforcement.— Section 47111 is amended by adding at the end the following: “(e) Action on Grant Assurances Concerning Airport Revenues.— If, after notice and opportunity for a hearing, the Secretary finds a violation of section 47107(b) of this title, as further defined by the Secretary under section 47107(1) of this title, or a violation of an assurance made under section 47107(b) of this title, and the Secretary has provided an opportunity for the airport sponsor to take corrective action to cure such violation, and such corrective action has not been taken within the period of time set by the Secretary, the Secretary shall withhold approval of any new grant application for funds under this chapter, or any proposed modification to an existing grant that would increase the amount of funds made available under this chapter to the airport sponsor, and withhold approval of any new application to impose a fee under section 40117 of this title. Such applications may thereafter be approved only upon a finding by the Secretary that such corrective action as the Secretary requires has been taken to address the violation and that the violation no longer exists. “(f) Judicial Enforcement.— For any violation of this chapter or any grant assurance made under this chapter, the Secretary may apply to the district court of the United States for any district in which the violation occurred for enforcement. Such court shall have jurisdiction to enforce obedience thereto by a writ of injunction or other process, mandatory or otherwise, restraining any person from further violation.”. (c) Civil Penalties.— (1) General penalty.— Section 46301(a) is amended— (A) in paragraph (1) by striking “or 46303” and inserting “46303, 47107(b) (including any assurance made under such section)”; and (B) by adding at the end the following: “(5) In the case of a violation of section 47107(b) of this title, the maximum civil penalty for a continuing violation shall not exceed $50,000.”. (2) Administrative penalty.— Section 46301(d)(2) is amended by striking “or 46303” and inserting “46303, or 47107(b) (as further defined by the Secretary under section 47107(1) and including any assurance made under section 47107(b))”. (3) Procedures.— Section 46301(d)(7) is amended by adding at the end the following: “(D) In the case of a violation of section 47107(b) of this title or any assurance made under such section— “(i) a civil penalty shall not be assessed against an individual; “(ii) a civil penalty may be compromised as provided under subsection (f); and “(iii) judicial review of any order assessing a civil penalty may be obtained only pursuant to section 46110 of this title.”. (d) Consideration of Diversion of Revenues in Awarding Discretionary Grants.— Section 47115 is amended by adding at the end the following new subsection: “(f) Consideration of Diversion of Revenues in Awarding Discretionary Grants.— “(1) General rule.— Subject to paragraph (2), in deciding whether or not to distribute funds to an airport from the discretionary funds established by subsection (a) of this section and section 47116 of this title, the Secretary shall consider as a factor militating against the distribution of such funds to the airport the fact that the airport is using revenues generated by the airport or by local taxes on aviation fuel for purposes other than capital or operating costs of the airport or the local airports system or other local facilities which are owned or operated by the owner or operator of the airport and directly and substantially related to the actual air transportation of passengers or property. “(2) Required finding.— Paragraph (1) shall apply only when the Secretary finds that the amount of revenues used by the airport for purposes other than capital or operating costs in the airport’s fiscal year preceding the date of the application for discretionary funds exceeds the amount of such revenues in the airport’s first fiscal year ending after the date of the enactment of this subsection, adjusted by the Secretary for changes in the Consumer Price Index of All Urban Consumers published by the Bureau of Labor Statistics of the Department of Labor.”. (e) Unreasonable Burden on Interstate Commerce.— Section 40116(d)(2)(A) is amended by adding at the end the following: “(iv) Levy or collect a tax, fee, or charge, first taking effect after the date of the enactment of this clause, exclusively upon any business located at a commercial service airport or operating as a permittee of such an airport other than a tax, fee, or charge wholly utilized for airport or aeronautical purposes.”. SEC. 113. RESOLUTION OF AIRPORT-AIR CARRIER DISPUTES CONCERNING AIRPORT FEES. (a) In General.— Subchapter I of chapter 471 of subtitle VII is amended— (1) by redesignating section 47129 (and any references thereto) as section 47131; and (2) by inserting after section 47128 the following new section: “§47129. Resolution of airport-air carrier disputes concerning airport fees “(a) Authority To Request Secretary’S Determination.— “(1) In general.— The Secretary of Transportation shall issue a determination as to whether a fee imposed upon one or more air carriers (as defined in section 40102 of this subtitle) by the owner or operator of an airport is reasonable if— “(A) a written request for such determination is filed with the Secretary by such owner or operator; or “(B) a written complaint requesting such determination is filed with the Secretary by an affected air carrier within 60 days after such carrier receives written notice of the establishment or increase of such fee. “(2) Calculation of fee.— A fee subject to a determination of reasonableness under this section may be calculated pursuant to either a compensatory or residual fee methodology or any combination thereof. “(3) Secretary not to set fee.— In determining whether a fee is reasonable under this section, the Secretary may only determine whether the fee is reasonable or unreasonable and shall not set the level of the fee. “(b) Procedural Regulations.— Not later than 90 days after Federal Register, publication. the date of the enactment of this section, the Secretary shall publish in the Federal Register final regulations, policy statements, or guidelines establishing— “(1) the procedures for acting upon any written request or complaint filed under subsection (a)(1); and “(2) the standards or guidelines that shall be used by the Secretary in determining under this section whether an airport fee is reasonable. “(c) Decisions By Secretary.— The final regulations, policy statements, or guidelines required in subsection (b) shall provide the following: “(1) Not more than 120 days after an air carrier files with the Secretary a written complaint relating to an airport fee, the Secretary shall issue a final order determining whether such fee is reasonable. “(2) Within 30 days sifter such complaint is filed with the Secretary, the Secretary shall dismiss the complaint if no significant dispute exists or shall assign the matter to an administrative law judge; and thereafter the matter shall be handled in accordance with part 302 of title 14, Code of Federal Regulations, or as modified by the Secretary to ensure an orderly disposition of the matter within the 120-day period and any specifically applicable provisions of this section. “(3) The administrative law judge shall issue a recommended decision within 60 days after the complaint is assigned or within such shorter period as the Secretary may specify. “(4) If the Secretary, upon the expiration of 120 days after the filing of the complaint, has not issued a final order, the decision of the administrative law judge shall be deemed to be the final order of the Secretary. “(5) Any party to the dispute may seek review of a final order of the Secretary under this subsection in the Circuit Court of Appeals for the District of Columbia Circuit or the court of appeals in the circuit where the airport which gives rise to the written complaint is located. “(6) Any findings of fact in a final order of the Secretary under this subsection, if supported by substantial evidence, shall be conclusive if challenged in a court pursuant to this subsection. No objection to such a final order shall be considered by the court unless objection was urged before an administrative law judge or the Secretary at a proceeding under this subsection or, if not so urged, unless there were reasonable grounds for failure to do so. “(d) Payment Under Protest; Guarantee of Air Carrier Access.— “(1) Payment under protest.— “(A) In general.— Any fee increase or newly established fee which is the subject of a complaint that is not dismissed by the Secretary shall be paid by the complainant air carrier to the airport under protest. “(B) Referral or credit.— Any amounts paid under this subsection by a complainant air carrier to the airport under protest shall be subject to refund or credit to the air carrier in accordance with directions in the final order of the Secretary within 30 days of such order. “(C) Assurance of timely repayment.— In order to assure the timely repayment, with interest, of amounts in dispute determined not to be reasonable by the Secretary, the airport shall obtain a letter of credit, or surety bond, or other suitable credit facility, equal to the amount in dispute that is due during the 120-day period established by this section, plus interest, unless the airport and the complainant air carrier agree otherwise. “(D) Deadline,— The letter of credit, or surety bond, or other suitable credit facility shall be provided to the Secretary within 20 days of the filing of the complaint and shall remain in effect for 30 days after the earlier of 120 days or the issuance of a timely final order by the Secretary determining whether such fee is reasonable. “(2) Guarantee of air carrier access.— Contingent upon an air carrier’s compliance with the requirements of paragraph (1) and pending the issuance of a final order by the Secretary determining the reasonableness of a fee that is the subject of a complaint filed under subsection (a)(1)(B), an owner or operator of an airport may not deny an air carrier currently providing air service at the airport reasonable access to airport facilities or service, or otherwise interfere with an air carrier’s prices, routes, or services, as a means of enforcing the fee. “(e) Applicability.— This section does not apply to— “(1) a fee imposed pursuant to a written agreement with air carriers using the facilities of an airport; “(2) a fee imposed pursuant to a financing agreement or covenant entered into prior to the date of the enactment of this section; or “(3) any other existing fee not in dispute as of such date of enactment. “(f) Effect on Existing Agreements.— Nothing in this section shall adversely affect— “(1) the rights of any party under any existing written agreement between an air carrier and the owner or operator of an airport; or “(2) the ability of an airport to meet its obligations under a financing agreement, or covenant, that is in force as of the date of the enactment of this section. “(g) Definition.— In this section, the term ‘fee’ means any rate, rental charge, landing fee, or other service charge for the use of airport facilities.”. (b) Conforming Amendment.— The analysis to such chapter is amended— (1) by striking “47129” and inserting “47131”; and (2) by inserting after the item relating to section 47128 the following: “47129. Resolution of airport-air carrier disputes concerning airport fees.”. SEC. 114. TERMINAL DEVELOPMENT. Section 47109 is amended— (1) in subsection (a) by striking “subsections (b) and (c)” and inserting “subsection (b)”; and (2) by striking subsection (c). SEC. 115. LETTERS OF INTENT. Section 47110(e) is amended by adding at the end the following: “(6) Limitation on statutory construction.— Nothing in this section shall be construed to prohibit the obligation of amounts pursuant to a letter of intent under this subsection in the same fiscal year as the letter of intent is issued.”. SEC. 116. MILITARY AIRPORT PROGRAM. (a) Military Airport Set-Aside.— Section 47117(e)(1)(E) is amended by striking “, and 1995” and inserting “, 1995, and 1996”. (b) Designation of Military Airports.— Section 47118(a) is amended— (1) by striking “12” and inserting “15”; and (2) by adding at the end the following: “The Secretary may only designate an airport for such grants (other than an airport designated for such grants on or before the date of the enactment of this sentence) if the Secretary finds that grants under such section for projects at such airport would reduce delays at an airport with more than 20,000 hours of annual delays in commercial passenger aircraft takeoffs and landings.”. (c) Elimination of Extension of 5-Year Period of Eligibility.— Section 47118(d) is amended by striking the last sentence. (d) Construction of Parking Lots, Fuel Farms, and Utilities.— Section 47118(f) is amended by striking “-1995” and inserting “-1996”. SEC. 117. TERMINAL DEVELOPMENT COSTS. Section 47119 is amended— (1) in subsection (a) by inserting “or, in the case of a commercial service airport which annually had less than 0.05 percent of the total enplanements in the United States, between January 1, 1992, and October 31, 1992,” after “July 12, 1976,”; and (2) by adding at the end the following: “(c) Nonhub Airports.— With respect to a project at a commercial service airport which annually has less than 0.05 percent of the total enplanements in the United States, the Secretary may approve the use of the amounts described in subsection (a) notwithstanding the requirements of sections 47107(a)(17), 47112, and 47113.”. SEC. 118. AIRPORT SAFETY DATA COLLECTION. (a) In General.— Chapter 471 of subtitle VII is further amended by inserting after section 47129 the following: “§47130. Airport safety data collection “Notwithstanding any other provision of law, the Administrator of the Federal Aviation Administration may contract, using sole source or limited source authority, for the collection of airport safety data.”. (b) Clerical Amendment.— The analysis for such chapter 471 is further amended by inserting after the item relating to section 47129 the following: “47130. Airport safety data collection.”. SEC. 119. SOUNDPROOFING AND ACQUISITION OF CERTAIN RESIDENTIAL BUILDINGS AND PROPERTIES. Section 47504(c) is amended— (1) by redesignating paragraphs (2), (3), and (4) as paragraphs (3), (4), and (5), respectively; (2) by inserting after paragraph (1) the following: “(2) Soundproofing and acquisition of certain residential buildings and properties.— The Secretary may incur obligations to make grants from amounts made available under section 48103 of this title— “(A) for projects to soundproof residential buildings— “(i) if the airport operator received approval for a grant for a project to soundproof residential buildings pursuant to section 301(d)(4)(B) of the Airport and Airway Safety and Capacity Expansion Act of 1987; “(ii) if the airport operator submits updated noise exposure contours, as required by the Secretary; and “(iii) if the Secretary determines that the proposed projects are compatible with the purposes of this chapter; and “(B) to an airport operator and unit of local government referred to in paragraph (1)(A) or (1)(B) of this subsection to soundproof residential buildings located on residential properties, and to acquire residential properties, at which noise levels are not compatible with normal operations of an airport— “(i) if the airport operator amended an existing local aircraft noise regulation during calendar year 1993 to increase the maximum permitted noise levels for scheduled air carrier aircraft as a direct result of implementation of revised aircraft noise departure procedures mandated for aircraft safety purposes by the Administrator of the Federal Aviation Administration for standardized application at airports served by scheduled air carriers; “(ii) if the airport operator submits updated noise exposure contours, as required by the Secretary; and “(iii) if the Secretary determines that the proposed projects are compatible with the purposes of this chapter.”; and (3) in paragraph (4), as so redesignated, by striking “paragraph (1) of.” SEC. 120. LANDING ATOS AND NAVIGATIONAL EQUIPMENT INVENTORY POOL. (a) Purchase.— Section 44502(a) is amended by adding at the end the following new paragraph: “(4) Purchase of instrument landing system.— “(A) Establishment of program.— The Secretary shall purchase precision approach instrument landing system equipment for installation at airports on an expedited basis. “(B) Authorization.— No less than $30,000,000 of the amounts appropriated under section 48101(a) for each of fiscal years 1995 and 1996 shall be used for the purpose of carrying out this paragraph, including acquisition, site preparation work, installation, and related expenditures.”. (b) Cost Savings Associated With Purchase.— Notwithstanding other provisions of law or regulations to the contrary, the Administrator shall establish, within 120 days after the date of the enactment of this Act, a process through which airport sponsors may take advantage of cost savings associated with the purchase and installation of instrument landing systems, along with associated equipment, under existing or future Federal Aviation Administration contracts. The process established by the Administrator may provide for the direct reimbursement (including administrative costs) of the Administrator by an airport sponsor using grants funds under subchapter I of chapter 471 of subtitle VII of title 49, United States Code, relating to airport improvement, for the ordering of such equipment and installation or for the direct ordering of such equipment and installation by an airport sponsor, using such grant funds, from the suppliers with which the Administrator has contracted. SEC. 121. REVIEW OF PASSENGER FACILITY CHARGE PROGRAM. The Secretary shall conduct a review of section 158.49(b) of title 14, Code of Federal Regulations, to assess the effectiveness of such section in light of the objectives of section 40117 of title 49, United States Code, and shall take such corrective action as the Secretary determines to be necessary to address any problems discovered in the review.Wendell H. Ford Aviation Investment and Reform Act for the 21st Century
Pub. L. 106–181 title I § 155(b) · 114 Stat. 61
Added · 49 U.S.C. § 47106(f)
Pub. L. 106–181 added subsec. (f)
Source evidence
Code amendment note
Subsec. (f). Pub. L. 106–181 added subsec. (f).Enacted provision · exact public law section
(b) In General.— Section 47106 is amended by adding at the end the following: “(f) Competition Plans.— “(1) Prohibition.— Beginning in fiscal year 2001, no passenger facility fee may be approved for a covered airport under section 40117 and no grant may be made under this subchapter for a covered airport unless the airport has submitted to the Secretary a written competition plan in accordance with this subsection. “(2) Contents.— A competition plan under this subsection shall include information on the availability of airport gates and related facilities, leasing and sub-leasing arrangements, gate-use requirements, patterns of air service, gate-assignment policy, financial constraints, airport controls over air-and ground-side capacity, whether the airport intends to build or acquire gates that would be used as common facilities, and airfare levels (as compiled by the Department of Transportation) compared to other large airports. “(3) Covered airport defined.— In this subsection, the term ‘covered airport’ means a commercial service airport— “(A) that has more than .25 percent of the total number of passenger boardings each year at all such airports; and “(B) at which one or two air carriers control more than 50 percent of the passenger boardings.”.Aviation and Transportation Security Act
Pub. L. 107–71 title I § 123(a) · 115 Stat. 597
Added · 49 U.S.C. § 47106(f)(3); 49 U.S.C. § 47106(f)(4)
Pub. L. 107–71, which directed the amendment of section 47106(f) by adding par. (3)
Redesignated · 49 U.S.C. § 47106(f)(3); 49 U.S.C. § 47106(f)(4)
Pub. L. 107–71, which directed the amendment of section 47106(f) by redesignating former par. (3) as (4), without specifying the Code title to be amended, was executed by making the amendments to this section, to reflect the probable intent of Congress
Source evidence
Code amendment note
Subsec. (f)(3), (4). Pub. L. 107–71, which directed the amendment of section 47106(f) by adding par. (3) and redesignating former par. (3) as (4), without specifying the Code title to be amended, was executed by making the amendments to this section, to reflect the probable intent of Congress.Enacted provision · exact public law section
(a) Competition Plan.— Section 47106(f) is amended— (1) by redesignating paragraph (3) as paragraph (4); and (2) by inserting after paragraph (2) the following: “(3) Special rule for fiscal year 2002.— This subsection does not apply to any passenger facility fee approved, or grant made, in fiscal year 2002 if the fee or grant is to be used to improve security at a covered airport. ” .Homeland Security Act of 2002
Pub. L. 107–296 title IV § 426(b) · 116 Stat. 2135
Added · 49 U.S.C. § 47106(g)
Pub. L. 107–296 added subsec. (g)
Source evidence
Code amendment note
Subsec. (g). Pub. L. 107–296 added subsec. (g).Enacted provision · exact public law section
(b) Approval of AIP Grant Applications for Security Activities.— Section 47106 of title 49, United States Code, is amended by adding at the end the following: “(g) Consultation With Secretary of Homeland Security.— The Secretary shall consult with the Secretary of Homeland Security before approving an application under this subchapter for an airport development project grant for activities described in section 47102(3)(B)(ii) only as they relate to security equipment or section 47102(3)(B)(x) only as they relate to installation of bulk explosive detection system.”.Aviation Streamlining Approval Process Act of 2003
Pub. L. 108–176 § 305(1) · 117 Stat. 2490
Inserted · 49 U.S.C. § 47106(c)(1)(A)(iii)
Pub. L. 108–176, § 305(1), inserted “and” after semicolon at end
Source evidence
Code amendment note
Subsec. (c)(1)(A)(iii). Pub. L. 108–176, § 305(1), inserted “and” after semicolon at end.Enacted provision · exact public law section
(1) by inserting “and” after the semicolon at the end of paragraph (1)(A)(iii) (as added by this Act);Effective date note
Amendment by Pub. L. 108–176 applicable only to fiscal years beginning after Sept. 30, 2003, except as otherwise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title.Pub. L. 108–176 § 187 · 117 Stat. 2490
Added · 49 U.S.C. § 47106(c)(1)(A)(iii)
Pub. L. 108–176, § 187, added cl. (iii)
Target inherited from the preceding amendment note.
Source evidence
Code amendment note
Pub. L. 108–176, § 187, added cl. (iii).Enacted provision · exact public law section
SEC. 187. INTERMODAL PLANNING. Section 47106(c)(1)(A) is amended— (1) by striking “and” at the end of clause (i); (2) by adding “and” at the end of clause (ii); and (3) by adding at the end the following: “(iii) with respect to an airport development project involving the location of an airport, runway, or major runway extension at a medium or large hub airport, the airport sponsor has made available to and has provided upon request to the metropolitan planning organization in the area in which the airport is located, if any, a copy of the proposed amendment to the airport layout plan to depict the project and a copy of any airport master plan in which the project is described or depicted;” .Effective date note
Amendment by Pub. L. 108–176 applicable only to fiscal years beginning after Sept. 30, 2003, except as otherwise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title.Aviation Streamlining Approval Process Act of 2003
Pub. L. 108–176 § 305(2) · 117 Stat. 2490
Redesignated · 49 U.S.C. § 47106(c)(1)(B); 49 U.S.C. § 47106(c)(1)(C)
Pub. L. 108–176, § 305(2), (3), redesignated subpar. (C) as (B)
Struck · 49 U.S.C. § 47106(c)(1)(B); 49 U.S.C. § 47106(c)(1)(C)
Pub. L. 108–176, § 305(2), (3), struck out former subpar. (B) which read as follows: “only if the chief executive officer of the State in which the project will be located certifies in writing to the Secretary that there is reasonable assurance that the project will be located, designed, constructed, and operated in compliance with applicable air and water quality standards, except that the Administrator of the Environmental Protection Agency shall make the certification instead of the chief executive officer if—
Source evidence
Code amendment note
Subsec. (c)(1)(B), (C). Pub. L. 108–176, § 305(2), (3), redesignated subpar. (C) as (B) and struck out former subpar. (B) which read as follows: “only if the chief executive officer of the State in which the project will be located certifies in writing to the Secretary that there is reasonable assurance that the project will be located, designed, constructed, and operated in compliance with applicable air and water quality standards, except that the Administrator of the Environmental Protection Agency shall make the certification instead of the chief executive officer if—“(i) the State has not approved any applicable State or local standards; and “(ii) the Administrator has prescribed applicable standards; and”.
Enacted provision · exact public law section
(2) by striking subparagraph (B) of paragraph (1);Effective date note
Amendment by Pub. L. 108–176 applicable only to fiscal years beginning after Sept. 30, 2003, except as otherwise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title.Aviation Streamlining Approval Process Act of 2003
Pub. L. 108–176 § 305(4) · 117 Stat. 2490
Substituted · 49 U.S.C. § 47106(c)(2)(A)
Pub. L. 108–176, § 305(4), substituted “stage 3” for “stage 2”
Source evidence
Code amendment note
Subsec. (c)(2)(A). Pub. L. 108–176, § 305(4), substituted “stage 3” for “stage 2”.Enacted provision · exact public law section
(4) in paragraph (2)(A) by striking “stage 2” and inserting “stage 3”;Effective date note
Amendment by Pub. L. 108–176 applicable only to fiscal years beginning after Sept. 30, 2003, except as otherwise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title.Aviation Streamlining Approval Process Act of 2003
Pub. L. 108–176 § 305(5) · 117 Stat. 2490
Redesignated · 49 U.S.C. § 47106(c)(4); 49 U.S.C. § 47106(c)(5)
Pub. L. 108–176, § 305(5)–(7), redesignated par. (5) as (4)
Substituted · 49 U.S.C. § 47106(c)(4); 49 U.S.C. § 47106(c)(5)
Pub. L. 108–176, § 305(5)–(7), substituted “paragraph (1)(B)” for “paragraph (1)(C)”
Struck · 49 U.S.C. § 47106(c)(4); 49 U.S.C. § 47106(c)(5)
Pub. L. 108–176, § 305(5)–(7), struck out former par. (4) which read as follows:
Source evidence
Code amendment note
Subsec. (c)(4), (5). Pub. L. 108–176, § 305(5)–(7), redesignated par. (5) as (4), substituted “paragraph (1)(B)” for “paragraph (1)(C)”, and struck out former par. (4) which read as follows:“(4)(A) Notice of certification or of refusal to certify under paragraph (1)(B) of this subsection shall be provided to the Secretary not later than 60 days after the Secretary receives the application. “(B) The Secretary shall condition approval of the application on compliance with the applicable standards during construction and operation.”
Enacted provision · exact public law section
(5) by striking paragraph (4);Effective date note
Amendment by Pub. L. 108–176 applicable only to fiscal years beginning after Sept. 30, 2003, except as otherwise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title.FAA Modernization and Reform Act of 2012
Pub. L. 112–95 § 133 · 126 Stat. 11
Added · 49 U.S.C. § 47106(a)(6)
Pub. L. 112–95, § 133, added par. (6)
Source evidence
Code amendment note
Subsec. (a)(6). Pub. L. 112–95, § 133, added par. (6).Enacted provision · exact public law section
SEC. 133. RECYCLING PLANS FOR AIRPORTS. Section 47106(a) is amended— (1) in paragraph (4) by striking “and” at the end; (2) in paragraph (5) by striking “proposed.” and inserting “proposed; and”; and (3) by adding at the end the following: “(6) if the project is for an airport that has an airport master plan, the master plan addresses issues relating to solid waste recycling at the airport, including— “(A) the feasibility of solid waste recycling at the airport; “(B) minimizing the generation of solid waste at the airport; “(C) operation and maintenance requirements; “(D) the review of waste management contracts; and “(E) the potential for cost savings or the generation of revenue.” .FAA Modernization and Reform Act of 2012
Pub. L. 112–95 § 111(c)(2)(A)(i) · 126 Stat. 11
Substituted · 49 U.S.C. § 47106(f)(1)
Pub. L. 112–95, § 111(c)(2)(A)(i), substituted “charge” for “fee”
Source evidence
Code amendment note
Subsec. (f)(1). Pub. L. 112–95, § 111(c)(2)(A)(i), substituted “charge” for “fee”.Enacted provision · exact public law section
(i) Section 47106(f)(1).FAA Modernization and Reform Act of 2012
Pub. L. 112–95 § 134 · 126 Stat. 11
Struck and inserted · 49 U.S.C. § 47106(f)(2)
Pub. L. 112–95, § 134, struck out “patterns of air service,” after “gate-use requirements,” and “, and airfare levels (as compiled by the Department of Transportation) compared to other large airports” after “common facilities” and inserted “and” after “ground-side capacity,”
Source evidence
Code amendment note
Subsec. (f)(2). Pub. L. 112–95, § 134, struck out “patterns of air service,” after “gate-use requirements,” and “, and airfare levels (as compiled by the Department of Transportation) compared to other large airports” after “common facilities” and inserted “and” after “ground-side capacity,”.Enacted provision · exact public law section
SEC. 134. CONTENTS OF COMPETITION PLANS. Section 47106(f)(2) is amended— (1) by striking “patterns of air service,”; (2) by inserting “and” before “whether”; and (3) by striking “, and airfare levels” and all that follows before the period.FAA Reauthorization Act of 2018
Pub. L. 115–254 § 148(a)(2) · 132 Stat. 3187
Inserted · 49 U.S.C. § 47106(a)(6)
Pub. L. 115–254, § 148(a)(2), inserted “that includes the project” before “, the master plan” in introductory provisions
Source evidence
Code amendment note
Subsec. (a)(6). Pub. L. 115–254, § 148(a)(2), inserted “that includes the project” before “, the master plan” in introductory provisions.Enacted provision · exact public law section
(2) in paragraph (6), by inserting “that includes the project” before “, the master plan”;FAA Reauthorization Act of 2018
Pub. L. 115–254 § 148(a)(1) · 132 Stat. 3187
Added · 49 U.S.C. § 47106(a)(7)
Pub. L. 115–254, § 148(a)(1), (3), (4), added par. (7)
Source evidence
Code amendment note
Subsec. (a)(7). Pub. L. 115–254, § 148(a)(1), (3), (4), added par. (7).Enacted provision · exact public law section
(1) in paragraph (5), by striking “and” at the end;FAA Reauthorization Act of 2018
Pub. L. 115–254 § 149 · 132 Stat. 3187
Added · 49 U.S.C. § 47106(h)
Pub. L. 115–254, § 149, added subsec. (h)
Source evidence
Code amendment note
Subsec. (h). Pub. L. 115–254, § 149, added subsec. (h).Enacted provision · exact public law section
SEC. 149. EVALUATION OF AIRPORT MASTER PLANS. Section 47106 of title 49, United States Code, is amended by adding at the end the following: “(h) Evaluation of Airport Master Plans.— When evaluating the master plan of an airport for purposes of this subchapter, the Secretary shall take into account— “(1) the role the airport plays with respect to medical emergencies and evacuations; and “(2) the role the airport plays in emergency or disaster preparedness in the community served by the airport.” .Pub. L. 118–63 title VII § 712(c)(1) · 138 Stat. 1256
Substituted · 49 U.S.C. § 47106(a)(7)
Pub. L. 118–63 substituted “section 47114(d)(2)(B)” for “section 47114(d)(3)(B)” in introductory provisions
Unresolved: Pub. L. 118–63 was not found in the local Statutes at Large index.
Source evidence
Code amendment note
Subsec. (a)(7). Pub. L. 118–63 substituted “section 47114(d)(2)(B)” for “section 47114(d)(3)(B)” in introductory provisions.
19 of 23 references resolved to an enrolled provision · 3 partial · 1 unresolved
Notes
historicalAndRevision
| Historical and Revision Notes | ||
|---|---|---|
| RevisedSection | Source (U.S. Code) | Source (Statutes at Large) |
| 47106(a) | 49 App.:2208(b) (1)(A)–(D). | Sept. 3, 1982, Pub. L. 97–248, §§ 503(a)(8), 509(b)(1)(A)– (D), (2)–(4), (5) (last sentence words after 11th comma), (6)(B)–(8), 96 Stat. 673, 683, 684. |
| 47106(b) | 49 App.:2202(a)(8). | |
| 49 App.:2208(b) (2)–(4). | ||
| 47106(c) (1)(A) | 49 App.:2208(b)(6)(A). | Sept. 3, 1982, Pub. L. 97–248, § 509(b)(6)(A), 96 Stat. 684; Oct. 31, 1992, Pub. L. 102–581, § 113(b), 106 Stat. 4881. |
| 47106(c) (1)(B) | 49 App.:2208(b)(7)(A) (1st, 2d sentences). | |
| 47106(c) (1)(C) | 49 App.:2208(b)(5) (last sentence words between 11th and 12th commas and after last comma). | |
| 47106(c)(2) | 49 App.:2208(b)(8). | |
| 47106(c)(3) | 49 App.:2208(b)(6)(B). | |
| 47106(c)(4) | 49 App.:2208(b)(7)(A) (last sentence), (B). | |
| 47106(c)(5) | 49 App.:2208(b)(5) (last sentence words between 12th and last commas). | |
| 47106(d) | 49 App.:1731. | May 21, 1970, Pub. L. 91–258, 84 Stat. 219, § 31; added Feb. 18, 1980, Pub. L. 96–193, § 206, 94 Stat. 55; Sept. 3, 1982, Pub. L. 97–248, § 524(e), 96 Stat. 697. |
| 47106(e) | 49 App.:2218(b) (related to application). | Sept. 3, 1982, Pub. L. 97–248, 96 Stat. 324, § 519(b) (related to application); added Dec. 30, 1987, Pub. L. 100–223, § 112(2), 101 Stat. 1504. |
In subsection (a)(1), the word “reasonably” is omitted as surplus.
In subsection (a)(2), the words “carrying out” are substituted for “accomplishment of the purposes of” for consistency in the revised title.
In subsection (a)(3), the words “that portion of” are omitted as surplus.
In subsection (a)(5), the words “which submitted the project grant application” and “legal” are omitted as surplus.
In subsection (b), before clause (1), the words “for an airport” are added for clarity. In clause (1), the words “or an agency thereof” are omitted surplus. In clause (3), the words “that the Secretary . . . decides is necessary” are substituted for “when it is determined by the Secretary that any such item is required” to eliminate unnecessary words.
In subsection (c)(1)(B), before subclause (i), the words “chief executive officer” are substituted for “Governor” because this chapter applies to the District of Columbia which does not have a Governor. The words “except that the Administrator of the Environmental Protection Agency shall make the certification instead of the chief executive officer if” are substituted for “In any case where . . . certification shall be obtained from such Administrator” for clarity. Subclause (i) is substituted for “such standards have not been approved” for clarity.
In subsection (c)(2), before clause (A), the words “Notwithstanding any other provision of law” are omitted as surplus. The words “that does not involve the location of an airport or runway, or a major runway extension” are substituted for “(other than an airport development project in which paragraph (7)(A) applies)” for clarity. The words “the preparation of” are omitted as surplus. In clause (B), the words “statutory and administrative” are omitted as surplus.
In subsection (c)(4)(A), the words “to the Secretary” are added for clarity.
In subsection (c)(5), the words “full and” are omitted as surplus. The words “in writing” are omitted as surplus because of the requirement that the decision be a matter of public record.
In subsection (d)(1), the words “(as defined by section 1711(8) of this Appendix, as in effect on )” are omitted because of the definition of “air carrier airport” in section 47102 of the revised title.
In subsection (d)(2), the words “Notwithstanding any other provision of the Airport and Airway Improvement Act of 1982 [49 App. U.S.C. 2201 et seq.]” and “single” are omitted as surplus.
In subsection (e)(1) and (2), the word “sponsor” is substituted for “applicant” for consistency.
In subsection (e)(1), before clause (A), the words “under this subchapter” are added for consistency in this section. The word “other” is omitted as surplus.
In subsection (e)(2)(A), the word “mutual” is omitted as surplus.
In subsection (e)(3), the words “adversely affected” are substituted for “aggrieved” for consistency in the revised title and with other titles of the United States Code. The words “the date on which” are omitted as surplus.
Editorial Notes
Amendments1994–2024 · 8 rounds
2024
Subsec. (a)(7). Pub. L. 118–63 substituted “section 47114(d)(2)(B)” for “section 47114(d)(3)(B)” in introductory provisions.
2018
Subsec. (a)(6). Pub. L. 115–254, § 148(a)(2), inserted “that includes the project” before “, the master plan” in introductory provisions.
Subsec. (a)(7). Pub. L. 115–254, § 148(a)(1), (3), (4), added par. (7).
Subsec. (h). Pub. L. 115–254, § 149, added subsec. (h).
2012
Subsec. (a)(6). Pub. L. 112–95, § 133, added par. (6).
Subsec. (f)(1). Pub. L. 112–95, § 111(c)(2)(A)(i), substituted “charge” for “fee”.
Subsec. (f)(2). Pub. L. 112–95, § 134, struck out “patterns of air service,” after “gate-use requirements,” and “, and airfare levels (as compiled by the Department of Transportation) compared to other large airports” after “common facilities” and inserted “and” after “ground-side capacity,”.
2003
Subsec. (c)(1)(A)(iii). Pub. L. 108–176, § 305(1), inserted “and” after semicolon at end.
Pub. L. 108–176, § 187, added cl. (iii).
Subsec. (c)(1)(B), (C). Pub. L. 108–176, § 305(2), (3), redesignated subpar. (C) as (B) and struck out former subpar. (B) which read as follows: “only if the chief executive officer of the State in which the project will be located certifies in writing to the Secretary that there is reasonable assurance that the project will be located, designed, constructed, and operated in compliance with applicable air and water quality standards, except that the Administrator of the Environmental Protection Agency shall make the certification instead of the chief executive officer if—
“(i) the State has not approved any applicable State or local standards; and
“(ii) the Administrator has prescribed applicable standards; and”.
Subsec. (c)(2)(A). Pub. L. 108–176, § 305(4), substituted “stage 3” for “stage 2”.
Subsec. (c)(4), (5). Pub. L. 108–176, § 305(5)–(7), redesignated par. (5) as (4), substituted “paragraph (1)(B)” for “paragraph (1)(C)”, and struck out former par. (4) which read as follows:
“(4)(A) Notice of certification or of refusal to certify under paragraph (1)(B) of this subsection shall be provided to the Secretary not later than 60 days after the Secretary receives the application.
“(B) The Secretary shall condition approval of the application on compliance with the applicable standards during construction and operation.”
2002
Subsec. (g). Pub. L. 107–296 added subsec. (g).
2001
Subsec. (f)(3), (4). Pub. L. 107–71, which directed the amendment of section 47106(f) by adding par. (3) and redesignating former par. (3) as (4), without specifying the Code title to be amended, was executed by making the amendments to this section, to reflect the probable intent of Congress.
2000
Subsec. (f). Pub. L. 106–181 added subsec. (f).
1994
Subsecs. (d), (e). Pub. L. 103–305 added subsec. (e), redesignated former subsec. (e) as (d), and struck out former subsec. (d) which read as follows:
“(d) General Aviation Airport Project Grant Application Approval.—(1) In this subsection, ‘general aviation airport’ means a public airport that is not an air carrier airport.
“(2) The Secretary may approve an application under this subchapter for an airport development project included in a project grant application involving the construction or extension of a runway at a general aviation airport located on both sides of a boundary line separating 2 counties within a State only if, before the application is submitted to the Secretary, the project is approved by the governing body of each village incorporated under the laws of the State and located entirely within 5 miles of the nearest boundary of the airport.”
Statutory Notes and Related Subsidiaries
Effective Date of 2003 Amendment
Amendment by Pub. L. 108–176 applicable only to fiscal years beginning after , except as otherwise specifically provided, see section 3 of Pub. L. 108–176, set out as a note under section 106 of this title.
Effective Date of 2002 Amendment
Amendment by Pub. L. 107–296 effective 60 days after , see section 4 of Pub. L. 107–296, set out as an Effective Date note under section 101 of Title 6, Domestic Security.
Effective Date of 2000 Amendment
Amendment by Pub. L. 106–181 applicable only to fiscal years beginning after , see section 3 of Pub. L. 106–181, set out as a note under section 106 of this title.
Prohibition on Certain Runway Length Requirements
Pub. L. 118–63, title VII, § 752, , 138 Stat. 1284, provided that: “Notwithstanding any other provision of law, the Secretary [of Transportation] may not require an airport to shorten the length or width of the runway, apron, or taxiway of the airport as a condition for the receipt of federal financial assistance if the airport directly supports a base of the United States Air Force or the Air National Guard at the airport, regardless of the stationing of military aircraft.”
Environmental Review of Airport Improvement Projects
Pub. L. 106–181, title III, § 310, , 114 Stat. 128, provided that:
“(a) Study.—
The Secretary [of Transportation] shall conduct a study of Federal environmental requirements related to the planning and approval of airport improvement projects.
“(b) Contents.—
In conducting the study, the Secretary, at a minimum, shall assess—
“(1) the current level of coordination among Federal and State agencies in conducting environmental reviews in the planning and approval of airport improvement projects;
“(2) the role of public involvement in the planning and approval of airport improvement projects;
“(3) the staffing and other resources associated with conducting such environmental reviews; and
“(4) the time line for conducting such environmental reviews.
“(c) Consultation.—
The Secretary shall conduct the study in consultation with the Administrator [of the Federal Aviation Administration], the heads of other appropriate Federal departments and agencies, airport sponsors, the heads of State aviation agencies, representatives of the design and construction industry, representatives of employee organizations, and representatives of public interest groups.
“(d) Report.—
Not later than 1 year after the date of the enactment of this Act [], the Secretary shall transmit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate a report on the results of the study, together with recommendations for streamlining, if appropriate, the environmental review process in the planning and approval of airport improvement projects.”
Grants for Engineered Materials Arresting Systems
Pub. L. 106–181, title V, § 514(c), , 114 Stat. 144, provided that: “In making grants under section 47104 of title 49, United States Code, for engineered materials arresting systems, the Secretary [of Transportation] shall require the sponsor to demonstrate that the effects of jet blasts have been adequately considered.”
Grants for Runway Rehabilitation
Pub. L. 106–181, title V, § 514(d), , 114 Stat. 144, provided that: “In any case in which an airport’s runways are constrained by physical conditions, the Secretary [of Transportation] shall consider alternative means for ensuring runway safety (other than a safety overrun area) when prescribing conditions for grants for runway rehabilitation.”
Compliance With Requirements
Pub. L. 106–181, title VII, § 737, , 114 Stat. 172, provided that: “Notwithstanding any other provision of law, in order to avoid unnecessary duplication of expense and effort, the Secretary [of Transportation] may authorize the use, in whole or in part, of a completed environmental assessment or environmental impact study for new construction projects on the air operations area of an airport, if the completed assessment or study was for a project at the airport that is substantially similar in nature to the new project. Any such authorized use shall meet all requirements of Federal law for the completion of such an assessment or study.”
Credits
1994–2024 · 9 acts
- 1994Pub. L. 103–272, § 1(e), , 108 Stat. 1254
- 1994Pub. L. 103–305, title I, §§ 108, 109, , 108 Stat. 1573
- 2000Pub. L. 106–181, title I, § 155(b), , 114 Stat. 88
- 2001Pub. L. 107–71, title I, § 123(a), , 115 Stat. 630
- 2002Pub. L. 107–296, title IV, § 426(b), , 116 Stat. 2187
- 2003Pub. L. 108–176, title I, § 187, title III, § 305, , 117 Stat. 2518, 2539
- 2012Pub. L. 112–95, title I, §§ 111(c)(2)(A)(i), 133, 134, , 126 Stat. 18, 22
- 2018Pub. L. 115–254, div. B, title I, §§ 148(a), 149, , 132 Stat. 3214, 3215
- 2024Pub. L. 118–63, title VII, § 712(c)(1), , 138 Stat. 1256.
Show as published
(Pub. L. 103–272, § 1(e), , 108 Stat. 1254; Pub. L. 103–305, title I, §§ 108, 109, , 108 Stat. 1573; Pub. L. 106–181, title I, § 155(b), , 114 Stat. 88; Pub. L. 107–71, title I, § 123(a), , 115 Stat. 630; Pub. L. 107–296, title IV, § 426(b), , 116 Stat. 2187; Pub. L. 108–176, title I, § 187, title III, § 305, , 117 Stat. 2518, 2539; Pub. L. 112–95, title I, §§ 111(c)(2)(A)(i), 133, 134, , 126 Stat. 18, 22; Pub. L. 115–254, div. B, title I, §§ 148(a), 149, , 132 Stat. 3214, 3215; Pub. L. 118–63, title VII, § 712(c)(1), , 138 Stat. 1256.)