S. 182 · 119th Congress (2025–2027)

Northwest Energy Security Act

This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho.

Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin.

The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary.

Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.

Show official title

A bill to provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.

Referred to committee

Latest actionReferred to committee

This bill’s path

This is S. 182’s recorded path, not a universal congressional workflow.

How bills become lawAll actions
  1. Introduced

  2. Passed Senate

  3. Passed House

  4. Sent to President

  5. Signed into law

Sponsor
Sen. James E. Risch (R-ID)
Cosponsors
5 cosponsors

5 original · 0 later

  1. Sen. John Barrasso (R-WY)· Original · Jan 22, 2025
  2. Sen. Mike Crapo (R-ID)· Original · Jan 22, 2025
  3. Sen. Steve Daines (R-MT)· Original · Jan 22, 2025
  4. Sen. Cynthia M. Lummis (R-WY)· Original · Jan 22, 2025
  5. Sen. Tim Sheehy (R-MT)· Original · Jan 22, 2025
Policy area
Water Resources Development
Subjects
  • Alternative and renewable resources
  • Dams and canals
  • Electric power generation and transmission
  • Idaho
  • Lakes and rivers
  • Montana
  • Oregon
  • Washington State

On this page

Timeline

i

In chronological order. Major procedural acts are shown in full. Committee work and ordinary amendments fold in place where they happened, so they do not jump the sequence or stretch the timeline.

  1. Introduced in Senate

    Document: Introduced in Senate

    Sources
  2. Latest

    Referred to committee

    Read twice and referred to the Committee on Environment and Public Works.

    Sources

Committees

  1. SenateEnvironment and Public WorksReferred Jan 22, 2025

Text & titles

i

Each distinct name Congress.gov recorded, once. Official, short, display, and popular titles stay distinct when the wording differs. The same wording is not repeated for every text version.

Text versions
VersionDateLinks
Introduced in Senate
Titles (2)
  1. Northwest Energy Security Act

    Display title, Short title · Introduced in Senate

  2. A bill to provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.

    Official title · Introduced in Senate