Northwest Energy Security Act
This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho.
Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin.
The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary.
Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.
Show official title
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Referred to committee
Latest actionReferred to Water Resources and Environment
This bill’s path
This is H.R. 626’s recorded path, not a universal congressional workflow.
How bills become lawAll actionsIntroduced
Passed House
Passed Senate
Sent to President
Signed into law
- Sponsor
- Rep. Dan Newhouse (R-WA-4)
- Cosponsors
3 cosponsors
3 original · 0 later
- Rep. Cliff Bentz (R-OR-2)· Original · Jan 22, 2025
- Rep. Michael Baumgartner (R-WA-5)· Original · Jan 22, 2025
- Rep. Russ Fulcher (R-ID-1)· Original · Jan 22, 2025
- Policy area
- Water Resources Development
- Subjects
- Alternative and renewable resources
- Dams and canals
- Electric power generation and transmission
- Idaho
- Lakes and rivers
- Montana
- Oregon
- Washington State
On this page
Timeline
i
In chronological order. Major procedural acts are shown in full. Committee work and ordinary amendments fold in place where they happened, so they do not jump the sequence or stretch the timeline.
Introduced in House
Document: Introduced in House
Sources
- Congress.gov actionIntro-H
- Library of Congress
- Latest
▸ 2 committee actions · Jan 22, 2025 – Jan 23, 2025
Referred to committee
Referred to the Committee on Natural Resources, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Sources
- Congress.gov action
- House floor actions
Referred to Water Resources and Environment
Referred to the Subcommittee on Water Resources and Environment.
Sources
- Congress.gov action
- House committee actions
Committees
Text & titles
i
Each distinct name Congress.gov recorded, once. Official, short, display, and popular titles stay distinct when the wording differs. The same wording is not repeated for every text version.
| Version | Date | Links |
|---|---|---|
| Introduced in House |
Titles (2)
Northwest Energy Security Act
Display title, Short title · Introduced in House
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Official title · Introduced in House